Loading...
HomeMy WebLinkAboutWQ0035749_Residual Annual Report 2019_20200228f N. STATE `< •�,�'y',=:J-.� arc- �+��, ffSff�k.vin w STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR February 28, 2020 North Carolina Department of Environmental Quality Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Non-Discharge.Reports@ncdenr.gov Attention: Non -Discharge Branch Reference: 2019 Land Application Annual Report North Carolina Department of Transportation Permit No. WQ0035749 Division of Water Resources: JAMES H. TROGDON, III SECRETARY North Carolina Department of Transportation (NCDOT) is submitting monitoring and reporting for 2019 as specified in the above referenced permit to be submitted electronically annually (Condition IV.6). NCDOT compiled this report using data gathered during the compliance year by NCDOT and our contractors. This data includes: I) Diamond Grinding Slurry (DGS) and Hydrodemolition Operation Slurry (HOS) Analyses (Permit Condition IV.2); and II) DGS and HOS pH and Land Application Logs (Permit Conditions IV.2 and IV.5). If there is further information required or questions regarding this annual report, please contact NCDOT for further assistance. Sincerely, J�_j Y7�'- David Harris State Roadside Environmental Engineer Enclosures Mailing Address: NC DEPARTMENT OF TRANSPORTATION ROADSIDE ENVIRONMENTAL UNIT 1557 MAIL SERVICE CENTER RALEIGH, NC 27699-1557 Telephone: (919) 707-2920 Fax: (919) 715-2554 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: TRANSPORTATION BUILDING— 5T" FLOOR I SOUTH WILMINGTON STREET RALEIGH, NC 27601 NC DEPARTMENT OF TRANSPORTATION LAND APPLICATION OF DIAMOND GRINDING AND HYDRODEMOLITION OPERATION SLURRY Permit No. WQ0035749 2019 LAND APPLICATION PROJECT SUMMARY TABLE NCDOT CONTRACTOR PROJECT LOCATION TYPE PROJECT ID C203702 Lane Construction 1-85 Widening and Improvements, China Grove, NC DGS (1-3802B) Company C203792 Lane Construction Greensboro Western Loop from East of US 220 DGS (U-2524D) Company (Battleground Ave) to East of SR 2303 (Lawndale Dr) C230991 Barnhill Contracting Morrisville Pkwy Ext from west of Highcroft Dr DGS (U-5315A&B Company to east of Mills Park Dr in Cary C204053 Triangle Grading & 1-85 Widening and Improvements from DGS (1-5793) Paving East of US-64 to NC-109 in Thomasville, NC 2019 Project Status Report Prepared 02/20/2020 NC Department of Transportation Permit #WQ0035749 Prepared For: NC Department of Transportation 1536 Mail Service Center Raleigh, North Carolina 27601-1536 The Lane Construction Corporation 306 NC HWY 152 E China Grove, NC 28203 Project TIP # 1-3802B Project Contract # C203702 1-85 Widening and Improvements, China Grove, NC 02/20/2020 NCDEQ-DWR Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attention: Information Processing Unit Reference Land Application Project Completion Report for Project TIP 1-3802B, C203702 NC Department of Transportation Permit No. WQ0035749 Non -Discharge Compliance Unit: The Lane Construction Corporation is submitting the monitoring and reporting data for the Subject Project for 2019. Per the North Carolina Department of Transportation (NCDOT) Permit No. WQ0035749, this report is to be submitted annually, on or before March 1 st, for work accomplished by our firm on this project report using data gathered by our staff and/or contractors during the compliance year for diamond grinding slurry. If additional information is required or if there are questions concerning this project status report, please contact my office for assistance at: CPHurley@Laneconstruct.com or 919-279-7264. Sincerely, Casey P. Hurley, PE, PLS Project Manager Enclosures NC DEPARTMENT OF TRANSPORTATION LAND APPLICATION OF DIAMOND GRINDING AND HYDRODEMOLITION OPERATION SLURRY PERMIT NO. WQ0035749 2019 LAND APPLICATION SUMMARY CONTRACTOR DOT PROJECT PROJECT TYPE (DGS OR YEAR APPLIED NO. LOCATION HOS) The Lane TIP# 1-3802B China Grove, Construction Contract # NC DGS 2019 Corporation C203702 TABLE OF CONTENTS SECTION NO. TITLE Diamond Grinding Slurry (DGS) Analyses II. Diamond Grinding Slurry (DGS) pH and Land Application Logs SECTION I DIAMOND GRINDING SLURRY (DGS) ANALYSIS NC DEPARTMENT OF TRANSPORTATION DGS ANALYSIS Permit No.WQ0035749 The Lane Construction Corporation 1-85 Widening and Improvements, China Grove, NC Date Sampled: 8/27/2019 Solids: 11.9% pH: 12.5 Parameter % Mg/Kg Dry Weight Pounds/Dry Ton x 10,000) (mg/Kg (mg/Kgx 0.002 Calcium Carbonate 6.2 62,000 124 E. SECTION II DIAMOND GRINDING SLURRY (DGS) pH AND LAND APPLICATION LOGS LANE l 1-85 Rowan County Date LF W SY 31-Aug 5,460 4 2,427 4-Sep - 5-Sep - 6-Sep 12,374 4 5,500 7-Sep 19,335 4 8,593 9-Sep 14,860 4 6,604 10-Sep 14,864 4 6,606 11-Sep 7,895 4 3,509 12-Sep 16,840 4 7,484 13-Sep 13,115 4 5,829 15-Sep 8,365 4 3,718 16-Sep 6,816 4 3,029 19-Sep 11,135 4 4,949 20-Sep 8,678 4 3,857 22-Sep 11,960 4 5,316 23-Sep 14,481 4 6,436 24-Sep 8,832 4 5,098 25-Sep 13,448 4 5,977 26-Sep 7,772 4 3,454 29-Sep 18,645 4 8,287 30-Sep 13,030 4 5,791 1-Oct 10,779 4 4,791 2-Oct 22,091 4 9,818 3-Oct 23,639 4 10,506 4-Oct 16,776 4 7,456 7-Oct 22,178 4 9,857 8-Oct 16,.310 4 7,249 9-Oct 10,250 4 4,556 10-Oct 18,895 4 8,398 11-Oct 17,590 4 7,818 13-Oct 10,784 4 4,793 14-Oct 14,519 4 6,453 16-Oct 5,704 4 2,535 18-Oct 27,470 4 12,209 20-Oct 25,910 4 11,516 21-Oct 25,067 4 11,141 22-Oct 21,725 4 9,656 23-Oct 27,862 4 12,383 24-Oct 20,698 4 9,199 27-Oct 32,482 4 14,436 28-Oct 35,520 4 15,787 29-Oct 30,125 4 13,389 1-Nov 34,911 4 15,516 4-Nov 22,722 4 10,099 5-Nov 190 4 84 Total 322,106 Total 316,432 Excluding Str 8 Bridge LAN E 000!t iUrrlinl STA Ending STA lir 014191-1140 11't92� 2U N[Yr1:5: ' Collcrrac Dinrnnnd Y1tUdI;C : 3,129 DAILY ( iRINI ODINO 1VORK SUNINIARY DATE UV WORK; • 9r�11]Olr} START' 9t00 ANI (11.0SUR1. SE I': _ C'Lt]SURI: RU-IM Vl;k1, --- I.No: 6700 I'M completed 1!}' Lcrr �11r p i') 11'itkth of Ihrs+ l- I'1 It of Pnsses f ',m f'urkn ' Unkl lnillols 2;126.7 S Y + " 7R0 I 7.tFU I'ar trul lic,lrill onto Blythe'', prnjccl. Appendix 4 - ply Monitoring Log The Lane Construction Corporation Project Name: hi�lv Contract: -10'7j D Z 'b L-t SS Q Date: U14, /11 ` L —+- . % p- pH Monitoring 23ot$ • 6-1- �y Amount of Muriatic Verified ,--- T ck number Acid added (gal) Time Comments ��af �3 -o�d3 rszo'3 OZ,03 -0-La3 d ��5 1 l 7A Sm � rs #0 r�n � �" If' G L�•�j �7 . `7 ©,'7 PH Testing Tested number pH results Time ;Comments ~%einrl„r A _ nH Monitorinq Log Appendix 4 - pH Monitoring Log The Lane Construction Corporation Project Name: Contract: Date: pH Monitoring Truck number Amount of Muriatic Acid added (gal) Time Comments Veriiie by 6 w Sri- r c 1 m pH Testing Truck number pH results Time Comments Tested by �D f� PROJECT: 3429 LANE` DAILY GRINGDING WORK SUMMARY DATR OF WORK: 9/6/2019 STAR' i q 5 AAA CLOSURE SET: r CLOSURE REMOVED: END; : AJ Completed Verified by 1-nae Star i STA l nding STA Total Lengtii I"I') 1Vidth of Pass FT) Of PflSSe3 T A) Toda Unit Initials S0-LA 0685+74 0626+45 5,929 4 I 2,635.1 SY S94A 0685+74 0672+60 1,314 4 1 584.0 SY SB-tA 0672+60 06264-45 4,615 4 I 2,051.1 SY SB-1A 06854.74 0680+58 516 4 l 229.3 SY Total 5,499.6 SY N0'm: *COncrele Diamond Grinding S13 - Lane 4 Appendix 4 -- pH Monitoring Log The Lane Construction Corporation Project Name: Contract: Date: pH Monitoring Amount of Muriatic Truck number Acid added (gal) Time Comments Verified by Q 3 C� -L `>J 33 crc ,3 n� CI 333� �t G� 0 pH Testing Truck number pH results Time Comments Tested by 3AM 4, 2 - v ,5j 0: �, /er ta* I� LI PA, i i �� b 1/6 A- l� P12bJCCT: 3429 LANEr ,,,w DAILY GRINGDING WORK SUMMARY DATE OF WORK: 9l7/2019 START: CLOSURE SET: CLOSURE REMOVED: END: Completed Verified by Lnne Starling STA Ending STA Total Length (1- r) WIdtlt of lass ( r H of Pnsses GA Today Unit Initials It f S13.1A 0626+45 05954.48 3,097 4 1 1,37G.4 5Y SB-LA 0672+60 0595+48 7,712 4 I 3,427.E Sy SF3 L 1 OG2G+45 0595+48 3,097 4 1,376.4 SY SB-L1 06274.25 0607+18 2,007 4892.0 SY JE SH L3 0599+30 0595+48 382 4 1 L—K- 169.8 SY SNLD 0653+40 0623+00 3,040 4 i 1,351.1 SY Total 8,593.3 SY MOTES: *Concrete Diamond Grinding SI3 %D'Oef- I verify hat Ile t tititles r c Oded and i itiate are correct for the above date of work. V u all Rep ese tativ Date The 1n1141 Constructicm CorIllwatlon Protect N,unu; ! '�� r a� '� �r..rr.� (,\;,(II {'untr Id: 4 Z/ 3j!oZ` Ditto: PH Monitoring Amount of IV ildiltic TrLIClt number Acid added (1pl) Tlmo Commollts Vurlflq.by CD V - 7, 3 -c7zo 3 O � en C_ PH Testing i'riu:lc rninrbur PH rosults Time Comi11onts Tustod by 4 g L1 ?0 Le ua.s.r ll b'( lV3 _ ! . Lnnc SB-L3 SB-1.3 SB-L3 SB-L3 SB-L3 SB-L3 SHLD SHLD PROJECT: 3429 DAILY GIt1NGD1NG WORK SUMMARY LANEDATE. OF WORK: 9/9/2019 START: ' CX7 AvK CLOSURESET: CLOSURE REMOVED: END: OD pry Completed Verified by �....:.. eme rndtn�. R't A Total Leutiti 0627+25 0595+48 3,177 06014-18 0595+48 1,170 0627+25 05954-48 3,177 0685+74 0642+20 4,354 0685+74 0673+25 1,245 0685+74 0680+85 489 0623+00 0622+10 90 0685+74 0674+20 1,15. Tolnl 6,604,4 S'Y NOTHS: *Concrete Dinniood Grinding SB I verify tic 91lprF�lties roV 78nZiliare correct for the above date of work. !q //p//9 F hall RcpreseutaN a Dale Q /c7 LANE es the Datc Appendix 4 .. pI l lviollitoring Loci 1'1141 Lnlut CunstrucUol) Corlmr;11 -1"ll ) I rn c.cl N,mh : � f t;c,iltr;,c:t; G7.n3o'Z 1 PH Monitoring Amatmt of NII'Intic rucic Iunnbor Acid added (I{nl) 1'11110 Conunonts 33-7MCI -3-E33 33 Dzo3 _ fib. M PH Testing Trtscic number pH results Time �(0 tint Tusted by I r Lane SB-L3 SB-L3 SB-L3 SB-L3 SB-L3 SHLD PROJECT: 3429 LANELY GRINGDING WORK SUMMARY DATE Or WORK: 9/ 10/2019 START: CLOSURE SET: CLOSURE REMOVED: -CND: 5' Completed Verified by Ctaw•iino �.ndinn IRTA i.enu_th nth of Pass f Passes (I Today Unit Initials 0595+48 0569+30 2,618 4 1 1,163.6 SY 0595+48 0581+20 1,428 4 1 634.7 SY / 0673+25 0642+20 3,105 4 1 1,380.0 SY 0680+85 0642+20 3,865 4 1 1,717.8 SY 0595+4810582+001 1,348 4 1 599.1 SY 0622+10 0597+10 2,500 4 1 1,111.1 SY i:d Total 6,606.2 SY NOTES: *Concrete Diamond Grinding SB I verify that he quantities recorded and initialed are correct for the above date of work. Pe Representative Date i E Representative Date Appendix 4 ° pi-i it onitorilig L.N The hello Collstrucllu/n CoOlurulloll Pro I -'k ,.p 5%-x1W e pl-I Mollitol,11111, Truck number A1110011t of M111-1ntic Acid ndded (Ital) Time Cmm��aiits vt�iNiccl.by 33—orzb3' rj4 1 3� -- t�o3 a r `� •w pH Testhig Truck numbor pH results Time Commonts _I'estcd by S: Z q ,ate.