Loading...
HomeMy WebLinkAboutNC0026051_Petreatment Compliance Evaluation Inspection_20200318 (2)ROY COOPER Co�cmor I`VIICHAEL S. REGAN searran S. DANIEL SMITH Virccror ,IDRTH CAROIINA Environmental Quality March 18, 2020 Ms. Stephanie Brixey, Deputy Director Department of Engineering and Environmental Services Durham County 5926 NC Hwy 55 E Durham, NC 27713 Subject: Pretreatment Compliance Inspection Durham County Triangle WWTP NPDES Permit No. NC00260S1 Durham County Dear Ms. Brixey: On March 4, 2020, Cheng Zhang of the Raleigh Regional Office (11110) conducted a Pretreatment Compliance Inspection of Durham County's pretreatment program. The assistance given by Ms. Amy Moore, the Compliance Manager, was greatly appreciated. The inspection report is attached. Findings during the inspection were as follows: 1. There are 13 Significant Industrial Users (SIUs), 12 of which are also Categorical Industrial Users (CIUs). It was noted that Aurobindo was in significant non- compliance for the second six-month period of 2019 for acetone violations. 2. The pretreatment inspection file review included Aurobindo (Permit No. DC-089), AstraZeneca (Permit No. DC-078), and Biogen (Permit No. DC-080). The files needed for review were available for inspection, contained all the required elements and were in excellent condition. 3. The POTW and three SIUs completed monitoring as required by the Industrial User Pretreatment Permits (IUDs) during the second semi-annual period of 2019. AstraZeneca was in compliance. Biogen had one reporting violation (late in monthly flow report submission for November 2019). Aurobindo had multiple acetone violations in August and September, and was in SNC for TRC violations of acetone monthly average limit. Ivor lh Caro€ina DeparrrnLnt of EwA-unrucotal QuaSly Uivis'.on of Wxxvr esouicei D_ E Q� Rate'.9h Rc9.ortol01fice JF00 0arrett l_)F1vc Raikigh, North Carolina doll) Crwn vac!!.m<nxuv�G�n� �� 91n 791-1'llll 4. A review of the files containing the pretreatment program elements was conducted. These files are well organized and up to date. Enforcement Response Plan was updated and approved recently. 5. Long Term Monitoring Plan (LTMP) data were reviewed during the inspection. It was noted that all locations were sampled with required frequencies and all samples analyzed with required detection levels since the last inspection. The data were very well organized in spreadsheets. Durham County's pretreatment Program is very well managed. Thank you for your continued support of the Pretreatment Program. If you have any questions or comments, please call Cheng Zhang at (919) 791-4200 (or email: cheng.zhang@denr.gov). Sincerely, , Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources ATTACHMENTS PC[ Inspection Reports Cc: Central Files w/attachment Raleigh Regional Office w/attachment Amy Moore (electronic copy only) NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COLNIPLIANCE INSPECTION (PCI) REPORT BACKGROUND INFOILNIATION [Complete Prior To PCI,• Review Pro4iram Info Database Sheetfs 1. Control Authority (POTW) Name: Durham County- Triangle «'NN'TP 2. Control Authority Representative(s): Amy Moore 3. Title(s): Compliance Manager 4. Last Inspection Date: August 16 2018 Inspection Type (Check One): ® PCI ❑ Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions`? ❑ YES E NO Order Type, Number, Parameters: Are Milestone Dates Being Nlet? ❑ YES ❑ NO ICIS CODING Main Program Permit Number M%1 DD YY N I C 1 0 1 0 1 21 6 1 0 1 51 1 1 L03 1 04 1 20 7. Current Number OF Significant Industrial Users (SiUs)? 