Loading...
HomeMy WebLinkAboutNCC201236_NOI Application_20200327Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 3/25/2020 4:33:25 PM (NCG01 NOI Submission) Approve by Garcia, Lauren V 3/26/2020 10:46:31 AM (Review- Construction NOI 23614) • The task was assigned to Garcia, Lauren V by round robin distribution 3/25/2020 4:33 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 27, 2020 5:00 PM 3/25/2020 4:33 PM Submit by McCoy, Suzanne 3/27/2020 4:53:11 PM (Payment Verification for NCC201236) * Justin Hall • McCoy, Suzanne assigned the task to McCoy, Suzanne 3/27/2020 4:52 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: May 7, 2020 5:00 PM 3/26/2020 10:46 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information la. Project Name * Dormie Club - Maintenance Facility 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 2. County* Moore 3. Highway or Street Beulah Hill Church Road Address* Street name only is acceptable if no address nunber assigned yet 4. City or Township* West End 5. State * NC 6. Zip Code* 27376 7. Latitude* Enter the latitude in decinal degrees 35.2572 8. Longitude * Enter the longitude in decinal degrees (MJSTbe negative) -79.4894 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 03/30/2020 Estimated Construction Project Start Date 10. Date to End * 08/17/2020 Estinated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Development 12. Acres to be 5.65 disturbed* (including off -site borrow and waste areas) 13. Total site area 9.86 (acres)* 14. Post- 5.25 construction (Estirated) impervious area (acres) * NCC Project NCC-MOORE-2020-Dormie Club - Maintenance Facility Tracking ID Assignedautorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Little River (Lower Little River) Wate rbody* Nine of waterbody into which storrrwater runoff will discharge 15b. Waterbody 18-23-(1) Index No. * NCWaterbody Index Minter Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Sampson Construction Co., Inc. Name * If perrrittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name* Justin IF Corporation, enter Fbgistered Agent First Barre 3. Last Name* Hall If Corporation, enter Faegistered Agent Last Wre 3b. Title Senior Project Manager 4. Permitee E-mail justin.hall@sampson-construction.com Address * 5. Permittee 402-416-6569 Telephone No.* 6. Permittee Mailing Street Address Address* 5825 South 14th Street Address Line 2 city State / Frovince / Region Lincoln NE Fbstal / Zip Code Country 68512 us Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 5825 South 14th Street Address Line 2 City State / Ffovince / Fbgion Lincoln NE Fbstal / Zip Code Country 68512 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration ................................................................................................................................................................................................................. 1. Primary Site Peter Contact - First Name * 2. Primary Site Erickson Contact - Last Name * 3. Title Superintendent 4. Site Contact E- peter.erickson@sampson-construction.com mail Address* 5. Site Contact 402-610-3599 Telephone No.* 6. Organization Sampson Construction Co., Inc. Name 7. Site Contact Street Address Mailing Address* 6033 Beulah Hill Church Road Address Line 2 City State / Rovince / Region West End NC Postal / Zip Code Country 27376 us 8. Consultant Name (Optional) Philip Picerno First and Last nacre 9. Consultant E-mail philip@lkcengineering.com This person will be copied on all correspondence. 10. Consultant 910-420-1437 Telephone No. D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 03/11/2020 Approved * 2. E&SC Plan Project MOORE-2020-044 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Fayetteville (FRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan Approval letter or Grading Permit Site Map (Optional) moore044apMod.pdf Mast be RDFfornat Helpful for linear project review Mast be FDFform3t 87.5KB Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. Include additional w aterbodies for linear projects if necessary. 6. NOI Certification NCG01-eNO1-Certification- Form. pdf 1.08MB Form Mast be RDFformat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Justin Hall Title Senior Project Manager Organization Sampson Construction Co., Inc. Date * 03/25/2020 F. Tracking and COC Info NOI Tracking No. 23614 NC Reference No. NCG01-2020-1236 Uses 'count number' variable (incremrented by SP) Certificate of NCC201236 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 1236 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)