HomeMy WebLinkAbout20200376 Ver 1_More Info Requested_20200325Strickland, Bev
From: Homewood, Sue
Sent: Wednesday, March 25, 2020 3:37 PM
To: mhorstman@wkdickson.com; Wendi Hartup (WHartup@toknc.com)
Cc: Roden Reynolds, Bryan K CIV (US)
Subject: RE: [External] FW: SAW-2020-00523_Broken Saddle (Notice of Incomplete Pre -
Construction Notification)
Mark/Wendi,
The PCN states that this project is not subject to any riparian buffer regulations but Reedy Fork is within the Jordan Lake
Watershed and therefore the stream is subject to the Jordan Lake Buffer Regulations. Although any buffer impacts
would be temporary, they will need to be included in the PCN form and approved by DWR in accordance with the Table
of Uses (as either protection of existing structures, or streambank stabilization activities)
Please update the PCN form and the plan sheets to clearly indicate Zone 1 and Zone 2 buffer impacts within the limits of
disturbance. Please note that anything currently within the footprint of the roads would be considered an existing
transportation facility so only areas outside of the road shoulders need to be incorporated into the application.
Please contact me if you have any questions/concerns.
I will place this application on hold until this information is submitted.
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue. Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
From: Roden Reynolds, Bryan K CIV (US) <Bryan.K.Roden Reynolds@usace.army.miI>
Sent: Wednesday, March 25, 2020 10:21 AM
To: Homewood, Sue <sue.homewood@ncdenr.gov>
Subject: [External] FW: SAW-2020-00523_Broken Saddle (Notice of Incomplete Pre -Construction Notification)
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Thanks,
Bryan Roden -Reynolds, WPIT
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District
Charlotte Regulatory Field Office
8430 University Executive Park Drive
Charlotte, NC 28262
Office: (704)510-1440
From: Mark Senior <msenior@wkdickson.com>
Sent: Wednesday, March 25, 2020 10:15 AM
To: Roden Reynolds, Bryan K CIV (US) <Bryan.K.RodenReynolds@usace.army.mil>
Cc: Marc Horstman <mhorstman@wkdickson.com>; Wendi Hartup <WHartup@toknc.com>
Subject: [Non-DoD Source] RE: SAW-2020-00523_Broken Saddle (Notice of Incomplete Pre -Construction Notification)
Bryan; Thanks again for responding so quickly to our submittal and my call. Attached is a PDF package in response to
your comments. It includes a narrative response to each of your comments as well as a revised impact table. I've also
included a signed Agent Authorization form and a revised Impact Map exhibit. Both the impact table and Impact Map
have incorporated the riffles as permanent impacts and include the pipe replacement under Saddle Brook Lane as a
permanent impact.
Please let me know if you need any additional information.
Thanks, Mark Sr.
Mark T. Senior, PE
Senior Project Engineer
WK Dickson & Co., Inc.
720 Corporate Center Drive
Raleigh NC 27607
Office: 919-782-0495
Direct 919-256-5650
Email: msenior@wkdickson.com
Blockedwww.wkdickson.com
Connect with us: Facebook I Twitter I LinkedIn
From: Roden Reynolds, Bryan K CIV (US) <Bryan.K.Roden Reynolds@usace.army.mil>
Sent: Tuesday, March 24, 2020 2:45 PM
To: Mark Senior <msenior@wkdickson.com>
Subject: RE: SAW-2020-00523_Broken Saddle (Notice of Incomplete Pre -Construction Notification)
You are welcome to call my office any time. I will be working all week.
Thanks,
Bryan Roden -Reynolds, WPIT
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District
Charlotte Regulatory Field Office
8430 University Executive Park Drive
Charlotte, NC 28262
Office: (704)510-1440
From: Mark Senior <msenior@wkdickson.com>
Sent: Tuesday, March 24, 2020 2:27 PM
To: Roden Reynolds, Bryan K CIV (US) <Bryan.K.RodenReynolds@usace.army.mil>
Cc: Marc Horstman <mhorstman@wkdickson.com>
Subject: [Non-DoD Source] SAW-2020-00523_Broken Saddle (Notice of Incomplete Pre -Construction Notification)
Good afternoon Bryan. Thank you for the quick turnaround on this submittal. I have reviewed your comments and have
a few questions if you're available to talk. Should I call your work number or are you working remotely? When is a good
time to call?
Thanks, Mark Sr.
