Loading...
HomeMy WebLinkAbout20131279 Ver 3_USACE IP Modification_20200330From: Pelletier, Josh R CIV CESAW CESAD (USA) To: outtenCcidarenc.com; Brad Rosov Cc: Coats, Heather; Scarbrauah, Anthony; Howell, Jonathan; Twvla Cheatwood - NOAA Federal Subject: [External] Hatteras Inlet Modification Date: Monday, March 30, 2020 9:24:12 AM Attachments: Hatteras Inlet Permit Modification 20200330.odf Modificaiton Plans 18 March 2020.odf External emai . o not click links or open attachments unless you verify. Send all suspicious email as an attachment toreaort.spamCcDnc. oovv Mr. Outten, Please see the attached Hatteras Inlet modification with added special conditions. If you have any questions or concerns please let me know. Thanks and have a great week! Josh Pelletier Project Manager US Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, North Carolina 27889 Phone: (910) 251-4605 Email: josh.r.pelletier@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.arm)t.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. ��Ep1T Op O� Gry'TfO STA-. of Regulatory Division Action ID No. SAW-2016-02140 Mr. Robert Outten Dare County Manager 954 Marshall C Collins Drive Manteo, North Carolina 27954 Dear Mr. Outten: DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS Washington Regulatory Field Office 2407 W 5` Street Washington, North Carolina 27889 March 30, 2020 Please reference the Department of the Army permit (Action ID SAW-2016-02140) issued on March 1, 2017, and your written request of March 17, 2020, for permit modification to allow the North Carolina Department of Transportation's (NCDOT) cutterhead pipeline dredge to perform a one-time event to dredge a channel 200 feet wide to a depth of -12 feet mean low water (MLW) within the Hatteras Inlet Connector Channel corridor with disposal of the dredge material at the NCDOT upland disposal site located at the north end of Ocracoke Island, in Hyde County, North Carolina. This modification also addresses your request as it relates to Special Condition 15 of the subject permit that states: "In order to protect threatened and endangered species and to minimize adverse impacts to offshore, and intertidal resources, no excavation activities, including mobilization and demobilization, shall occur from April I to September 30 of any year without notification to the Corps of Engineers Regulatory Division in coordination with the appropriate resource agencies. " After review of your modification request and coordination with the appropriate state and federal agencies, the U.S. Army Corps of Engineers Wilmington District (Corps) grants a relief to the moratorium for this one-time dredging event only. The relief will expire on April 30, 2020. The Corps shall be notified on the day dredging begins, the day that dredging is completed pursuant to this modification, and at any time a weather -related event causes work to be delayed. It is understood that all conditions of the original permit remain applicable and that the expiration date is unchanged. The Corps expects subsequent dredging events associated with this project to abide by the permitted dredge window of October 1-March 31. The permit is hereby modified to include the work as shown on the enclosed plan along with the attached special conditions. It is understood that all conditions of the original permit remain applicable and that the expiration date is unchanged. Thank you for your time and cooperation. If you have any questions, please contact Mr. Josh Pelletier of my staff at (910) 251-4605, or josh.r.pelletiergusace.army.mil. Sincerely, David M. Lekson, SPWS Chief, Washington Regulatory Field Office Enclosure Copies Furnished with enclosure: Chief, Source Data Unit NOAA/National Ocean Service 1315 East-West Hwy, Room 7316 Silver Spring, Maryland 20910-3282 Mr. Todd Bowers Mrs. Twyla Cheatwood Permit Review Specialist Fishery Biologist Wetlands Regulatory Section Habitat Conservation Division -Atlantic Branch USEPA — Region 4 101 Pivers Island Road Sam Nunn Atlanta Federal Center Beaufort, North Carolina 28516-9722 61 Forsyth Street, SW Atlanta, GA 30303-8960 Mr. Pete Benjamin Mr. Jonathan Howell U.S. Fish and Wildlife Service CAMA Major Permits Coordinator Fish and Wildlife Enhancement NC Division of Coastal Management Post Office Box 33726 400 Commerce Avenue Raleigh, North Carolina 27636-3726 Morehead City, North Carolina 28557 2 Special Conditions Connector Channel Corridor Project Action ID SAW-2016-02140 March 30, 2020 The Permittee shall monitor any in -water dredge pipelines used during the construction activities in order to check for potential leaks which may emanate from the pipeline couplings. All dredge and fill activities shall cease if leaks are found. Operations may resume upon appropriate repair of affected couplings, or other equipment. 2. The Permittee shall coordinate the placement of all dredge pipelines along the beach with the N.C. Wildlife Resources Commission and the U.S. Fish and Wildlife Service. Pipeline locations must be located via GPS and the GPS bearings must be mapped and provided to the U.S. Army Corps of Engineers once placement is completed. 3. All dredged material excavated by a cutterhead pipeline dredge shall be placed in the approved N.C. Department of Transportation's upland disposal site located at the north end of Ocracoke Island, Hyde County, North Carolina. Dredge M: Disposal Notes- 1- 2018 background imagery is from the USDA's National Agricultural Imagery Program_ o n� Leaend: I= Proposed Pipeline Dredge Channel E=1 Previously Dredged NCDOT Channel M Proposed 2019 NCDOT Channel Iu Hatters Inlet Permit 224-87 C3 NCDOT 2014 Channel C3 Permitted Dare County Channel Corridor M 1.006 2.000 FFrI 0D Nearshore Disposal Area " SAV C3 Dredge Avoidance Areas