Loading...
HomeMy WebLinkAbout20140832 Ver 3_REVISED 80% ISSUE FOR PERMITTING_20200324No.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:NOT FORCONSTRUCTIONSEALJDHNAEJDHJDHISSUED FOR:80% PERMITTING LOCATION MAP NTS. PROJECT DESCRIPTION: THE PURPOSE OF THIS PROJECT IS TO REPAIR AND ENHANCE PORTIONS OF THE CHANNEL ASSOCIATED WITH THE CARTOOGECHAYE CREEK. MACON COUNTY PROJECT SITE PROPERTY LOCATION LAT: 35° 08' 26.58" N; LONG: 83° 29' 12.50"W MACON COUNTY, NORTH CAROLINA CARTOOGECHAYE CREEK REPAIRISSUE FOR 80% PERMITTING DRAWINGS FOR CARTOOGECHAYE CREEK REPAIR PREPARED BY JENNINGS ENVIRONMENTAL & LDSI, INC FOR RESOURCE INSTITUTE & NRCSSUEGISSURVEYINGGNIREENIG NE CHARLOTTE OFFICE:201 WEST 29TH STREET CHARLOTTE NC 28206 KINSTON OFFICE: 1308 HIGHWAY 258 KINSTON NC 28504 PHONE: 704.337.8329 | FAX: 704.308.3153 WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-1925 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 PHONE: 919.600.4790 WEB: WWW.JENNINGSENV.COM NC FIRM #: P-1932 NRCS SERVICE PROVIDER NOTE: TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, JUDGEMENT, & BELIEF, THESE PLANS MEET APPLICABLE NRCS STANDARDS BY: DATE: Sheet List Table Sheet Number Sheet Title 1 COVER SHEET 2 GENERAL NOTES 3 GENERAL NOTES 2 4 GENERAL NOTES 3 5 E&SC 6 E&SC DETAILS 7 0+00.00 - 6+33.00 8 6+33.00 - 12+66.00 9 12+66.00 - 18+99.00 10 18+99.00 - 25+32.00 11 25+32.00 - 31+65.00 12 31+65.00 - 37+98.00 13 BOULDER TOE 14 FORD CROSSING 15 PLANTING DETAILS G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:24:36 PM, AutoCAD PDF (General Documentation).pc3 No.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:JDHNAEJDHJDH08/09/2019NOT FORCONSTRUCTIONSEALISSUED FOR:80% PERMITTING LEGEND SPOIL AND WOODY DEBRIS PILE LOCATION WRP SOIL BORING TEST HOLE LOCATION 5:1 ALIGNMENT CURVE MARKER TF TFTFTF2.35 15 0 SLOPE SPOT ELEVATION PROPOSED CONTOUR LINE EMBANKMENT AND SLOPE DRAINAGEWAY OR DITCH BENCHMARK BRUSH/TREE LINE WETLAND RESERVE PROGRAM CONSERVATION EASEMENT LIMITS CENTER LINE, BUILDING, ROAD, ETC. N 1000.00 E 1000.00 STRUCTURE, BUILDING OR FACILITY LOCATION POINT- COORDINATES DRAINAGE OR DITCH FLOW DIRECTION LIMITS OF DISTURBANCELODLOD SILT FENCESFSF WATER CONTROL STRUCTURE 25 0 EXISTING CONTOUR LINE ALIGNMENT LINE MARKER TREE PROTECTION FENCING OVERHEAD ELECTRICAL LINEOHEOHE WRE WETLAND RESERVE EASEMENT LIMITS LINEAR LOW - DENSITY POLYETHYLENELLDPE TURBIDITY CURTAIN WATER TRANSFER STRUCTURE TH XX-LS-1 XX-LV-1 XX-CV-1 XX-RW-1 XX-RP-1 LOG SILL LOG VANE LOG CROSS VANE ROOT WAD RIFFLE PLANTING XX-LR-1 LOG ROLL STRUCTURE XX-J-01 LOG J VANE 0+0012.810.17STATION PROPOSED ELEVATION EXISTING ELEVATION L1 C1 PROFILE PROPOSED FILL GRADE PROFILE PROPOSED CUT GRADE GENERAL PROJECT SPECIFICATION AND NOTES 1. DEFINITIONS: 1.1. CONSTRUCTION DOCUMENTS: THE CONTRACT AND APPLICABLE PLAN SHEET(S), DETAILS, SPECIFICATIONS, PERMIT(S), AND/OR ANY OTHER DOCUMENTS (MEETING MINUTES, PUNCH LISTS, BID TABS, ETC.) FOR COMPLETE INFORMATION ABOUT THE REQUIRED WORK. ANY ONE OF THESE PARTS OF THE MAY NOT CONTAIN ALL OF THE INFORMATION REQUIRED TO COMPLETE THE PROJECT WORK. 1.2. PROJECT OWNER: ########### 1.3. PROJECT COOPERATOR:########## 1.4. ENGINEER: JENNINGS ENVIRONMENTAL PLLC (JE) 2. THE WORK ON THIS PROJECT SHALL ADHERE TO THE FOLLOWING SPECIFICATIONS, STANDARDS AND/OR REGULATIONS: 2.1. NC DEQ'S "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (2013) 2.2. NC DOT'S "2018 STANDARD PROVISIONS" 2.3. NC DOT'S "2018 SPECIFICATIONS AND SPECIAL PROVISIONS" 2.4. UNITED STATES ARMY CORPS OF ENGINEERS NATIONWIDE PERMIT NUMBER 27 2.5. THE CONSTRUCTION DOCUMENTS TOPOGRAPHIC SPECIFICATIONS AND NOTES STREAM RESTORATION SPECIFICATIONS AND NOTES QUANTITIES AND MATERIALS SPECIFICATIONS 3.NOT ALL EXISTING UTILITIES ARE SHOWN. SOME LOCATIONS MAY BE ARE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY LOCATION AND COORDINATION. ANY UTILITIES SHOWN ON THE CONSTRUCTION DOCUMENTS ARE FOR INFORMATIONAL PURPOSES ONLY AND IN NO WAY RELIEVES THE CONTRACTOR FROM COORDINATING, VERIFYING AND PROTECTING EXISTING UTILITIES. THE CONTRACTOR SHALL ADHERE TO THE PROVISIONS OF THE 1985 UNDERGROUND DAMAGE PREVENTION ACT, NORTH CAROLINA GENERAL STATUTES 887, CHAPTER 785, SENATE BILL 168, ARTICLE 3. TO ASSIST THE CONTRACTOR AND UTILITY OWNERS IN MEETING THE REQUIREMENTS OF THIS LAW, THERE IS A "ONE-CALL SYSTEM" CALLED "NC ONECALL." MOST MAJOR UTILITIES WITH UNDERGROUND FACILITIES IN THE STATE SUBSCRIBE TO THIS SERVICE. 4.ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. 5.THE CONTRACTOR IS RESPONSIBLE FOR THE PROJECT AREA UNTIL COMPLETION AND FINAL ACCEPTANCE BY MC S&WCD. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY AND SHALL BEAR ALL RISK OF LOSS OR DAMAGE. THE CONTRACTOR WILL FURNISH ALL NECESSARY EQUIPMENT, TOOLS, LABOR, TRANSPORTATION, AND SUPERVISION TO COMPLETE THE WORK ACCORDING TO THESE SPECIFICATIONS AND APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. THE CONTRACTOR SHALL CONFINE ALL ACTIVITIES, INCLUDING EQUIPMENT STORAGE, TO THE LIMITS OF DISTURBANCE, STAGING AREAS, AND DESIGNATED CONSTRUCTION ACCESS POINTS. 6.THE MANNER IN WHICH THE CONTRACTOR DEALS WITH PEOPLE AND THEIR PROPERTIES WHILE PERFORMING THIS WORK IS EXTREMELY IMPORTANT TO LDSI, RI, USDA, JE AND MACON S&WCD. THEREFORE, THE CONTRACTOR AND THE CONTRACTOR'S REPRESENTATIVES SHALL MANIFEST A SPIRIT OF FRIENDLINESS AND COOPERATION WHEN DEALING WITH PROPERTY OWNERS AND THE GENERAL PUBLIC WHILE PERFORMING WORK UNDER THIS SPECIFICATION. 7.EXTREME CARE AND DILIGENCE SHALL BE EXERCISED BY THE CONTRACTOR TO ASSURE THE SAFETY OF PERSONS, ANIMALS, AND PROPERTY. IF AT ANY TIME LDSI, RI, USDA, JE AND MACON S&WCD DETERMINES THAT THE CONTRACTOR'S METHODS OR EQUIPMENT ARE INADEQUATE FOR SECURING THE SAFETY OF THE CONTRACTOR'S EMPLOYEES OR THE PUBLIC, THE DESIGNATED REPRESENTATIVE MAY DIRECT THE CONTRACTOR TO TAKE SPECIFIC ACTIONS TO ENSURE SAFETY. THE CONTRACTOR SHALL IMPROVE METHODS AS DEEMED APPROPRIATE BY THE DESIGNATED REPRESENTATIVE WITHOUT ADDITIONAL COST TO XXX, SO AS TO ASSURE COMPLIANCE WITH SAFETY CONCERNS. FAILURE OF THE DESIGNATED REPRESENTATIVE TO MAKE THIS DEMAND SHALL NOT RELIEVE THE CONTRACTOR OF ANY OBLIGATION TO ENSURE THE SAFE CONDUCT OF ITS WORK. 8.THE CONTRACTOR SHALL MAINTAIN ALL LIGHTS, GUARDS, SIGNS, TEMPORARY PASSAGES, OR OTHER PRECAUTIONS NECESSARY FOR THE SAFETY OF ALL PERSONS. THE CONTRACTOR SHALL ABIDE BY ALL SAFETY RULES AND CONSTRUCTION CONDITIONS REQUIRED BY GOVERNMENTAL AUTHORITIES AND OTHER ENTITIES, INCLUDING RAILROADS, SO THE PUBLIC IS SAFEGUARDED FROM ACCIDENTS AND DELAYS. GUARDS AND FLAGS REQUIRED BY GOVERNMENTAL OR RAILROAD AUTHORITIES SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE, UNLESS DIRECTED OTHERWISE BY THE DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL AT NO TIME COMPROMISE EITHER SAFETY OR ENVIRONMENTAL REQUIREMENTS. 