13 8. Number of SIUs With No IUP, or With an Expired IUP? 0 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year`? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Period? 1 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 0 13. Number of SIUs in SNC with Pretreatment Schedule? 0 14. Number of SIUs on Schedules? 0 15. Current Number Of Cate orical Industrial Users (CIUs)? 12 16. Number of CIUs in SNC? 1 POTW INTERVIEW I7. Since the Last PCI, has the POTW had any NPDES Limits Violations'? EYES ❑ NO If Yes, What are the Parameters and How are these Problems Being Addressed`? BOD, 9/2018 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial ❑ YES ®NO Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed`? 19. Which Industries have been in SNC for Limits or Reporting_ during SNC for Limits: Aurobindo for acetone violations either of the Last 2 Semi -Annual Periods? Not Been Published for SNC for Reporting: None Public Notice?(Nlay refer to PAR if Excessive SiUs in SNC) Not Published: None 20. Which Industries are on Compliance Schedules or Orders? For all SiUs on an None Order, Has a Signed Copy of the Order been sent to the Dig ision? 21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which ❑ YES ®NO Ones? LM%IPISTi IP FILE REVIEW: 22. Is LTMP. STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. Are Correct Detection Levels being used for all LTNIP.:STMP Monitoring? ® YES ❑ NO 24. Is LTMPfSTMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO 25. All LTMP.:STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO Division Inspector, please verify yourself? 26. If NO to 23 - 26, list violations 27. Should any Pollutants of Concern be Eliminated from or Added to LTNIP; STNIP'? ❑ YES ® NO If yes, which ones? Eliminated: Added: NC DWR Pretreatment Compliance inspection (PCI) Form Updated December 2016 P:t e i 28. PRETREATMENT PROGRAM ELEMENTS REVIENV - Please review POTW files, verify POTW has copy of Program Element in their files. complete with sutmortine documents and cnnv nF PFRC C, Annmv�l I oit, r qnd At.. . ;ti, n—.,...,.,, t.,r . Program Element Last Submittal Date In tile? Last Approval Date In rile Date Next Due, If Applicable Headworks Analysis (HWA) 311612018 Yes LJ No 5/2/2018 Yes 0 No 4/1/2023 Industrial Waste Survey IWS) 3/1412016 Yes 0 No 5/31/2016 L<j Yes Ll No 4/1/2021 Sewer Use Ordinance SUO 12120.1012 Yes LJ No 4/3/2013 Yes Lj No Enforcement Response Plan (ERP) 24 V2020 Yes U No 2/1312020 Yes No Long Term Monitoring Plan (LT?*IP) 9f9f2413 Yes No 10/8/2013 Z Yes LLJj No INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 [UP FILE REVIEWS OR 1 FILE REVIEW AND I [U INSPECTION) 29, User Name 1, Aurobindo 2. AstraZeneca 3. Biogen 30. IUP Number 31. Does File Contain Current Permit? DC-089 Lj Yes LjNo DC-078 VA Ye Lj No DC-080 N Yes 0 No 32. Permit Expiration Date 10/8/2024 12/31/2021 8/23/2020 33. Categorical Standard Ap2lied (I.E. 40 CFR, Etc.) Or N.A 439 D&E 439 D&E 439 D&E 34, Does File Contain Permit Application Completed Within One Fear Prior Yes El No ®YesEl No Yes El No to Permit Issue Date? 35, Does File Contain an Inspection Completed Within Last Calendar Year? Yes No S'esLi N-o-J, Z Yes No 36. a_ Does the File Contain a Slug Spill Control Plan? b. If No, is One Needed'? (See Inspection Form from POTW) a. ®Yes ❑No Ia. b. ❑Yes ❑No 11 ®Yes ❑No b. ❑Yes 0 a. ®Yes ❑No 1 b. ❑Yes ❑No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic Organic Management Plan (TOMP)? ❑YcS❑No®N A 7EIYcs0No0N_Aj ❑Yes❑NoON A 3& a_ Does File Contain Original Permit Review Letter from