- ac b t- 12 1 X-fn� ti •,O 1.5q b i.L-5 5Orvx I I'anc SB-LA-P l SH-1 rl-P i SIMA-P2 SB-L4.1'3 rRo.Irc'r: 3429 LANEP,.,o DAILY GRINODING WORK SUMMARY DATE OR WORK: STAWf: CLOSURE SET: CLOSURE REMOVED: END: Campletcd rrri 44 ..P n.. rRAI 'I•ndn 9/11/2019 6:30 AM 5:001'M Verifrctl by rhdr Inilints auiruug a l r.---- 0569+30 0560+00 930 4 l 413.3 SY 0547+00 05394-55 745 4 l 331.1 SY 0538+90 3,040 4 I 1.351.1 5Y =0569+30 0537+50 3,180 4 I 1,4133 SY { Total NOTES: *Concrete Diamond Grinding SB verify Illal the gtiantm corder and initialed are corrmt for the above date of work-, PCIII611 Represent ate LANE RCgfVditative bate 3,508.9 SY Appel-ldix d. PH V ollitO'011g Log TIIII ( ino Coll%tructtcm Corlxrriltiun I'ro)l'O. Ni11111l: �� Y4�� ��r, lPiltw, 9V JAI Mollitol,1118 Amount of IVUn'lintle Truck Wombat Add tldded (gal) TGIF C pH TastilIg Truck number pH results Time C l t.b'1 R; Z3 v) 0 vvdfla f.by Posted by N Lana S[3-LI-P I SB-L,I-PI SR-L4-P2 SB-LA-P3 SB-L3-P3 SB-L3-P3 LANE r PROJ]:CT-. 3429 DAILY GR1NGDING WORK SUMMARY DATT: OF WORK: 9/12/2019 STAIZA': 6:30 AM CLOSURE SET: CLOSURE REMOVED: END: 4:45 PM Completed Vicellied by — ,,.... .,_- .,--_ —..1 —1_.. _.._.,. n- , —!—.. -en...... ir. -% H !I: A\ Tminv Ilntl Tnilink 0560+00 0547+00 1.300 4 1 577.78 SY C 0537+50 0492+20 4,530 14 l 2.0I3.33 SY C/ 05384-90 04924.20 4,670 4 1 2,075.56 SY 0537+50 0492+20 4,530 4 l 2,013.33 SY 0556+45 0552+25 420 4 I 186.67 SY 0514+15 0500+25 1,390 4 1 617,78 SY NOTES: 'Concrete Dianiond Grinding S➢ Total 7,484.4 SY Appendix 4 -, pI-I Monitoring Loci TIle 1,0110 CAmstru(tlotl Col-I)O upon P if�J J�� ' tt Ik I I l),�i,l,l 111�i111t.; f ' � � � At /t- t r�.rbti {:llllllact: G2o'�xOz 1 V6IN �:�3 � IVlc�rtitc�k'In[; PrIICI( mimbor o2 ^ov5 33 - cr1 o'' - 3'3 —Oza"3 33 �aza'3 131-I Testing Amount of Mul'Intic Acid added Mal) Comments M- M Varlflc by CT _ 0 k'rncic Illtmbor t�l l results The cot mponts Tested by . --� 3 H �1.b3 JIM 4= S► �yao 1 r r><toarc•r: 3429 LANEDAILY GRINGDING WORK SUMMARY DATE Or WORK: 9/1312019 START: CLOSURE SET: CLOSURE REMOVED: END: Completed Verified by Lane Starting S I'A > ndiug S'I'A Total I.eugtlt(pT) WidlU of Pass (h 1) N of Passes (LA Today Milt Initials SB-L3-P3 0552+25 0514+15 3,810 4 1 1,693.33 SY C SB-L3-P3 05001,25 0492-1-20 805 4 1 357.78 SY SE-L3-P2 05544,70 0492a 20 G,250 4 1 2,777.78 SY G SG-L3-P1 05544-70 0532+20 2,250 4 l 1,000.00 SY Total 5,828.9 SY NO'm: *Concrete Diamond Grinding SB I verify 0 ttt s uantitics orded and imfl led are correct for the above date ofwork. 5� Date Appendix 4 .. pl-I Monitoring Log LANE r PROJECT: 3429 DAILY GRINGDING WORK SUMMARY DATE Or WORK: _ START: — CLOSURE SET: _ CLOSURE REMOVED: END: J Completed Lane Starting STA Endin STA Tolttl Length (FT) Wldlh of Pnss (lT) Hof Posses (EA) Today Unit Shoulder 0492+20 6,245 4 l 2,775.56 SB-L3-PI[:0�554+65 2+20 0511+00 2,120 4 i 94122 Total 3,717,8 SY NOTES: *Concrete Diamond Grinding SB I ellto grant' ' s record an itinled are correct For lire about date of work. Penhall Representative Date Dale 9/15/2019 verified by Initials SY 61 SY G Appendix -el, pI I Mollitoi'i(1g Loci The t.tmn Collstructioll Corhoratlorr Pro out W11w: �J t'untr�u;t, GZfl3��Z- pH Monitoring Truck number �3 -ozo'3 7i 3 -- b7v 3 33 —0"W3, 33 - Ozo'3 Trucic number 1 ' Amount of Murlatic Acld added (Rai) results ez mo Comments Pon 3� � r a lCom Ifle Tested by LANE r Lone Stam•ling S7 A l' 11( 1 g STA Total Length SB-L3-PI SB-L3-P2 SB-1.3-P3 SB-IA-PI 0511-+00 0492+20 1,880 05801-24 0569+62 1,062 0581+98 0569+62 1,236 0595+48 1 0569+10 2,638 NOTES: l verify LANE *Concrete Diamond PROJECT: 3429 DAILY GRfNGDiNG WORK SUMMARY DATE OF WORK: START: CLOSURESET:� CLOSURE REMOVED: _ END: Completed - if f P ses (CA) lbdny Unit 9/16/2019 Vedflcd by G1lilals idllr of PASS rT) 4 ns 4 ] 835.56 SY I d 4 ] 472.00 SY 4 1 549.33 SY l% 4 1 1,172.44 SY Totnl 3,029.3 SY Appendix 4 a pl-I Moilitorillc) 1_09 Lpne SR-IA-P Stl-L4-P2 56-LA-P3 SB-SHLI) PROJECT: 3429 LANE( DAILY GRINGDING WORK SUMMARY DATE OF WORK: START: CLOSURE SET: CLOSURE REMOVED; END; Completed ..rn,,.,— WA % 'r'ndn 9l1 W2019 Verified by I1„h Tnitinls 0759+65 0728+00 3,165 4 1 1,406.67 SY C 0759+65 0728+00 3.165 4 1 1,406.67 SY 0759+65 07284 00 3,165 4 1 1,406.67 SY 0759+65 0743+25 1,640 = 1 728.89 SY { Total NOTES: / *Caacrclee Diamond Grinding SB I veriuvitbd initialed are correct for (heabove date or work, l-ennsal Iccpresemuuvn t LANE lWrosrillative, Data 4,948.9 SY Appendix 4 - pFl Mollitol`irlg 1_.09 The I-mul Coltstl'llrtioll Col'itor;ltioll Contract, GlpvWL I mt ( � " - - pH Monitoring 'ruck nutnbel' a ? � 3 _crt.a3 33 - oZo3 33 �OZD3 ' Amotillt Of Mll"I"tlt: Acid nddQd;I;nlj Tlmo Comments P, pH Testing ITucic numbor pH rosults ' - 1 ILA Tlmo :ZZ 2'•5Z tq:�+ ants Posted rRo.IlJcr: 3d29 LANEDAILY GRINGDING WORK SUMMARY DATE OF W ORK: 9/2012019 START: CLOSURE SET: CLOSURE REMOVED: END: Completed Lane Star11 STA Cnd61 STA Total length (FT) Widtb 0f Pass (FT) 8 of i'nsses (EA Today Unit SB-L3-Pl 0727+80 2,262 4 1 1,005.33 SY SB-L3-P2 0750+42 0727+90 2,262 4 1 1,005.33 SY SB-L3-P3 0750+42 0727+80 2,262 4 1 1,005.33 SY SB-L3-P3 0759+65 0757+20 245 6 l 163,33 SY SB-SHLD 0743+25 0728+00 1,525 4 1 677.78 SY Total 3,857.1 SY NOTES: *Collucte Diamond/ Grinding SB I vedryoa�c jWti yfcl coded initialed are correct for the above dnla of hark. es s LANE Rep ntalivo Dalc Verified by ❑iilinis Cl C C C G Appendix 4 pi-i Mo nit(10119 Log Thu. how Collstruc;tlon Corporotion 1'I'iliowI Na111i!:' Cont'I':lc't; Cjp OZ t)olo, pH Monitoring Amount of Murintic Truck �tiumbar• Acld nddacl Sli:►il Tltlia Canu�wants 33 pH Testing Truck number pli rt2xu11:9 ' l t •5 j� 4Jr Imo Comments ey Tasted by LANE r I,.mo Starting STA SB-L3-PI 0722+15 S13-1,3-P2 0722-1-15 SB-1,3-P3 0722•1,15 SB-tA-PI 0722+15 3B-UI-P2 0722+15 S13-LA-P3 0722+15 SB-SHLD 0722+15 NOTES: I verify Odin g STA Total Lcagt 0704+70 1,745 0704+70 1,745 0704+70 1,745 0705+30 1 0705+30 I 0705+30 I PROJECT.- 3429 DAILY GRINGDING WORK SUMMARY DATE OF WORK, 9/2212019 START: CLOSURE SET: CLOSURE REMOVED: END: Completed Ver{Ced by rRT1 Widtb orPnss (i; T) 9 of Pnsscs (EA) Today Unit Iaritinis l'otal *Coircrete Diamond Grinding SB Ankties reeended and indaled are correct for the above (into ofNvork, / Dato' Date l 775,5G { 775.56 I 775.56 1 748.89 { 748.89 748.89 1 742.22 5,315,6 SY SY Ci SY C SY C SY C SY SY SY G Appendix 4 pi-i Mollitoving Log The 1,;111n Constructfule C01I)ON10011 Prop od N,m1E (�l1,1i1�1E�1: �zv3�z pI l IVIc1lIItorllily, A111a1111t of 1lrlurintls I'rucic number Add addad (gal) 3-oz '33 -tYLo3 33 -Dzo3 pH Testing Veiriffed. Lane SMA-1'I,P2 Sl]•l.d-N3 Y-19 RP 0 Y-19 RP A Y-19 RP A SHLD Y-19 Clore lrenlllsr S13-1-4-P1,P2,1`3 SE-Gt•SI ILD S0-L3•P 1,1'2 50.1.3-0 ItP A Y-19 Decal RP 13 Y. 19 Aceel RP D Y-19 300' Tnptr /�I� GRINGPROJECT: 3429 L1ANE !, DAILY DINGWORK SUMMARY [[( DATE OF WORK: 912312019 START: CLOSURE sET: CLOSURE REMOVED: END: completed YerlOcd by N I NAILIfl 10A 0701+15 r.nout am 0G85+74 f,54] 4 2 1,319.78 SY C 0701+IS 06R7+69 1.346 4 1 598.22 SY OUIE+96 U010+00 498 4 3 6640) SY 0013+00 0010+00 390 4 4 693.33 SY 0013+91) OOID+00 390 4 1 173.33 SY 0724+10 0722+15 195 4 I 86,67 SY 072810D 0722+15 585 4 3 780.00 SY 0728+00 0727+80 0725+27 0722+15 273 565 4 4 1 2 121.33 502.22 sY SY /�l� l.i 0727+80 0723+50 430 4 l 191.11 SY 0728+00 0725+27 273 4 2 242.G7 sY +6 1 069R+00 0692+IS 585 4 3 78p.00 SY pR92+IS 0G89+15 300 riva 3 233J7 SY Tolnl 6,43S,8 SY NOTES: *C015erele Dinnsond Grinding S➢ I ver' nl gt ltltie Sac n1 'I led nre correct for Ilu nbove dnte ofivork. off/ n nIt Represen i Da LANE Represen Dnte Appendix 4 pi-i Motnitorillg 1Lo9 The Low Col►structiol► Corporation Proio►:t. W1111A; � 1'.Gt"l �ft'r.�tn �•�ticicll A�' an A- A pH Moo-libWll19 Amount Of M111'Intic Truck lulmbor Acid nddud (Rol) 33 �cszo3 3'3 OW ' 33 o-u 3 pH Testing Trucic n►►mbar I pN reswitS t k. 4. t E1 } 1 1"u ti'�ci lane SB.I1J•P2,3 SP-L3.P3 SP•L3-P2 0 Shld SC-1,3-1' 1 Sll-l2-P3 Sit-W-P3 � y PROJECT: 3429 LANE{/ DAILY ORINGDING WORK SUMMARY iii � DATE OF WORK: 9124/2019 START: CLOSURC SCT: CLOSLJItC ItEMOVEl3: Com0leted Verlfled by Totnl 5,097.8 SY Appendix ,eI... pl-I Monitoring Log Tho t.imei Comtructiofl Corporation I C + Contract: PH IVicmitorittl, Amouirt Of iViUNMIC Truck munbar ACIt iddad (l;nl) Tlmo Comments Vuriflc i. t to 3 3 O7o3 33 (il 3D,2 C7� t pH 'f'estlrtl; Truck nwnbur PM rosults Time Comtnants Tustod by L Lmia sn.L3-p3 SMldd 50-1,2-B SO -Loop A-Accel BB -Loop A-3WV Toper PROJECT: 3429 LANEDAILY GRINGDING WORK SUMMARY DATE Or WORK: 9/25/2019 START: CLOSURE SET: CLOSURE REMOVED: END: Completed Verincd by 1.064. 0642+20 0627+25 1495 4 3 1993.33 SY 0586+00 0570+20 1520 4 I 702.22 SY l 0670+00 0639+10 3,090 4 1 1.373,33 SY 0 0+45 0556+89 1256 4 1 3 1 167467 1 SY 055GE89 0553+89 300 vnr 3 233.17 SY t.:. 