Loading...
HomeMy WebLinkAboutWQCSD0179_Compliance Evaluation Inspection_20200318ROY COOPER ; `'I `r"'? >� Gotierrtnr •, - r � Off, MICHAELS. REGAN S. DANIEL SMITH MOR H C=RQLlr1.4 DirectDr Environmental Quality March 18, 2020 Mr. Guy Solie, Manage Member Trinity Properties, LLC 2723 Campus Walk Ave. Durham, NC 27705 Subject: Compliance Evaluation Inspection Duke Apartments Collection System Permit No: WQCSD0179 Durham County Dear Mr. Solie: On March 12, 2020, Cheng Zhang of the Raleigh Regional Office (RRO) Division of Water Resources conducted a Compliance Evaluation Inspection of the subject facility. The assistance and cooperation of Mr. Chris Lewis, were very helpful and appreciated. A checklist of items is enclosed with this letter. During the inspection the following items were noted: l .) Trinity Properties, LLC holds a deemed sewer collection system permit for the facility located at 2723 Campus Walk Ave. in Durham County. There has been no reportable sanitary sewage overflow (SSO) incidents from the collection system since the last inspection. 2.) The collection system includes gravity sewer lines. Wastewater from the facility flows into City of Durham's sewer main. 3.) The facility had maintained a map of the system on site. Pipe sixes, materials, and approximate pipe age need to be added to the map. 4.) The facility has developed a spill response plan, please add procedure for reporting reportable sanitary sewer overflows (SSOs) to the plan. 5.) Grease educational materials are distributed twice every year (handed out during annual lease renewal and once via emails). 6.) The sewer main and the Ione high -priority line are inspected by a contractor twice per year. Inspections were documented in a log. The high -priority line was visited during the inspection. The 12-inch steel line runs across a creek, with seven concrete pillars. The line North (atalir 0cpxtaielitoCErt:irunr:;ca:.,1C)+�a[it<, [)f:i�.anolVrau-Rcsourr.es l P.�IC:yh Rcg'ru:aE Cif?rr JflC�O L'arra'ir L7rtLc Rafcich, Nor th f.',r. �Fttd L1Uo!G - �- nU.:1r\ �� 91n 7°)I 1100 and supports were found in good condition. Please remove the tree limbs leaning on the line. Right-of-way maintenance shall he documented in the log. If you have any questions regarding the attached report or any of the findings, please contact Cheng Zhang at: (919) 791-4200 (or email: cheng.zhana (i-t ncdenr.aov). Sincerely, Scott Vinson, Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources Attachments: Compliance Inspection Report Cc: Central Files w `attachment Raleigh Regional Office wlattachment Chris Lewis wlattachment (electronic copy only) Permit: WQCSD0179 SOC: County: Durham Region: Raleigh Contact Person: Guy Solie Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Corniahance Inspection Report Effective: 03/01/00 Expiration Effective: Expiration Title: Certification Owner: Trinity Properties Facility: Duke Apartments Phone: 919-309-9765 Phone: Inspection Date: 03/12/2020 Entry Time 10 OOAM Exit Time: 11.00AM Primary Inspector:Cheng Zhang Phone: 919-791-4200 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampl ng Permit Inspection Type: Deemed permitted collect.on system management and operat!on Facility Status: E Compliant Not Compliant Question Areas: Miscellaneous Questions N General Grease Control Spills/Response Plan a inspections Lines (See attachment summary) Page 3 of 4 Permit: WOCSD0179 Owner- Facility: Tr mly Properties Inspection Date: 0311212020 Inspection Type Collection System Inspect Non Sampling Reason for Visit: RSutir,e General Yes No NA NE # Is this system a satellite system? M ❑ ❑ ❑ # If Yes. what is system name or permit number? WQCS00005 Is there a overall sewer system map? ■ ❑ ❑ ❑ Does the map include