Loading...
HomeMy WebLinkAboutNCC201209_ESC Approval Submitted_20200326ROY COOPER MICHAEL S. REGAN Scc rezar p RRIAN WRENN Ac tlng Dire_ ror NORTH CAROLINA Environmental Quality March 18, 2020 LETTER OF APPROVAL AV Homes of Raleigh LLC ATTN: Sarah Larson, VP Finance 15501 Weston Parkway, Suite 100 Cary, NC 27513 RE: Project Name: Holden Creek Phase 5 (Lots 57,58,62,64,65,182,183,186, l 87,188,201) Project ID: FRANK-2020-021 Approved Acres: 3.10 County: FRANKLIN, City: Youngsville Address: Holden Road River Basin: Neuse Stream Classification: Other Submitted By: The John R. McAdams Company, Inc. Date Received by LQS: February 27, 2020 Plan Type: New Dear Ms. Larson: The subject erosion and sedimentation control plan has been approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The cNOI fonn may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNO1 form to Annette Lucas at Annett_e.Lucas alncdenr.goy or Paul Clark at Paul.Clark u,ncderingov. If the owner,'operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. North Carolina Dup irtmcnt of Lnti,ronntental Qualay UivNion uf Lrergy Mineral and Land resnurcc s RalciyltRcnionc�101iircr It>13i1;ii15crrirGC'cn4r 'IA�OR;u�ert[hwe i;alcigft.NorthCaenlina2r4,U4 Letter of Approval AV Homes of Raleigh LLC March 18, 2020 Page 2 of) Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring; protection of existing; natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the infonnation provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation ofthis pen -nit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, S Sally Castle, El Regional Engineering Associate Land Quality Section Enclosures: Certificate of Approval NPDES NCGOi Fact Sheet cc: John C. Martin, PE fimartinc@mcadamsco.com)—Electronic Copy Regional Office file