5,976.7 SY Appendix /I.., p}_i Monitoring Log Lvate SII-SI114 Sl1-Slild SB-L•I-P I SB-L1•P3 SB•LYP2 SB•L1•PI S11-1U'8-Y-19 SD-L4•PI 1 P1i0JCC'C: 3429 LANE r((' l DAILTOR1NGDINO WORK SUMMARY DATE OF WORK: 9/26/2019 START: CLOSURE SET: CLOSURE REMOVED: END: Contpleled VeNHO by 0569+45 0554+64 1 •181 4 1 2 658.22 SY 1 6 0689430 0685+74 356 4 1 158,22 SY lC? 0687+25 0685+74 i51 4 1 67.11 SY C, 0704+70 0693191 Y 079 4 I k79.56 SY C O704+70 0685+74 1,8 4 i 842.67 SY 0704+70 0685+74 1896 4 I 842.67 SY t 001.1+98 0010+00 498 4 I 221.33 SY 0765+30 0701+15 1 115 1 4 1 184.44 SY r"l' y NOTES: *Copicrele DiamorijArilidinsS13 1 verify 111 unnl'ly Vrde al/1' i�lel�re correct for the above date LANE Triml 3,454.2 SY Dale Appendix 4 - pI-I I ollit0l'ili � 1-09 Lnne N4 . B-L3•PI,P2,P3 B-L4-Pl -IA•P2 8-1,1.1'3 S •Sldd 1'R03CCT; 3429 LANE(( DAII,Y GRINODINO WORK SUMMARY ip DATL' OF WORK: 912/12019 CLOSURE SE.T: CLOSURE REMOVED: END: Completed Veri13ed by _ _�. _ .. ..m. ... .. .. ....... ......... .�.,___ro•,•, „_e.,_____.a., v,...r..-. rr..b r..v tale 0519+55 0556+30 3,675 4 3 4,900.00 SY /�//^ , 0519+55 0538+50 1895 4 1 842,22 SY 0519+55 0539+50 1895 4 1 8-12.22 SY /L/►' 05191-55 1 0538+70 ] 915 4 1 1151.11 SY 051055 0538+70 ] 915 4 1 851,11 SY l NOTES: 'Conarcle Diamond Grinding S➢ Taint 8,286.7 SY Appendix 4 pl-I Mollito l illcl L.oc9 ,olo Lunn construction Corporation 01111'rocl: C103-407, )I I {l ollitorirst" Amount of MOAntic Trucic number Acid added hall Tlmo C 3 3 - I�za3 2- c3 33 ~Dun ,.. 'E c f 33 -c7w mac, pl-I Testing Truck numborNII rirsults nmQ ..2 � ti.35 1D�3k �-- j :'Lq nttottts >Q4)1 CO A-= Tasted by I.Nic NJ3-L4-P1 SO•G3-P3 9R-L4-P2,P3 SR-5111.O SR-RPr4SOLD 5R ACC SH-L24.1 PROJECT: 3429 LANE � DAILY GRINGD[NG WORK SUMMARY HATE OF %VORK: 9/30/2019 START. CLOSURE SET: CLOSURE REMOVED; ENll_ Cornpleled VeriGcd by WIJ- -t—.. rr,v, 11.fll...—?PA 1 II.;' T..rrM. 05381-50 0626+50 8,800 4 1 3,911 A I SY 0693+91 0685+74 817 4 1 363.11 SY 0705+30 0701+15 415 4 2 368.99 SY r 0705+45 07(l0+50 495 .4 1 220.00 SY f 0014+98 0010+00 499 4 1 221.33 SY j 0698+00 0693+72 429 't 1 190.22 SY 0705+12 0693+50 1162 4 1 516.44 SY t NOTES: C/o/r�creI liar/n/oned Orindiog SB fyllfo I verit Ur6ntia111rU1s recar�pd-arid inilialccteq Towl 5,191.1 S), for the above dale of wor •. op ❑ale Appondix 4 - p1-1 Mclliitol'ilig 1_,09 The Lino CUlwnlctlall Corpora I loll L:ilill'I'ilf'I; C�A3�t)Z Date: / la _ L— pl l IV ollit:f?I'lli f; Amount of Mtll'Intic Truck numbor Acid nddod (gal) Time Cor►ln►ants Vul Iflc4l.11y 33 -ozn3 8`2v W t C 33 —oza3 �-- �' C _33 -nzv3 o r - 33 � b f CT - 33 pH Testing number 1 III results Tlmo con►monts ` Tasted �7 L d • JA 1 „A 1 Lorca i40-L4•Tcst Strip NUd.14'2 SH-Gofa Taper si RP B W-SHLD PROJEC1'; 3429 LANEDAILY GRINGDING WORK SUMMARY DATE OF WORK: 101112019 START; CLOSURE. SGT; CLOSURE RCNIOVGD: END: Coiuplcicd Verlficd by Slnrting STA Elitli S I A 7-ouu t.cu at — 0$19+55 597 4 3 796.00 SY ��513.58 0538+50 0622+50 8,400 A 1 3,733.33 SY i QOIA+9$ 0012+88 210 4 1 93133 SY Cl- 0693+72 1 0689+94 378 4 I 168.OD SY t 4,790.7 SY Appendix 4 pl-I Moliitoring Log The I.411141 Caltstructiurt COI'por'Otlon Contract"CZy3�vZ pH Monitoring Truck m allbur 3 -a2a3 3 3 oZo3 33 - ozo3 33 -0'2�3 pl-I Testirlg Amount of Wrintia Add added iital) r2- 'i'r'tri:lc rlunrlyrar' ,_ ill ra!sults lie COr11111UrrtS C30 F k-3 0 �an�y r Tim tl'"t D — Tasted Ir Lane ND-1.4-PI ND-L4-P2 SD-L2-P2 SD-L2-P3 SO-L3-P3 SD-L3-P2 SP-ItPA-Dore pcoiher ND-L4,P2 ND-L3-PI PROJECT: 3429 LANE[ (olll DAILY GRINGDING WORK SUMMARY DATE Of WORK: 10l212019 START: CLOSURE SET: CLOSURE REMOVED; END: Completed Verified by _._. .. .. ...... ... .. ........... .vr_,.,. _e,.___.,�-.•, ., _r u__-_-era♦ •T...i.... M.4 r,,;i la �...,�... 0626+50 „„v... ... 0685+30 ............ ... .. 5,880 ........... . .-- - - 4 - -- - ...... 1 2,613.33 SY ram' 6 0622+50 0695+70 7320 4 1 3,253.33 SY /- 1. 0732+88 0720+93 1,195 4 I 531.11 SY 0750+39 D719+43 3,096 4 1 1376.00 SY tt 0723+50 D722+15 135 4 1 60.00 SY \�1 0728+30 0721+38 692 4 1 307.56 SY C!.. 0013490 00114-53 237 4 I 105,33 SY 0685+30 0696+00 1.070 4 I 475.56 SY G 0632+70 0657+37 2,467 4 I 1096,44 SY C, 9,818 SY _aix 4 - pH Monitoring Log Lane Construction Corporation Project Name: Contract: Date: 1 u l pH Monitoring Amount of Muriatic (ruck number Acid added (gal) Time �6��� Comments �_3•-v�-�:�� Z r min �,k� 33-crzo'3 pH Testing Truck number pH results Time Comments s. 7-1 .3 3 �►'`► C Tested Lane S4-L2•P2 S0.1.2-1`2 Sn-L2-P2 89-L2-P3 SD-RPA-Decel SD.RPA-Gore Fent&er ND-L3-P2 NIA-1-3-0 ND-L3-P3 ND-I.3-P2 ND-1,3.P1 PROJI'sCTI 3429 LANEDAILY GRINODINO WORK SUMMARY DATE OF WORK: 101312019 START: CLOSURE SET: CLOSURE REMOVED: END: Completed Veelried by Stgrflug STA Lllrlrll•zilA ro[nll,en w rr ,.,mu�,,..aa ,-. „........� �.' --.... /�rl• 0750+42 0732+88 1,754 4 1 779.56 SY 0719+43 4745+12 1431 4 I 636.00 SY 0720+93 0703+95 I,698 4 I 754.67 SY SY 0589+14 0598+34 80 4 2 11.11 C 0591+09 0586+42 467 4 1 207.56 SY 0015+60 0010+00 SGD 4 I 248.89 SY 0569+80 0617+88 4 B48 4 1 2,136.89 SY 4 f 0632+70 0646+80 1 410 4 1 626.67 SY ////,••• 0568+70 0619+16 4.946 4 I 2,198.22 SY 0632+70 0657+00 2,430 4 k 1080.00 SY 1 0657+37 0697+.12 3,975 4 1 1766.67 SY Toted 10,506 SY NOTES: •Concrela Diamond Grinding N131SD I ver n qu 11 s recor d inili Ito correct for the nbove date ofivnrk. ra�tg LANE lte olive Date Lnne NB-L4-P3 Feather NB-L3-PI NB-L3-P2 NB-L3-P3 SB-RYA SB-RPA SB-RPA SB-RPA Feather SB-Loop A Feather !' PROJECT: 3429 DAILY GRINGDING WORK SUMMARY [ � DATE DI° WORK: 101+112019 START: 6:001'M CLOSURE SET: CLOSURE RP.MOVED: END: a:1S AM Rnin Cotnnlded Vcrlfred by NOTES: *Cmterete Diamond Grinding NBISB Towi 7,456 SY Appendix 4 - pH J\/j()jiitorin9 Log Lntte SR-LI-PI SB-Lt-P2 SB-Ll-PI PROJECT: 3429 LANDAILY GRINGDfNG WORK SUMMARY DATE OF WORK: lan12019 START: 6:00 AM CLOSURP SET: CLOSURE RFMOVFD: END: 4:00I'M Rain Complcled Verlllcd by Total 9,857 SY Appe l'idi)c 4 - pH Monitoring Log Latle SB-L I -P 1 SB-LI -P2 }y YRDJI.ci•I 3429 LANES//� DAILY GRINGDJNG WORK SUMMARY DATF OF WOItK. 101612019 START: 6:00 AM CI.OSURF SF.T: CLOSUH RI;MOVFD; HNO; 4:00 PM Raia Completed Verincd by NOTES: *Concrc.V Dinlnond Grinding NBISB J verify LANE Total 7,29IJ.9 SY for the above date of work. Appendix 4 -- pH Monitorilig Log The lane Construction Corporation c',rnu'1: c2d3�flZ l)ar;Jolt Zo q pH Monitoring TRIClc number .ram p N Testing Truck number 2 k Amount of iVlUHMIC Acid added (gal) Time C0111111�11tS PH results 1%."54 1t•`�1 il•`�a It.3q Time Comments g: ru ±" Q 23 kii In�.yb� Z 57A)4 3 : 15 PM Lone SB-LI-PI SB-1, [ -P2 PROJECT, 3429 LANE DAILY GRING DING WORK SUMMARY r DxrE OF WORK: 1019/2019 START: 6M AN-1 CLOSURL"SET: CLOSURE ItEMOvsn: END: 4 M PM Cawlrleted vertlietl by of--fh— RTA flndivia STA Tninl I.enafh lli Tl W[JIL of 1'nss [Wri it of Passes ITA) Today Unit Itillinis 05,12+43 0,184+40 5,803 4 1 2.579.11 SY L 0573447 0529100 4.447 4 1 1,97E-44 SY TOW 4,555.E SY NOTES; *Concrelc Diamond Grinding NBISB I verir? lstt lfe ( wilier rded and inilialed ore correct far the aboveJdlate of work. Y I nhalI Representative , ale LANE Represents ' tte Appendix 4 - pH Monitoring Log Lurie SB-l.l -P2 SB-Ll-P3 SB-L2-Y 1 � rRorrcT: 3419 LANE DAILY DAILY ORINGDING WORK SUMMARY llA'fG 011 WORK: 1011012019 START: 6:00 AM CLOSURE SET: CLOSURE RCMOVHD; END: 4:00 PM Congdctrd Verllicd by _._.. _ �.... ... .. ..,_,.. _�,........cnv x..rn,..,.,.,., MAI dale L,Itinl.e 0529+00 0,184440 4,460 4 1 1,982,22 SY 0750+39 0642-1-68 10.771 4 1 4,787.11 SY 0750+42 0113+91 3,661 4 1 1,627.11 SY Total 8,398.0 SY NOTES; *Concrete Diamond Grinding NB13B 1 vent t 411 ntities c d a n ifl ccd are correct for the above date e LANE Appendix 4 -- pf-I Monitoring Log Lane SB.LI-P3 SH-L I-P2 rno.lLcr: 3429 LANE DAILY GRINODING WORK SUMMARY DACE OF WORK: loll ]12019 START': CLOSURE SET: CLOSURE REMOVED: rND: Congdeled Verlried by --A I ....... 1171.1 41..e11..—.rr.Al 9-l—, Unit Cnitinls 0642I68 0544+75 9,793 4 I 4,352.41 SY 0713181 06354-84 7.797 I 1 3,465.33 SY Total 7,817.8 SY NOTES: narcte Dia Grin 'fig NB IV 1 l It n iti carded id initinled fire correct for the above date f work. v 1 hall Repres • v 4 D e LANE Re senlfilive Ditto Appendix 4 - pl-I Monitoring Log Lane NB-L4-P3 NB-13-Pt NB-L4-P3 NB-L6-P3 3 0 PRoileCT; 3429 LANE DAILY GRINGDING WORK SUMMAItY UATE Of WORK: 10113I2019 START: CLOSURE SET: CLOSURE ItEMOVEU: END: CAMO1eIC[I Verified by NOTES: LANE the Totat 4,793.3 SY are correct for the above date of Mrk. Date Appendix 4 M pH Monitoriil() I.ocj Lane NB-L4-PI N13-bl-P2 N©-L3-PI N13-1.3-112 NB-L3-P3 NB -IA -PI NB-L4-P2 N8-L4-P3 � PROJECT: 3429 LANE DAILY GRINGDING WORK SUMMARY DATE OF WORK: 1011-0l2019 START: CLOSURE SET: CLOSURE REMOVED: END: Cumpleled Verified by 1rvx AUM11...rn,.-.. rr•r, o,.rn,.ee..e MAN 9'.,d,,.. TI., 14 in lhml. 0723+00 0768+85 4,585 4 1 2,037.78 BY d/' 0723+00 0745+80 2,280 'I 1 1,013.33 SY 0717+10 0720+13 303 d 1 134.67 SY 0705+15 0720+0D 1,485 4 1 660.00 SY C 0705+15 0720+18 1.503 4 1 668.00 BY C 0705+15 0719+80 1,465 4 1 651.11 5Y /L C 0705+15 0719+64 1,449 1 644,00 BY C 0705-115 07191-64 1,449 4 1 644,00 BY Told 6,452.9 BY NOTES: *Concrete Diamond Grinding N13 I verify, la a qua s recor d d initial a correct for lire above daft of work. l4n'tfall Represcninfive ale /a !S LANE Re pre alive Cate Appondi)c 4 pl-I Mc7i7101111j L-09 Lpac SB-L2-P2 Sf3-L2-P3 '' PROJECT:3�1x9 LANEf(� DAILY GRINGDING WORK SUMMkRY llA'1'E OP WORK; 10l1612019 START: CLOSURE SC'L': 9:00 PM CLOSURE TIFMOVED: 4:15 PM END: Completed verlRed by __ .._.. _ . _ .. .