9.CONTRACTOR SHALL FIELD VERIFY ALL SURVEY CONTROL POINTS WITHIN THREE (3) WEEKS OF RECEIPT OF THE NOTICE TO PROCEED. CONTRACTOR SHALL CONTACT PROJECT ENGINEER WITHIN FOUR (4) WEEKS OF RECEIPT OF NOTICE TO PROCEED WITH ANY CONTROL POINT DISCREPANCIES, AFTER SUCH TIME HAS PASSED IT WILL BE THE ASSUMPTION THAT ALL CONTROL POINTS AS SHOWN ON THE PLANS ARE IN GOOD STANDING AND CONTRACTOR AGREES WITH PUBLISHED COORDINATES. 10.SEE SHEET 3.1 FOR DETAILED EROSION AND SEDIMENTATION CONTROL PLAN, SEQUENCE AND DETAILS. 11.ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY JE, LDSI, RI, USDA, MACON S&WCD AND NRCS PRIOR TO USE. 12.NO FILL IN WETLANDS MAY OCCUR. ALL EXCESS SOILS FROM STREAM STABILIZATION AND CHANNEL WORK SHALL BE DISPOSED OF IN OLD STREAM CHANNEL TO OTHER AREAS APPROVED BY LDSI, RI, USDA, JE AND MACON S&WCD. 13.SITE SHOULD BE "STORM READY" AT THE END OF EACH WORK DAY AND WORK WEEK. 14.MATERIAL SHALL BE SUITABLE SOIL OBTAINED FROM THE EXCAVATION OF ALL PROJECT COMPONENTS AS SHOWN ON THE CONSTRUCTION DRAWINGS AND/OR BORROW AREA. BORROW AREA SHALL BE APPROVED BY PROJECT ENGINEER PRIOR TO USE, NO ADDITIONAL COMPENSATION WOULD BE GIVEN FOR BORROW AREA. NOR WOULD ANY ADDITIONAL FUNDS BE GIVEN FOR HAULING, BORROWING, REMEDIATION, OR STABILIZING AFOREMENTIONED BORROW AREA. 15.MAINTAIN, RELOCATE OR REPLACE EXISTING SURVEY MONUMENTS, CONTROL POINTS AND STAKES WHICH ARE DISTURBED OR DESTROYED. PERFORM THE WORK TO PRODUCE THE SAME LEVEL OF ACCURACY AS THE ORIGINAL MONUMENT(S) IN A TIMELY MANNER AND AT THE CONTRACTORS EXPENSE. 16.EXISTING TOPOGRAPHY, STRUCTURES AND SITE FEATURES ARE SHOWN SCREENED AND/OR LIGHT-LINED . NEW FINISHED GRADE, STRUCTURES AND SITE FEATURES ARE SHOWN AS HEAVY-LINED. 17.ELEVATIONS GIVEN ARE TO SETTLED GRADE UNLESS OTHERWISE SHOWN 18.ALL SLOPES SHALL BE 5:1 OR FLATTER UNLESS OTHERWISE SPECIFIED. SLOPE UNIFORMLY BETWEEN CONTOURS AND SPOT ELEVATIONS SHOWN. 19.CONTRACTOR SHALL REMEDIATE ALL; HAUL ROADS, FARM PATHS AND OTHER ON FARM UTILITIES TO PRE-CONSTRUCTION OR BETTER CONDITION PRIOR TO DEMOBILIZATION. 20.ELECTRONIC SURVEY DATA, BASE DRAWINGS AND SITE DATA WERE CURATED BY LDSI. 21.HORIZONTAL DATUM IS NAD83(2011) & VERTICAL DATUM IS NAVD88. ALL COORDINATES ARE BASED ON NAD83(2011) AND ALL ELEVATIONS ARE BASED ON NAVD88. 22.EXISTING GROUND SURFACES ARE ON A SURVEY COMPLETED IN MAY 2019. SOME CHANGES MAY HAVE OCCURRED SINCE THE SURVEY WAS COMPLETED, PARTICULARLY IN AREAS EXPERIENCING CHANNEL DEGRADATION AND BANK EROSION. 23.ALL ELEVATION DATA SHALL BE FIELD VERIFIED BY THE CONTRACTOR AND THEN COORDINATED WITH THE ENGINEER. THESE PLANS WERE PREPARED WITH THE FIELD INFORMATION AT THE TIME OF PROJECT SURVEY. IT IS POSSIBLE THAT FIELD CONDITIONS AT THE TIME OF CONSTRUCTION VARY FROM THESE PLANS AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY FIELD CONDITIONS SUCH AS ELEVATIONS, DEPTHS, ETC PRIOR TO PROCEEDING WITH WORK. SURVEY DATA COLLECTION WAS VERY SPARSE DUE TO FIELD CONDITIONS, THEREFORE, ALL ELEVATIONS SHOULD BE CHECKED IN THE FIELD BY CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT PROJECT ENGINEER IMMEDIATELY UPON DISCOVERING ELEVATIONS WHICH ARE DIFFERENT THAN THOSE SHOWN ON THE PLANS. 24.MAINTAIN, RELOCATE OR REPLACE EXISTING SURVEY MONUMENTS, CONTROL POINTS AND STAKES WHICH ARE DISTURBED OR DESTROYED. PERFORM THE WORK TO PRODUCE THE SAME LEVEL OF ACCURACY AS THE ORIGINAL MONUMENT(S) IN A TIMELY MANNER AND AT THE CONTRACTORS EXPENSE. 25.THE PROPOSED ELEVATIONS AND GRADES SHOWN HEREIN ARE BASED ON THE TLS SURVEY THAT ENCOMPASSES THE EXISTING GROUND SURFACE FROM WHICH ALL COMPUTATIONS OF CUT AND FILL ARE BASED. SLIGHT DISCREPANCIES BETWEEN THE EXITING GROUND AND DIGITAL SURFACE AND FIELD CONDITIONS CAN RESULT IN VARIATIONS OF TOTAL EXCAVATED QUANTITIES. THUS, QUANTITIES OF MATERIAL EXCAVATED SHOULD BE COMPARED TO THOSE SHOWN ON THE PLANSHEETS TO MANAGE THE MOVEMENT OF MATERIAL ACROSS THE SITE. 26.THE INTENT OF THE CHANNEL AND FLOODPLAIN GRADING PLAN IS TO MAINTAIN A "LIVE SURFACE" THAT CAN BE ADJUSTED QUICKLY DURING CONSTRUCTION AND INCORPORATED INTO A 3D SURFACE FOR CONSTRUCTION USING SURVEY GRADE GPS EQUIPMENT. 27.FIELD CONDITIONS AND PROJECT VARIABILITY MAY REQUIRE ADAPTATION OF THE PLANSHEETS AND/OR DETAILS PROVIDED IN THE CONSTRUCTION DOCUMENTS DEPENDING ON SITE CONDITIONS OR PROJECT NEEDS. MINOR VARIATION(S) OR ADAPTATION(S) OF THE PROPOSED WORK SHOWN ON THE PLANSHEETS AND/OR DETAILS ARE CONSIDERED INCIDENTAL TO THE WORK. 28.WHERE PRACTICABLE, EXISTING TREES AND VEGETATION SHOULD BE LEFT IN PLACE TO FACILITATE NATURAL REGENERATION AND SOIL STABILIZATION. 29.THE CONTRACTOR SHALL STAKE OUT THE PROPOSED STREAM CENTERLINE IN APPROXIMATELY 500 FT SECTIONS USING SURVEY GRADE GPS EQUIPMENT FOR REVIEW BY THE ENGINEER BEFORE BEGINNING EXCAVATION AND GRADING. DEPENDING ON ENCOUNTERED CONDITIONS SOME SHIFTING OF THE STREAM ALIGNMENT MAY BE NECESSARY. STAKING MAY BE OMITTED FOR PORTIONS OF THE STREAM WHEN SURVEY-GRADE GPS IS USED TO CONSTRUCT THE CHANNEL. 30.PRIOR TO CLEARING AND GRUBBING, THE CONTRACTOR SHALL MARK THE LIMITS OF CLEARING NEAR TREES FOR VERIFICATION OF INTENT BY THE ENGINEER. SOME MINOR ADJUSTMENT OF CHANNEL ALIGNMENT MAY BE REQUIRED TO PRESERVE TREES OR MINIMIZE IMPACT TO TREES. 31.ANY HARVESTING OF TREES FROM ONSITE MUST BE APPROVED BY THE ENGINEER. 32.CONTRACTOR SHALL MINIMIZE, TO THE MAXIMUM EXTENT POSSIBLE, IMPACTS TO THE ADJACENT TREES. 33.CONSTRUCTION EQUIPMENT TRACKS AND ACCESS PATHS SHALL BE GRADED AND RE-CONTOURED AFTER CONSTRUCTION TO PREVENT RILL AND GULLY EROSION. 34.CONTRACTOR SHALL USE AN EXCAVATOR WITH A HYDRAULIC THUMB TO INSTALL IN-STREAM STRUCTURES. 35.ELEVATIONS OF TRIBUTARIES AT CONFLUENCES MAY NEED TO BE ADJUSTED TO MEET CONSTRUCTED CONDITIONS. ADJUSTMENTS SHALL BE MADE IN CONJUNCTION WITH THE ENGINEER. 36.PROFILES MAY NEED TO BE ADJUSTED TO AVOID ABRUPT CHANGES IN ELEVATION. ADJUSTMENTS SHALL BE MADE IN CONJUNCTION WITH THE ENGINEER. 37.CHANNEL REALIGNMENT WORK SHALL BE COMPLETED AND STABILIZED PRIOR TO ALLOWING FLOW TO ENTER INTO THE NEWLY CONSTRUCTED STREAM CHANNEL. THE CONTRACTOR SHALL NOT OPEN UP MORE THAN 200 FEET OF CHANNEL WITHOUT EROSION CONTROL MATTING IN PLACE OR BY APPROVAL OF THE ENGINEER. IF THE CHANNEL REALIGNMENT WORK IS NOT COMPLETED PRIOR TO ABANDONING THE OLD CHANNEL, A TEMPORARY SYSTEM SHALL BE USED ACCORDING THE APPROVED E&SC PLAN AND DETAIL. IN-LINE CHANNEL WORK SHALL UTILIZE THE TEMPORARY PUMP AROUND SYSTEM AT ALL TIMES. 38.STREAM RESTORATION WORK SHALL BE IMPLEMENTED BY FIRST GRADING THE FLOODPLAIN ADJACENT TO THE CHANNEL TO THE ELEVATIONS AND GRADES SPECIFIED IN THE PLANSHEETS. THE PROPOSED STREAM CHANNEL SHALL THEN BE EXCAVATED TO THE CHANNEL CROSS-SECTION GEOMETRY AND LONGITUDINAL PROFILE IN THE CONSTRUCTION DOCUMENTS. THIS CHANNEL WORK SHALL BE DONE WITH LOW GROUND PRESSURE TRACK EQUIPMENT. PLANSHEETS PROVIDE DIMENSIONS, ELEVATIONS AND SLOPES TO AID IN CONSTRUCTION OF THE CHANNEL. THE THALWEG CAN FIRST BE EXCAVATED TO THE ELEVATION SPECIFIED IN THE LONGITUDINAL PROFILE AND EXCAVATION AND FINE GRADING OF THE CROSS-SECTIONS SHALL THEN BE PREFORMED. ANY TEMPORARY STOCKPILING OR DOUBLE HANDLING OF EXCESS EARTH NECESSARY TO BUILD THE CHANNEL SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. 