PLANTING PERIOD
TYPE
PLANTING RATE
APRIL 15 - JULY 15**
HULLED SUNSTAR OR RIVERA BERMUDA
85 LBS /ACRE*
JULY 15-AUG. 15
SUNSTAR OR RIVERA BERMUDA SPRIGS
5 BUSHELS11,000 SF
AUG. 15 - APRIL 15
TEMPORARY SEEDING APPLIES**
* OR AS REQUIRED TO ACHIEVE 95% COVERAGE AS DETERMINED ON A PER SQUARE YARD BASIS PRIOR TO SUBSTANTIAL COMPLETION.
** WHEN SEEDING MUST TAKE PLACE OUT -OF -SEASON FOR PERMANENT GRASS, APPROPRIATE TEMPORARY SEEDING SHALL BE DONE AND THE
CONTRACTOR SHALL BE RESPONSIBLE FOR PERMANENT SEEDING AS SPECIFIED IN SEASON AT NO ADDITIONAL COST TO THE OWNER.
LAWN MAINTENANCE NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR LAWN MAINTENANCE UNTIL FINAL COMPLETION.
2. LAWN MUST BE AT 95% COVERAGE AT SUBSTANTIAL COMPLETION REVIEW TO BE ACCEPTED.
3. IF NOT AT 95% COVERAGE, SUBSTANTIAL COMPLETION WILL BE DELAYED UNTIL THE FOLLOWING GROWING SEASON.
SUBSTANTIAL COMPLETION NOTES (GRASS):
CONTRACTOR SHALL BE RESPONSIBLE FOR LAWN MAINTENANE AND WATERING UNTIL SUBSTANTIAL COMPLETION. LAWN/TURF SHALL BE
CONSIDERED SUBSTANTIALLY COMPLETE WHEN GRASS ESTABLISHMENT IS AT A MIN. 95% COVERAGE AND THE SURFACE COMPLIES WITH THE
SLOPE, SMOOTHNESS AND OTHER SPECIFIED TOLERANCES. IF THE MINIMUM REQUIREMENTS ARE NOT MET; SUBSTANTIAL COMPLETION WILL BE
DELAYED UNTIL THE MINIMUM REQUIREMENTS ARE MET (POSSIBLY INTO THE FOLLOWING GROWING SEASON). THE CONTRACTOR SHALL BE
FULLY RESPONSIBLE FOR WATERING AND MAINTENANCE OF THE GRASS UNTIL SUBSTANTIAL COMPLETION IS REACHED. SEE SPECIFICATIONS
FOR FURTHER INFORMATION.
I»:�',T L9a.`j��a��1L`I���':I��I�11� ��:�'I�I�I ����►�
PLANTING PERIOD
TYPE
PLANTING RATE
TALL FESCUEAND
70 LBS/ACRE
AUGUST 15 - FEBRUARY I
WINTER RYE (GRAIN)
25 LBS/ACRE
TALL FESCUE AND
720LBS/ACRE
APRIL 1 -AUGUST 15
GERMAN MILLET (SMALL STEMMED VARIETY)***
25 LBS/ACRE
** TEMPORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT
ALLOW TEMPORARY COVER TO GROW OVER 12" HEIGHT BEFORE MOWING.
NOTES:
PERMANENT OR TEMPORARY GROUND COVER SHALL BE PROVIDED OVER ALL DISTURBED AREAS OF THE SITE
AS SOON AS POSSIBLE, HOWEVER, NO LATER THAN 30 DAYS AFTER CONSTRUCTION ACCTIVITIES HAVE
PERMANENTLY OR TEMPORARILY CEASED DURING ANY PHASE OF WORK.
TEMPORARY OR PERMANENT GROUND COVER SHALL BE PROVIDED ON ALL SLOPES WITHIN 15 WORKING
DAYS OR 30 CALENDAR DAYS AFTER CONSTRUCTION ACTIVITIES PERMANENTLY OR TEMPORARILY CEASE.
CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION
CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES
ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS; OTHER SEEDING RATE COMBINATIONS ARE
POSSIBLE.
