Loading...
HomeMy WebLinkAbout20020726 Ver 1_COMPLETE FILE_20020508`o?OF Q ?i U GL r O May 9, 2002 Iredell County DWQ Project #: 02-0727 Approval Of 401 Quality Certification with Additional Conditions and Catawba River Buffer Rules Simonini Builders 817 East Morehead Street Charlotte, NC 28202 Dear Sirs: You have our approval, in accordance with the attached conditions, to place fill material in .025 acres of shoreline for the purpose of shoreline stabilization at The Point subdivision, Phase 7, Lot 731 as you described in your application dated May 8, 2002. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Number 3376, which may be viewed on our website at http://h2o.enr.state.nc.us/ncwetlands. This certification allows you to use General Permit Number 30 when the Corps of Engineers issues it. This approval is also valid for the Catawba River buffer rules (15A NCAC 2B .0243). In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed regulations. This approval will expire when the accompanying 404 or CAMA permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h) (6) and (7). This approval shall expire when the corresponding Nationwide Permit expires or as otherwise provided in the General Certification. For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality 1. Stormwater shall be directed to flow at non-erosive velocities across the entire protected stream buffers; 2. No trees shall be removed from Zone 1 of the Catawba Buffer unless they are directly within the construction access corridor. If trees are removed, at least two species of native forested vegetation shall be re-established within the construction access or other temporary impact area occurring in the protected buffer zone within the next growing season following construction of the project; 3. This project is for the installation of a bulkhead to prevent further erosion of the property due to wave action. The use of mechanical equipment on the beach must be minimized; #JLDE_NR N. C. Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) (919) 733-1786 (phone), 919-733-6893 (fax), (httpJ/h2o.enr.state.nc.us/ncwetlands 4. Equipment and materials may be offloaded to the beach at the bulkhead site, but steps must be taken to keep all equipment out of the reservoir; 5. Any disturbance within 50 feet of the shoreline must be done in compliance with the Catawba River buffer rules; 6. Upon completion of the project, the applicant shall complete and return the enclosed "Certification of Completion Form" to notify DWQ that all the work included in the 401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly at 919-733-1786 or Mike Parker at our Mooresville Regional Office at 704-663-1699. Sincerely, ? o Gregory J. Thorpe, Ph.D Attachments cc: Corps of Engineers Asheville Field Office Mooresville DWQ Regional Office File copy Central Files Chip Bridges, CBC Custom Shorelines, Inc. 5R r J $'' ? , r1 -4 AOW N /r • k - i 0 -t- VIA I T-1 1, Z4 rz �A 4ag m. f 4\ T.-- u .14 ?L ._ 013 : ?`) ?\ -- --rr-- ?•••• ..?+trarauug mavrmauon as WeWas.a non-refundable application fee to the Divisloix of Water Quality of $200.00 for impacts of to lake bottom of less than 1 acre and $475.00 for impacts to lake bottom of greater or equal to 1 acre. Applications should be sent to: - Division of Water Quality Wetlands Unit ' 1650 Mail Service Center 1i SAY $2' Raleigh, NC 27699-1650 020726 WETLANDS NlP, TON ? -_.e..?__-....... 1. Applicant Information 1. Owncr/Applicant Informat7??' r Name: t ? r-- S' Mailing Address: C S4- AA,? .n < N' ' Telephone Number: - W Fax Number: E-mail Address: - 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the gent si atory authority for the owner/applicant.) Name: Company Affiliation: A Mailing Address: N Telephone Number: E-mail Address: / Number: II. Project Information Attach a vicinity map clearly.showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. You may use the diagram below to make a hand sketch of your project. Also; see the example below for guidance. Both the vicinity map and site plan must include a scale and north arrow. The. footprints of all buildings, impervious surfaces, or other facilities must be included. 1. Location Neaze ?,,e County: l st Town: Subdivision name or site address (include phase/lot number): P Le ?B/?in r Directions to site please include road numbers, landmarks, etc. This is not necessary if an adequate vicinit map is, included):- 4b Thi3 /VY17? 14 , wq t. r 2. Describe the a fisting land use o condition of /the siteat the time ofththi? application. I -f- n n_ n n 14 n n /7/ ?. L i. A )(13P ' ra4 c?-?-c9 A - PE's 3. Property size (acres): 4. Nearest body of water (stream/river/sound/ocean/lake): 5. Describe the purpose of the proposed work: -[ ?5 ?'