HomeMy WebLinkAboutNCC201280_ESC Approval Submitted_20200331G0wmor
MICHAEL;S. REGAN
Secretary'
BRIAN WRENN..
Acting D100crar
American States Utility Services, Inc.
Attn: Shay Coombs, PE, Sr. Engineer
P.O. Box 73316
FortBragg, NC 28307
NORTH CAROLINA
Eawtronm wal QN01ty,
March 25, 2020
LETTER OF APPROVAL
RE: Project Name: FB — Pope 12" Water Main Replacement
Acres Approved: 1.51
Project ID: CUMBE-2020-128
County: Cumberland, City: Fort Bragg, Address: Pope Air Field
River Basin: Cape Fear
Stream Classification: Other
Submitted By: ASUS Fort Bragg
Date Received by LQS: March 3, 2020
Plan Type: New
Dear Ms. Coombs:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby
issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire
three (3) years following the date of approval, if no land disturbing activity has been undertaken, as required by Title 15A
NCAC 4B.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI)
form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This
form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named
project. The NOI form may be accessed at de .nc. ov/NCG01. Please direct questions about the NOI form to Annette
Lucas at Annette.lucas c ncdenr. ov or Paul Clark at Paul.clark(u,nedenr.gov. After you submit a complete and correct NOI
Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of
Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
ftnkTNorth Caroiina.Department of Environmental Quality.! Divlsfnn of Energy, Mineral and Land Resources
Fayetteville. Reglonal Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina28301
910.433.3300
Letter of Approval
American States Utility Services, Inc.
March 25, 2020
This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the
approved plan.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this
letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the
approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the
revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity.
This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility
Form, which you provided. You are requested to file an amended form if there is any change in the information included on
the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres.
Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In
addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you
plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Jodi Pace, EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
NPDES NCGO 1 Fact Sheet
cc: Isaiah Koonce, ASUS Fort Bragg (electronic copy)
Lee Ward, Water Management Branch (electronic copy)
DEMLR - Fayetteville Regional Office File