«»•. ,rT. ., _rn__-__ ir. A� 9--l..., rl..Lf r.,11I.N 0703+95 0655+75 4.820 4 1 2142,22 SY 0693+50 068,1+66 884 4 l 392,89 SY Total 2,535.1 SY NOTES: *Concrete Diamond Grinding NB I ven ynflitiLs rded and i • mled are correct for Ills above date of work. Appandi)c 4 pI-I Il ollito dlIg L09 Lane SB-L2-P3 f SB-1,2-1'3 V SB-L2-P2 NB-1.l-P2 SB-Ll-P3 w NB-L4-P l f SB-1,2-PI NB.L4-Pl I'ItOJI+.C'1'; 3429 LANE DAILY ORINODING WORK SUMMARY DATE OF tivoRlt: 10,1812019 START: CLOSURE SFT; 9A0 PM CLOSURE REMOVED: 4:00 AM END: Conip1cled VcrlRed by all rnur g o.n .•.,..,,,. -... ....—...... .... . .. .. ...... _. _..-- - - - -- ----- - C 0684+66 0670100 1,466 '4 1 651.56 SY 0639+05 0595-105 4400 4 t 1,955.56 SY C 0655 F75 0591 +30 6,445 4 I 2,864.44 SY C 0484+40 0487+00 260 4 1 115.56 SY 0544+75 0484+40 6,035 4 1 2,682,22 SY 04$4+�10 0499+10 1,470 4 I 653.33 SY C OG35+84 0591+00 4,4$4 $ l 1,992.89 SY G 0492+10 0513+50 2,140 4 1 951.11 SY 'I'olal NOTFS: *Cancretc Diamond Grinding Nflly� 12120� q S� Cl Ar pondix 4 - PH 1VIollftol illg L-09 Lalle NB-L3-P3 NB-L3-P2 NB-L3-PI NB-L2-P3 N B-L2-P2 N B-L,I-P I NB-LA-P2 NB.Llt-P3 SB-Loop A PROJECT: 3429 DAILY GRINODING WORK SUMMARY f0/Z.p) LiAN `r,..-. gp1'E OF woRl:: S'I'ART: CLOSURE SE'r: 9:001'M CLOSURE REMOVED: 4:00 AM END: Completed Veriticd by _ _._. _ .. ,..... .� .. .. ,-..... ..a, �.._ _en___...wC\ ll _r\\_-.._- Ir.TAI �I•...In., Ilnil rrtilinre 'uu u,l • .,.- ­.,,,, • U... .............. ... . . .. ...... _. - ..-- - - ..... - .----- C 0484+40 0519+55 3,515 4 l 1,562.22 SY C 0484+40 05t91-55 3.515 4 ! 1,562.22 SY C 0484+110 0519155 3,515 4 1 I,SG2,22 SY cl 0484+40 0513170 2,930 l 1 1,302.22 SY 0484+40 0519 r00 3,460 4 1 1,537.78 SY C! 0484+40 0513 F55 2,915 4 1 1,295.56 SY C 048,1+40 0513IL55 2,915 4 1 1,295.56 SY C 0,184+40 0513+55 2 915 $ 1 1,295.56 SY C 0012+30 0010+00 230 4 I 102.22 SY Totnl 11,515,E SY NOTCS: *Concrete Dimnond Grinding NB ! verify la le r iti re ded an ilialed are correct for the nbove dnlc of work. enhnll Representative Date LANF,lZcpresel I Dalk Appendiac 4 pH i ollitorilig Log Lane NB-L4-P3 NB-L2-P3 NB-L3-P 1 NB-L3-P2 NB-L3-P3 NB-IA-P1 NB-L4-P2 SB-L2-P 1 SB-L2-P2 SB-L2-P3 SB-L2-P3 LANE r ...i— CPA r— M.— RTA ' 0723+00 0742+10 0703+80 07080-30 0697+12 07051.15 0697+12 0701+15 0696+00 07051-15 0696+00 0705+15 0695+70 0705+15 0591.00 0521+94 1+30 0529+101+50 r 0570+003+00 0532+50 PROJECT: 3429 DAILY GRiNGDING WORK SUMMARY PATE OP WORK: 1012112019 START: CLOSURG SET: 9:00 Ptvt CLOSURE REm0VGU: 5:01) AMEND: Cuntilkled Verified by TONI 11,140.9 SY NOTES: "Concrete Dinmond Grinding NB 1 veri t to q es recorc d 1 ' f 'a Ore correct for the above dale of work. a i e presentative Datc Date L i�E.Rc1>resentative 4 � ADDe nix 4 - PH ManitorilIg l_,ag Lanc NB-L4-P3 NB4.2-M NB-1.3-P3 SB-L2-P3 SB-L2-P2 SB-L2-P3 NB-L4-P3 SB-L2-P I SB-L2-P2 SB-L2-P3 Y-115 RPC PROJECT: 3429 UNEDAFLY GRINGDING WORK SUMMARY DATE.' OF WORK: I0122/2019 START: CLOSURE•. SLT: 9:00 PM CLOSURF. R.L&IOVED: 5:00 AM END: C.umpleled Verified by o...i:.... Vq'A r...... h IVIIi IMAM .rn.,va W.T% V rT3... —IVAI T.,I.v Ihoit Initink 0646+85 0649+17 232 4 1 103.11 SY 0641100 0697+07 5,607 4 1 2,492.00 SY C 06911-50 0696+00 450 4 I 200.00 SY 1 0532+50 0529+75 275 4 1 122.22 SY 1 0529+10 0498+00 3,110 4 1 1,382.22 SY 1 0529+75 0496+38 3.337 4 1 1,483.11 SY 0538+79 0556+00 1,721 4 l 764.99 SY /1 0521+94 0484+40 3,754 4 l 1,668.44 SY /C �! 0498+00 0484+40 1,360 4 l 604.44 SY 1 049608 0484+40 1,198 4 l 532.44 SY 1 0015+50 0008+69 681 1 l 302.67 SY NOTES: *Coperele Diamond Grinding NB I Totn1 9,655,E SY corrcct for the above dnle of work. Z3 Append i)c 4 - pH Il o nitorilig Log Lane NB- RP C Y-19 Deceln'aper RP C Y-19 NB-L2-P3 NB-L2-P2 NB-[A-P3 NB-L3-P3 NB-L3-P l NB.L3.P l NB-L2-P3 NB-L2-P3 NB-L3-P3 NB-L3-P2 NB-L3-PI NB-L2-P3 NB-RPC Y-19 NB-RPC Y-19 NB -RFC Y-19 NB-RPC Y-19 NB-L4-P3 NH-L2-P3 P11,oarcT: 3429 LANE r(/� DAILY GRINGD➢VG WORK SUMMARY DATE OF WORK: 10/23/2019 START: CLOSURE SST: 9:00 YM CLOSURF. RENIOVED: 4:30 AM CND: Completed Ycr4Ficd by IVAN '1'.,.1..,, 71n:T 7nlflnle 0010+00 . 0012+89 289 4 4 513.78 SY i 0698+02 069900 188 4 4 334.22 SY 0696+92 0709+-80 1,288 4 1 572.44 SY 0692-100 0709+50 1,750 4 1 777.78 SY 0697+07 0705+15 808 4 1 359.11 SY f 0618+16 0632+70 1,454 4 1 646.22 SY 0617+88 0632+70 1 1,482 4 1 658.67 SY 0617+72 0632+-70 1,498 4 1 665.78 SY 0617+43 0632+42 1,499 4 1 666.22 SY 0697+07 0705+15 808 4 1 359.11 SY 0556150 0568+70 1,220 4 1 5,12.22 SY C 0556+32 0569+80 1,348 4 1 599.11 SY 05554-50 0569+80 1,430 I 1 635,56 SY 0570+50 0613+75 4,325 4 l 1,922.22 SY C 0 15+50 00161-55 1 105 4 l 46.67 SY 0009+14 0016+55 741 4 l 329.33 SY r 0009+84 0016+55 671 4 l 298.22 SY 0008+44 00161-06 762 4 l 338.67 SY 0556100 0582+15 2,615 4 I 1,162.22 SY �1 [//�'' 0549+00 0570r50 2,150 4 I 955.56 SY i,i. Tolnl 12,383.1 SY NOTES: 'Concrele Dinmond Grinding SB I verify Ivqua ' s r rdcd anti rCkd'a co¢ccl far tilt aUuve daft of >,vork. 9 Append pFi illlonitoring Log Tho Lano Construction Corporation c:ontrm:t: C V-5407- PH MonitoHng .,,.n._...........�..... irucic nuanlaar Aanount of iz�tic AcIthiddud (gal) Commonts _ —tr---e V�rfztiic by yr - - - -_ - — -------------'--w pli Testing Truck OnlbOr M rusnits Pima Comrr4nRs Tested by 61 LA 104, ,, —,,4k, G� Lane NB-I,2-P3 NB-L2-P2 NB-1,3-PZ NB-L3-1'2 NB-1.3-P2 NB-L3-PI NB-L3-P I NB-L3-P 1 NB-1..3-P3 NB-L3-P3 NB-L4-P2 NB-RPD Accel NB-RPD NB-RPD Accel NB-ItPD Accel P1toa>;cT; 3429 LANEe-,;; DAILY OR]NODING WORK SUMMARY DATE OF WORK: 1012412019 STAwr: CLOSURE SET: 9:00 P&I CLOSURC REMOVED: 4:30 AM CND: Completed A'crilicd by H..r n......... IF A A T..,I,. Ilr.if irrlfinlc 0709+80 07534.55 4,375 4 1 1,944.4,1 SY 0709 1-50 0753+55 4 405 4 1 1,957.78 SY 0720+13 0724+00 387 4 1 172,00 SY C 0737+50 0745+45 1 795 4 l 353.33 SY C 07451-45 0752+71 726 4 l 322,67 SY C 0720+19 0727+00 682 4 1 303.11 SY 0737+50 07,19+00 1,150 4 1 511.11 SY 0749+00 0752+71 1 371 4 1 164.99 SY L G 0737+00 0740 r00 300 4 1 133.33 SY 0740+00 07521-71 1,271 4 1 564.89 SY C! 0745+80 0768+85 2,305 4 1 1024.44 SY 072,4+58 1 0732+45 787 4 1 349.78 SY 0721+38 07241-58_1 320 4 4 568.89 SY /++ 0724+58 0734r25 967 4 1 429.78 SY G 0724+58 0733+55 897 4 1 398.67 SY NOTES: *Concrete Diamond Grinding SB s A /1 TWO 9,199.1 SY correct for the above dale of work. Append I N4- pl-I Mollitodllg 1-09 m Lano NB-L 1-P2 N B-L 1-P3 NB-L2-P3 NB-L l -P t NB-LI-PI NB-L2-PI NB-L I-P 1 NB-L I -P2 NB-L3-PI NB-L2-P2 PROJECT: 3429 LANEDAILY G[i[NGp1NG WORK SUMMARY DATE OF WORK: 10127l2019 START: CLOSURESCT: 900Pm CLOSURE REMOVED: 5:00 AM END: Completed Verified by 14-1 - QTA r...er,... Q`rA '1`nlot 1 ,.e1, ne•r•ti lV;dlh of Pnee !f"r'1 Il of Pnc a lTAl T. l— Tlnit Initials C 0484+40 0488+70 430 4 1 191.11 SY C/, 0484+40 0519+00 3,460 4 1 1,537.78 SY d, 0519+00 0549+00 3,000 4 1 1,333.33 SY C, 0519+00 1 0537+47 1,847 4 1 820.89 SY 0487+50 0519+00 3,150 4 1 1,400,00 SY 0519+00 0609+40 9,040 4 1 4,017.79 SY l�3 0484+40 0487+50 310 4 1 137.78 SY ��! 0,188+70 0519100 3,030 4 1 1,346,67 SY 051905 0520+13 78 4 1 34.67 SY 0519+00 0600+37 8.137 4 1 3,616.44 SY Total 14,436.4 SY NOTES: 'Concrete Diamond Grinding NB tialed are correct for the above date of work. !7 W enhall Reoresemative Dole Dale Appendix 4 ,- pFl 1\11ollitnrillg LO9 Lane NB-L I-P I N13-LI-P2 NB-LI-P3 NB-L I-P2 NB-1-1-P 1 NB-1.2-P3 NB-LI-PI NB-L2-PI NB-L2-P2 NB-L I-P I NB-LI-PI NB-L2-P2 NB-L2-P3 LANE l�naarc•r:3�1a9 ADAILY GRINGDINO WORK SUMMARY (< DA"1'L OF WORK: 10/28/2019 STrUtf: CLOSURE SET: 9:00 PM CLOSURE REMOVED: 5:00 AM END: Completed Verified by M.M.it. I'l Jr.f o„oo.,.. IC Al T-1 Unit Inlfink 0537+47 0575+00 3,753 4 1 1,668,00 SY /I 0575+70 0580100 430 4 1 191.11 SY I✓ 05004-55 0598-175 1,820 4 I 809.89 SY I 0599+00 D +55 95 4 I 424 44 SY �C 0608+70 0666 90— S aT, 4 l _l;7Slf"87_ SY /l;� 0632+42 0641+00 858 4 l 381.33 SY C 0582+40 06081-70 2,630 4 I 1,168.89 SY 0609+40 0687140 7,800 4 1 3,466.67 SY 0682+00 0687+40 1 5,10 4 1 2,10.00 SY 0575+00 0582+40 740 4 1 328.89 SY �L C 0580+00 0599+00 1,900 4 1 844.44 SY 0600+37 0676+10 7,573 4 1 3,365.78 SY I 0613+75 1 0617+43 368 4 1 163.56 SY i NOTES: *Concrete Diamond Grinding NB 7btni � � �Bb� 4�C ApperldN 414 PH illl()nitOrillg l.,OcJ Line NB-I.I-PI NB-L I -P2 NB-LI-P3 NB-LI-PI NB-LI-P3 NB-L I-P2 NB-L2-P2 NB-L2.P2 NB-L1-PI NB-Ll-P2 NB-LI-PI NB-L2-PI NB-L l-P I LANEZA� PROJECT: 3429 [ ( DAILY GRINGDING WORK SUMMARY DATE Or wank: 10129r20l 9 START: CLOSURE SET: 9M PM CLOSURE REMOVED: 5:GO ANI FND: Completed Verified by 0484+40 0519+00 3.460 4 I 1,537.78 SY 0519+00 0575 t-70 5,670 f I 2,520.00 SY 0575+70 0580155 485 4 I 215.56 SY /W C 0648+30 0652400 370 4 I 164.44 SY 0652+00 0665+50 1,350 4 l 600,00 SY 0669+90 0686+50 1,660 4 [ 737.78 SY (� 0676+10 0692+00 590 4 ! 262.22 SY 0687+40 0692100 460 1 1 20444 SY 0686+50 0718+10 3,160 4 1 1,404.44 SY ! 0652+00 0669+90 1,790 4 1 795.56 SY 0669+90 0686+50 1660 4 t 737,78 SY 0687+40 0753+55 6.615 4 l 2,940.00 SY /;� CL 0725+00 1 0753+55 2.855 4 f 1,269,89 SY 13,398.9 SY Appendix 4 µ pH i ollitorillg Log Lane NB-L I -P3 NB-I.3 -P 1 NB-L3-P2 NB-L3-P3 NB -I. I -P3 NB-L4-P3 NB-bl-P2 NB-L ,1-P3 NB -IA -PI NB-Ll-P2 NB-L1-P2 Np-L1-Y3 NB-LI-P3 NB-L4-P I 3429 LANE�elll PROJECT: DAILY GRINGDING WORK SUN1NiAltY DATE OF WORK: 1 1/112019 START: CLOSURE SET: 12:01 AM Ilinhmyclosure CLOSURE REMOVED: 5A5 AM END: Completed Verified by .Rf—f,nn CTA R.-11— STA Tnfnl T.--fi, lfYl1 Width of knee fPTI I! nF 11.