Loading...
HomeMy WebLinkAbout20020608 Ver 1_Complete File_20020419\0?0V VV' j r c,9QG Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources d Gregoray J_ Thorpe, Ph.D., Acting Director Division of Water Quality May 17, 2002 DWQ Project # 02-0608 Wake County North Carolina State University Environmental Health and Safety Center c/o: Ms. Gwyn Ann McCullough Campus Box 8007 Raleigh, NC 27695-8007 Subject Property: Doak Baseball Field / Tennis Court Renovations and Thurman Drive Road Improvements NCSU, Main Campus, Raleigh, NC Rocky Branch [03-04-02; 27-34-6; C NSW] Neuse River Buffer Rules [15A NCAC 2B .0233] Compliance Review Dear Ms. McCullough: The Division of Water Quality (DWQ) has reviewed your plans to construct the proposed renovations and improvements at the subject property. It is the determination of the DWQ that the proposed activity as indicated in your request letter dated May 13, 2002 and associated plans complies the Neuse River Buffer Rules (15A NCAC 2B.0233). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control and Non-Discharge. This approval is only valid for the purpose and design that you described in your request and additional conditions listed below. If you change your project, you must notify us and you may be required to send us an application for authorization. If the property is sold, the new owner must be given a copy of this letter and is thereby responsible for complying with all conditions. For this confirmation to be valid, you must follow the conditions listed below as well as any other conditions identified within 15A NCAC 2B .0233. Conditions: 1. Renovations / maintenance of the existing stormwater discharge pipe has been determined to be in compliance with the Neuse Buffer Rules (i.e., exempt) as long as no new stormwater from additional impervious surfaces is directed through the new pipe. 2. Improvements of Thurman Drive and the parking area has been determined to be in compliance with the Neuse Buffer Rules (i.e., exempt) as long as no new impervious surface is added to the buffer in locations where it did not previously exist. Please be aware that any impacts wetlands or surface waters (e.g., streams) will need to comply with the 404 / 401 programs. If you have any questions or would like a copy of the buffer rules, please call Mr. Bob Zarzecki at 919-733- 9726. r deg ry J. Thorpe, P .D., ctl Director, DW cc: Steve Mitchell/ DWQ Raleigh Regional ffi e File Copy Central Files North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), hftp://h2o.enr.state.nc.us/ncwetlands/ North Carolina State University is a land- Office of Finance and Business grant university and a constituent institution Environmental Health and of The University of North Carolina Public Safety Division An Equal Opportunity/Affirmative Action Employer http./Avww2.ncsu.edu/ncsu/ehs May 13, 2002 Mr. Bob Zarzecki NC DENR - Division of Water Quality 401 Wetlands Unit 1621 Mail Service Center Raleigh, North Carolina 27699-1621 RE: Doak Baseball Field/Tennis Court Renovations Dear Mr. Zarzecki: Environmental Health and Safety Center Campus Box 8007 Raleigh, North Carolina 27695-8007 Director 919.515.4238 Environmental Affairs 919.515.6859 Industrial Hygiene 919.515.6860 Health and Safety 919.515.6858 Radiation Protection 919.515.2894 (Fax) 919.515.6307 MAY f 3 2002 I am writing in response to your letter dated April 22, 2002 and our meeting (May 9, 2002) requesting additional information concerning the above-mentioned project. Enclosed are three maps that illustrate the areas of disturbance, which we discussed during our meeting. The project proposes to replace the existing 12" RCP pipe with a 30" pipe. The project does not increase the amount of impervious surface area, nor will the discharge from the site change. It was simply determined that the 12" pipe was originally undersized for the site and is now proposed to be upgraded. As for the roadway/parking area, the removal and replacement of pavement, curb & gutter and utilities that fall within the buffer, will match the exiting footprint. There will be no increase to impervious surface area and no