ALL SLOPES 3:1 OR STEEPER TO HAVE BIODEGRADABLE EROSION CONTROL MATTING INSTALLED.
TEMPORARY SEEDING SCHEDULE
PUMP FLOW TO LOCATION
/DOWNSTREAM OF UTILITY TRENCH.
PLANTING PERIOD
TYPE
PLANTING RATE
60 LBS PER ACRE OR PER
MARCH 1 -DUNE 1
NATIVE STEEP SLOPE MIX WITH ANNUAL RYEGRASS
MANUFACTURER'S
REQUIREMENTS FOR 90%
COVERAGE
MIX COMPOSITION (BASED ON ERNMX-181)
31.9% SORGHASTRUM NUTANS NY4 ECOTYPE (INDIANGRASS, NY4 ECOTYPE)
20.0% LOLIUM MULTIFLORUM (ANNUAL RYEGRASS)
70.0% ELYMUS VIRGINICUS, PA ECOTYPE (VIRGINIA WILDRYE, PA ECOTYPE)
9.6 % ANDROPOGON GERARDII, 'NIAGARA' (BIG BLUESTEM, NIAGARA )
70% ELYMUS CANADENSIS (CANADA WILDRYE)
5.07. AGROSTIS PERENNANS, ALBANY PINE BUSH -NY ECOTYPE (AUTUMN BENTGRASS, ALBANY PINE BUSH -NY ECOTYPE)
4.07. PANICUM VIRGATUM, NJ ECOTYPE (SWITCHGRASS, NJ ECOTYPE)
3.0% PANICUM CLANDESTINUM, 'TIOGA' (DEERTONGUE, 'TIOGA)
2.0% SCHIZACHYRIUM SCOPARIUM, 'CAMPER' (LITTLE BLUESTEM, 'CAMPER)
1.37. CHAMAECRISTA FASCICULATA, PA ECOTYPE (PARTRIDGE PEA, PA ECOTYPE)
1.2% ECHINACEA PURPUREA (PURPLE CONEFLOWER)
ALL SLOPES 3:1 OR STEEPER TO HAVE
1.21'.' TRIDENS FLAWS (PURPLETOP)
BIODEGRADABLE EROSION CONTROL
1.07. COREOPSIS LANCEOLATA (LANCELEAF COREOPSIS)
MATTING INSTALLED.
1.0% RUDBECKIA HIRTA, COASTAL PLAIN NC ECOTYPE (BLACKEYED SUSAN, COASTAL PLAIN NC ECOTYPE)
0.7% HELIOPSIS HELIANTHOIDES, PA ECOTYPE (OXEYE SUNFLOWER, PA ECOTYPE)
0.2% MONARDA FISTULOSA, FORT INDIANTOWN GAP -PA ECOTYPE (WILD BERGAMOT, FORT INDIANTOWN GAP -PA ECOTYPE)
0.1% ASTER LAEWS, NY ECOTYPE (SMOOTH BLUE ASTER, NY ECOTYPE)
0.1% ASTER NOVAE-ANGLIAE, PA ECOTYPE (NEW ENGLAND ASTER, PA ECOTYPE)
0.1% GEUM CANADENSE, PA ECOTYPE (WHITE AVENS, PA ECOTYPE)
0.1% LIATRIS SPICATA, PA ECOTYPE (MARSH (DENSE) BLAZING STAR (SPIKED GAYFEATHER), PA ECOTYPE)
0.1% PENSEMON DIGITALIS, PA ECOTYPE (TALL WHITE BEARDTONGUE, PA ECOTYPE)
0.1% PYCNANTHEMUM TENUIFOLIUM (NARROWLEAF MOUNTAINMINT)
0.1% SOLIDAGO JUNCEA, PA ECOTYPE (EARLY GOLDENROD, PA ECOTYPE)
SOURCE: ERNST SEED CO. (1-800-873-3321) OR APPROVED EQUAL
JUNE 1- FEBRUARY 28
SEE TEMPORARY SEEDING SCHEDULE
SEEDING AND MAINTENANCE NOTES:
1. PRIOR TO SEEDING, A LICENSED SPRAY TECHNICIAN SHALL APPLY AN APPROVED HERBICIDE.
2. FOR AREAS WITH A SLOPE GREATER THAN 3:1, FINAL TRACKING SHALL BE PERPENDICULAR TO THE SLOPE AS THE TRACKS WILL HELP REDUCE EROSION,
RETAIN SEED, AND RETAIN MOISTURE.
