Loading...
HomeMy WebLinkAboutNC0020443_AUTHORIZATION TO CONSTRUCT_19951120 NPDES DOCUNENT SCANNING COVER SHEET NPDES Permit: NCO020443 Columbia WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct L(AC) _ �f Permit Modification Speculative Limits 201 Facilities Plan Instream Assessment (67B) Environmental Assessment (EA) Permit History Document Date: November 20, 1995 This daca�meat i�pri�sted os�reuse paper•-ignore a.�y oouteat on the z�werme Hide - State of North Carolina Department of Environment, Health and Natural Resources 4 • • Division of Environmental Management James B. Hunt, Jr„ Governor � C C Jonathan B, Howes, Secretary A. Preston Howard, Jr., P.E., Director November 20, 1995 Mr. William C. Harrell, Town Manager Town of Columbia P. O..Box 361 Columbia, North Carolina 27925 SUBJECT: Town of Columbia Permit No. NCO020443 Authorization to Construct (Revised) Wastewater Treatment Facilities Project No. CS370501-02 Tyrrell County Dear Mr. Harrell: The revised final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of a new wastewater treatment facility to include an influent structure with a manual bar screen and grit chamber; a 0.300 MGD oxidation ditch with dual 30 Hp rotors; dual 30-foot diameter secondary clarifiers; dual 7.5 Hp RAS pumps with a capacity of 325 GPM; dual 15 Hp effluent pumps with a capacity of 630 GPNI; a 28-foot diameter (46,000 gallon) aerobic digester with a 10 Hp floating mechanical aerator; a 48-foot diameter (135,000 gallon) sludge holding tank with a 25 Hp dual-speed, floating, mechanical aerator; a chlorination building with a laboratory and electrical room; relocation of existing . standby generator to the new main pump station site; a new standby power generator at the new treatment plant site; modifications to the existing treatment facility to include conversion of the existing chlorination facility to a dechlorination facility and installation of a new 3.0 Hp blower for post aeration; abandonment of the existing influent pump station; construction of a new pump station, to include dual 20 Hp, 450 GPM influent pumps; approximately 8,465 LE of 8-inch and 10-inch sewer force main between the existing and new treatment facilities; and all associated site work, electrical, and appurtenances at all sites. P.O. Box 29535.Rdeigh,North Carolina 27626-0536 Telephone 919-733-7015 FAX 919-733-2496 An Equal opportunity Affirmative Action Employer 5096 recycled/ 10%post-consumer paper - 2 - Do not proceed with construction until the Authorization-to-Award package, EEO, and MBE documentation/certification have been reviewed, and you are in receipt of our approval, if funding is desired for project construction. The Pennittee shall employ an actively State certified wastewater treatment plant operator to be in responsible charge of the wastewater treatment facilities. Such operator must hold a valid State Certificate of the grade at least equivalent to the classification assigned to the wastewater treatment facilities by the Certification Commission. When a new chief operator must be obtained to be in responsible charge of the new facilities, it is required that this be done by the time the construction of the facilities is 50% complete. This Authorization to Construct (ATC) supersedes and replaces the original Authorization to Construct and is issued in accordance with Part III, Paragraph "B" of NPDES Permit No. NC0020443, issued October 2, 1995 and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the approved plans, specifications, and supporting,documents; and are in compliance with the conditions and limitations specified in Permit No. NC0020443. The Permittee shall have an acceptable sludge analysis and a sludge toxicity analysis which have been approved by the Division of Environmental Management, Water Quality Section prior to the disposal of any sludge from the new wastewater treatment plant. Copies of the analyses, supporting documents, and approvals shall be submitted to the Division of Environmental Management's Washington Regional Office. The disposing, selling or free distribution of wet, dried, composted sludge or sludge-like materials from wastewater facilities without prior review and approval by this Division is illegal. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constricted in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. - 3 - One (1) set of final approved plans and specifications is to be forwarded to you for your files. The copy of the approved plans and specifications shall be maintained on file by the Owner for the life of the project. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P. O. Box 29535, Raleigh, North Carolina 27626-0535. (Engineer's Certification Form is attached.) If you have any questions or need additional information, please contact Mr. Bill Hoffinan, at (919) 715-6225. Sincerely, .I; A. Presto oward, Jr., P.E. Attachment DMB:vk cc: McDavid Associates, Inc. IVhY"Ddh'Safi-it Washington Regional Office Mr. Tom Fahnestock Mr. Don Evans Ms. Valerie Lancaster Mr. Daniel Blaisdell Mr. Ron Ferrell DMU SRF