39.BANKFULL CHANNEL DIMENSIONS WILL BE HELD TO THE DIMENSIONS SHOWN ON THE TYPICAL CROSS-SECTION PLANSHEETS. ELEVATIONS SHALL BE CONSTRUCTED WITHIN 0.1' (VERTICAL). WIDTHS AND DEPTHS MUST FALL WITHIN RANGES SHOWN IN THE PLANSHEETS. CHANNEL CROSS-SECTION DIMENSIONS SHALL BE WITHIN 0.2' (HORIZONTAL). 40.IF THE EXISTING GROUND IS LESS THAN 0.2' HIGHER THAN THE PROPOSED BANKFULL ELEVATION, IT IS NOT NECESSARY TO EXCAVATE TO THE PROPOSED ELEVATIONS AND GRADES IN THE CONSTRUCTION DOCUMENTS. 41.THE CONTRACTOR SHALL UTILIZE NATIVE ONSITE ROCK, WOOD AND VEGETATION MATERIALS WHERE AVAILABLE AND APPROVED BY THE HENDERSON S&WCD AND ENGINEER. 42.IN-STREAM STRUCTURES SHALL BE INSTALLED AS THE CHANNEL IS BEING CONSTRUCTED. INSTREAM STRUCTURES SHALL BE FINISHED TO A SMOOTH SURFACE IN ACCORDANCE WITH THE LINES, GRADES AND ELEVATIONS SHOWN IN THE CONSTRUCTION DOCUMENTS. THE FINISHED STRUCTURE SLOPES AND PROFILE ELEVATIONS SHALL BE WITHIN 0.1' (VERTICAL) OF THE CONSTRUCTION DOCUMENTS. 43.WOOD AND ROCK STRUCTURES MAY BE SUBSTITUTED TO FIT FIELD CONDITIONS AND AVAILABLE MATERIALS. 44.COIR LOG TOE PROTECTION MAY BE UTILIZED WHERE ADDITIONAL BANK REVETMENT IS NEEDED OR SUBSTITUTED FOR TOE WOOD REVETMENT. 45.FILTER FABRIC SHALL BE USED BENEATH ALL ROCK ARMORING AND WITH SPECIFIED STREAM AND STORMWATER STRUCTURES. ALL FILTER FABRIC SHALL BE 8OZ. NON-WOVEN GEOTEXTILE UNLESS OTHERWISE SPECIFIED IN STRUCTURE DETAILS OR SPECIFICATIONS. FILTER FABRIC SHALL BE TRIMMED TIGHT TO THE SURFACE OF THE STRUCTURE AND SHOULD NOT BE OBSERVED BY VISUAL INSPECTION. 46.BOULDER STRUCTURES SHALL BE CONSTRUCTED FROM BOULDERS THAT ARE CUBICAL OR RECTANGULAR IN SHAPE AND SIZED ACCORDING TO THE STRUCTURE DETAILS. 47.LOG STRUCTURES SHALL BE CONSTRUCTED FROM LOGS THAT ARE INTACT, WITH BRANCHES TRIMMED AND IN NON-DECOMPOSED CONDITION AND APPROVED BY ENGINEER. 48.AFTER THE STRUCTURE IS COMPLETE AND FLOW IS RESTORED TO THE CHANNEL, SOME ADJUSTMENT TO THE STRUCTURE OR ADDITIONAL STABILIZATION MEASURE MAY BE NECESSARY TO ACHIEVE THE DESIRED FUNCTION. 49.THE CONSTRUCTED CHANNEL SHALL BE STABILIZED AS SOON AS POSSIBLE BY TEMPORARY AND PERMANENT SEEDING, ADDING STRAW MULCH TO BARE SOIL AND INSTALLING EROSION CONTROL MATTING FROM THE TOE OF THE BANKFULL CHANNEL TO 4' BEYOND THE BANKFULL STAGE. PRIOR TO INSTALLING THE EROSION CONTROL MATTING, PREPARE THE SOIL SURFACE BY LOOSENING 3 -6" OF SOIL OR APPLYING 3 - 6" OF TOPSOIL TO THE PROPOSED ELEVATIONS AND APPLY SEED AND THEN STRAW MULCH. SEED SHALL BE BROADCAST EVENLY OF THE AREA USING A BROADCAST SPREADER PRIOR TO COVERING WITH THE EROSION CONTROL MATTING. THE MATTING SHALL BE ROLLED OUT IN THE DIRECTION OF ANTICIPATED RUNOFF FLOW. INSTALL MATTING IN ACCORDANCE WITH THE DETAIL INCLUDED IN THE CONSTRUCTION DOCUMENTS. REWORKING OF AREAS THAT DO NOT ESTABLISH VEGETATION OR BECOME UNSTABLE SHALL BE NECESSARY IN THE MATTING SEPARATES FROM THE SOIL. 50.IF THE TIMING OF CONSTRUCTION IS SUCH THAT PERMANENT RIPARIAN SEED CANNOT BE PLACED UNTIL THE FALL OR WINTER, THEN THE CONTRACTOR SHALL SEED WITH TEMPORARY SUMMER COVER (MILLET - UROCHLOA RAMOSA) AND RETURN THE FOLLOWING SPRING TO INSTALL THE PERMANENT RIPARIAN SEED. 51.THE HARVESTING AND INSTALLATION OF LIVE STAKES SHALL BE PREFORMED ONLY DURING THE DORMANT SEASON, TYPICALLY BETWEEN DECEMBER 1 AND MARCH 1. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 7 DAYS PRIOR TO HARVESTING TO REVIEW AND APPROVE ALL HARVESTING SITES AND SPECIES. 52.LIVE STAKES SHALL BE INSTALLED ALONG THE TOE OF SLOPE ON OUTSIDE MEANDER BENDS OF POOLS AND IN RIFFLES WHERE SHOWN ON THE RE-VEGETATION PLAN. LIVE STAKES SHALL BE INSTALLED THROUGH THE EROSION CONTROL MATTING TO A DEPTH THAT REACHES THE WATER TABLE. 53.EXCESS EARTH MAY BE USED TO BACKFILL THE OLD CHANNEL OR SPREAD IN OTHER LOCATIONS WITHIN THE PROJECT AREA THAT ARE APPROVED BY THE ENGINEER. 54.TOPSOIL SHALL BE REMOVED FROM EXCAVATION AND FILL AREAS PRIOR EXCAVATION AND GRADING AND RE-APPLIED TO AREAS AFTER ROUGH GRADING IS COMPLETE. 2 - 4" OF TOPSOIL SHALL BE PLACED ON DISTURBED AREAS TO THE ELEVATIONS AND GRADES INCLUDED IN THE CONSTRUCTION DOCUMENTS. 55.FILL AREAS SHALL BE SEEDED WITH TEMPORARY VEGETATION WITHIN 14 DAYS OF GRADING. THE PLACEMENT OF STRAW MULCH SHALL OCCUR WITHIN 48 HOURS OF SEEDING. MULCH SHALL BE SPREAD TO COVER DISTURBED CHANNEL AND FLOODPLAIN AREAS. MULCH SHALL BE KEPT OUT OF THE CROWNS OF SHRUBS AND GROUND COVER. 56.THE CONTRACTOR SHALL FURNISH ALL MATERIALS NECESSARY TO COMPLETE THE PROPOSED WORK UNLESS OTHER PROVISIONS HAVE BEEN AGREED UPON PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL DELIVER ALL MATERIALS TO THE DESIGNATED ACCESS POINTS AND STAGING AREAS OR TO A LOCATION SPECIFIED BY CONSTRUCTION DOCUMENTS. MATERIAL QUANTITIES, DIMENSIONS AND SIZES SHALL CONFORM TO THE NOTES AND SPECIFICATIONS PROVIDED IN THE CONSTRUCTION DOCUMENTS OR ON THE QUANTITIES AND MATERIALS LIST. THE ENGINEER MAY INSPECT AND APPROVE ALL MATERIALS PRIOR TO CONSTRUCTION. IF MATERIALS DO NOT MEET THE MINIMUM REQUIREMENTS SPECIFIED IN THE CONSTRUCTION DOCUMENTS, THE ENGINEER SHALL REJECT THE MATERIALS. 57.COSTS INCURRED DUE TO PROJECT DELAYS RESULTING FROM FAILURE OF THE CONTRACTOR TO MEET THE REQUIREMENTS OF THE GENERAL SPECIFICATIONS, CONSTRUCTION DOCUMENTS, OR CONSTRUCTION SPECIFICATIONS, SHALL BE THE EXPENSE OF THE CONTRACTOR. QUANTITIES LISTED ARE ESTIMATES ONLY AND SHALL BE CONFIRMED BY THE CONTRACTOR. 58.THE EROSION CONTROL MEASURES DEPICTED ON THE PLANS ARE TO BE INSTALLED AS NEEDED TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. ADDITIONAL EROSION CONTROL MEASURES (ABOVE THOSE SHOWN ON THE PLANS AND ON THE QUANTITIES AND MATERIALS LIST) MAY BE REQUIRED IN ORDER TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER AND NCDEQ PRIOR TO INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES. 59.ANY ADDITIONAL GRADING OTHER THAN WHAT IS SHOWN ON THE PLANS SHALL REQUIRE PRIOR APPROVAL FROM THE ENGINEER. ANY ADDITIONAL AREAS OF DISTURBANCE (CHANGES IN ACCESS, GRADING, CLEARING, ETC.) WILL REQUIRE APPROVAL FROM THE ENGINEER AND NCDEQ. 60.THE USE OF ANY BRAND NAMES/MANUFACTURERS OR MODELS IS INTENDED SOLELY TO DENOTE THE QUALITY STANDARD OF THE DESIRED PRODUCT. ANY USE OF BRAND NAMES IS NOT INTENDED TO RESTRICT BIDDERS TO A SPECIFIC BRAND, MAKE, MANUFACTURER, OR NAME. THE BRAND NAMES / MANUFACTURERS OF MODELS ARE INTENDED TO CONVEY THE GENERAL STYLE, TYPE, CHARACTER, AND QUALITY OF PRODUCT. EQUIVALENT PRODUCTS WILL BE ACCEPTABLE IF THE PROJECT OWNER OR ENGINEER HAS GIVEN APPROVAL OF THE SPECIFIC PRODUCT IN WRITING. 