3. FOR THE FIRST GROWING SEASON, WHENEVER THE VEGETATION REACHES A HEIGHT OF 18"-24", USE A BRUSH HOG MOWER OR STRING TRIMMER TO TRIM
THE MEADOW TO A HEIGHT OF 8". PLEASE NOTE THAT A MOWER IS NOT RECOMMENDED AS THE MOWER HEIGHT WILL BE T00 LOW AND THE NATIVE
GRASSES WILL BE KILLED.
4. FOR THE SECOND GROWING SEASON, TRIM ANY MATERIAL STANDING FROM THE PREVIOUS YEAR CLOSE TO THE GROUND WHILE IT IS DORMANT. THIS WILL
ALLOW THE SOIL TO WARM MORE QUICKLY WHICH WILL STIMULATE THE EMERGENCE OF NEW GROWTH.
5. DO NOT TRIM THE MEADOW AT A HEIGHT OF LESS THAN 8" AS THIS WILL KILL THE NATIVE GRASSES.
PERMANENT SEEDING SCHEDULE- NATURALIZED SEED 'NO -MOW MIX
TO BE APPLIED TO ALL PLANTING BEDS
-
t1.
MULCH BED DETAIL N.T S.
LOCATE ALL EXISTING UTILITIES PRIOR TO INSTALLATION OF PLANT MATERIAL. NOTIFY LANDSCAPE
TOP OF BANK
ARCHIECT OF ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THOSE SHOWN ON THE PLAN.
2.
VERIFICATION OF TOTAL QUANTITIES AS SHOWN ON THE PLANT LIST SHALL BE THE RESPONSIBILITY
❑ ❑
OF THE CONTRACTOR, AND THE TOTAL QUANTITIES SHALL BE AS SHOWN ON THE PLAN.
❑ ❑ ❑ ❑
3.
CONTACT THE LANDSCAPE ARCHITECT FOR INSPECTION 48 HOURS IN ADVANCE OF THE
❑ ❑ ❑ ❑
SCHEDULED SITE VISIT AND AT THE FOLLOWING INTERVALS:
❑
❑ ❑ ❑ ❑ ❑
- REVIEW OF GRADING PRIOR TO PLANT AND LAWN INSTALLATION
❑
❑ ❑ ❑ ❑ ❑
- REVIEW OF PLANT MATERIAL PRIOR TO INSTALLATION.
FLOC ❑
❑ ❑ ❑ ❑ ❑ BOTTOM OF CHANNEL
- ONE SUBSTANTIAL COMPLETION MEETING FOR PLANT INSTALLATION.
❑
❑ ❑ ❑ ❑ ❑
- ONE FINAL INSPECTION FOR ALL SEEDING/PLANTING OPERATIONS.
❑ ❑ ❑ D
4.
ALL PLANT MATERIAL SHALL CONFORM WITH THE STANDARDS SET FORTH BY THE AMERICAN
❑ ❑
ASSOCIATION OF NURSERYMEN AND THE WRITTEN SPECIFICATIONS.
❑ E
5.
ESTABLISH POSITIVE DRAINAGE IN ALL PLANTING BEDS AND AWAY FROM BUILDING.
❑
6.
APPLY PRE -EMERGENT HERBICIDE TO ALL NEW PLANTING BEDS AT MANUFACTURER'S
TOP OF BANK
RECOMMENDED RATE PRIOR TO INSTALLATION OF PLANT MATERIAL.
TEMP. COFFER DAM
UTILITY TRENCH
7
DO NOT INSTALL PLANT MATERIAL IN IMPERVIOUS SOILS (i.e. HOLES WHICH WHEN FILLED WITH
/j
WATER, DO NOT COMPLETELY DRAIN WITHIN TWO HOURS).