the Division? b. All Issues Resolved? a. ®Yes [IN o b ❑Ycs❑No❑N A a. ®Yes ❑No b ❑YLs❑No❑N All a. ®Yes ❑No b ❑Y,s❑tio❑ v A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete its Sampling as Required by IUP, including flow? Yes ElNo S'esLj No 17 Yes No 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? L9 Yes U No Yes El No Yes No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its Sam lin as Re uired b IUP, includin flow? ®Ye,❑No❑�I A ®Yci❑No❑V A ®Ycs❑No❑V A 41b. During the Most Recent Semi -Annual Period, Did S[U submit all reports on time? 0Y45❑NOON A ®Yes❑No❑N A ❑Ycs®No❑N A 42a. For categorical IUs with Combined Wastestream Formula (CWF), does file include process2dilution flows as Required b [UP? ❑Yes❑NoON A ❑N'esONo®N A ❑Yes❑NoON A 42b_ For categorical IUs with Production based limits, does file include production rates and/or flows as Required by IUP? 0Ycs❑No0N A ❑Ycs❑No®N A ❑Ycs❑No®N A 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify All Limits Non -Compliance from Both POTW and SIU Sam line? EWL-�ONo❑N'A ❑N'es❑NoON A ❑Yes❑No®N A 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify All Re ortin Non-Com liance from SIU Sampling? ❑Yes❑No®N A ❑Yes❑NoON'A ®Yes❑No❑N A 44. a. Was the POTW Notified by SIU (Within 24 hours) of All Self- Monitoring Violations? a.®Ycs❑No❑N A a.❑ cs❑No®N A a.0Yes0No0N A b. Did Industry Resample and submit results to POTW Within 30 Days? b ®Y,,i0Na[3N A b pees❑NOON A b ❑Yts❑NoGN A c. If applicable, Did POTW resample within 30 days of becoming aware of SIU limit violations in the POTW's sampling of the SIU? ` ❑ti `❑y°mN A s.❑Y°'❑N°®N A c ❑Ycs❑tio®ti A 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? Yes ❑ No Yes 0 No Yes No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in the POTW's ERP (NOVs, Penalties, timin *, etc.)? ®Ycs❑No❑N A OYes❑NoON.A ®Ycs❑No❑N-A 48. Does the File Contain Penalty Assessment Notices'? ❑Ycs❑NOO ❑Yes❑NoON!A ❑Ycs❑No®N A 49. Does The Fife Contain Proof Of Penalty Collection'? ❑Ycs0No0N.A ❑Ycs❑NoON1A ❑Ycs❑NOON A 50, a. Does the File Contain Any Current Enforcement Orders'? b_ Is SIU in Compliance with Order? a.❑YoboNnEIN A b OY4MNLION A a.❑Yes❑NoON A b ❑Yes❑*0N A a.❑Yes❑No®N A b 0Yes0N;o0N A 51. Did the POTW Representative Have Difficulty in Obtaining Any of Thi{ Requested Information For You? ❑ Yes ® No Yes ® goYes No NC DWR Pretreatment Compliance Inspection (PCI) Forth )Updated Drcembcr 2016 Pa-e 2 FILE REVIEW CONI3IENTS: 41b- Biogen was late to submit its monthly flow report in November 2019. 43a — Aurobindo had multiple acetone violations in August and September 2019. 43h — The POTW identified Biogen's report violation. 46 — Aurobindo was in SNC for TRC violations (acetone monthly averages) 47 — The POTR' issued two NOVs to Aurobindo and one NOV to Biogen. INDUSTRY INSPECTION IC1S CODING: Main Program Permit Number I. Industry Inspected: 2. Industry Address: 3. Type of Industry,' Product: 4. Industry Contact_ Title: NIXI DD YY Phone: Fax: 5. Does the POTW Use the Division Model Inspection Form or Equivalent'? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES [:]NO D. Sampling Review ❑ YES ❑ NO E_ Exit Interview ❑ YES ❑ NO Industrial Inspection Continents; OVERALL SUMMARY AND CO,NINIENTS: Comments: The Rrogram is well managed. Requirements: None Recommendations; None NOD: ❑ YES ®NO NOV: ❑ YES ® NO QNCR: ❑ YES ®NO POTW Rating: Satisfactory ®Marginal ❑ UnSatis€actory ❑ PCI COMPLETED BY: Cheng Zhang. Raleigh Regional Office DATE: March 4, 2020 NC DWR Pretreatment Compliance Inspection (PCO Form Updated December 2016 Page 3