Pipe sizes ❑ 0 ❑ ❑ Pipe materials (PVC, DIP, etc) ❑ E ❑ ❑ Pipe location M ❑ ❑ ❑ # Flow direction M ❑ ❑ ❑ # Approximate pipe age ❑ E ❑ ❑ # Pump station ID location and capacity ❑ ❑ 0 ❑ # Force main air release valve location & type ❑ ❑ E ❑ # Location of satellite connections E ❑ ❑ ❑ Are system maintenance records maintained? ❑ ❑ ❑ ❑ Comment: Pipe sizes, materials, and approximate pipe age need to be added to the map. Grease Control Yes No NA NE Is grease/sewer education program documented with req'd customer distribution? ❑ ❑ ❑ # Are other types of education tools used like websites, booths, special meetings, etc? ❑ ❑ ❑ If Yes, what are they? (This can reduce mailing to annual,) Tenants are given educational material when leases are renewed every year. The facility also sends educational material to all tenants via email once every year. For public systems, is there a Grease Control Program via an ordinance/agreement? ❑ ❑ M ❑ If Yes, does it require grease control devices at applicable locations? ❑ ❑ M ❑ Is the Grease Control Program enforced via periodic inspectionstrecords review? ❑ ❑ 0 ❑ Is action taken against violators? ❑ ❑ M ❑ Comment: Spills and Response Action Plan Yes No NA NE # Is system free of known points of bypass? ❑ ❑ ❑ If No, describe type of bypass and location # Have there been any sewer spills in the past 3 years? ❑ 0 ❑ ❑ If Yes. were they reported to the Division if meeting the reportable criteria? ❑ ❑ 0 ❑ If applicable, is there documentation of press releases and public notices issued? ❑ ❑ 0 ❑ Are all spills or sewer related issuestcomplaints documented? ❑ ❑ 0 ❑ # Are there repeated overflows/problems (2 or more in 12 months) at same location? ❑ ❑ M ❑ # If Yes, is there a corrective action plan? ❑ ❑ 0 ❑ Page 3 of 4 Permit: WOCS00179 Owner- Facility: Trinity Properties Inspection Date: 03/12/2020 Inspection Type: Collection System Inspect Non Sampling Reason for visit: Routine Is a Spill Response Action Plan available? ■ ❑ ❑ ❑ Is a Spilt Response Action Plan available for all personnel? E ❑ ❑ ❑ Does the plan include # 24-hour contact numbers ■ ❑ ❑ ❑ # Response time ❑ . ❑ ❑ # Equipment list and spare parts inventory ❑ ❑ . ❑ # Access to cleaning equipment ❑ ❑ ■ ❑ # Access to construction crews contractors, and; or engineers M❑ ❑ ❑ # Source of emergency funds ❑ ❑ ■ ❑ # Site sanitation and cleanup materials ❑ ❑ ■ ❑ # Post-overflow/spill assessment ❑ ❑ ■ ❑ Comment: Plan lists contractors that are needed under various circumstances. Please add SSO re ortin Procedure to the i3lan. Inspections Yes No NA NE Are adequate maintenance records maintained? ❑ ❑ ❑ Are pump stations being inspected at the required frequency? ❑ ❑ 0 ❑ Is at least one complete functionality test conducted weekly per pump station? ❑ ❑ M ❑ Is there a system or plan in place to observe the entire system annually? ❑ ❑ ❑ Is the annual inspection documented? ■ ❑ ❑ ❑ # Does the system have any high -priority lines/locations? Are inspections of HPL documented at least every 6 months? Are new lines being added to the HPL list when found or created? ■❑❑❑ ❑❑❑ ❑❑■❑ Comment: Contractor performs two inspections every year on sewer mains and high -priority line. LinestRi ht-of-Wa s/Aerial Lines Yes No NA NE Please list the Lines/Right of Ways/Aerial Lines Inspected The lone aerial line was inspected during the inspection, the 12" steel line runs across a creek All seven concrete pillars were in good condition, A couple of tree limbs were observed lying on the line, which need to be removed. Are right-of-ways and easements maintained for the full width for access? ❑ ❑ ❑ If No, give details on temporary access: Is maintenance documented? ■ Cl ❑ ❑ Were all areas/lines inspected free of issues? 0 El ❑ ❑ Comment: Page 4 of 4