61.THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROVIDING STORAGE AREAS FOR CONSTRUCTION MATERIALS AND EQUIPMENT. THE MATERIAL AND EQUIPMENT STORAGE SHALL COMPLY WITH THE CONSTRUCTION DOCUMENTS AND ALL LOCAL, STATE AND FEDERAL REGULATIONS THROUGHOUT THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL RESTORE THE STORAGE AREA TO ITS ORIGINAL (OR BETTER) CONDITION UPON COMPLETION OF THE PROJECT OR UPON SUCH TIME AS DIRECTED BY LDSI, RI, USDA, JE AND HENDERSON S&WCD. SUCH RESTORATION SHALL BE AT NO ADDITIONAL COST TO TOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEGUARDING OF MATERIALS AND EQUIPMENT AGAINST FIRE, THEFT AND VANDALISM AND SHALL NOT HOLD LDSI, RI, USDA, JE AND HENDERSON S&WCD RESPONSIBLE IN ANY WAY FOR THE OCCURRENCES OF SAME. FOR MATERIALS AND EQUIPMENT STORAGE AREAS THE CONTRACTOR SHALL FURNISH AND ERECT, AT NO ADDITIONAL COST, WHATEVER WORKS MAY BE NECESSARY FOR THE PROTECTION OF THE PUBLIC, INCLUDING BUT NOT LIMITED TO BARRICADES, FENCES, ETC. PRIOR TO FINAL PAYMENT BEING MADE, THE CONTRACTOR SHALL OBTAIN A RELEASE FROM THE PROPERTY OWNER OF THE STORAGE AREA UTILIZED FOR THE PROJECT. 62.THE CONTRACTOR SHALL ESTABLISH, PROVIDE AND MAINTAIN AN EFFECTIVE QUALITY CONTROL PROGRAM THAT DETAILS THE METHODS AND PROCEDURES TO BE TAKEN TO ASSURE THAT ALL MATERIALS AND COMPLETED WORK, REQUIRED FOR THE PROJECT, CONFORM TO THE CONSTRUCTION DOCUMENTS. ALTHOUGH GUIDELINES ARE ESTABLISHED AND CERTAIN MINIMUM REQUIREMENTS ARE SPECIFIED HEREIN AND ELSEWHERE IN THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR IS FULLY RESPONSIBLE FOR DEVELOPING AND EXECUTING THEIR OWN QUALITY CONTROL PROGRAM. THE CONTRACTOR SHALL PERFORM INSPECTION, TESTING, AND MEASUREMENT OF ALL ITEMS OF WORK REQUIRED BY THE CONSTRUCTION DOCUMENTS AND TECHNICAL SPECIFICATIONS, INCLUDING THOSE PERFORMED BY SUBCONTRACTORS. REVIEW OF THE MATERIALS AND COMPLETED WORK BY LDSI, RI, USDA, JE AND MACON S&WCD DOES NOT RELIEVE THE CONTRACTOR OF PERFORMING QUALITY CONTROL INSPECTIONS/REVIEW OF THE CONTRACTOR'S AND/OR SUBCONTRACTOR'S WORK. 63.THE CONTRACTOR SHALL WARRANTY ALL MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF ACCEPTANCE OF BY THE OWNER AND SHALL REPLACE ANY PORTIONS THAT FAIL DUE TO FAULTY MATERIALS OR WORKMANSHIP, AT NO ADDITIONAL COST TO THE HENDERSON S&WCD. A SIX (6) MONTH AND ELEVEN (11) MONTH INSPECTION WILL BE PERFORMED DURING THE WARRANTY PERIOD. THE CONTRACTOR SHALL IMMEDIATELY REPAIR ALL ITEMS DETERMINED BY THE PROJECT OWNER OR AUTHORIZED REPRESENTATIVE TO BE DEFECTIVE UPON NOTIFICATION. THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE FAILED ITEMS UPON NOTIFICATION BY DEP. SEASONALLY INSTALLED ITEMS SHALL BE REPAIRED OR REPLACED DURING THE NEXT AVAILABLE INSTALLATION PERIOD. ITEMS REPAIRED OR REPLACED UNDER THIS PROVISION SHALL HAVE AN ADDITIONAL ONE (1) YEAR WARRANTY PERIOD FROM THE NEW DATE OF ACCEPTANCE. AREAS AND/OR OTHER WORK DISTURBED WHILE ACCESSING AND/OR REPAIRING/REPLACING WARRANTY COVERED ITEMS SHALL BE STABILIZED. BAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNCARTOOGECHAYE CREEK REPAIRGENERAL NOTESSUEG I S SURVEYING GNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-19257 SAMUEL ASHE DRIVEASHEVILLE, NC 28805PHONE: 919.600.4790WEB: WWW.JENNINGSENV.COMNC FIRM #: P-1932 PROJ: 4519025 DWG: 4519025E.DWG SHEET: 2 of 15 DATE: 2020/03/20 G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:25:17 PM, AutoCAD PDF (General Documentation).pc3 No.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:JDHNAEJDHJDH08/09/2019NOT FORCONSTRUCTIONSEALSECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Site Area Description (a) Perimeter dikes, swales, ditches, and perimeter slopes (b) High Quality Water (HQW) Zones (c) Slopes steeper than 3:1 7 7 7 Timeframe variations None None (d) Slopes 3:1 to 4:1 14 (e) Areas with slopes flatter than 4:1 14 GROUND STABILIZATION SPECIFICATION PAINT AND OTHER LIQUID WASTE PORTABLE TOILETS EARTHEN STOCKPILE MANAGEMENT POLYACRYLAMIDES (PAMS) AND FLOCCULANTS HERBICIDES, PESTICIDES AND RODENTICIDES HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on-site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE EQUIPMENT AND VEHICLE MAINTENANCE ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER A SANDBAGS (TYP.) OR STAPLES SILT FENCE 1:1 SIDE SLOPE (TYP.) CONCRETE WASHOUT 10 MIL PLASTIC LINING SANDBAGS (TYP.) OR STAPLES HIGH COHESIVE & LOW FILTRATION SOIL BERM 10' MIN B 10 MIL PLASTIC LINING 1:1 SIDE SLOPE (TYP.) SANDBAGS (TYP.) OR STAPLES HIGH COHESIVE & LOW FILTRATION SOIL BERM 2' SECTION B-B A B CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN.) SECTION A-A NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. PLAN 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE.PLAN CONCRETE WASHOUT SANDBAGS (TYP.) OR STAPLES CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN.) NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE 6" CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site.3'-0"10'MIN8"3'-0"Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Stabilize within this many calendar days after ceasing land disturbance If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: 2.Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3.Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4.Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5.Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 7.Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 2.Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 5.Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. 1.Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2.Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3.Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. 1.Show stockpile locations on plans. Locate earthen-material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2.Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 4.Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. 2.Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3.Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4.Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5.Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6.Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7.Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8.Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9.Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10.At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. 1.Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2.Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3.Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4.Do not stockpile these materials onsite. 3.Provide stable stone access point when feasible. 4.Containment must be labeled, sized and placed appropriately for the needs of site. 3.Contain liquid wastes in a controlled area. 1.Do not dump paint and other liquid waste into storm drains, streams or wetlands. 9.On business days, clean up and dispose of waste in designated waste containers. 8.Dispose waste off-site at an approved disposal facility. 6.Anchor all lightweight items in waste containers during times of high winds. 1.Never bury or burn waste. Place litter and debris in approved waste containers. 1.Maintain vehicles and equipment to prevent discharge of fluids. 2.Provide drip pans under any stored equipment. 3.Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4.Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5.Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6.Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. 5.Store flocculants in leak-proof containers that are kept under storm-resistant cover or surrounded by secondary containment structures. 4.Provide ponding area for containment of treated Stormwater before discharging offsite. 3.Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 2.Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 1.Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. Temporary Stabilization Permanent Stabilization ·Temporary grass seed covered with straw or other mulches and tackifiers ·Hydroseeding ·Rolled erosion products with or without temporary grass seed ·Appropriately applied straw or other mulch ·Plastic sheeting ·Permanent grass seed covered with straw or other tackifiers ·Geotextile fabrics such as permanent soil reinforcement matting ·Hydroseeding ·Shrubs or other permanent plantings covered with mulch ·Uniform and evenly distributed ground cover sufficient to restrain erosion ·Structural methods such as concrete, asphalt or retaining walls ·Rolled erosion control products with grass seed ISSUED FOR:80% PERMITTING STA =STATION BM =BENCHMARK TBM =TEMPORARY BENCHMARK IP =IRON PIN (FOUND OR SET) ELEV / EL=ELEVATION INV =INVERT ELEVATION H =HEIGHT HDPE =HIGH-DENSITY POLYETHYLENE LF =LINEAR FOOT MAX =MAXIMUM MIN =MINIMUM No. / # =NUMBER TOB =TOP OF BANK TOS =TOE OF SLOPE DBT =DITCH BOTTOM RCP =REINFORCED CONCRETE PIPE CMP =CORRUGATED METAL PIPE GALV =`GALVANIZED SF =SILT FENCE LOD =LIMITS OF DISTURBANCE WRP =WETLAND RESERVE PROGRAM WRE =WETLAND RESERVE EASEMENT CONC =CONCRETE W/=WITH Wo/=WITHOUT NCDOT =NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BH = SOIL BORE HOLE DBKF =DEPTH AT BANKFULL MMI =MOGENSON MITIGATION, INC LDSI =LDSI, INC NTS =NOT TO SCALE WCS =WATER CONTROL STRUCTURE WTS =WATER TRANSFER STRUCTURE SL =SLOUGH PC =POINT OF CURVATURE PT =POINT OF TANGENT PVI =POINT OF VERTICAL INTERSECTION PVE =POINT OF VERTICAL INTERSECTION EL R 20 =RADIUS OF 20.0' TYP.=TYPICAL ESMT =EASEMENT I.D.=INSIDE DIMENSION TH =SOIL BORING TEST HOLE MS =MAIN STEM LS =LOG SILL CL =COVER LOG LV =LOG VANE CV =LOG CROSS VANE RW =ROOT WAD HB =HABITAT STRUCTURE BMA =BRUSH MATTRESS LJ =LOG 'J' VANE LR = LOG ROLL LP = LEAF PACK RP =RIFFLE PLANTINGS BLDR = BOULDER LLDPE = LINEAR LOW-DENSITY POLYETHYLENE PVC =POLYVINYL CHLORIDE TC =TURBIDITY CURTAIN ABBREVIATIONS / ACRONYMS BAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNCARTOOGECHAYE CREEK REPAIRGENERAL NOTES 2SUEG I S SURVEYING GNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-19257 SAMUEL ASHE DRIVEASHEVILLE, NC 28805PHONE: 919.600.4790WEB: WWW.JENNINGSENV.COMNC FIRM #: P-1932 PROJ: 4519025 DWG: 4519025E.DWG SHEET: 3 of 15 DATE: 2020/03/20 G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:26:16 PM, AutoCAD PDF (General Documentation).pc3 No.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:JDHNAEJDHJDH08/09/2019NOT FORCONSTRUCTIONSEALPART III PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF-INSPECTION SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: · They are 25 gallons or more, · They are less than 25 gallons but cannot be cleaned up within 24 hours, · They cause sheen on surface waters (regardless of volume), or · They are within 100 feet of surface waters (regardless of volume). 2. Reporting Timeframes and Other Requirements NOTE: The rain inspection resets the required 7 calendar day inspection requirement. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically-available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard-copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] (a) This general permit as well as the certificate of coverage, after it is received. 2.Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site-specific exemption based on unique site conditions that make this requirement not practical: Self-inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self-inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. (b) Anticipated bypasses and unanticipated bypasses. (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. Inspect Frequency (during normal business hours Inspection records must include (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual-day rainfall information is available, record the cumulative rain measurement for those un-attended days (and this will determine of a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain-monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event ≥ 1.0 inch in 24 hours 1. Identification of measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken (3) Stormwater discharge outfalls (SDOs) At least once per 7 calendar days and within 24 hours of a rain event ≥ 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event ≥ 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event ≥ 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land-disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. Item to Document Documentation Requirements (a) Each E&SC Measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC Plan. Initial and date each E&SC Measure on a copy of the approved E&SC Plan or complete, date and sign an inspection report that lists each E&SC Measure shown on the approved E&SC Plan. This documentation is requires upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC Plan. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC Measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC Measures. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate the completion of the corrective action Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case-by-case basis. • If the stream is named on the NC 303(d) list as impaired for sediment related causes, the permitee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired-waters conditions. (b) Oil spills and release of hazardous substances per item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification • Within 7 calendar days, a report that includes an evaluation of the quality and efect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment [40 CFR 122.41(I)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6)]. • Division staff may waive the requirement for a written report on a case-by-case basis. ISSUED FOR:80% PERMITTING BAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNCARTOOGECHAYE CREEK REPAIRGENERAL NOTES 3SUEG I S SURVEYING GNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-19257 SAMUEL ASHE DRIVEASHEVILLE, NC 28805PHONE: 919.600.4790WEB: WWW.JENNINGSENV.COMNC FIRM #: P-1932 PROJ: 4519025 DWG: 4519025E.DWG SHEET: 4 of 15 DATE: 2020/03/20 G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:27:17 PM, AutoCAD PDF (General Documentation).pc3 BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKF BKF BKF BKFBKFBKFBKFBKFBKF BKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKF BKF BKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKF BKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKF BKF BKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKF BKFBKFBKFBKF BKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKF BKF BKF BKFBKFBKF BKF BKF BKF BKFBKFBKFBKF BKF BKF BKF BKF BKFBKFBKFBKFBKF BKF BKF BKF BKF BKFBKFBKFBKF BKFBKF BKF BKFBKFBKF BKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKFBKF BKF BKF BKFBKFBKFBKF BKFBKF BKF BKF BKF BKFBKFBKFBKF BKF BKF BKF BKF BKF BKF BKFBKFBKFBKF BKF BKFBKFBKF BKF BKF BKFBKFBKFBKF BKF BKF BKF BKF BKF BKF BKFBKFBKFBKF BKF BKF BKF BKF BKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKF BKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKF BKF BKF BKF BKF BKFBKFBKFBKFBKF BKF BKF BKF BKF BKF BKFBKFBKFBKF BKF BKF BKF BKF BKFBKFBKF BKF BKF BKF BKFBKFBKF BKF BKF BKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKF BKFBKF BKFBKF BKF BKFBKF BKFBKF BKFBKF BKF BKFBKF BKFBKF BKF BKFBKF BKF BKFBKF BKFBKF BKF BKFBKF BKF BKFBKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKFBKF BKF BKFBKF BKF BKFBKF BKFBKF BKF BKFBKF BKFBKF BKFBKF BKFBKF BKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKF BKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKF BKF BKF BKF BKFBKFBKFBKFBKFBKFBKF BKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKF BKF BKF BKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKF BKFBKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKF BKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKF BKFBKF BKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKF BKFBKFBKF BKF BKF BKF BKF BKF BKFBKFBKFBKF BKF BKF BKF BKF BKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKFBKFBKF BKF BKF BKF BKFBKFBKFBKFBKFBKF BKF BKF BKFBKFBKFBKFBKF BKF BKF BKF BKF BKF BKFBKFBKFBKFBKF BKF BKF BKF BKF BKF BKFBKFBKFBKFBKF BKF BKF BKF BKF BKF BKFBKFBKFBKF BKF BKF BKF BKF BKF BKF BKFBKFBKFBKF BKF BKF BKF BKF BKF BKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKF BKFBKF BKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKFBKFBKFBKF BKF BKFBKF BKF BKF BKFBKFBKF BKF BKF BKF BKFBKFBKFBKFBKF BKF BKF BKF BKF BKFBKFBKFBKF BKFBKF BKF BKF BKFBKFBKF BKF BKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKF BKFBKF BKFBKF BKF BKFBKF BKFBKF BKFBKF BKF BKFBKF BKFBKF BKF BKFBKF BKFBKF BKF BKFBKF BKF BKFBKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKFBKF BKFBKF BKF BKFBKF BKF BKFBKFBKFBKF BKF BKFBKF BKFBKF BKFBKF BKFBKF BKF BKFBKF BKFBKF BKFBKF BKFBKFBKFBKF BKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKF BKFBKFBKF BKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKF BKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKFBKFBKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKF No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:CARTOOGECHAYE CREEK REPAIRE&SCJDHNAEJDHJDH03/20/2020NOT FORCONSTRUCTIONSEALSUEG I S SURVEYING GNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-19257 SAMUEL ASHE DRIVEASHEVILLE, NC 28805PHONE: 919.600.4790WEB: WWW.JENNINGSENV.COMNC FIRM #: P-1932 DATE: 2020/03/20 PROJ: 4519025 DWG: 4519025E.DWG SHEET: 5 of 15 EROSION AND SEDIMENTATION CONTROL MEASURES WATTLES STREAMBANK MATTING DUST CONTROL STORMWATER SOLID WASTE CONSTRUCTION SCHEDULE 15. WHEN APPROPRIATE, INSTALL PERMANENT VEGETATION PER PLANTING PLANS. MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURESDURING PROJECT IMPLEMENTATION, BMPS/CONSERVATION MEASURES WILL BE IMPLEMENTED TO REDUCE SEDIMENTATION INTO LIMEKILN CREEK. EFFORTS WILL BE MADE TO LIMIT AND EXPEDITE EQUIPMENT TIME IN THE STREAM CHANNEL. WHEN POSSIBLE, WORK WILL OCCUR FROM THE STREAMBANKS. THE DESIGN ATTEMPTS TO MINIMIZE SEDIMENTATION AND OTHER POTENTIALLY NEGATIVE IMPACTS THROUGH THE FOLLOWING PRACTICES: 1.EXCAVATION AND GRADING ON THE SITE IS BALANCE. NO EARTH SHOULD BE REMOVED FROM THE LOD. 2.THE CONTRACTOR WILL BE REQUIRED TO STAGE AND STORE EQUIPMENT AND MATERIALS AT LEAST 25 FEET FROM TOPS OF BANKS. 3.EQUIPMENT WILL BE WELL-MAINTAINED, CLEANED PRIOR TO MOBILIZATION, AND CHECKED DAILY FOR LEAKS OF PETROLEUM PRODUCTS. 4.FUELING WILL BE PERFORMED IN A CONTAINED AREA AWAY FROM SURFACE WATER. 5.THE CONTRACTOR WILL BE REQUIRED TO STAGE WORK SUCH THAT DISTURBED AREAS WILL BE STABILIZED IN PHASES WITH SEEDING, MULCH AND BIODEGRADABLE (COIR) EROSION CONTROL MATTING (WHERE APPROPRIATE). 6.ALL TREES, UTILITIES AND OTHER SITE FEATURES WILL BE PROTECTED UNLESS MARKED FOR REMOVAL OR RELOCATION. 7.ALL WORK ADJACENT TO STREAM WATERS WILL BE CONDUCTED IN A DRY WORK AREA TO THE EXTENT POSSIBLE. 8.TO THE EXTENT POSSIBLE, CONSTRUCTION WILL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 9.CONSTRUCTION ACTIVITIES SHALL NOT OCCUR IN THE CHANNEL DURING WET WEATHER OR STORMFLOWS. 10.CONSTRUCTION SCHEDULING AND STAGING WILL BE TIMED TO MINIMIZE THE AMOUNT OF TIME SPENT WORKING IN THE STREAM CHANNEL. 11.APPROPRIATELY SIZED EQUIPMENT WILL BE UTILIZED TO PREVENT EXCESSIVE COMPACTING AND MINIMIZE CLEARING. PRIMARY SITE ACCESS WILL OCCUR THROUGH THE DRIVEWAY ACCESS POINTS OFF OF AMERICAN THREAD ROAD. ACCESS WITHIN THE PROJECT WILL UTILIZE A DESIGNATED ACCESS PATH FROM THE ACCESS POINT UP VALLEY THROUGH THE PROJECT AREA. SILT FENCE WILL BE PLACED ON THE SIDE OF THE ACCESS PATH WITH ACTIVE STREAM FLOW. A FORD CROSSING WILL BE ESTABLISHED TO MOVE CONSTRUCTION MATERIALS, EQUIPMENT AND EXCAVATED EARTH TO AND FROM THE SOUTH SIDE OF LIMEKILN CREEK. SITE ACCESS AND STAGING SILT FENCE PRIOR TO ANY SOIL DISTURBANCE AND HAULING, APPROXIMATELY 710 FEET SILT FENCE WILL BE INSTALLED ON THE SITE AS INDICATED IN THE CONSTRUCTION DOCUMENTS. SILT FENCE WILL BE LOCATED ALONG THE DOWNSTREAM SIDE OF THE ACCESS AND STAGING AREAS. AT THE END OF THE PROJECT, WHEN ALL DISTURBED AREAS HAVE BEEN STABILIZED, ALL SILT FENCE WILL BE REMOVED. MATERIAL SPECIFICATIONS, INSTALLATION PROCEDURES, AND MAINTENANCE SHALL CONFORM TO SECTION 6.62 OF THE NORTH CAROLINA SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, INCLUDING THE CONSTRUCTION DETAIL BELOW. AFTER STREAM CHANNEL CONSTRUCTION AND ROUGH FLOODPLAIN GRADING HAS BEEN COMPLETED, APPROXIMATELY 770 FEET OF STRAW EROSION CONTROL WATTLES WILL BE INSTALLED ALONG THE TOE OF SLOPE AS INDICATED IN THE CONSTRUCTION DOCUMENTS. AT THE END OF THE PROJECT, WHEN ALL FILL SLOPE ON THE NORTH SIDE OF THE LIMEKILN CREEK HAS BEEN STABILIZED, ALL WATTLES WILL BE REMOVED. 700 GRAM COIR FIBER MATTING WILL BE USED ALONG NEWLY GRADED STREAM BANK SECTIONS. MATTING WILL NOT CONTAIN SYNTHETIC (PLASTIC) MATERIALS. MATTING WILL BE INSTALLED BEGINNING AT THE TOE OF STREAMBANK TO 4 FT BEYOND THE BANKFULL STAGE. A COMBINATION OF 12-INCH AND 24-INCH WOODEN STAKES WILL BE USED TO SECURE THE MATTING IN PLACE.BELOW. EXPOSED SOILS ON LEVEL SURFACES WILL BE KEPT MOIST DURING DRY CONDITIONS TO MINIMIZE THE POTENTIAL FOR WIND EROSION AND DUST ACCUMULATION. THE STREAM RESTORATION PROJECT WILL NOT CREATE ADDITIONAL POINT SOURCES OF STORMWATER. THE INTENT OF THE PROJECT IS TO IMPROVE OVERALL WATER QUALITY IN LIMEKILN CREEK BY STABILIZING ERODING STREAMBANKS, PROVIDING FLOODPLAIN STORAGE, AND PROMOTING APPROPRIATE RIPARIAN VEGETATION. ALL CONSTRUCTION ACTIVITIES WILL CONFORM TO NORTH CAROLINA GENERAL STORMWATER PERMIT NCG 010000. SPECIFICALLY: 1.SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND-DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: I) ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3: 1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY. 2.ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY. IT IS NOT ANTICIPATED THAT EXCAVATION FOR THIS PROJECT WILL UNEARTH ANY SOLID WASTE. IN THE CASE THAT ANY SOLID WASTE IS INADVERTENTLY EXCAVATED, THE FOLLOWING PROCEDURES WILL BE FOLLOWED: 1.STOCKPILE SOLID WASTE OUTSIDE OF BUFFER. 2.INSTALL SEDIMENT FENCE AROUND TEMPORARY STOCKPILE AS NEEDED TO PREVENT SEDIMENT FROM WASHING OFF OF WASTE AND ENTERING SURROUNDING AREAS. 3.ARRANGE FOR WASTE DISPOSAL WITHIN 14 CALENDAR DAYS IN ACCORDANCE WITH LOCAL AND SOLID WASTE REGULATIONS. 4.MCDOWELL COUNTY SOLID WASTE DEPARTMENT: 828-652-0707 5.NC DEQ SOLID WASTE SECTION: 919-707-8200 6.REMOVE SILT FENCE AND GRADE ALL AREAS TO FINAL DESIGN. 13. ONCE SITE IS STABILIZED, REMOVE AND DISPOSE OF ALL NON-BIODEGRADABLE EROSION CONTROL DEVICES. 14. NOTIFY INSPECTOR FROM DEQ OFFICE AFTER STABILIZATION. ALL EROSION CONTROL AND SEDIMENTATION MEASURES WILL BE INSPECTED DAILY AND AFTER SIGNIFICANT RAIN EVENTS BY THE ON SITE ENGINEER AND THE CONTRACTOR. THE CONTRACTOR WILL ASSURE THAT ALL INSTALLATIONS ARE FUNCTIONING PROPERLY AT THE END OF EACH WORK DAY. INSPECTION REQUIREMENTS, AS DETAILED IN THE STORMWATER SECTION, WILL BE FOLLOWED. ONCE THE SITE IS STABILIZED, ALL NON-BIODEGRADABLE EROSION CONTROL MEASURES WILL BE REMOVED AND PROPERLY DISPOSED OF BY THE CONTRACTOR. PLAN VIEW (1" = 150' HORIZ.) CONSTRUCTION ENTRANCE LAYDOWN AREA, SURROUND WITH SILT FENCE PER DETAIL ISSUED FOR:80% PERMITTING 1.OBTAIN EROSION AND SEDIMENTATION CONTROL PLAN APPROVAL AND ALL OTHER APPLICABLE PERMITS. 2.NOTIFY INSPECTOR FROM DEQ OFFICE PRIOR TO DISTURBANCE. 3.POST CERTIFICATE OF APPROVAL FOR LAND DISTURBANCE AT SITE. 4.INSTALL RAIN GAUGE AND PREPARE INSPECTION FORMS AS DESCRIBED ABOVE. 5.FLAG THE WORK LIMITS AND STAKE OUT THE EXTENTS AND ELEVATIONS OF THE PROJECT. 6.LOCATE ALL UNDERGROUND UTILITIES WITHIN THE WORKSITE. 7.HOLD PRE-CONSTRUCTION MEETING PRIOR TO STARTING CONSTRUCTION. 8.INSTALL CONSTRUCTION ENTRANCES, ACCESS ROADS AND SILT FENCE PER THE ATTACHED PLAN SHEETS AND DETAILS. 9.INSPECT EROSION AND SEDIMENTATION CONTROL PRACTICES DAILY AND AFTER SIGNIFICANT RAINFALL EVENTS. MAKE NEEDED REPAIRS IMMEDIATELY. 10.STOCKPILE MATERIALS FOR STREAM WORK (E.G., BOULDERS, LOGS, WOODY DEBRIS) AT LEAST 25 FEET FROM THE TOP OF BANK. 11.TO THE EXTENT PRACTICABLE, WORK ITERATIVELY FROM UPSTREAM TO DOWNSTREAM THROUGHOUT THE PROJECT REACHES. CONTRACTOR SHALL LIMIT STREAMBANK DISTURBANCE TO AREAS THAT CAN BE COMPLETED AND STABILIZED DURING ONE DAY OF WORK. DURING EACH ZONE OF DISTURBANCE, FOLLOW THE FOLLOWING STEPS: 11.1.AS NEEDED TO IMPLEMENT BANK GRADING, REMOVE VEGETATION. DO NOT REMOVE HEALTHY, NATIVE VEGETATION FROM AREAS WHERE NO GRADING OR STRUCTURE INSTALLATION WILL OCCUR. STOCKPILE VEGETATION FOR REPLANTING, AS APPROPRIATE. 11.2.AS SHOWN ON PLANS, REALIGN CHANNEL. ENSURE CONSTRUCTED SLOPES ARE GRADED AT A 3:1 SLOPE OR FLATTER, UNLESS DIRECTED OTHERWISE BY THE FIELD ENGINEER. WHEN POSSIBLE, PERFORM WORK FROM STREAMBANKS IN ORDER TO MINIMIZE TIME SPENT WORKING IN THE CHANNEL. 11.3.INSTALL IN-STREAM STRUCTURES, BEDFORM FEATURES, AND STREAMBANK PROTECTION PER THE PLANS. WHEN POSSIBLE, PERFORM WORK FROM STREAMBANKS IN ORDER TO MINIMIZE TIME SPENT WORKING IN THE CHANNEL. 11.4.INSTALL COIR STREAMBANK MATTING AND TEMPORARY SEEDING ON ALL DISTURBED SURFACES ON THE STREAMBANK UP TO THE TOP OF BANK. 12.ANY AREA DISTURBED WITHIN 25 FEET FROM THE TOP OF THE STREAM BANK SHALL BE PROVIDED WITH TEMPORARY GROUND COVER SPECIFIED IN THE VEGETATION PLAN WITHIN CALENDAR DAYS, UNLESS SUPERSEDED BY THE CONDITIONS OF GENERAL STORMWATER PERMIT NCG 010000. 10 G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:27:19 PM, AutoCAD PDF (General Documentation).pc3 No.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:NOT FORCONSTRUCTIONSEALF L O W STEEL FILTER FABRIC SHALL BE IN ACCORDANCE WITH CONSTRUCTION SPECIFICATIONS 8' MAXIMUM SPACING WITH WIRE SUPPORT FENCE; 6' MAXIMUM SPACING WITHOUT WIRE SUPPORT FENCE ATTACH FILTER FABRIC SECURELY TO UPSTREAM SIDE OF POST 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE 6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE 5' T- POST PLASTIC OR WIRE TIES (TYP.) 18" TO 24"WIRE FENCE (BEHIND) WOVEN GEO-TEXTILE EXISTING GROUND 8" DOWN AND 4" FORWARD 24" 24" 5' T- POST PLASTIC OR WIRE TIES (TYP.) WIRE FENCE (BEHIND) WOVEN GEO-TEXTILE BACKFILL TRENCH AND COMPACT THOROUGHLY UPSLOPE 4" MIN. CROSS-SECTION VIEW . DEAD TREES AND SCRUB OR INDER GROWTH SHALL BE CUT FLUSH WITH ADJACENT GRADE. NO GRUBBING ALLOWED UNDER DRIP LINE. TREE PROTECTION FENCE DETAIL (NTS.) NOTES: 1.REMOVE ALL BARRIERS UPON COMPLETION OF PROJECT. 2.SEDIMENT AND EROSION CONTROL PLAN SHALL SHOW THE LOCATION OF ALL TREE PROTECTION FENCES. 3.REFER TO PLANTING SPECIFICATION FOR PLANTING DIRECTION. ONE FOOT FOR EACH INCH OF TRUNK DIAMETER (DBH). 6 FT. MIN. WIDTH FOR 2 IN. CAL. TREES OR SMALLER PLAN VIEW OF ROOT ZONE (NTS.) FOR PRUNING SEE INTERNATIONAL SOCIETY OF ARBORICULTURE SPECIFICATIONS NOTES: 1.WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL 2.LETTERS TO BE 3 IN. MIN. CLEARLY LEGIBLE AND SPACED AS DETAILED. SEE LETTERING DETAIL FOR PROPER SIGNAGE. 3.SIGNS TO BE PLACED 200 FT. O.C. MAX. 4.SIGNS TO BE PLACED AT EACH END AND 200 FT. O.C. THEREAFTER. 5.ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 6.MAINTAIN FENCE THROUGHOUT DURATION OF PROJECT. 7.FOR SAFETY FENCE SIGN AS FOLLOWS: TREE PROTECTION AREA - DO NOT ENTER. POSTS SHALL BE PAINTED 'T'-POST 1.33 lb/ LF STEEL. HIVIS FLORESCENT YELLOW GREEN UV RESISTANT, HIGH TENSILE STRENGTH POLY FABRIC 8.0' O.C. MAX.WATERPROOF SIGN 40" 3 IN 4 IN 4 IN 4 IN 3 IN 3 IN SEE NOTES 2.0' MIN4.0' MIN1.75 IN X 1.75 IN STANDARD SAFETY FENCING MAY BE USED 2.0'4.0'NOTES: 1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 2. WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. 3. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. (NTS.) TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT A A 2"-3" COURSE AGGREGATE MIN. 6" THICK DIVERSION RIDGE REQUIRED WHERE GRADE EXCEEDS 2% SECTION A-A ROADWAY SPILLWAY FILTER FABRIC 2% OR GREATER NOTE: USE SANDBAGS, STRAW BALES OR OTHER APPROVED METHODS TO CHANNELIZE RUNOFF TO BASIN AS REQUIRED. STRAW BALES, SANDBAGS, OR CONTINUOUS BERM OF EQUIVALENT HEIGHT SUPPLY WATER TO WASH WHEELS IF NECESSARY ROADWAYFLOW FLOWFLOWFLOWFLOW 20' MIN. 50' MIN. PLAN DIVERSION RIDGE JDHNAEJDHJDH07/03/2019ISSUED FOR:80% PERMITTING CONSTRUCTION FENCING (NTS.) SILT FENCE (NTS.) NOTES: 1.SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. 2.INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN NECESSARY. 0.5 FT. MAXIMUM RECOMMENDED STORAGE HEIGHT. 