??_? 6. List the type of equipment to be used to construct the project: k e 7. Amount of impact (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level in square feet or acres: t 8. a. Amount of impact (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level and 50 feet land-ward in square feet or acres: b. Please describe vegetation above the normal pool lake level and 50 feet land- ward to be impacted (number of trees for instance): - - u jAppli nt/Agent's nature D tc gsignature alid only if an authorization letter from the applicant is provided.) 4 YP-r ea v-- azdtd St` bv•A4r ?- 461 xa` h1+ b dory C bt-f i i Please approximately sketch the following s information such aatio ft. xthis plan 100 ft): (please provide dimensions for each item, 1) All proposed vegetation clearing (provide dimensions) .2) location of'rip rap or fill to be pined above the "Normal Pool' elevation 3) Location of rip rap or fill to be placed below the "Normal Pool' elevation d) The location of any proposed structures such as buildings, retaining walls. docks, etc. 3) The location of any excavation or dredging below the "Normal Pool" elevation. 6) Location of construction access corridors. DUKE POWER LAKE MANAGEMENT, EC12-Q P O BOX 1006 , - } CHARLOTTE, NC 28201-1006 704--382-1567 or TOLL FREE 1-800443-5193 APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA Please type or print and fill in all blanks.' If information is not applicable, so indicate by placing N/A in blank. PLEASE SUBMIT APPLICATION AND APPROPRIATE FILING FEE, PAYABLE TO DUEE POWER, TO ABOVE ADDRESS. 1. Applicant Information A. Name B. Mailing Address fN kA r-/n Ft n r(t' A $'A0':?- C. Telephone: II. Location of Proposed Project A. Lake ff df 1'0- B. C? Street Address 7 C. County Ti.oaQ?? D City, town, community or landmark . E. Section Lot # b F. Directions togroperty by road Subdivision n _ i n - G. Latitu a and tongitu e for the project site 35. 574gO6 ` Please submit a map showing the coordinates or a detailed map ( GS quad map, city map, etc.) showing the exact location of the project site. (NOTE: Latitude/ longitude coordinates can be found on internet site, www.mapblast.com) y IS40 III. Description of Project A. Length of wall cQT? B. Material C. Distance from property line/shoreline 111 IV. Intended Use of Project Area A. Private B. Commercial V. Applicant Signature Date `? NOTE: PLEASE SUBMIT COPY OF A LICATION WITH ROAD.MAP SHOWING LOCATION OF PROPERTY TO: US ARMY CORPS OF ENGINEERS 151 PATTON AVE. - ROOM lM a 0'9 ASIIEVILLE, NC 28801-5006 00/28/00ssb Page 1 of 1 a MAPSL.AST! Mooresville, NC 28117-6035 Everyone needs a little direction in life 1,61 Lake Norman [ Icon Latitude: 35.5749001, Longitude: -80.885500 ] ...,'mPrint.mb?CT=35.52505 74%3 A-80.9313 56%3A50000&LV=4&GAD3=Mooresville%2C+NC-+5/2/02 ` PRELIMINARY PLAT NOT FOR CONSTRUCTION THE'VOINT RECORDATION,SALES OR CONVEYANCES $ �9A�p and P-.Yer eL CaAFinis o+ gll� I I s 49" key 765 -- h 0' MBS AND 1- VEGETATIVE \. ' BUFFER I rte/ r . I 80•x100 �..., I BASEMENT I I CRA r I I I TREE LINE r 3 N � 5 Nn IN 820 II Z , 45,844 1 SQ.FT. rr ' 818 I I I � r � r I > I i 50•.MbS go I-<I L --- 1 > I I PP PREPAIR� r' PRELIMINARY J I �1 __j 83-01'33' 83'01'33" 'H 48.35' UGHTSHIP DRIVE / THIS PROPERTY SUBJECT TO A 10' FLOOD EASEMENT TC 50' PUBLIC RIGHT OF WAY 12;5 ELEVATION 770' PER DUKE POWER. .5.RCP ,.;RO? — — — — 1% STPEET TREES TO BE PLANTED OUTSIDE OF R/W CURVE TABLE CURVE RADIUS LENGTH BEARING CHORD DELTA CI _225,00' 70,72' N74'01'19"W_ _ 70,43'_ 18'00'34" LEGEND R/W-RIGHT—CF—WAY SSRW - SEWER R/W MBS - MINIMUM BUILDING SETBACK S.Y. - SIDE YARD R.Y. — REAR YARD PDE - PUBLIC DRAINAGE EASEMENT FPE - FLOOD PROTECTION ELEVATION PHASE 8 LOT 819 PSDE —PERMANENT STORM DRAINAGE EASEMENT © - RED MAPLE "AUTUMN FLAME" LIGHTSHIP DRIVE 1.052 ACRE 45,844 (SF) FISP ASSOCUMS, P-4. WOODED enpirutr{np survtytnp•ptann{nq 1"-50' 09/04/01 PHSNR819.DWG "Prior to constructing any pier,structure or other Improvement within any pier zone shown on this plat, a permit must be obtained by the applicable lot owner from Duke Energy Corporation in accordance with the terms of the applicable Lot Purchase and Sale agreement and the Declaration of Coven ants,Conclition a and Restrictions for The Point." Piers may extend from the shore for a distance of 80 feet regardless of the water depth and may extend to a maximum length of 120 feet to achieve a water depth of 10 feet, measured at full pond. In no event may a pier extend more than 1/3 of the width of the cove in which It is located. The top decking of all piers must be at least 1 foot above the water surface at full pond. BAR SCALE 1"=50' 0 25 50 100