Loading...
HomeMy WebLinkAboutNC0020443_AUTHORIZATION to CONSTRUCT_19940527 l 'S State of North Carolina Department of Environment, Health and Natural Resources A • • Division of Environmental Management James B. Hunt, Jr., r ry Am2m® E H N F 1 Jonathan B. Howes,, Secretary A. Preston Howard, Jr., P.E., Director May 27, 1994 Mr. William C.,Harrell, Town Manager Town of Columbia P. O. Box 361 Columbia, North Carolina 27925 SUBJECT: Town of Columbia Permit No. NCO020443 Authorization to Construct Wastewater Treatment Facilities Project No. CS370501-02 Tyrrell County Dear Mr. Harrell: The final plans and specifications for the subject project have been reviewed and found to be satisfactory. . Authorization is hereby granted for the construction of a new wastewater treatment facility to include an influent structure with a manual bar screen and grit chamber; a 0.225 MGD oxidation ditch with dual 25 Hp rotors; dual 26-foot diameter secondary clarifiers; dual 5 Hp RAS pumps with a capacity of 250 GPM, dual 10 Hp effluent pumps with a capacity of 450 GPM, a 26-foot diameter aerobic digester with a 7'/z Hp floating mechanical aerator; a 44-foot diameter sludge holding tank with a 20 Hp dual speed floating mechanical aerator; a chlorination building with a laboratory and electrical room; relocation of existing standby generator to new treatment plant site; modifications to the existing treatment facility to include conversion of the existing chlorination facility to a dechlorination facility and installation of a new 1.5 Hp blower for post aeration; modifications to the existing influent pump station, including replacing the existing dual 5 Hp influent pumps with new dual 5 Hp pumps, 450 GPM pumps; approximately 8,140 Lf. of 8-inch sewer force main between the existing and new treatment facilities, all associated site work, electrical and appurtenances at all sites. P.O. Box 29535,Raleigh,North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Affirmative Action Employer 50%recycled/ 10%post-consumer paper r - 2 - Do not proceed with construction until the Authorization-to-Award package, EEO, and MBE documentation/certification have been reviewed, and you are in receipt of our approval, if funding is desired for project construction. The Permittee shall employ an actively State certified wastewater treatment plant operator to be in responsible charge of the wastewater treatment facilities. Such operator must hold a valid State Certificate of the grade at least equivalent to the classification assigned to the wastewater treatment facilities by the Certification Commission. When a new chief operator must be obtained to be in responsible charge of the new facilities, it is required that this be done by the time the construction of the facilities is 50% complete. The Authorization-to-Construct is issued in accordance with Part III, Paragraph "C" of NPDES Permit No. NC0020443, issued March 28, 1994 and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the approved plans, specifications, and supporting documents; and are in compliance with the conditions and limitations specified in Permit No. NC0020443. The Permittee shall have an acceptable sludge analysis and a sludge toxicity analysis which have been approved by the Division of Environmental Management, Water Quality Section prior to the disposal of any sludge from.the new wastewater treatment plant. Copies of the analyses, supporting documents, and approvals shall be submitted to the Division of Environmental Management's Washington Regional Office. The disposing, selling or free distribution of wet, dried, composted sludge or sludge-like materials from wastewater facilities without prior review and approval by this Division is illegal. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when lica le, the North.Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. - 3 - One (1) set of final approved plans and specifications is to be forwarded to you for your files. The copy of the approved plans and specifications shall be maintained on file by the Owner for the life of the project. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P. O. Box 29535, Raleigh, North Carolina 27626-0535. (Engineer's Certification Form is attached.) If you have any questions or need additional information, please contact Mr. Bill Hoffman, at (919) 733-6900, extension 615. Sincerely, 4 Presto ard, Jr., P.E. Attachment GJ/nw cc: McDavid Associates, Inc. Mr. Don Safrit Washington Regional Office Mr. Tom Fahnestock Mr. Don Evans _ Ms. Valerie Lancaster y Mr. Gene Johnson Ms. Cindy Finan DMU SRF f y