Loading...
HomeMy WebLinkAboutNCC201216_NOI Application_20200326Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 3/24/2020 4:36:32 PM (NCG01 NOI Submission) Approve by Clark, Paul 3/25/2020 8:38:01 AM (Review- Construction NOI 23469) • The task was assigned to Clark, Paul by round robin distribution 3/24/2020 4:37 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 26, 2020 5:00 PM 3/24/2020 4:37 PM Submit by McCoy, Suzanne 3/26/2020 8:13:29 AM (Payment Verification for NCC201216) * David Michaels • McCoy, Suzanne assigned the task to McCoy, Suzanne 3/26/2020 8:12 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: May 6, 2020 5:00 PM 3/25/2020 8:38 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information la. Project Name * Owl's Trail @ Calebs Creek 1 b. Specific Lot This field rray be used to list specifc lot numbers. Numbers 12-18, 47-54, 73-80, 55-58. 2. County* Forsyth 3. Highway or Street Teague Lane Address* Street name only is acceptable if no address nunber assigned yet 4. City or Township* Abbotts Creek 5. State * NC 6. Zip Code* 27284 7. Latitude* Enter the latitude in decinal degrees 36.0626 8. Longitude * Enter the longitude in decinal degrees (MJSTbe negative) -80.0911 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 03/09/2020 Estirrated Construction Project Start Date 10. Date to End * 03/09/2021 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial Classification for Development 12. Acres to be 3.60 disturbed* (including off -site borrow and waste areas) 13. Total site area 6.94 (acres)* 14. Post- 1.85 construction (Estirrated) impervious area (acres) * NCC Project NCC-FORSY-2020-Owl's Trail @ Calebs Creek Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Abbotts Creek Waterbody* INbrre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 12-119-(1) Index No.* NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Windsor Investments, LLC Name * If perrrittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name* David IF Corporation, enter Fbgistered Agent First Barre 3. Last Name* Michaels If Corporation, enter Faegistered Agent Last %rre 3b. Title Company Agent 4. Permitee E-mail DMichaels@uvindsorinvestments.com Address * 5. Permittee 336-382-3535 Telephone No.* 6. Permittee Mailing Street Address Address* 5603 New Garden Village Drive Address Line 2 City State / Frovince / Region Greensboro NC Fbstal / Zip Code Country 27410 us Check box if the rJ Yes street address the same as mailing address 7. Permittee Street Street Address Address* 5603 New Garden Village Drive Address Line 2 City State / Ffovince / Plegion Greensboro NC Flostal / Zip Code Country 27410 us 8. Type of Individual Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site David Contact - First Name * 2. Primary Site Michaels Contact - Last Name * 3. Title Company 4. Site Contact E- Dmichaels@Wndsorinvestments.com mail Address* 5. Site Contact 336-282-3535 Telephone No. 6. Organization Windsor Investments, LLC Name 7. Site Contact Street Address Mailing Address* 5603 New Garden Village Drive Address Line 2 City Greensboro Fbstal / Zip Code 27410 8. Consultant Name (Optional) Evans Engineering, Inc First and Last nacre 9. Consultant E-mail adl@evans-eng.com This person will be copied on all correspondence. 10. Consultant 336-282-3535 Telephone No. State / Rovince / Region NC Country US D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information .......................................................................................................................................................................................................................................................................................................................__ 1. Date E&SC Plan 03/09/2020 Approved * 2. E&SC Plan Project FORSY-2020-024 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Winston-Salem (WSRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan Letter of Approval -Owl Trails @ Calebs Creek.pdf 7.16MB Approval letter or Mist beRDFformat Grading Permit Site Map (Optional) Helpful for linear project review Owl's Trail Erosion Plans-03-11-20.pdf 7.13MB Mast be RDFfornat Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 6. NOI Certification 20200324164512591.pdf 551.94KB Form Wst be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * David B. Michaels Title Company Agent Organization Windsor Investments, LLC Date * 03/24/2020 F. Tracking and COC Info NOI Tracking No. 23469 NC Reference No. NCG01-2020-1216 Uses 'count number' variable (incremrented by SP) Certificate of NCC201216 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 1216 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)