Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0041515_Application (FTSE)_20200227
State of North Carolina WR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Dl�lslan of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: w (j� r� �(lo becompleled by DWR) All items must be completed or the application will be returned 1. APPLICANT INFORMATION: 1. Applicant's name: City of Mebane (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State/County ® Municipal 3. Signature authority's name: David Cheek per 15A NCAC 02T.QI06(b Title: Ci!y Manager 4. Applicant's mailing address: 106 E. Washington Street City: Mebane State: NC Zip: 27302- 5. Applicant's contact information: Phone number: 9( I9) 563-5901 Email Address: dcheekt cityofinebane.com 11. PROJECT INFORMATION: "i we5AU to, b ❑ Privately -Owned Public Utility ❑ Other 1. Project name: Project Tomorrow "Medline Mebane" 2. Application/Project status: ® Proposed (New Permit) ❑ Existing PermitlProject If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Orange 4. Approximate Coordinates (Decimal Degrees): Latitude: 36.072623' Longitude:-79.211701' 5. Parcel ID (if applicable): 9834868296 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: R. Blake Day, P.E License Number: 045238 Firm: Kimley-Hom and Associates Mailing address: 200 South Tryon Street City: Charlotte State: NC Zip: 28202- Phone number: 704) 319-5691 Email Address: blake.da kimle-horn.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: City, of Mebane WWTP(WRRF) Permit Number: NC 0021474 Owner Name: City of Mebane V. RECEIVING DOWNSTREANI SEWER INFORMMATION (if different than WWTF): 1. Permit Number(s): WQ i Downstream (Receiving) Sewer Size: 12 inch System Wide Collection System Permit Number(s) (if app icab1c): WQCS00081 Owner Name(s): City of Mebane a 5 r Q E �` o r� m LU c Li- •� C U 7- ,_ " FORM: FTA 04-16 Page of 5 VI. GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? []Yes ❑No ®N!A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement FORM: DEV been attached? [_—]Yes ❑No ®NIA 3. If the Applicant is a Flome/Pro ert Owners` Association has an Operational Agreement FORM: HOA been attached? ❑ Yes ❑No ®NrA 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filler Backwash ® Businesses! offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: % Domestic/Commercial 100 % Commercial % Industrial See 15A NCAC 027" _0103(20)) bIs there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .01 14(f)? ❑ Yes ® No ➢ if -Yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: 160 Jf WIJOJ�5 iA? Establishment Type (see 22T.0114a Daily Design Flow' a No. of Units Flow Warehouse 100 gal/day 440 44,000 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gat/ GPD Total 44,000 GPD a See 15A NCAC 02T .01 141b). (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A4). b Per 15A NCAC 02T .01 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 44,000 GPD (per 15A NCAC 02T _01 14) Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & 14IDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 2,728 DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) D Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIM PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & KIDC(Pump StationslForce Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: - Longitude: - 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): , gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305 h 1 : ❑ Standby power source or pump with automatic activation and telemetry - I5A NCAC 02T .0305(h)(1)(B)_ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telcmetry - l5A NCAC 02T .0305(h)(1)(C): Y It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPA.R.ATIONS — (02B .0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305 f & ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be orovided for sewer systemc- ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains (vertical -water over sewer including in benched trenches) 18 inches Water mains (horizontal) 10 feet Reclaimed water lines vertical - reclaimed over sewer) 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet "Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation) and wetlands see item IX.2) 50 feet "Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches ➢ 15A NCAC 02T.0305u contains alternatives where separations in 02T.0305 t cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g) see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes [:]No ❑ NIA ➢ Seethe Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ NIA ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ® Yes ❑ No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permittinsi Branch 5. Does project comply with 15A NCAC 02T.0105 c 6) (additional permitsicertifications)? ® Yes [:]No Per I SA NCAC 02'C.OI05(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this pern it is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ NIA ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location) High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: Does the submitted system comply with 15A NCAC 02T, the tdinimu«t Design Criteria 1br 111C Permiitilyr* nt' Pump S.1ations and Force Mains latest versionand the Gravity Sew r Minin um Desigg Criteria flatesi VCINJO01 as applicable? V tv,4- Yes [I No If No, complete and s bmit the Variance/Alle ative Design Request application (VADC 10-14) and supporting documents for review. Approval of the reguest is 'e uired iirior to submittal of the Fast Track Application and su ortin documents. 2. Professional Engineer's Certification: I R. Blake Day, P.E. (Professional Engineer's name from Application Item III.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (Iatest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $ I0,000, as well as civil penalties up to $25,000 per violation. IsIur North Carolina Professional Engineer's seal, signature, and date: ICA 2,N Qom° SEAL '• 0�45238 : RrBL �..._�R,�,.....&- „---2/-2�/2020 3. Applicant's Certification per 15A NCAC 02T .0106(b): 1, �Ivj S. ChG�!� _ attest that this application for (Signature Authority's name & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE - In accordance with General Statutes t43-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: l J g v FORM: FTA 04-16 Page 5 of 5 State of North Carolina DWR Department of Environmental Quality Division of Water Resources Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: City of Mebane Project Name for which flow is being requested: Project Tomorrow "Medline Mebane" More than one FTSE may be required for a single project ifthe owner of the WWTP is not responsible for all pump stations along the route of the proposed wasteimter flow I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: City of Mebane WWTP Z. b. WWTP Facility Permit M NC 0021474 CY All, flows are in MGD c. WWTP facility's permitted flow 2.5 d. Estimated obligated flow not yet tributary to the WWTP 0.638 e. WWTP facility's actual avg. flow 1.597 .3: C., f. Total flow for this specific request .044 w M g. Total actual and obligated flows to the facility 2.279 ° �r It. Percent of permitted flow used 91 % o II. Complete this section for each pump station you are responsible for along the route of this 1roposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** Gray Hill tad OoMO .288 .115 .027 0.00 .027 .0882 GE .720 .288 .163 0.00 .163 .125 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided iiy a peaking factor (pi) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Orange County Buckhorn Outfall Downstream Permit Number: IV& Oi0 o-7 Page 1 of 6 FTSE 10-18 III. Certification Statement: certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. 51 W Signing OPIcial Signature Title of Signing Official Date Page 2 of 6 FTSE l0-18 cu 4-1 � | � � � � bi LL k � \ r�_m__ \k � �cn e � (30- ] / # ) 2 2LLI J P O O � k ; m � } J ! cl kch 8 / J f = k® % u COO._ s a Rot.� @ ___ - & . 2 2 ® ID _ o k { _-a - \ �m \ �k 0 ©®®� aj � 2 �\ �o % » »2LL . k 2 r§ � �k _ _,.■� � _ � KimlepMorn February 25, 2020 NCDENR-DEQ Attn: Mr. Jason Robinson Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 RE: Medline Distribution Center (Project Tomorrow) 5511 West Ten Road, Mebane, NC Public Gravity Sewer Extension FTA 04-16 Narrative Mr. Robinson NC Dept of Fnvironmental Quality Raleigh Regional Office The proposed public gravity sewer system being proposed will serve a 1,200,000 square -foot distribution center and future site development. The proposed structure will gravity feed via 2,728 LF of 8" DIP and eight (8) proposed manholes to an existing manhole and 12" gravity line along the existing stream on the eastern boundary of the development. The existing sanitary sewer infrastructure ultimately terminates at the City of Mebane WWTP (WRRF) permit #NC0021474. This submittal package consists of the following: • Check #3375 — Payable to NCDEQ in the amount of $480.00 • FTA 04-16 — Medline Mebane • FTSE 10-18 — Medline Mebane • USGS Topographic Map • Site Location Map • Site Utility Plans and Sewer Profiles We trust this meets your needs for approval of this project; please feel free to call me at (704) 319- 5691 if you have any questions or concerns. We look forward continuing our relationship on this project. KIMLEY-HORN AND ASSOCIATES, INC. WIN,1 .