Loading...
HomeMy WebLinkAboutNCS000061_BIMS Inspection Report with Letter_20190611ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director Lenoir Mirror Company Attention: Tim Brown Post Office Box 1650 Lenoir, North Carolina 28645 NORTH CAROLINA Environmental Quality June 11, 2019 Subject: Compliance Evaluation Inspection Permit:NCS000061 Caldwell County, North Carolina Dear Mr. Brown: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on May 30, 2019. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. X Isaiah Reed, Q, EPS , MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NOFM CAFIXINA 828.296.4800 Compliance Inspection Report Permit: NCS000061 SOC: County: Caldwell Region: Asheville Contact Person: Tim Brown Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Effective: 08/01/09 Expiration: 07/31/14 Owner: Lenoir Mirror Company Effective: Expiration: Facility: Lenoir Mirror Co -Caldwell Site 401 Kincaid St Title: Environmental Inspection Date: 05/30/2019 Entry Time: 12:OOPM Primary Inspector: Isaiah L Reed Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Certification: Lenoir NC 28645 Phone: 828-728-3271 Phone: Exit Time: 01:OOPM Phone: 828-296-4614 Inspection Type: Compliance Evaluation Page 1 of 3 permit: NCS000061 Owner -Facility: Lenoir Mirror Company Inspection Date: 05/30/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: On May 30, 2019 this facility was inspected for compliance. I met with Tim Brown on site. During the inspection, the following items were noted. 1) The SWPPP was found to be incomplete and not current. The permittee is directed to immediately review and complete the SWPPP as required by the permit. 2) Monthly monitoring has not been conducted in accordance with the Tier 2 requirements. The permittee is directed to immediately begin monthly monitoring in accordance with the permit. 3) Investigative monitoring, as proposed by Mr. Brown, is recommended. This facility will be re -inspected on or after August 1, 2019. If the above items have not been addressed, further action will be taken. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCS000061 Owner - Facility: Lenoir Mirror Company Inspection Date: 05/30/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices'? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ N ❑ ❑ # Does the facility provide all necessary secondary containment? E ❑ ❑ ❑ # Does the Plan include a BMP summary? N ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? N ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? N ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: See summary for more information Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? N ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Monthly monitorinq has not been done. Facility is currently in Tier 2 status. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? M ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ OT,17i= Page 3 of 3