loss of vegetation within the buffer. Minimal grading will be necessary; however, it will be localized within the existing footprint and post- construction elevations will closely match pre-construction conditions. I believe the aforementioned construction activities of this project to be exempt from the Neuse River Buffer Rules. I respectfully request your assessment of the information regarding this project and provide your conclusions and/or concurrence in writing. Thank you for your assistance in resolving this matter. If you require additional information or have any questions, please don't hesitate to contact me. Sincerely, G n McCullough i enclosures f e PF 5fj?jA d t If .11, -1 t ,.V l Nrw l rr 77777 fi --t I i i f, I ?s s Y e • I<imley-Horn and Associates, Inc. Pat OfF" Bw MU R"9K Nall Cadbm 27M ? Plain MO-M-2= fox MO-67e-MM g m R L c? 0 L x -4v O d m Z ° Y I III a I I ( • Kimley-Horn m- a and Associates, Inc. e rat onw. aat w dmG ° RdOW6 Plm l"9-M-2 Fat MO-678-4176 K O V) 01 d O C -C. gg & b $ g3' S I I I c2_n 9 a Kimley-Horn ®- g _ and Associates, Inc. a Pot Ofibe Box 3MO Rdd^ NW& 0WORM 27M Ph? MO-M-2= F= IH9-67"176 W AT FRQG o 15i? ? Michael F. Easley Governor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D., Acting Director Division of Water Quality April 22, 2002 DWQ Project # 02-0608 CERTIFIED MAIL RETURN RECEIPT REQUESTED NCSU - Environmental Health and Safety Center C/o: Gwyn Ann McCullough Campus Box 8007 Raleigh, NC 27695-8007 Subject Property: Doak Baseball Field / Tennis Court Renovations Dear Ms. McCullough, On April 19, 2002, the Division of Water Quality (DWQ) received your letter dated April 19, 2002 requesting that the proposed activity at the subject property is exempt under the Neuse River Basin: Nutrient Sensitive Waters Management Strategy: Protection and Maintenance of Existing Riparian Buffers rule (Neuse Buffer Rule; 15A NCAC 2B .0233). The DWQ has determined that additional information will be required to make a determination that the proposed project is exempt under the Neuse Buffer Rule. Specifically, please provide additional information including a site plan depicting the location of the existing Neuse River Buffers (Zone 1 and 2), existing impervious surface within the buffers, the proposed new. post-construction impervious surface and any removal of vegetation, grading or fill proposed within the buffers. We will place this project on hold until we receive this additional information. If we do not receive this information within three (3) weeks of the date of this letter we will assume that you no longer wish to pursue this request. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware any impacts requested within your application are not authorized by the DWQ. Please call Mr. Steve Mitchell of the DWQ Raleigh Regional Office at 919-571-4700 or Mr. Bob Zarzecki of this office at 919-733-9726 if you have any questions regarding this matter. 5 cere`iy 1 ? l o Dorney, 401 Wetlands Unit. Cc: Steve Mitchell, DWQ Raleigh Regional Oi -`-File Copy-._ -- Central Files DWQ 020608 North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwettands/ North Carolina State University is a land- Office of Finance and Business grant university and a constituent institution Environmental Health and of The University of North Carolina Public Safety Division An Equal Opportunity/Affirmative Acton Employer APR 1 9 W http://www2.ncsu.edu/ncsu/ehs April 19, 2002 Mr. Bob Zarzecki NC DENR - Division of Water Quality 401 Wetlands Unit 1621 Mail Service Center Raleigh, North Carolina 27699-1621 RE: Doak Baseball Field/Tennis Court Renovations Dear Mr. Zarzecki: Environmental Health and Safety Center Campus Box 8007 Raleigh, North Carolina 27695-8007 Director 919.515.4238 Environmental Affairs 919.515.6859 Industrial Hygiene 919.515.6860 Health and Safety 919.515.6858 Radiation Protection 919.515.2894 (Fax) 919.515.6307 This letter follows my telephone conversation and e-mail correspondence with you on April 18, 2002 concerning proposed reconstruction of the roadway/parking area associated with the Doak Baseball Field/Tennis Court Renovation Project