—e 1rA1 Tndnv Their Tntrinre 0598+75 0628+00 2,925 4 I 1.300.00 SY t 0727100 0737+50 1,050 4 1 466.67 SY 0724+00 0737+50 1,350 4 1 600.00 SY 0720100 0737+50 1,750 4 1 777.78 SY /, ' 05194-00 0575+70 5.670 4 1 2,520.00 SY 0719164 0723+00 336 4 1 149.33 SY 0719+64 0723+00 336 4 1 149.33 SY �� C 0742+10 0768+77 2,667 4 1 1185.33 SY 0718+10 0725+00 690 4 1 306.67 SY 0686+50 0748-1.72 6,222 4 1 2,765.33 SY 0608+55 0648+30 3,975 4 1 1,766,67 SY 0648+30 0652+00 370 1 1 164.44 SY 0665+50 0738+00 7,250 4 1 3,222.22 SY C 0719+80 0723+00 320 4 1 142.22 SY C NOTES: *Conorele Dinmond LANE 34911.00 Total Cirinding NB for the above dale or work. 15,516.0 SY Appendix 4 w pH IUIonitoririg 1-09 PROJECT: 3429 LANE DAILY GRINCiDING WORK SUMMARY DA'M Or WORK: I I1-112019 START: CLOSURL SET: 9:00 PM CLOSURE. REMOVED; 6:00 AM UND: Completed VeriR¢d by Lane Sim•tiun STA > ndhte STA Total Lnttnth (RT1 WlrI1h of Pnss if Tl U of Pneses (PA1 Tnrine 111111 AJ11nlc NB-LI-P3 N l3-L I -1'2 NB-LI-P3 Y115 RPC YI IS RPC Loop C Loop C-ncccl Loop C-taper Y115 STR8 06281-00 0648+30 2,030 4 1 902.22 SY 07481-72 0753+55 483 4 1 214.67 SY 0738-r00 0753+55 1555 4 1 691.11 SY /L! 0016+75 1 0016+55 20 4 3 26,67 SY i 00164-75 0016+06 69 4 1 30.67 SY 0011+80 0010+00 180 4 4.5 360.00 SY G OS641-83 0578+32 1349 4 3 1799.67 SY 1 0578+32 0581+32 300 4 3 400.00 SY C 0063+14 0057+06 608 4 21 5,674.67 SY 4644 TOO 10,098.7 SY NOTES: *Concrele Diamond Grinding NB I I 1 6f Ih mnlitie. riled and ' ilinled are correct for the above dale of work. Rcprescnlativc / �� Ap pendi)c 4 - pFl monitoring Log Lurie YII5RPA Loop C LANE FADING W 3429 bA[LY GRINDING WORK SUMMARY DATE OE' WORK; 11/512019 START: CLOSURE SET: 9:00 PM CLOSURE REMOVED: 6:00 AM END: L'omplcind Yeritled by Stamina STA Rndtun STA TotalLenuffi(Mi Width of Pass (YT) H of Passes frA) Today Unit initials 0014-1-74 0014+49 25 4 4 44.44 SY i 60t1+80 0010f00 180 4 0.5 40.00 SY 'fetal 84.4 SY NO'l'L'S: *Concrete Diamond GriadingNE I verify fi Ru ies c rd u ' fiiti cd are correct for lire above daic of work. Penball Repr sentaliv Dme LANE Rep alive Date Appendix 4 .. pl-I Monitoring Log HYDRODEMOLITION OPERATION SLURRY/ DIAMOND GRINDING SLURRY pH LOG Project Name (So urce of H O,S/D G S): Project Location: �m� ���✓e N� Project Description: — g� Lard Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) [�j g 3r G- -T T /y tz �,' q fi b! l C( . �' .` 5 T.�/Il� e� 3 CIN liq I e t i N:ITransportabonkFrojectslRoadXNC-DOT1201616480166142-Statewide Land Application Permit\DeliverablelGuidelinesWCDOT comments 48191combine docslAttachment C - formslpH LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name OZ� (Source of HOS/DGS):�3�[�Z s ` Project Location: Uina 8j-we P�f, Project Description: S� Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed/ Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) q jbllq q l .f' 1 s II cid if. 57 JeAAkal- ram! -�- q! l 1 ve �' t 4-1 1,C) Q1:]d(q 4 Cf . I H(C4 °t l - I-Itq c - v�v r [-Tlt� al-jlq P:ITransportabonlProjectslRoadING00i120161WOl66i42-Statewide Land Application Permit\De[iverablelGuidelineslNCDOT comments 48191comNne doc$lAttacnment C:-tormskpH LUU - Marcn 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Dame (Source of HOS/DGS):�Z{7�j�C7� Project Location: UIY1Cti AJ-00e,— Project Description: Land Application Operator in Responsible Charge: �G j i,4 Date pH Sample collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) ��Ivl{4 k1q Am of lo�iq N'G�di1•"�� mil/ Rlip {r°� `�d IZ.Z�t 1\ �lzl� "AarG It o Ilb It jlo a�ro Iq brae :tlno�rg Ii.6Z �`�clt tiAiL P:%TransportabonTrojectslmead\NGDOT1201616480166142Statewide Land Application PermitXL)eliverablelGuidelineskNC:L7V i comments 4b lylcombjne corsvatmonment L; - iormslprt LuU - marcn 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Dame ff (Source of H0S/DGS):�2(��jC7� Project Location: Project Description: — g� Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed/ Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) �I6'LVOq l t19 .rG�d �t.5\'b,a`a° rls Pond q( rZ ! 19 l u 4� -1.5�20 !s 'P64 afrz k ��.5, l l Js� �S r q[lz��� 12 R�r2(�Scld [(.31 �(�5GO Lib -1 K0 :'Zoo A0 P:1TransportationlProjects\Road%NC-DOT1201 fi16480166142-Statewide Land Application Permit\Deliverab]elGuidelineslNCDOT comments 48191combine docsWtachment C-- formslpH LOG -March 2019_doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (Source of H0SIDGS): Project Location: �hWACA &OV& PC, Project Description: Land Application Qperatorin Responsible Charge: j Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Track, Frac Tank, Dewatering Box, etc.) qJ [bill r S! ti 'w `ti RA � R fry liq rrat 1 � ! a ��� 11, lqr� �•l Z: 5L w 1' �1M6 C�l U� k =Ivo P:1Transportation\ProjectslRoacRNGDD7%2016164&0166142-Statewide Land Application Permit\Deliverable\Guideiines\NCDOT comments 48191combine docslAttachment C - formslpH LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Dame (Source of H0S/DGS):�ZC73��z- r Project Location: �hs>n� &vve— Project Description: Land Application _ Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) �rizall� �'- ;�,� � [� ill ��,� I i �b 1�j,l.l �fu,• �� �F� ffA 'q1Z,741 rl /s, r, Its ° �� -a� �ILl Q 1ZiV�l� rlr1�.a5 ✓l-` Ll �L �'- �nr� (17V� tiPF a lv)k ��,a a k- ti*.'t"- I � /� i �'la t � I-r 1/� I I. 15 -�✓� �Tri'rr'- P:1TransportabonTrojects\Road\NC-DO112016 WO-1 66142-Statewide Land Application PermitlDeliverablelGuide[ineslNCDOT comments 4819Lcombine docskk tachment C - formslpH LOG - March 2019-doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (Source of HOS/DGS):��f73�Z s Project Location: alyla lwe— Project Description: Land Application Operatorin Responsible Charge; La�G (,�✓�rt�r.��� yA CD� Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) �I:33 Iaa (0 { 2 [c q old A—n i r1 iv141r 1b1 i (8�'klt�i E-£Ld II-bZ N Li � r taIB��� ►J��� ��.1�4 4 1� P:1TransportationlProjectsXRoadXNC-DOT1201616480166142-Statewide Land Application PermiADeliverablelGuidelineslNGDOT comments 48191combine docsrAtlachment C - formslpH LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Dame (Source of H0S/DGS): Project Location: ama &Vve' �(J� Project Description: — g� Land Application Operator in Responsible Charge: ��i0rf►q/1 } �l^ �,� l Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) (A 4 13 9 I « IOb v I v P:1TransportaticnlProjeetslRoadWC-DO-R201615480'166142-Statewide Land Applicabon Permit\DeliverablelGuidelineslNCDOT comments 48191combine docslAttachment C - formslpH LOG -March 2019-doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (Source of HOS/DGS):CZ(73f�Z s { —55026 Project Location: Ulna &OV& Project Description: 85 Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) lvioII U c .rja V V 'v P:1TransportabonlPmjects\RoadWGDOT1201616480166142-Statewide Land Appiication permit\Deliverable\Guidelines\NCDOT comments 4819%combine docsWttachment G - formslpH LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project fame (Source of HOS/DGS):`�3r�Z Project Location: UIVICA &OV& Project Description: Land Application Operator in Responsible Charge: Lac WfkAI&L. �r�fY� AQ�• Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) o 4 L9 (o j lei ( I9 �!� [ �•SZ �/ ` aD (z•f� I t.�iZ (o I b .Cl yid t� •Zq r l-44 iV <k-qG i P:kTransportation\Projects\Road\NC-DOT12016\6480166142Statewide Land Application PermitlDeliverable\Guidelines\NCDOT comments 4819\combine docs\Attachment C - forms%pH LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name p2� (Source ofH0S/DGS): Project Location: l lylcl &Ove' a /Uc, Project Description: Land Application Operator in Responsible Charge: Lw Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) t<-35 v ,v z� 1� IV Ip. if R I dos, I i. Lv F_1TransportationlProjectslRoadWGDOT1201616480166142-Statewide land Application Permit\Deli rarablelGuidelineswcDUT comments 4413191ccmbine docMAttachment G - tormslpm LUU - march 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Dame I (Source of HDS/DGS):�3��Z Project Location: Chmn, &ale - Project Description: Land Application Operatorin Responsible Charge: ! L Date pH Sample Collected Date pH Analyzed/ Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Sox, etc,) l 0 2 to P:1Transportation\ProjectslRoadWGDOT1201fi1648D166142-Statewide Land Application PermMDeliverable%GuidelinesWCDOT comments?8191combine docs\AttaohmentC-formslpH LOG -March 2419_doc HYDRODEMOLITION OPERATION SLURRYIDIAMOND GRINDING SLURRY pH LOG Project Name pZ (Source of H O S/D G S): Project Location: �iYtGie PC, Project Description: Land Applications Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) V e\ t� © �i a Zlr 1 t.6 Pull jam,. v V% P;lTransportationlProjects\RoadING00i1201616480166/42-S'tatewide Land Apprioation PermiftDefiverable\GuidelineslNCDOT comments 48191cambine docslAttachment G - formslph LUG -March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project fame (Source of HOS/DGS): Project Location: mA AFOV& Project Description: — S� Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed/ Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Sox, etc.) ro V1 rq 41d JvJtAlol \Y (_ �Z 1t LA P:1TransportatonlProjectslReacANG-DOTI201b'16480166142-Sfiatewicle Lend Application Permuteliverable\Guideiines\NCDOT comments 4819lcomhine docslAttachmer t C - formslpH LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (Source of H0S/DGS): 3 Project Location:Arove Project Description: Land Application Operator in Responsible Charge:tj� �( Date pH Sample Collected Date pH Analyzed/ Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) 1A, fl_3� �], q 7 P:1TransportabonTrojectslRoad\NGDOT12016 W0166142-Statew4de Land Application PermitOp-liverablelGvidelinesWCDOT comments 481 ftombine docs\Attachment G-forrnslpH LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (S o urce of H 0 S/D G S): Prflject Location: Uma 1-6ve- , /ic- Project Description: - 8 Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit sampled (Truck, Frac Tank, Dewatering Box, etc.) Ll P_FTransporiationlProjectsXRoad\NC—DOT1201616480166142-Statewide Land Application PermitlDeliverabie\GuidelinesW CDOT ccmments 48191combine docs%Attachment C-fonnslpH LOG - Mamh 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project