Loading...
HomeMy WebLinkAboutNCC201114_NOI Application_20200330Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 3/17/2020 10:34:38 PM (NCG01 NOI Submission) Approve by McCoy, Suzanne 3/19/2020 1:41:24 PM (Review- Construction NOI 23205) • The task was assigned to McCoy, Suzanne by round robin distribution 3/17/2020 10:38 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 19, 2020 5:00 PM 3/17/2020 10:38 PM Submit by Garcia, Lauren V 3/30/2020 10:39:23 AM (Payment Verification for NCC201114) * Caviness and Cates Building Devp Co • Garcia, Lauren V assigned the task to Garcia, Lauren V 3/30/2020 10:37 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 30, 2020 5:00 PM 3/19/2020 1:41 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information la. Project Name * Roslin Farms West, Section Three, Part One - Lot 197 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 2. County* Cumberland 3. Highway or Street Hunters Den Road Address* Street name only is acceptable if no address nunber assigned yet 4. City or Township* Rockfish Township 5. State * NC 6. Zip Code* 28348 7. Latitude* Enter the latitude in decinal degrees 34.9072 8. Longitude * Enter the longitude in decinal degrees (MJSTbe negative) -78.9463 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 03/11/2020 Estirrated Construction Project Start Date 10. Date to End* 03/31/2022 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial Classification for Development 12. Acres to be 0.45 disturbed* (including off -site borrow and waste areas) 13. Total site area 0.51 (acres)* 14. Post- 0.08 construction (Estirrated) impervious area (acres) * NCC Project NCC-CUMBE-2020-Roslin Farms West, Section Three, Part One - Tracking ID Lot 197 Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Cold Camp Creek WaterbodY * Ibrre of w aterbody into w hich storrrw ater runoff w ill discharge 15b. Waterbody 14-22-1-1 Index No.* NCWaterbody Index Number Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Caviness & Cates Building and Development Co. Name * If perrrittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name* Christopher It Corporation, enter Registered Agent First f brre 3. Last Name* Cates If Corporation, enter Faegistered Agent Last Wre 3b. Title Vice President 4. Permitee E-mail pam@cavinessandcates.com Address * 5. Permittee 910-778-7902 Telephone No.* 6. Permittee Mailing Street Address Address* 639 Executive Place, Suite 400 Address Line 2 city State / Province / Region Fayetteville NC Postal / Zip Code Country 28305 us Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 639 Executive Place, Suite 400 Address Line 2 City State / Province / Pegion Fayetteville NC Fostal / Zip Code Country 28305 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration ........................................................................................................................................................................................................................................................................... 1. Primary Site Pamela Contact - First Name * 2. Primary Site Geddie Contact - Last Name * 3. Title Start Coordinator 4. Site Contact E- pam@cavinessandcates.com mail Address* 5. Site Contact 910-778-7902 Telephone No.* 6. Organization Caviness & Cates Building and Development Name Co. 7. Site Contact Street Address Mailing Address* 639 Executive Place, Suite 400 Address Line 2 City State / Rovince / Region Fayetteville NC Postal / Zip Code Country 28305 us 8. Consultant Name (Optional) Dennis A. Gilbert First and Last nacre 9. Consultant E-mail dgilbert@mkrinc.com This person will be copied on all correspondence. 10. Consultant 910-484-5191 Telephone No. D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 03/11/2020 Approved * 2. E&SC Plan Project CUMBE-2020-117 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Fayetteville (FRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan APPROVAL CUMBE-2020-117 CAVCATES.pdf 76.59KB Approval letter or Mast beRDFfornat Grading Permit Site Map (Optional) Helpful for linear project review Mast be R7Fform3t Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. Include additional w aterbodies for linear projects if necessary. 6. NOI Certification RF197 NOI.pdf 6.06MB Form Mast be RDFformat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Amide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Christopher E. Cates Title Vice President Organization Caviness & Cates Building and Development Company Date * 03/17/2020 F. Tracking and COC Info NOI Tracking No. 23205 NC Reference No. NCG01-2020-1114 Uses 'count number' variable (incremrented by SP) Certificate of NCC201114 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 1114 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)