From: Roden Reynolds, Bryan K CIV (US) <Bryan.K.RodenReynolds@usace.army.mil>
Sent: Tuesday, March 24, 2020 8:17 AM
To: Marc Horstman <mhorstman@wkdickson.com>
Cc: whartup@toknc.com; Sue Homewood <sue.homewood@ncdenr.gov>
Subject: SAW-2020-00523_Broken Saddle (Notice of Incomplete Pre -Construction Notification)
Importance: High
Mr. Hortsman,
On March 16, 2020, we received the Pre -Construction Notification you submitted on behalf of the Town of Kernersville
on a property located in Forsyth County, North Carolina. I have completed my initial review of the report and I have
determined that it is incomplete. The following information is necessary before I will issue a determination:
a. The PCN did not contain a signed Agent Authorization Form between the applicant (i.e., Wendi Hartup of the
Town of Kernersville) and the consultant (i.e., March Horstman of WK Dickson). Therefore, please provide a
signed Agent Authorization form between applicant and consultant;
b. In the PCN, Section D(3) Stream Impacts and the Figure labeled "Impact Map" depicts the proposed impacts
for the project. However, there are discrepancies between these two sources. Please clarify and accurately
represent the proposed impacts. Below is the impacts as described in the PCN;
Proposed Impact
Reason for Impact
Impact Type
(Permanent or
Temporary)
Table in PCN
(Section D)
Impact Map
S1
Bank stabilization
Permanent/Temporary
10 linear feet
(Permanent)
10 linear feet
(Temporary)
S2
Bank stabilization
Permanent
70 linear feet
65 linear feet
S3
Riffle grade control
Temporary
10 linear feet
10 linear feet
S4
Bank Stabilization
Permanent/Temporary
9 linear feet
(Permanent)
9 linear feet
(Temporary)
S5
Culvert extension
Permanent
40 linear feet
35 linear feet
S6
Riffle grade control
Temporary
10 linear feet
65 linear feet
PROPOSED PERMANET IMPACTS
129 LINEAR FEET
100 LINEAR FEET
PROPOSED TEMPORARY IMPACTS
20 LINEAR
FEET
94 LINEAR FEET
TOTAL STREAM IMPACTS I 149 LINEAR FEET I 194 LINEAR FEET
c. The riffle grade control proposed at Broken Saddle Lane is proposed as 10 linear feet of temporary impacts.
Please describe the type of riffle grade control that will be placed as proposed and to why it is considered a
temporary impact and not a permanent impact. Please note all temporary stream impacts will need to be
restored to pre-existing conditions after the completion of construction. Therefore, these temporary grade
controls will need to be removed to comply with any issued permit. Riffle grade controls proposed as
temporary installments will likely cause more adverse effects to the stream channel because of installation
and removal;
d. The riffle grade control proposed on Marylebone Drive is proposed as a buried riffle complex. However, as
stated in Additional Information Request "b", there are discrepancies in length of impact and duration of
impact (i.e., temporary or permanent). If the activity is a buried riffle, then the Corps would consider this
impact as permanent, as it would not be removed after the completion of construction;
e. The Broken Saddle portion of the project, proposes to replace an existing culvert with an appropriately sized
culvert in the same footprint of the existing culvert. This culvert replacement (i.e., 60 linear feet of
permanent stream impacts) needs to be depicted in the table in Section D(3) and the figure labeled "Impact
Map" Therefore, please revise these sections accordingly;
f. The PCN states the culvert at Marylebone Drive is adequately sized for the Town's design storm. The PCN
lacked enough detail to determine the size of the existing culvert under Marylebone Drive. Therefore, please
provide the current size of this existing culvert. In addition, if this culvert is a different size than the culvert
to be replaced and installed under Broken Saddle Lane, please provide explanation as to why culverts in
series on the same stream channel and in the same watershed would be required and designed to have two
different sizes.
g. The Corps is unsure/confused as to why a PCN was submitted and requested for a Nationwide Permit 3.
Nationwide Permit 3 notification requirements, on page 2 of Nationwide Permit 3, state "for activities
authorized by paragraph (b) of the NWP, the permittee must submit a PCN. Activities under paragraph (b)
refer to the removal of accumulated sediments and debris outside the immediate vicinity of existing
structures. However, the activities as proposed in the PCN are more related to activities described in
paragraph (a) of NWP 3 (i.e., repair, rehabilitation, or replacement of any previously authorized structure or
fill and includes minor deviations in authorized structures and any minimum stream channel work necessary
for the repair). Once all the additional information requested in "a-f" is received, the Corps will be able to
make a determination if the proposed project qualifies for a non -reporting Nationwide Permit 3. If a non -
reporting Nationwide Permit 3 would cover these proposed activities, then the Corps will issue an non -
reporting email to the applicant rather than reviewing the PCN, which was not needed, and issuing a formal
verification letter. If the additional information provided does not meet the conditions in paragraph (a) of
NWP 3, then the Corps will likely issue a formal verification letter for the proposed project.
Please provide the information requested above in ONE consolidated response within 30-days of the date of this
correspondence. If you do not respond within 30-days, the request will be administratively canceled. Please contact me
via telephone or e-mail if you have any questions.
Thanks,
Bryan Roden -Reynolds, WPIT
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District
Charlotte Regulatory Field Office
8430 University Executive Park Drive
Charlotte, NC 28262
Office: (704)510-1440
Mark T. Senior, PE
Senior Project Engineer
WK Dickson & Co., Inc.
720 Corporate Center Drive
Raleigh NC 27607
Office: 919-782-0495
Direct 919-256-5650
Email: msenior@wkdickson.com
BlockedBlockedwww.wkdickson.com
Connect with us: Facebook I Twitter I LinkedIn