Name (Source of H0S/DGS): I Project Location: ffw- l/n� in,VA I Project Description: t �� Land Application in Responsible Charge: �, Operator �JiAA Date of Land Application Location of Receiving Site Receiving Site Address or (Land Owner Name) Latitude/Longitude Quantity Applied % Solids (Gallons or Dry Weight) �Ivoj A 37 '5 $[3r fi4 3r7ti P:1TransportatianlProjects\RoadWC-DO-R2016W6480165142-5tatewfde Lana Appltcation t-ermrnueuveraoteiuuiaeunesuvt.L,U i aomrns[Eu wo IZJIUUIIIULI[C uuwv-,LLCI ] IiIICill V - JUIIL�llLft u APPLICATION LOG - March 2019_doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project fame (Source of HOS/DGS):t��J�JZ 3gaZ� Project Location: C��na Project Description: 1 — 55 Land Application Operator in Responsible Charge: Date of Land Application Location of Receiving Site (Land Owner ]Name) Receiving Site Address or Latitude/ Longitude Quantity Applied (Gallons or Dry Weight) % Solids alAd - [ Q - Az -rye �.5vv al6ll I C���f(� qf7l Ilia P:1Transportation%ProjectsXRoad1NC-DO11201616480166142-Statewide Land Application Permit\DeliverablelGuidelineslNCDOT ccmments 48191combine docslAttachment C-forms\LAND APPLICATION LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project Name (S o urce of H 0 S/D G S): zz��?, Project Location: � &Dve— a� Project Description: r �5 Land Application Operator in Responsible Charge: Date of Land Application Location of Receiving Site (Land Owner Name) Receiving Site Address or Latitude/ Longitude Quantity Applied (Gallons or Dry Weight) % Solids QCAOJ - L A06 Otwd A - NG - cpeL 3, r zs —1 P:\Transportabon\Projects\Road1NC-DOTI2016\6480166142-Statewide Land Application Permit\Deliverable%Guidelines\NCDOT comments 4.819\combine docslAttachment C - fonnsUAN❑ APPLICATION LOG -March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project Dame (Source of HOS/DGS): 4*- Z- Project Location: &Vve- /l)C-, Project Description: j SS Land Application Operator in Responsible Charge: Le &Anir4�'l ! AGl i Date of Land Application Location of receiving Site (Land Owner Name) Receiving Site Address or Latitude Longitude Quantity Applied (GalloAs r Dry Weight) % Solids �r l�rrr*RQWJ- - tiL -c52 2,� zs q(ro(I�r ,5Do 25 Q rD�l9 � 500 2S gJi,vq kfo(tq ZS ' o a�1l�t� Sh4Ua ! 'L1w �4 th81a v110m -It, u, -1 idul L 1UWJ1%r-4UJw 1I , NUCU I'lIrULJ i uu 1 o1D4ou ioo 144-01arewiae nano Applicauon rermre�uenveraaieluulcelmeslNUL)U I comments 48191combine docslAttachment C-forms\LAND APPLICATION LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project Name (Source of HOS/DGS): ��Zp3�Z- 35C>Z-,3 Project Location: Project Description: �S Land Application Operator in Responsible Charge: S�r Date of Land Application Location of Receiving Site (Land Owner Name) Receiving Site Address or Latitude Longitude Quantity Applied (Gallons or Dry Weight) % Solids I �l-Al � SA� (�4e - - sk z 5 u k - s 37-� L4,D= - it gob , 5kZ 5Kt 0 - a5 -15o 6twc a 0 uAaA A AX - t oD —j IdAI ransportationV-rojectstKoatlUVC`UU 112U16164130166142-Statewide Land Application PermitlDeliverable\Guidelines\NCDOT comments 48191combine docs)Aiiachment C - fonns\LAND APPLICATION LOG - March 2019_doc HYDRODLMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project Name (So urce of H 0 S/D G S): ZD�'jZ f — ?j$r7ZC,3 Project Location: C�, &fob , k)� Project Description: l — S5 Land Application Operator in Responsible Charge:Lw Date of Land Application Location of Receiving Site (Land Owner Name) Receiving Site Address or Latitude Longitude Quantity Applied (Gallons or Dry Weight) % Solids Iall(�9 -I�JZ a0 0 I I':1I ransportaton`YrojectSlRoad\NGoi]i�2-p15164tSUl b5142-Statewide Land Application PermitlDeliverablelGuideiines\NCDOT comments 48191combine docslA chment C - forms\LAND APPLICATION LOG - March 2019.doc 2019 Project Completion Report Prepared 01/31/2020 NC Department of Transportation Permit #WQ0035749 Prepared For: NC Department of Transportation 1536 Mail Service Center Raleigh, North Carolina 27601-1536 The Lane Construction Corporation 6125 Tyvola Centre Drive Charlotte, North Carolina 28217 Project TIP # U-2524D Project Contract # C203792 Greensboro Western Loop from East of US 220 (Battleground Avenue) to East of SR 2303 (Lawndale Drive) 01/31/2020 NCDEQ-DWR Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attention: Information Processing Unit Reference Land Application Project Completion Report for Project TIP U-2524D, C203792 NC Department of Transportation Permit No. WQ0035749 Non -Discharge Compliance Unit: The Lane Construction Corporation is submitting the monitoring and reporting data for the Subject Project for 2019. Per the North Carolina Department of Transportation (NCDOT) Permit No. WQ0035749, this report is to be submitted at project completion for work accomplished by our firm on this project report using data gathered by our staff and/or contractors during the compliance year for diamond grinding slurry. If additional information is required or if there are questions concerning this project completion report, please contact my office for assistance at: CMAnge@laneconstruct.com or 336-406- 9060. Sincerely, Christopher M. Ange Senior Job Engineer Enclosures NC DEPARTMENT OF TRANSPORTATION LAND APPLICATION OF DIAMOND GRINDING AND HYDRODEMOLITION OPERATION SLURRY PERMIT NO. WQ0035749 2019 LAND APPLICATION SUMMARY DOT PROJECT PROJECT TYPE (DGS OR CONTRACTOR NO. LOCATION HOS) YEAR APPLIED The Lane TIP# U-2524D Construction Contract # Greensboro, NC DGS 2019 Corporation C203792 TABLE OF CONTENTS SECTION NO. TITLE Diamond Grinding Slurry (DGS) Analyses II. Diamond Grinding Slurry (DGS) pH and Land Application Logs SECTION I DIAMOND GRINDING SLURRY (DGS) ANALYSIS NC DEPARTMENT OF TRANSPORTATION DGS ANALYSIS Permit No.WQ0035749 The Lane Construction Corporation Greensboro Western Loop from East of US 220 (Battleground Avenue) to East of SR 2303 (Lawndale Drive) Date Sampled: 7/22/2019 Solids: 11.9% pH: 11.23 Parameter % Mg/Kg Dry Weight Pounds/Dry Ton x 10,000) (mg/Kg (mg/Kgx 0.002 Calcium Carbonate 1.65 16,500 33 E. SECTION II DIAMOND GRINDING SLURRY (DGS) pH AND LAND APPLICATION LOGS HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (So nice or HOS/OGS)- Project location. Protect Description: Land Apphcmmn Operator n Responsible Charge Date pH Sainple Collected Date PH Analyzed / Reported Lab or Field Sample pH m"'."ment ' (lroc� Fro. a t J o-; •. ;^y?rc .,. IV7/1� �I/%/� I �CI� Ia�.�(12)*n.91 Tani II/711 11v7/1y C(tQ 11.3oL Tan�C IV7 ry IV7/1`1 Tiic(� )0.87 TIA tit'S1 II Fsevd H �J It T. Z f 1�IZ 21 <</80 )1/6/17 I{in/k4 Ili l,( li c.,:,,� IIIP1I i HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Ndmr: 1Soorce of HOS.'DGSI- ilk 30�p�\ibG/b L'1C)1crn. �� Project Locatmo- Project Descrlptme.. (and Apphcebon Operator m Responslble Charge- Dale pH Sample Collected Date PH Analyted/ Reported Labor Field Sample pH hleasu..moot Hoot Sampled (Truck. Frac lank, Dewatering Box, etc.) \11'L19. �L (rt _ It bb_..!'KGI�I.v _YLT i%. (a „lI9 he/d - 5n MaAc, /—p /1t1/9 0 /n�19 �G/cP HII ihak4t 6/W / i On _ Il-3! Shwtk- 11�1K�(q I(ILHI}9_ hr�� II.Ob an�rl (r l l"l'19- Il /I ,thI I1 (K co rl 11N I qhe(Q It.25 j S1taLld�/ Q].]. .....SR:nrtNC- DOT ' 1561A91661 d7 51ar L. JAt .... Nerd 9105 HYDRODEMOLITIONOPERAAOt SLURRY/DIAMOND GRINDING SLURRY 1111 H LOG Project Name (Source al HOSlDGS)- Project Location: Project Description: Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement I Unit Sampled (Truck Frac Tank, Devialering Box, etc.) L _ r%G161__ L. i t r P nunleooTcommas;a,,coa,dn.,OttsW';ar�mrma I HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name I (Source of HOS/DG S). �� Project Location: Project Description. - Land Application Operator in Responsible Charge. —_ - — Dale pH Sample Collected Date pH Analyzed/ Reported lab or Field Sample pH Measurement _ Unit Sampled (Truck. Frac Tank, Dewaterem Box, etc,) If y_ — — 1 q ry Ines_ / (Fit (Fit - I - - 9 ,346 J / n�9�9Gd firs �stt /�% /'/ la tl I'fti r e P-1 u,t°^ r,:az, ncooT <.m^M•. �e+s �1n..1 P \Lanspo�ialmn: PwledsRoaTNL-n)P1016'6JBn1661A2 2019 dl-- M n HYDRODEMOLITION OPERATICN S URRY/DIAMOND GRINDING SLURRY pH LOG Vrm ct Rama � s>urce, al H65(D GJI. P'Opc"t 1 ecalien Grolect DescnpUon. Land Appticatmn Operator in Responslb le Charge: Date an Sample Collected i Date pH Analyzed! Reported Lab or Field Sample pH Measurement Unit Sampled I (Truck, Frac Tank, Deviatertng Box, etc.) o �e, 111 yJG!l � IZ .G`I 96 I o .a.��, �i� P• Hays<, n.. �o ..nme,.tasi, c:. i,ni..,.,i � an >... ,.,. ...,, ..C": __ _.,,.... _ - __. �-..,, +o �. ne aoovmo�n-em e,-bmsbHLGG. Marc^ �G 5 hcr, HYORODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (Source of NOS/DC S).�__.——_— Project Location: -- Project Description _ _— tend Application Operator in Responsible Charge: .— Date pH Sample Collected Date pit Analyzed/ Reported I tab or Field Sample fill Measurement trot Sample] (Truck, Frac tank, Dev lur ng Bar, etc.{ (z�c�9 12 a/9AOM 12.(V _ -- /L/z &tiq - I t7i N t1 !z/-fhIt I2.zS 1 ----- rz-— — Rpu - z y P tTanspMelbntPmlrvlsV2oaddJC-DOP2nl616b89168142S1 i ca ac Pd ile we a P019.dx HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name 1 (Source of HOS/DGS) ) D-o _-3�l Project t ncetion: Project Description: Land Application Operator in Responsible Charge: Date pH Sample Collected Date p11 Analyzed/ Reported Lab or Field Sample pH Measurement USampled � (truck, Frac Tank, De xatenng Box, ela) I P. Tla spop.vp.. raecluRpaSJC-OOP2e1o618e'661425.aM .1 Lard gppcaPo Pe .Dn,.mmr1 a. '. ,, Anrnn I �n 3J81Sa. a.,w>AII=-c^—ir:C. 1,p4L0G M1IaT• t HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project Name (Source of HOS/DG S): 3430 i3�eaLvu lvjc m�� Project Location' Project Description: Land Application Operator in Responsible Charge. Dale of Land Location of Receiving Site Receiving Site Address or Quantity Applied % Solids Application (Land Ovmer Name) Latitude/Longitude (Gallons or Dry Weight) kk/�/14 NGoo i ru+urE!