&
LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING ALL PLANTS AND LAWN AREAS
TEMP. TIMBER
AT HIS COST FROM HIS OWN WATER SOURCE INCLUDING DURING PERIODS OF DROUGHT UNTIL
MAT
FINAL COMPLETION. ANY WATERING OR MAINTENANCE REQUIRED AFTER FINAL
COMPLETION SHALL BE AT OWNER'S COST.
PLAN
9.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ALL EQUIPMENT & SUBCONTRACTORS
AWAY FROM SEEDED AREAS. IF DAMAGE OCCURS, THROUGH NO FAULT OF THE OWNER, AREAS
TEMP. COFFER DAM
2,
SHALL BE REGRADED AND RESEEDED IMMEDIATELY AT NO ADDITIONAL COST TO THE OWNER.
TOP OF BANK
CONTRACTOR SHALL WATER AND MAINTAIN THOSE AREAS UNTIL THEY ARE AT 959 COVERAGE AT
o
SUBSTANTIAL COMPLETION.
0 0 1
2' MIN.
o
__o_
10.
SUBSTITUTIONS OF PLANT MATERIAL SHALL ONLY BE ACCEPTED 60 DAYS PRIOR TO COMMENCEMENT
FLOW
o0o SAND BAGS
OF PLANTING OPERATIONS. SUBSTITUTION REQUESTS MUST BE IN WRITING AND WILL ONLY BE
o
0000o BOTTOM OF CHANNEL
ACCEPTED FOR LACK OF AVAILABILITY REASONS WHICH CAN BE SUBSTANTIATED OR FOR SUPERIOR
6'
STOCK SUBSTITUTIONS.
SEEDING
TEMP. TIMBER
11.
GENERAL LAWN AREAS SHALL BE SEEDED WITH SUNSTAR/RIVIERA BERMUDAGRASS OR APPROVED EQUAL.
MAT
12.
LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHIECT TO REVIEW GRADING ONE WEEK
UTILITY TRENCH
PRIOR TO SEEDING, IF THE LANDSCAPE CONTRACTOR AND LANDSCAPE ARCHITECT FIND GRADING
UNACCEPTABLE FOR FINAL SEEDING, LANDSCAPE CONTRACTOR SHALL BRING IT TO THE ATTENTION
O
OF THE GENERAL CONTRACTOR. LANDSCAPE CONTRACTOR SHALL NOT PROCEED WITHOUT
APPROVAL BY LANDSCAPE ARCHITECT.
SECTION
COFFER DAM N.T S
LANDSCAPE NOTES
�{ 0 4
(JS 6"x6" SIDE BOARDS ° o
NO GAPS BETWEEN BOARD 0 Do°
ANCHOR BRIDGEMAT TO A
TREE, OR OTHER PERMANENT
OBJECT WITH SUFFICIENT
9T STRENGTH, USING STEEL
CHAIN OR CABLE.
S �EpM ' / o o ° o
0 4
ROAD/LOG MAT PER CAROLINA MAT
PERSPECTIVE VIEW INCORPORATED OR SUBMITTED EQUAL WWW.CAROLINAMAT.COM
TEMP. BRIDGEMAT SHALL BE SIZED, DESIGNED AND (252) 793-4045
MONITORED BY A LICENSED ENGINEER HIRED BY LOCATED ON BOTH SIDES OF APPROACH AND THROUGH
THE CONTRACTOR AS NEEDED TO ACCOMMODATE EXTENTS OF WETLAND AREAS.
EQUIPMENT REQUIRED FOR PROJECT.
