Loading...
HomeMy WebLinkAboutWQ0003396_Application_20200115arauco CERTIFIED MAIL 7014 1200 0001 2700 4506 Return Receipt Requested Division of Water Resources Non -Discharge Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Permit Modification Extension Request 985 Corinth Road Moncure, North Carolina 27559 Tel: 919-642-6600 Toll Free: 855 427-2826 Fax: 919-545-5822 January 10, 2020 otio R� 5 ti r.\15GT\ 01 VPQ Arauco North America, Inc. is submitting this letter to request an extension to permit condition 1.1. in our Non -Discharge Spray permit WQ0003396. This condition states, "Within 180 days of the effective date of this permit, the Permittee shall submit a permit modification request to establish 2 feet of protection from the 100-year floodplain for Pond 5." Arauco operates a particleboard and medium density fiberboard manufacturing facility in Moncure, NC. The wastewater irrigation system was originally permitted at Arauco in 1987-1988. At that time, only the particleboard manufacturing line was in operation but in 2009 the medium density fiberboard facility was constructed onsite and became operational. The addition of the facility significantly increased the amount of wastewater produced and sprayed on the fields. This increase in wastewater generation and heavy rainfall seasons led to the lagoons losing freeboard. On October 2016 and September 2018, hurricanes caused major flooding near the facility to the point of Shaddox Creek overtopping the lagoon. In February 2019 Arauco submitted a permit modification request to increase the daily influent flow to the sprayfields. The Division of Water Resources issued permit WQ0003396 July 23, 2019 with a new condition 1.1. to raise the lagoon berm of Pond 5 2-feet above the 100-year floodplain. The condition stipulated the permit application to raise the lagoon berm be submitted within 180 days of permit issuance, which would be January 19, 2020. Arauco spent the next several months conducting engineering studies to determine the feasibility of raising the lagoon berm. It was concluded, that raising the lagoon berm would be infeasible due to the location of the facility and Pond 5. At that point, Arauco only had 2 months left before the permit application was due, which was not enough time to develop an alternative storage solution. Arauco met with DWR representatives December 13, 2019 to discuss the current situation and long-term plan for the site. Arauco is planning on designing and constructing above ground tank storage to replace the ponds. In addition to new wastewater storage, Arauco's long term plan is to close both ponds 5C and 5D. A major aspect of the long-term plan is to stop utilizing the spray fields and discharge to the City of Sanford Publicly -owned Treatment Works (POTW) once the City completes its wastewater pipeline extension project. Once a customer, Arauco will send as much water as permitted to the City from the lagoons to lower the water level, while simultaneously using the new storage system and discharge permit for newly generated wastewater. Once the lagoons have been drained, Arauco will develop a State approved lagoon closure plan and close the lagoons. Arauco is requesting an extension of Permit Condition 1.1 in Permit WQ0003396 to require submittal of a permit modification application for the modified storage system until October 23, 2020; this will allow enough time to conduct engineering studies and determine the most efficient wastewater storage solution. If you have any questions, please contact Yvonne Couts, Environmental Manager, at (919-545-5848). Sincerely #�% 7/Gt� eM cMillian Plant Manager