- road bed G-Al- 5 ly�/,y NGL�oT F4+..� rogcl -bed 33-5o GAC.. -- lrJ Il(�/ly uGpor Fu+.� ca�wl bwl �50o &A(- l5 — I - N C D9 T oco Gat- I S NC Do I -ywrC_ ry _ a 500 GAf- I S i%801 N C WL---_ F�vj" of ik 15o Gnu IS I�/s/�q NGDoT F,'k,.rc rorC�J bej _ Soo (yAL 15 Mu FAAk*"J 1_951+»y (tj„1\1``Ct ti4 )ci `., ii 11' �A�7 - htlwr h�� L�'Cl eSwo �r ni,. IS N60-71 HYDRODEMOLITION OPERAfI'ON �LURRY/DIAMOND GRINDING SLURRY LAND ':1PP .ICATION LOG ,�Infe,� rllnle Im,Ir, n.,f nOs,DGsl P-op Ioc.tlum Propxl Occcriptmo I mJ Application - Opecaml ,n Ro,pu s:6ln_ Coargc 34-�c _ nSFA:ti WeLsn_ Lao, _ _ _ Dmc of land Location of Receiving Site Application (1 and Owner flame) I: �litr4 �SL%i 11;t371G NL}j o� AllaDT y1I�?�t<� N�Dl7r NCB 11 Ncwo (IeI N(oc-r )I�IH]IA NCOIY [//F,l(61 y1W l[/INIl9 AtipO'� ..- Receiving Site Address or latitude/longitude Ou.mbty Applied 16,lfons ur Dry WeighO i, Sohds kcrea dJ _o Gnti h too L4� rN � F-//�oudOn Pd '�500 (�p.Pv, t 5 G6,A,— 5 iU� � Y�`p� 350o GyV+t, I S -1. �'.1.1;ro I -P, ._"A HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project Name (Source of HOS/DG S): Project Location: Project Description: Land Application Operator in Responsible Charge: Date of Land Location of Receiving Site Receiving Site Address or Quantity Applied % Solids Application (Land Owner Name) Latitude/ longitude (Gallons or Dry Weight) 11 Ll5_�I�i A_,( C✓ - it /L:7VIq ---- AkkwT I(l I I, S t.o.. _ ___Lc, . -- _ ls_ 5611ndi,. boo 1.5 �1 �kad�: , e142 Slale:vbe Land Appl ,v ` 1ln0v1.lvrIG d1lo, NCDOT comme'�s la l9 cemaine tlocSNRacM1menl C 'otmcV Aun HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project Name /1 (Source of L1OS/DG S): {�`n GrrC4 S�oro l'v'Cf�ft71 I� Project Location: Project Description: Land Application Operator in Responsible Charge: Date of Land Location of Receiving Site Receiving Site Address or Application (Land Owner Name) Latitude/Longitude JIC Quantity Applied % Solids (Gallons or Dry Weight) hL1 �5 3mo _. Lack Ll I ibily &PUT — ��.� �1—�_ 200D 15_ 11 Ll ((q- - - - - 6te"'iii e-d t(o 5 RI[ti NGI Qi�- 4c"-" %d wNv 1 5 1t Ll14 [(A ,UGC law,l � " � lSC i5to _ _ s Air- _1t tN _ - AZ✓�"� - - �„2 _l°'"d` _ �=�-- 5coa l5 ((k ((I(q�(k ✓V[(Y( /�hti V � - gcb l5 APPLICATION LOG - March 2019 doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project Namn I, \ (Sourer. of 1105/OGS)' — 'r.L•IL' �)(�r�'�y—� �J Q,S)t lye, [�cl� — __- Project Location. Project Description', Land Application Operator in Responsible Charge: Date of Land Location of Receiving Site Receiving Site Address or Quantity Applied % Solids Application (Land Owner Name) Latitude/ Longitude (Gallons or Dry Weight) 1[I9It5 &OL71_ "4- _S d_ - - 250-- -- — � 5--- Itll9'l9 rcoor >�K. 9fk(L( W T50o l7 -Ivi k pCf)pr - Tat - - - 5%- 15 IllV11q - ,Ctr - �� / � Z � ! 5 Il7a p - — k/dol - I� phi /G P_ Pr,-- lied . 3ow 57 1,(z0[,9 _ - n�(d� hi- of s 1, (-7e [t, ter Cv�c A-J &ed s hlveln __.. UL'W.. -.. - _. F41t Ard- 04 7S'oc r5 _.. ll �', W A, , 1=I 11L, P`T.....Oa9ron Pm eels`Roafi'NG-0OP201fi 6J801Gfi IJb5lolev'de tuna Appl total Perm l'Del.'cnb Gu de'mes GDDOLsmmeols J919'; h _nonNllncnmenR' 'o'm9LAND APPLICADOIJ.OG IA8rCM12e19fiat Ll vnn n n[nnnl IT.nn ���..�rnvu nttN yr LtSAIIVN JLLIKKY / UTAMUNU UKINUING SLURRY LAND APPLICATION LOG Project Name (Source of NO S/DGS): - Project Location: Project Description: Land Application Operator in Responsible Charge: Date of Land Application Location of Receiving Site (Land Owner Name) Receiving Site Address or Latitude/ Longitude 9 Quantity Applied (Gallons or Dry Weight) % Solids c� 1ZIL !S i(l..Dt r✓al' �Lb few i s j 2 N (19I /Ucctll� r IS /Z g lq �U -• P' �TrarspcdalicnlProjectslRoaO WC-DOT{201a',fiaamre iao-c�e..,..,. __.. _ ___ rrrucnnUNLOG March2019.doc---"-""" ^vv �anvn rermnveWerable\Guidelines1NC00T eommenls J8191combine tlas'Aeachmenl C-(oimsILAND HYDRO DEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project Name (Source of HOS/DGS).--_-3y3 Project Location: Project Description, Land Application Operator in Respaesihle Charge'. Date of Land I Location of Receiving Site pplication g Receiving Site Addressor (land Dwner Name) Latitude/ion nude 9 Quantity Applied y pp' (Gallons or Dry Weight) #Solids z 6��9 ���r ��O l �ec� - � I , 5 �(2�6 5-00 APPnC,�TICJ IOG �\irrcn <09 C,nV� aw oo :a6i=lemCe LirC aGw-mum Prmvh0enera0le'Gwtleine>�NCpOT �umnroms a819'comCne CoaA9aznmemb-'cmaw.� 2019 Project Completion Report September 5, 2019 Land Application Program NC Department of Transportation Permit # WQ0035749 Prepared For: NC Department of Transportation 1536 Mail Service Center Raleigh, North Carolina 27601-1536 Barnhill Contracting Company 4325 Pleasant Valley Road Raleigh, North Carolina 27612 Compiled By: Brian Harrington Project No. U-5315 A&B Morrisville Parkway Extension From West Of Highcroft Drive To East Of Mills Park Drive In Cary BARNHILL CONTRACTING COMPANY 4325 Pleasant Valley Rd. PO Box 30097 (27622) Raleigh, NC 27612 919-787-2442 phone I www.barnhilicontracting.com NC General Contractors License No. 3194 September 5, 2019 NCDEQ-DWR Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attention: Information Processing Unit Reference Land Application Project Completion Report For Project U-5315 A &r B NC Department Of Transportation Permit No. WQ0035749 Non -Discharge Compliance Unit: Barnhill Contracting Company is submitting the monitoring and reporting data for the Subject Project for 2019. Per the North Carolina Department of Transportation (NCDOT) Permit No. WQ0035749, this report is to be submitted at project completion for work accomplished by our firm on this project using data gathered by our staff and/or contractors during the compliance year for Diamond Grinding Slurry. If additional information is required or if there are questions concerning this project completion report, please contact my office for assistance at (919) 787-2442 or by email at bharrington@barnhillcontracting.com. Sincerely, Barnhill Contracting Company Brian Harrington, P.E. Project Manager Enclosures NC DEPARTMENT OF TRANSPORTATION LAND APPLICATION OF DIAMOND GRINDING AND HYDRODEMOLITION OPERATION SLURRY PERMIT NO. WQ0035749 2019 LAND APPLICATION SUMMARY CONTRACTOR DOT PROJECT TYPE (DGS OR YEAR PROJECT NO. LOCATION HOS) APPLIED BARNHILL CONTRACTING COMPANY U-5315 A & B CARY, NC DGS 2019 TABLE OF CONTENTS SECTION NO. TITLE Diamond Grinding Slurry (DGS) Analyses 11. Diamond Grinding Slurry (DGS) pH and Land Application Logs SECTION 1 DIAMOND GRINDING SLURRY (DGS) ANALYSES NC DOT LAND APPLICATION PROGRAM DIAMOND GRINDING SLURRY ANALYSIS Residual I'N pc: Diamond Grinding Slurry (Barnhill Contracting) Date Sampled: 8/20/19 (DG-1) Barnhill Contracting -Morrisville Parkway Permit No. WQ0035749 22.04 % Solids 12.40 pll Parameter % Mg/Kg Dry Weight x 10,000 Pounds/Dry Ton (M x 0.002) Nitrogen (TKN) 0.000 0.000 Phosphorus 0.000 0.000 Potassium 0.000 0.000 PAN (injected)* 0.000 0.000 0.000 PAN (surface)* 0.000 0.000 0.000 Ammonia Nitro en 0.000 0.000 Calcium 0.000 0.000 Calcium Carbonate E . 28.200 282 000.000 564.000 Magnesium --- 0.000 Sodium --- 0.000 Sulfur --- 0.000 Nitrate N / Nitrite N --- 0.000 Barium --- 0.000 Chloride --- 0.000 Iron --- 0,000 Aluminum --- 0.000 Arsenic --- 0.000 Cadmium --- 0.000 Chromium --- 0.000 Copper --- 0.000 Lead --- 0.000 Mercury --- 0.000 Molybdenum --- 0.000 Nickel --- 0.000 Selenium --- 0.000 Zinc --- 0.000 Waypoint 19-233-0005 *Determination of Plant Available Nitrogen (PAN): Injected Application: (Mineralization Rate)(TKN-Ammonia N) + Ammonia N + Nitrate N + Nitrite N = % PAN Surface Application: (Mineralization Rate)(TKN-Ammonia N) + (0.5)(Ammonia N) + Nitrate N + Nitrite N = % PAN Note: Constituents N.D. (Not Detected) or < detection limits are listed as detection limits for calculation purposes. Report Number: 19-233-0005 Account Number: 08361 Send To: Willcox & Mabe Soil Solutions, PLLC 7231 B. Summerfield Rd Summerfield . NC 27358 Lab Number: 67888 Sample Id : DG-1 a Waypoint(2 ANALYTICAL Project : 18-04 REPORT OF ANALYSIS 7621 Whitepine Road, Richmond, VA 23237 Main 804-743-9401 U Fax 804-271.6446 www.waypointanalytical.corn Date Sampled: Date Received: 08/21/2019 00:00 Date Reported: 08/27/2019 Total Solids ` 22.04 JCM 08/21/2019 14:50 SM-254OG Moisture 77.95 JCM 08/21/201914:50 SM-254OG pH' 12A 1.0 JCM 08/26/201910:05 9045D Calcium Carbonate Equivalent 28.20 282000 2500 JCM 08/26/2019 14:25 AOAC 955.01 Comments: A!l values are on a dry weight basis except as noted by asterisk. Detection limit on all N series is on a wet basis. B - Analyte detected in blank H - Beyond holding time Our reports and letters are for the exclusive and confidential use of our clients, and may not be reproduced in whole or part, nor may any reference be made to the work, the results, or the company in any advertising, news release, or other public announcements without obtaining our prior written authorization. pwic it 1,1wr Pauric McGroary Agronomist Page 1 of 3 (2)iWaypont 7621 W 8 Road, Richmond, V7 n 4-7 Main 804-743-9401 0Fax 804-271-6446 -6446 ANALYTICAL www.waypointanalytical.com Cooler Receipt Form Customer Number: 08361 Customer Name: Willcox & Mabe Soil Solutions, PLLC Report Number: 19-233-0005 Shipping Method Fed Ex US Postal Lab Other UPS i Client 0 Courier Thermometer ID: - - Shipping containerlcooler uncompromised? 0 Yes 0 No Number of coolers received F 1 Custody seals intact on shipping container/cooler? 