1/4 SUPPORTED 1/4 SUPPORTED
ROAD/LOG MAT LOCATED ROAD/LOG MAT LOCATED
THROUGH EXTENTS OF WETLAND THROUGH EXTENTS OF WETLAND
AREA BRIDGEMAT AREA
ORIGINAL
STREAM STREAMBANK
SIDE VIEW ~
TEMPORARY TIMBER MAT
TIMBER MATTING N°T°S
1. CHISEL ALL CUT GRADED OR COMPACTED AREAS TO A MINIMUM DEPTH OF 8".
2. DISC ALL AREAS TO RECEIVE GRASS TO A MINIMUM OF 8 INCHES, MIX AND AMEND WITH 3 INCHES OF WELL SCREENED TOPSOIL. ON-SIE
TOPSOIL MAY BE USED IN PLACE OF IMPORTED TOPSOIL, IF WELL -SCREENED AND DRY PRIOR TO APPLICATION IN ACCORDANCE WITH
SPECIFICATION SECTION 329000.
J. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM.
4. APPLY AGRICULTURAL LIME, FERTILIZER, AND PHOSPHATE UNIFORMLY AS PER SPECIFICATIONS AND MIX WELL WITH SOIL.
5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED TO A 6 INCHES DEPTH.
6. SEED AT RATE SPECIFIED OR AS NEEDED TO ACHIEVE AND MAINTAIN A THICK HEALTHY GROUND COVERAGE.
7 MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. BEGIN THOROUGH WATERING OF GRASSED AREAS IMMEDIATELY UPON
INSTALLATION. DO NOT ALLOW GRASSED AREAS TO BECOME EXCESSIVELY DRY.
& INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS AS NEEDED.
9. IF CONFLICTS OCCUR BETWEEN WRITTEN SPECIFICATIONS AND THE DRAWINGS, THE WRITTEN SPECIFICATIONS SHALL PREVAIL.
SEEDBED PREPARATION
APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY A MINIMUM 3,000 LB/ACRE GROUND
AGRICULTURAL LIMESTONE AND A MINIMUM 500 LB/ACRE 10-10-10 FERTILIZER, AS NEEDED TO ESTABLISH
95% COVERAGE (AS DETERMINED ON A PER SQUARE YARD BASIS) PRIOR TO SUBSTANTIAL COMPLETION.
CONTRACTOR TO SUBMIT A COPY OF ALL SOIL REPORTS TO OWNER UPON RECEIPT.
LIME & FERTILIZATION SCHEDULE
1. DURING ALL PHASES OF CONSTRUCTION, GROUNDCOVER ON EXPOSED SLOPES SHALL BE PROVIDED WITHIN 14 CALENDAR DAYS
FOLLOWING COMPLETION OF ANY PHASE OF GRADING.
2. FINAL PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED ON ALL DISTURBED AREAS WITHIN 14
CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT.
J. USE EXCELSIOR MATTING OR OTHER APPROVED CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF CHANNELS.
4. APPLY 4000 LB/ACRE(2 TONS LB/AC) GRAIN STRAW OVER SEEDED AREAS AND ANCHOR STRAW CRIMPING WITH HAND OR
MECHANICAL CRIMPER 8" MAX. SPACING, ASPHALT TACKING OR OTHER APPROVED METHOD. ASPHALT TACKING SHALL BE 400
GAL/ACRE (9 GAL/1000 SF).
5. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES AND CLOG DRAINAGE DEVICES.
SURFACE STABILIZATION REQUIREMENTS
DO NOT PRUNE OR CUT LEADER.
SEE SPECIFICATIONS SECTION
32 90 00 FOR DETAILS.
MULCH IS NOT TO BE -
IN CONTACT WITH TRUNK
OF TREE
ARBORTAPE OR 3/4" -
WOVEN BELT SYNTHETIC
FABRIC STRAP, GREEN.
FLUORESCENT
SAFETY FLAGGING
3" MULCH
6" EARTH
SAUCER
ARBORTAPE OR 3/4"
WOVEN BELT SYNTHETIC
FABRIC STRAP, GREEN.
3" MULCH
FLUORESCENT
SAFETY FLAGGING
TOP OF ROOT BALL AT
/ \
4" EARTH
FINISHED GRADE. REMOVE
SAUCER
BURLAP AND TWINE FROM
2„ 2„
x
TOP 1/3 OF ROOT BALL.
