Loading...
HomeMy WebLinkAbout330017_Compliance Evaluation Inspection_20200325f0' _tb"16 A!� Division of Water Resources Facility Number - O Division of Soil and Water Conservation O Other Agency Type of Visit: fiYCom ance Inspection Q Operation Review Q Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other Q Denied Access Date of Visit: 13ZS 7t Arrival Timer Departure Time: Z 2 c! County: Farm Name: 1-�;q j2 Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Design Current Swine Capacity Pop. Wean to Finish Wean to Feeder ccderto Finish 4 Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other of Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Wet Poultry Capacity Pop. ILayer J Non -Laver Pullets Other Poults Design Current Region: Design Current Cattle Capacity Pop. Dairy Cow _Dairy Calf Dairy Heifer _Dry Cow Nan-Dai Beef Stocker Beef Feeder Beef Brood Cow Discharees and Stream Impacts I. Is any discharge observed from any part of the operation`? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑Ycs N NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) El Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation'? ❑ Yes NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facili Number: - Date of Inspection: 3 - 2S- Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate'? ❑ Yes Na ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes Ala ❑ NA ❑ NE Structure I Structure 2 Structure 3 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure 4 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? Structure 5 Structure 6 ❑ Yes No .. ❑ NA ❑ Yes No ❑ NA ❑ NE ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental eat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste ADPliCatiOR 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No NA ❑ NE maintenance or improvement? 11, is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): " 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �rN ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ['Io ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �rNo ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes � ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes � ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: 5 -3 - Date of Inspection; 3 Z S 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ONo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes �No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? [] Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA [] NE permit? (i.e., discharge, frccboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ AppIication Field ❑ Lagoon/Storale Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA [] NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question # ): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility, to better explain situations (use additional pages as necessary). s 11z �f SccYde� �o� P to3 Reviewer/Inspector Name: Phone: '!�7' Ig 911 V ZOO Reviewerllnspector Signature: N, 5 4,71Zf e— Page 3 of 3 Date: 3 — 2 J r 21412015