0 Yes 0 No Not Required Custody seals intact on sample bottles? 0 Yes 0 No 0 Not Required Chain of Custody (COC) present? Yes 0 No COC agrees with sample label(s)? 9 Yes 0 No COC properly completed 0 Yes 0 No Samples in proper containers? 0 Yes 0 No Sample containers intact? 0 Yes 0 No Sufficient sample volume for indicated test(s)? 0 Yes 0 No All samples received within holding time? 0 Yes No Cooler temperature in compliance? 0 Yes No Cooler/Samples arrived at the laboratory on ice. Samples were considered acceptable as cooling process had begun. 0 Yes No Water - Sample containers properly preserved 0 Yes 0 No 0 NIA Water - VOA vials free of headspace 0 Yes 0 No 0 NIA Trip Blanks received with VOAs 0 Yes 0 No 0 NIA Soil VOA method 5035 — compliance criteria met 0 Yes 0 No 0 NIA High concentration container (48 hr) r Low concentration EnCore samplers (48 hr) High concentration pre -weighed (methanol -14 d) Low conc pre -weighed vials (Sod Bis -14 d) Special precautions or instructions included? Comments: Signature: Brandi Watson YesIS Na Date & Time: 8/21/201913:56:11 Page 2 of 3 \VA5-1,FWATER SAMPLE RANSMITr i Waypoint Analyt 7621 Whilepine Road Richmond VA 23237 tel: R04-743-Y401 Fax: tied 1111N1111111111111111 �� Willcox & Mabe sal Solidioris PLLC 13 1736 Account # 08361 Customer Information Submitted By Ch... Willcox & Mabe Soil Solutions, PLLC Same - Project # 18-04 7231 B Summerfield Road Summerfield. NC 27358 Project 18-04 Phone- 336-339-9128 Fax E-mail rob@wilicoxmabesoil.com Sample Information Lab Number Collection Information Container Information Please Write in Desired Tests Sample ID (Lab Use Number % Total Only) Type Date Time of Bottles Type Volume PH CCE Solids DG-1 Grab X Composite Glass X Plasticint oz _gyp X X X qt dG-2 _ Grab X Composite _ Glass Plastic oz X pint o X X X DG-3 _ Grab X Composite — _ Glass X Plastic oz X pint p X X X — t Grab Glass — Oz _ Composite _ Plastic pint I. Relinquished t3 . Si naturel Date Time__ --,Received B (Signature) Date Time Test Available Special Instructions or Remarks Nitrogen Series Total Kleldahl Ammonium. Nitrate & Organic Nitrogen Phosphorus(lotal orthor). Poatsswm, Sulfate -Sulfur Calcium, Magnesium Sodium. Iron, Aluminum. Test all samples for pH, CCE & % Total Solids Manganese Copper Zinc, Arsenic. Barium. Cadmium. Chromium, Cobalt Molybdenum, Mercury. Lead E-mail results to rob@willcoxmab9soil.com Selenium. Silver Nickel Acidity (Total), Alkalinity (Total). Biochemical Oxygen Demand (5 days) Boron. Chemical Oxygen Demand, Chloride. Conductance (Specific), Hexavalent Chromium. Oil and Grease (EPA), PH, Phenol. Solids (Dissolved, Suspended. Total Volatile) 9N -0) t CiL � P Al Page 3 of 3 SECTION II DIAMOND GRINDING SLURRY (DGS) pH AND LAND APPLICATION LOGS HYDRODEMOLITION OPERATION SLURRY 1 DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project Name (Source of HOSIDGS): Morrisville Parkway — Cary, North Carolina (Contract ID: C203991) Project Location: Morrisville Parkway Project Description: Diamond Grinding Slurry Land Application Operator in Responsible Charge: Wesley Wooten — Lewis Farms Date of Land Application Location of Receiving Site (Land Owner Name) Receiving Site Address or Latitude I Longitude Quantity Applied (Gallons or Dry Weight) % Solids 8/20/19 Wesley Wooten Piney Woods Road - 34034'32" 1 78"04'12" 3,800 gallons 22.04 8/20/19 Wesley Wooten Piney Woods Road - 34°34'32" / 78104'12" 3,800 gallons 22.04 8/20/19 Wesley Wooten Piney Woods Road - 34034'32" 178°04'12" 3,800 gallons 22.04 8/21119 Wesley Wooten Piney Woods Road - 34°34'32" 178°04'12" 3,800 gallons 22.04 8/21/19 Wesley Wooten Piney Woods Road - 34°34'32" / 78°04'12" 3,800 gallons 22.04 8/21/19 Wesley Wooten Piney Woods Road - 34°34'32" 178°04'12" 3,800 gallons 22.04 8/21/19 Wesley Wooten Piney Woods Road - 34°34'32" / 78°04'12" 3,800 gallons 22.04 8/22/19 Wesley Wooten Piney Woods Road - 34°34'32" 1 78°04'12" 3,800 gallons 3,800 gallons 22.04 22.04 8/22/19 Wesley Wooten Piney Woods Road - 34034'32" 178°04'12" 8/23/19 Wesley Wooten Piney Woods Road - 34034'32" / 78004'12" 3,800 gallons 22.04 8/23/19 Wesley Wooten Piney Woods Road - 34°34'32" 178°04'12" 3,800 gallons 22.04 C:%Users\Rob\OneDrive for BusinesslSharedlWMSS Projects12018118-04 Barnhill Contractmg12019 Land App\LAND APPLICATION LOG - August 2019.doc HYDRODEMOLITION OPERATION SLURRY 1 DIAMOND GRINDING SLURRY pH LOG Project Name (Source of HOSIDGS): Morrisville Parkway — Cary, North Carolina (Contract ID: C203991 Project Location: Morrisville Parkway Project Description: Diamond Grinding Slurry Land Application Operator in Responsible Charge: Wesley Wooten — Lewis Farms Date pH Sample Collected Date pH Analyzed 1 Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) 8/20/19 8/26/19 Lab 12.4 Tanker 8/20/19 8/26/19 Lab 12.3 Tanker 8/20/19 8/20/19 Field 12.18 Tanker 8/20/19 8/20/19 Field 12.11 Tanker 8/20/19 8/20/19 Field 11.98 Tanker 8121/19 8/21/19 Field 11.84 Tanker 8/21/19 8/21/19 Field 11.88 Tanker 8/21/19 8/21/19 Field 11.75 Tanker 8/21/19 8/21/19 Field 11.80 Tanker 8/22/19 8122/19 Field 11.79 Tanker 8/22/19 8/22/19 Field 11.95 Tanker 8/23/19 8/23/19 Field 12.01 Tanker 8/23/19 8123119 Field 12.08 Tanker C:1UserslRob\OneDrive for BusinesslSharedlWMSS Projects12018118-04 Barnhill Contracting12019 Land App1pH LOG - August 2019.doc 2019 Project Status Report Prepared 02/24/2020 NC Department of Transportation Permit #WQ0035749 Prepared For: NC Department of Transportation 1536 Mail Service Center Raleigh, North Carolina 27601-1536 Triangle Grading & Paving Project TIP # 1-5793 Project Contract # C204053 1-85 Widening and Improvements from East of US-64 to NC-109 in Thomasville, NC TABLE OF CONTENTS SECTION NO. TITLE Diamond Grinding Slurry (DGS) Analyses II. Diamond Grinding Slurry (DGS) pH and Land Application Logs SECTION I DIAMOND GRINDING SLURRY (DGS) ANALYSIS NC DEPARTMENT OF TRANSPORTATION DGS ANALYSIS Permit No.WQ0035749 Triangle Grading & Paving 1-85 Widening and Improvements from east of US-64 to NC-109 in Thomasville Date Sampled: 11/05/2019 Solids: 12.0% pH: 11.23 Mg/Kg Dry Weight Pounds/Dry Ton Parameter % (/ x 10,000) (mg/Kg x 0.002) Calcium Carbonate Eq. 1.05 10,500 21 4CDA&CS Agronomic Division Phone: I ,,_'Ag5 Wphsite: www.ncaarmov/agronomlf Out of State Waste Report i ss9 Links to Helpful Information Farm: Not Provided Client: Austin Bross Advisor. 2301 Interstate 70 A NW Columbia, MO 65202 OUT OF STATE County Sampled: 11/052019 Received: 11f0612019 PALS #: Completed: 111132019 PALS M 504336 neym Nutrient Measurements are given in units of parts per million (ppm), unless utherwise speeded. I Other Resultso K Ca Mg B Fe Mn Zn Cu B N10 C AI Na CI: F en N P 5.37 126 1070 74.2 56.1 183 2.74 0.73 137 0.20 - - 176Kjeldahl I N: 9.64 T _ _ _ _ _ _ _ _ _ _ _ _ _ — — — — — Non-compnic:SS EC pH BO CCE ALE C:N DM Other JH4-N Blom) (mS/Cm) (Unitiess) (lbtyd') (%) (1000 gal) (Unilless) (%)slurryI Grower CN I(10s 328 3.28 1123 105 20.6 Estimate of Nutrients Available for First Year (lb/1000 gal) i other Results (lb/1000 gal) Application Method: N P205 K20 Ca Mg S Fe Mn Zn Cu B Mo AI Na CI Irrinatipn I 0.08 0.10 1.26 B.93 D.62 047 1,52 0.02 0.01 0.01 0.00 - 1A7 3.76 - North Carolina �'> cto i�isl fund Comrtdssbn Reprogramming of the laboratory -information e is being funded throughaa ggrant frofm thle North em tCarolina Tobacco Trust Fmakes this report lund Commission. 77tank you forusing agronomic services to manage nutrients and snfegiun d envir'anmenlal quality. - Steve Troadeq Cornmissianer sy Agiinthnre. SECTION II DIAMOND GRINDING SLURRY (DGS) pH AND LAND APPLICTION LOGS lvRtNP T7�vr 7 s � S � -r 7'c( 7 9' 7 9' `1 R 'T 9 HYDRODEMOLITION OPERATION SLURRY! DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project Name (Source of HOSIDG S): Z D cr p 5 J7 Project Location: Project Description: Land Application I I tk .k c(x, Operator In Responsible Charge: Lu Date of Land Application Location of Receiving site (Land Owner Name) Receiving Site Address or Latitude I Longitude Quantity Applied (Gallons or Dry Weight) % Solids S -� 5 y en 145T 1bJ_Q�_! �__1.Vori�eow��A �z n iJ nS,Jsi-�t�.5_��IO,,�Ie� /rl� 051� 925 fo99 No�-1�, 2�6 zo T— 5 :5I h t r 2 p T 10 f`T 40 /G( �J�i 2�5i�0 V 2 ... n5i �Zr^t��5ct5 5 I q_� I^�Q21rNorl�� 0 I 3� 12 Ihalol IIo^ rn5iA0.. T -U5 Sn0AU'ar J� 1 ►I n5l �Q� Q to J I'�or��6 /� (, �t.b y 20 — r,yitie2- •le Pin iQ IQ t? 7 0 20 1z 5 Zn��de Z - s65 S�oklaE ; pay 102-614 5a%,46ou 3 7`I6_(� . 2Q _ Po5A 96 4o 9t]7,5 Nor kLo 2 M2 2 (7 2-0 e poh 1014-0995 54$A m 2.Z�7 733H G 210 l2 l' S1 e 1' S a !` _....,, I"II�C IaS� 77,/ �'01Ur5 at hL, .,,,,r enNmnunn vnrmu\DeuvemblolGuldellnes\NCDOT comments 48191cambine '2.1}�� q� tlocaVUtachmonl C • tomta\LAND 2� P:1TransporlanomYro)eas�noaavvvvv�o oo.���••�••�••-•-•••-----•• APPLICATION LOG - March 2010.doc pH Dail/ Log Date: PIth ) Job: 19 Location: T c C Test 1 Time: �1, Reading: I0-n Test 2 Time: 3'.3O wm Reading:1o. 9 pH Daily Log Date: Z Job: IX -A 19 i Location: h u5v e C Test 1 Time: �Q '�� �I Reading: ICE, 5 Test 2 Time: Z' `� 0 C&rn Reading: 10,E pH Daily Log Date• t Z /%1%►� Job: 19 Location: T ti e NC Test 1 Time: I :30 m Reading: M Test 2 Time: �` 300'm Reading: 10,7 pH Daily Log Date: 2 I Job: l A ' / Location: Y omo-5 V Q Test 1 Time: 30 pm Reading: Test 2 Time: 2, 51 ww� Reading: 9, q pH Dail Log Date: Job: l U -19 Location: I Test 1 Time: Reading: 10, 6 Test 2 Time: Z' Ma \ Reading: IM pH Daily Log Date: 2/ I Job: Location: T V Test 1 Time: 10:q4 Reading: IQ, 1- Test 2 Time: 2 Reading: 11,0 pH Daily Log Date: Job: N' ' g Location: 7"Coyiliz Test 1 Time: ' 5 r6 Reading: 9.9 Test 2 Time: Reading: 10,