STAKE O
/
FINISHED
REMOVE CONTAINER.
GRADE
EDGE OF HOLE
-
-
- -
/ STAKES IN SOLID-
GROUND ONLY
NOTE
I
TL'
IIIII SOIL BACKFILL MIXTURE
III=L 1 PART GROUND PINE
I GUYING PLAN
PLANT PITS ONLY FOR
-I
_
II= BARK TO 6 PARTS SOIL
-I
SINGLE PLANTS. FOR
L-L�L
III I III
II
WITH 8-8-8 FERT.MIXED
II II IN AT 1 LB/100 S.F.
I
OTHER PLANTING PREPARE
L-LI-II
-II
-II
/ .
THE ENTIRE BED AREA
\ ONLY STAKE TREES ON SLOPES 3:1 OR GREATER SECURELY AT
\ OR IN HIGH WIND CONDITIONS.
ORIENT TREES AS THEY WERE IN THE FIELD.
/ WRAP ONLY TREES SUSCEPTIBLE TO SCORCH.
START \ / / TIE EELPTOP, BOTTOM, AND , IF REQUIRED, ATSAT 2' INTERVALS.
2" x 2" STAKE
24" MIN.
BELOW GRADE
REMOVE TOP 2/3
OF WIRE BASKET
WHERE PRESENT. ROOT BALL x 2
REMOVE FROM PIT
TREE PLANTING DETAIL
�S WETLAND NOTES
2" x 2" STAKE
48" MIN.
ABOVE GRADE
TOP OF ROOT BALL AT
FINISHED GRADE. REMOVE
BURLAP AND TWINE FROM
TOP 1/3 OF ROOT BALL.
/FINISHED
GRADE
PREPARED & MULCHED PLANT BED
OR PREPARED LAWN AREA
SOIL BACKFILL MIXTURE
1 PART GROUND PINE
BARK TO 6 PARTS SOIL
WITH 8-8-8 FERT.MIXED
IN AT 1 LB/100 S.F.
MAKE HOLE 1' WIDER ON
ALL SIDES THAN ROOT
BALL DIAMETER
N. T° S.
1. IF NATIVE TOPSOIL ON SITE IS TO BE UTILIZED, A SOIL ANALYSIS SHOULD BE CONDUCTED TO
DETERMINE THE VIABILITY OF SOILS FOR HEALTHY VEGETATION GROWTH. IMPORTED OR IN -SITU SOILS
MAY BE AMENDED WITH ORGANIC MATERIAL, DEPENDING ON SOIL ANALYSIS TO ENHANCE THE
SUITABILITY AS PLANTING MEDIA. CONTRACTOR SHALL SUBMIT RESULTS OF SOIL ANALYSIS TO
LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO CONSTRUCTION.
2. INSTALL AND FINE GRADE TOPSOIL TO FINISH GRADES. IF SOIL AMENDMENTS ARE REQUIRED PER THE
SOIL ANALYSIS, THE SOIL IS TO BE AMENDED TO A DEPTH OF 12" PER THE STATE REQUIREMENTS.
J. SEE SHEET C0705 FOR FURTHER WETLAND CONSTRUCTION NOTES AND DETAIL.
MAKE HOLE 12" WIDER ON
BALL + 24" ALL SIDES THAN ROOT
BALL DIAMETER
TYPICAL SHRUB PLANTING DETAIL N.T.S.
3" MULCH
FINISH
GRADE
SSA ���S S�T
?S S
L
II II
BACKFILL MIXTURE : I_ -I I I I I I I,; i I i I I ILI I'
1 PART SCREENED PINE
BARK TO 2 PARTS SOIL
WITH 8-8-8 FERT. MIXED
IN AT 1 LB./100 S.F.
GROUND COVER PLANTING DETAIL N.T°S
A T B C
r D
1
WETLAND CALCULATIONS
2
SHALLOW LAND PLANT LIST - SCM 2'
TOP 3' VEGETATED SHELF
3
KEY
PLANT SCHEDULE
QTY.
REMARKS
'�•`:�.
