Loading...
HomeMy WebLinkAbout20090713 Ver 2_More Info Received_20091204CIVIL / ENVIRONMENTAL / WATER / WASTEWATER IDR - O 1 1 3 V;. JOHN T. COXEY CONSULTING ENGINEERING, P.A. TRANSMITTAL k1;=3@TGV1 12i7 s "EC ?.2GC9 DATE : December 2, 2009 TO: Ian McMillan - NCDENR - DWQ RE: David Jennings Property, Berry Road, Avery County FROM: John T. Coxey Consulting Engineering, P. A. 53 Fox Chase Road Asheville, North Carolina 28804 Telephone: 828-645-4046 Fax: 828-658-1304 DENR - WATER QUAU-TY WETLANDS AND STORMATElR BRANCH COMMENTS: Ian- With regard to our phone call on December 1, 2009, enclosed are five (5) revised copies of page 4 of the PCN form for the referenced project which shows the stream impact length revised to 145 feet. Please call me if further information is required. C- JOHN T. COXEY, P.E. PRESIDENT 53 WEST FOX CHASE ROAD ASHEVILLE, NC 28804 PHONE (828) 645-4046 FAX (828) 658-1304 oof - o)%ob u a, C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were complet low for your project (check all that apply): ? Wetlands eams - tributaries ? Buffers ? Open Waters ? Pond construction 2. Wetland Impacts If there are wetland impac;s proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c_ Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401. other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one YesMo - W4 - Choose one Ctwose one Yes14jo - W5 - Choose one Choose one Yes/ h+b - W6 - Choose one Choose one JYes(Mo - 2g Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (inctuding temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (1NT)2 3e_ Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) 51 - Choose o I4&T ,l - f - l7 S2 - Choose one - S3 - Choose one - - S4 - Choose one - - S5 - Choose one - S6 - Choose one - - 3h. Total stream and tributary impacts 3i. Comments: ''J ? DENR - WATER WAUTY ViETIARDS AND STCrw;,: iT i ERANCti Page 4 of 10 PCN Form - Version 1.4 January 2009