on North Carolina State University's Main Campus. The Environmental Assessment/Finding of No Significant Impact for this project has been reviewed by the State Clearinghouse and concurrence received by our office on November 7, 2001. However, NC DENR - Division of Land Resources has placed the review of the Sedimentation & Erosion Control Plan on hold due to noted encroachments of the Neuse River Buffer. Please refer to enclosed letter dated April 12, 2002. The project, in part, proposes to remove and replace all existing pavement, curb and gutter and associated utilities along Thurman Drive starting from approximately 40 feet within the buffer and terminating at the northerly parking lot. The proposed roadway/parking area elevations closely match the existing elevations and land disturbance within the buffer is limited to the existing footprint. Mr. Bob Zarzecki April 19, 2002 Page 2 Based on our conversation and interpretation of the Neuse River Buffer Rules, I believe the encroachment noted by the Division of Land Resources to be exempt from the rules. I would appreciate your confirmation of this in writing. Thank you very much for your assistance in resolving this matter. If you require additional information, please don't hesitate to contact me. Sincerely, gAnnMcCullough attachment State of North Carolina Department of Environment and Natural Resources Raleigh Regional Office Michael F. Easley, Governor William G. Ross, Jr., Secretary 1WAk NCDENR T F_NVIAONMGNT ANG NATURAI-_ RE3ounc" DIVISION OF LAND RESOURCES April 12, 2002 George Worsiey N C State University Campus Box 7216 Raleigh, NC 27695-7216 Dear Mr. Worsley: RE: Doak Baseball Fleld/Tennis Court Wake County Neuse #1103-04-02 This office has received an Erosion and Sedimentation Control Plan for the subject project as required by the Sedimentation Pollution Control Act of 1973. We have performed a preliminary review of your plan and have noted apparent buffer encroachments subject to the Neuse River Riparian Area Protection and Maintenance Rule (15A NCAC 26.0233). This rule applies to all perennial and intermittent streams, lakes, ponds, and estuaries In the River Basin with existing vegetation on the adjacent land or "riparian area." In riparian areas with existing vegetation In the first 30 feet directly adjacent to the stream, the rule prohibits land disturbance or new development within the first 30 feet of land next to the water (the remaining 20 feet of the totat buffer must be revegetated upon completion of any proposed land-disturbing activity). In riparian areas with.existing vegetation that is less than 30 feet wide, the rule prohibits land disturbance or new development within the area that contains existing vegetation (but not the entire 50 foot riparian area). Encroachments on the protected buffers require written approval by the Division of Water Quality (DWQ). In light of the apparent buffer encroachments shown in your plan, we cannot consider your application complete until we receive a copy of your DWQ approval or statement of exemption from the rule. Therefore, we cannot initiate'our 30-day statutory review time period until your application is . complete. For more information about this riparian area rule, please contact the DWQ's Wetland/401 Unit at 9191733-1786 or DWQ in our regional office at 919/571-4700. By copy of this letter we are notifying them that your project will need their attention. Upon receipt of your DWQ paperwork and any necessary plan revisions related to DWQ review or our enclosed checklist, we will process your application for plan approval as soon as possible. If you have any questions or need additional information, please do not hesitate to contact us. Your cooperation in this matter is appreciated. . Sincerely, iL L. H ley, J PESC egi nal Engineer Quality Section JLH/clm cc: Ken Schuster. PE, DWQ Steve Bosban, Kimley-Horn and Associates, Inc. 1628 Mail Servico Center, Raleigh, NC 27699-1628 Telephone (919)571-4700 FAX(919)571-4718 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post-consumer paper Z00/Z00'd Z9TP# MdOH-7,R7NDI 9LTbeL96T6 ?t:ZZ Z00F,LT-ddK