ASCLEPIAS INCARNATA -SWAMP MLKWEED
112
4 CUBIC CONTAINERS (QT)
HELIANTHUS ANGUSUFOLIUS - SWAMP SUNFLOWER
113
2' O.C.
4
'; c"-"
LOBELIA CARDINALIS -CARDINAL FLOWER
113
LANDSCAPE ARCHI ECT TO
IRIS VWRGINICA - BLUE FLAG IRIS
113
APPROVE LOCATIONS IN THE FIELD
CAREX STRICTA - TUSSOCK SEDGE
113
PRIOR TO INSTALLATION
1,710 SF
REQUIRED: 428 PLANTS
5
(50 HERBACEOUS PLANTS1200SF)
6
563 TOTAL PLANTS PROVIDED
7
SHALLOW WATER PLANT LIST - SCM '2'
BOTTOM 3' VEGETATED SHELF
8
KEY
PLANT SCHEDULE
QTY.
REMARKS
" F' ` i' `:=.
ACORUS AMERICANUS -SWEET FLAG
126
4° CUBIC CONTAINERS (QT)
JUNCUS EFFUSUS - SOFT RUSH
126
2' O.C.
9
PELTANDRA VWRGINIANA - ARROW ARUM
126
LANDSCAPE ARCHI ECT TO
, i;
_ - _ ;
PONEDERIA CORDATA - PICKEREL WEED
126
APPROVE LOCATIONS IN THE FIELD
SAURURUS CERNUUS - LIZARD'S TAIL
127
PRIOR TO INSTALLATION
1,690 SF
REQUIRED: 423 PLANTS
i
(50 HERBACEOUS PLANTS/200SF)
11
554 TOTAL PLANTS PROVIDED
12
DEEP POOL PLANT LIST - SCM 2'
13
KEY
PLANT SCHEDULE
QTY.
REMARKS
NELUMBO LUEA - AMERICAN LOTUS
50
4" CUBIC CONTAINERS (QT)
NUPHAR LUEA POLYSEPALA - SPATERDOCK
50
2' O.C.
14
..... ......::
NYMPHAEA ODORATA - FRAGRANT WATER LILY
50
LANDSCAPE ARCHIECT TO
APPROVE LOCATIONS IN THE FIELD
PRIOR TO INSTALLATION
590 SF
REQUIRED: 148 PLANTS
15
(50 HERBACEOUS PLANTS1200SF)
16
150 TOTAL PLANTS PROVIDED
LAND
NO MOW
'
SH WATER
;// ° O °
0 MO
/
°
O O \
/
°
/
//
//•r �/oo a al� � e a al� � i� a al� o � o ,�
,,°
D P PO
L I /
a a e a ol/ a a % Q/ ol/ a a e O /� O //
I
//
. . . . . . . . . . .
f
\�.
�
/
o
NO MOW
_-
\ \
.........
/
WETLAND PLANTING
SCALE: 1"=10'
Piedmont Leaf Lofts
404 East 4th Street,
Winston-Salem, NC 27101
Phone 336 722 6152 Fax 336 722 6192
www.mckissickassociates.com
Consultants:
Consultant Name Civil/Structural/MEP
Seal:
CLH DESIGN, P.A.
400 Regency Forest Drive
Suite 120
Cary, North Carolina 27518
Phone: (919)319-6716
Fax: (919)319-7516
LA: C-106, PE: C-1595
�p*��If111isJJ�J
�.•',,N CARO-00"'
+' ?`.i �,A�P.,
sv
I_�-f0►
ISSUE LOG
Distribution
Date
No.
REVIEW COMMENTS
11/8/19
1
NCDEQ COMMENTS
1/30/20
Ai
NCDEQ COMMENTS
3/18/20
0
Client:
WINSTON-SALEM FORSYTH
COUNTY SCHOOLS
LEWISVILLE MIDDLE
SCHOOL
Drawing Title:
SITE DETAILS
Bid Documents
Issue Date
NOVEMBER 8, 2019
Project Number: Drawn by:
2017-8 RP/KL
Drawing Number
07006