�. R. Blake Day, P.E. Project Manager Cashion, Ted From: Day, Blake <Blake.Day@kimley-horn.com> Sent: Monday, March 23, 2020 12:01 PM To: Cashion, Ted; dcheek@cityofinebane.com Cc: Robinson, Jason; Watts, Austin Subject: [External] RE: Project Tomorrow "Medline Mebane" fast track sewer extension application � External email. Do not click Ilnks or open attachments unlessyou verify. Send all suspicious email as an attachmsnb-to eoort. soam EDS. Lov 410L— Ted, Please mark it with "yes" to certify it is compliance with the minimum design criteria. You have my permission. Thank you for your assistance with this! Thank you, R. Blake Day, P.E. (NC, SC, TX) Kimley-Horn Direct: 704 319 5691 Mobile: 704 804 9957 From: Cashion, Ted <ted.cashion@ncdenr.gov> Sent: Monday, March 23, 2020 11:57 AM To: Day, Blake <Blake.Day@kimley-horn.com>; dcheek@cityofinebane.com Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov> Subject: Project Tomorrow "Medline Mebane" fast track sewer extension application We are reviewing the subject application. item X.1 of the application was not marked as required. Please indicate how this needs to be marked ('yes' or'no') and with your permission, we'll make the revision and continue with review/drafting of the permit. ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion@ncdenr.eov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 Cashion, Ted From: Cashion, Ted Sent: Monday, March 23, 2020 11:57 AM To: 'blake.day@kimley-horn.com'; dcheek@cityofinebane.com Cc: Robinson, Jason Subject: Project Tomorrow "Medline Mebane" fast track sewer extension application We are reviewing the subject application. Item X. 1 of the application was not marked as required. Please indicate how this needs to be marked ('yes' or'no') and with your permission, we'll make the revision and continue with review/drafting of the permit. ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion(Mncdenr.sov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 V %4 D,— Q, Osv+r'. nsrt c! Im�orrrr.:sl 6ui Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties unless the content is exempt by statute or other regulation. Cashion, Ted From: Cashion, Ted Sent: Monday, March 23, 2020 12:45 PM To: Henderson, Justin L Cc: Robinson, Jason Subject: Fast track sewer extension project to Mebane WWTP, 44,000 gpd Hi Justin, Hope you're doing well. We have an application for a project in Orange Co. to discharge 44,000 gpd of 100% commercial waste from a 1.2 million square feet distribution center and future development. The project is called Project Tomorrow "Medline Mebane". Are you ok with us issuing this permit for the waste to go to Mebane WWTP? We'll cc you on the permit. Thx, ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cashion@ncdenr.goy 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 Subscribe to Collection System & Sewer Permitting Updates Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Cashion, Ted From: Henderson, Justin L Sent: Monday, March 23, 2020 1:19 PM To: Cashion, Ted Cc: Robinson, Jason Subject: Re: Fast track sewer extension project to Mebane WWTP, 44,000 gpd Ted, We have no objections to the issuance of this permit. Thanks for the notification. Get Outlook for iOS From: Cashion, Ted <ted.cash ion @ncdenr.gov> Sent: Monday, March 23, 202012:45:08 PM To: Henderson, Justin L <justin.henderson@ncdenr.gov> Cc: Robinson, Jason <jason.t.robinson@ncdenr.gov> Subject: Fast track sewer extension project to Mebane WWTP, 44,000 gpd Hi Justin, Hope you're doing well. We have an application for a project in Orange Co. to discharge 44,000 gpd of 100% commercial waste from a 1.2 million square feet distribution center and future development. The project is called Project Tomorrow "Medline Mebane". Are you ok with us issuing this permit for the waste to go to Mebane WWTP? We'll cc you on the permit. Thx, ted Ted Cashion Water Quality Regional Operations Division of Water Resources NC Department of Environmental Quality Raleigh Regional Office 919-791-4254 ted.cash ion @ncdenr.eov 1628 Mail Service Center Raleigh, NC 27699-1628 3800 Barrett Drive Raleigh, NC 27609 ,�D�.E L'sWr.R+sre a� [mzvrwrtuf Owi��