3.REMOVED SEDIMENT SHALL BE DEPOSITED IN SPOIL AREA AS SHOWN ON CONSTRUCTION DRAWINGS. BAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNCARTOOGECHAYE CREEK REPAIRE&SC DETAILSSUEG I S SURVEYING GNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-19257 SAMUEL ASHE DRIVEASHEVILLE, NC 28805PHONE: 919.600.4790WEB: WWW.JENNINGSENV.COMNC FIRM #: P-1932 PROJ: 4519025 DWG: 4519025E.DWG SHEET: 6 of 15 DATE: 2020/03/20 G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:30:02 PM, AutoCAD PDF (General Documentation).pc3 BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF 0+ 0 0 1+ 0 0 2+00 3+00 4+00 5+00 6+007+00BP: 0+00.00PC: 1+19.53PCC: 1+73.40PRC: 2+11.19PCC: 2+35.55PCC: 2+70.02PRC: 2+96.69PRC: 3+40.10PRC: 3+89.55PRC: 4+25.06PRC: 4+47.66PRC: 4+78.16PRC: 4+90.86PCC: 5+05.87PCC: 5+40 .64PCC: 5+ 5 8 . 2 9 PCC: 5 + 9 0 . 2 1 P C C : 6 + 1 4 . 3 9 PC C : 6 + 5 2 . 4 8 PR C : 7 + 1 2 . 4 3 ST A T I O N : 6 + 3 3 M A T C H L I N E No.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 20' 20100 40 60 PLAN VIEW (1" = 20' HORIZ.)JDHNAEJDHJDH03/20/2020NOT FORCONSTRUCTIONSEALISSUED FOR:80% PERMITTING NO WORK THIS SHEET BAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNCARTOOGECHAYE CREEK REPAIR0+00.00 - 6+33.00SUEG I S SURVEYING GNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-19257 SAMUEL ASHE DRIVEASHEVILLE, NC 28805PHONE: 919.600.4790WEB: WWW.JENNINGSENV.COMNC FIRM #: P-1932 PROJ: 4519025 DWG: 4519025E.DWG SHEET: 7 of 15 DATE: 2020/03/20 G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:31:03 PM, AutoCAD PDF (General Documentation).pc3 BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BK F BKF BKF BK F BKF BKF BK F BK F BK F BKF BK F BKF BK F BKF 7+0 0 8+00 9+00 10+00 11+ 0 0 12 + 0 0 PCC: 6+14 .39PCC: 6+ 5 2 . 4 8 PRC: 7 + 1 2 . 4 3 PCC: 7+50 .89PCC: 7+85.13PCC: 8+22.17PCC: 8+28.96PCC: 8+64.08PRC: 9+02.61PRC: 9+95.24PCC: 10+54.34PCC: 10+92.72PCC: 11+12.84PRC: 11+56.98PRC: 12+24.53PCC: 12+71.91STATION : 6+ 3 3MATCHLINE STATION: 12+66MATCHLINENo.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 20' 20100 40 60 PLAN VIEW (1" = 20' HORIZ.)JDHNAEJDHJDH03/20/2020NOT FORCONSTRUCTIONSEALISSUED FOR:80% PERMITTING BT 1 FURNISH AND INSTALL BOULDER TOE PER DETAIL, FIELD LOCATED PER PROJECT ENGINEER BAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNCARTOOGECHAYE CREEK REPAIR6+33.00 - 12+66.00SUEG I S SURVEYING GNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-19257 SAMUEL ASHE DRIVEASHEVILLE, NC 28805PHONE: 919.600.4790WEB: WWW.JENNINGSENV.COMNC FIRM #: P-1932 PROJ: 4519025 DWG: 4519025E.DWG SHEET: 8 of 15 DATE: 2020/03/20 G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:33:33 PM, AutoCAD PDF (General Documentation).pc3 BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKFBKF BKFBKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKFBKFBKF BKFBKF BKF BKFBKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF 13+00 14+00 15+00 16+00 17+00 18+00 19+00PCC: 12+71 .91PCC: 13+15.29PCC: 13+57.41PCC: 13+93.20PRC: 15+16.00PCC: 16+03.65PRC: 16+95.15PRC: 17+36.18PCC: 17+52.95PCC: 17+70.64PCC: 17+96.93PCC: 18+38 .18 P C C : 1 8 + 7 2 . 0 6 PR C : 1 9 + 0 2 . 1 5 P R C : 1 9 + 2 2 . 6 5 PR C : 1 9 + 5 6 . 6 0 STATION : 12+66MATCHLINE STATION: 18+99MATCHLINENo.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 20' 20100 40 60 PLAN VIEW (1" = 20' HORIZ.)JDHNAEJDHJDH03/20/2020NOT FORCONSTRUCTIONSEALISSUED FOR:80% PERMITTING BT 2 BT 3 FURNISH AND INSTALL BOULDER TOE PER DETAIL, FIELD LOCATED PER PROJECT ENGINEER FURNISH AND INSTALL BOULDER TOE PER DETAIL, FIELD LOCATED PER PROJECT ENGINEER CONTRACTOR SHALL ENSURE A SMOOTH TRANSITION FROM A 3:1 GRADE TO A 10:1 GRADE CONTRACTOR SHALL FIELD VERIFY GRADE OUT DOES NOT IMPACT AG FIELDS BAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNCARTOOGECHAYE CREEK REPAIR12+66.00 - 18+99.00SUEG I S SURVEYING GNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-19257 SAMUEL ASHE DRIVEASHEVILLE, NC 28805PHONE: 919.600.4790WEB: WWW.JENNINGSENV.COMNC FIRM #: P-1932 PROJ: 4519014 DWG: 4519025E.DWG SHEET: 9 of 15 DATE: 2020/03/20 FURNISH AND INSTALL STREAM CROSSING, PER DETAIL SEE SHEET 16 FIELD LOCATED PER PROJECT ENGINEER G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:35:26 PM, AutoCAD PDF (General Documentation).pc3 BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BK F BKF BKF BKF BKF BK F BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF19+00 20+00 21+00 22+00 23+00 24+0 0 25+00PRC: 1 9 + 0 2 . 1 5 PRC: 19+22 .65PRC: 1 9 + 5 6 . 6 0 PCC: 19+82 .10PCC: 20+04.14PCC: 20+23.62PCC: 20+39.61PCC: 20+45.55PRC: 21+35.31PCC: 21+93.67PRC: 22+22.52PCC: 22+67.68PCC: 23+05.23PRC: 23+42.72PCC: 24+05.91PRC: 24+41.93PRC: 24+82.96PCC: 25+58 .36 P C C : 2 5 + 7 3 . 9 1STATION: 18+99MATCHLINESTATION: 25+32MATCHLINENo.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 20' 20100 40 60 PLAN VIEW (1" = 20' HORIZ.)JDHNAEJDHJDH03/20/2020NOT FORCONSTRUCTIONSEALISSUED FOR:80% PERMITTING BT 4 FURNISH AND INSTALL BOULDER TOE PER DETAIL, FIELD LOCATED PER PROJECT ENGINEER BAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNCARTOOGECHAYE CREEK REPAIR18+99.00 - 25+32.00SUEG I S SURVEYING GNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-19257 SAMUEL ASHE DRIVEASHEVILLE, NC 28805PHONE: 919.600.4790WEB: WWW.JENNINGSENV.COMNC FIRM #: P-1932 PROJ: 4519014 DWG: 4519025E.DWG SHEET: 10 of 15 DATE: 2020/03/20 G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:37:43 PM, AutoCAD PDF (General Documentation).pc3 BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKFBKFBKFBKFBKF BKF BKF BKFBKF BKFBKF BKFBKF BKF BKF BKF BKFBKF BKF BKF BKFBKF BKF BKF BKF BKFBKF BKF BKF BKF BKFBKF BKF BKFBKF BKF BKF BKFBKF BKF BKFBKF BKF BKF BKF BKFBKF BKF BKF BKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKFBKF BKF BKF BKF BKFBKF BKFBKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BK F BKF BK F BKF BKF BKF BK F BK F BK F BK F BKF BKF BK F BKF BK F BKF BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BKF BKF BKF BKF BK F BK F BKF BK F BKF BKF BK F BK F BKF BKF BKF BK F BKF BK F BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BK F BK F BKF BKF BKFBKFBKF BK F BK F BK F BKFBKF BK F BK F BKFBKF BKFBKFBK F BKF BKFBKFBK F BKFBKF BK F BKF BKF BKFBKFBK F BKFBKF BKFBKFBKF BKF BKF BKFBK F BK F BKFBKF BK F BK F BKF BKF BK F BK F BKF BK F BK F BKF BK F BKF BK F BK F BKF BK F BKF BK F BK F BKF BK F BKF BKF BK F BK F BK F BKF BKF BKF BKF BKF BKF BKF BK F BKF BKF BKF BKF BKF BKF BK F BKF BK F BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKFBKFBKF BKF BKFBKFBKF BKF BKF BKFBKFBKF BKF BKF BKFBKFBKF BKF BKF BKFBKF BKFBKFBKF BKF BKF BKFBKFBKFBKFBKF BKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKFBKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BK F BKF BKF BK F BKF BKF BK F BK F BKF BK F BK F BK F BKF BKF BKF BK F BK F BKF BKF BK F BKF BKFBK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BKF BK F BK F BKF BK F BKF BK F BK F BKF BKF BKF BKF BKF BKF BK F BKFBKF BKF BK F BKF BKF BKF BKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKFBKF BKFBKF BKF BKFBKF BKF BKF BKFBKF BKF BKF BKF BKFBKF BKF BKF BKF BKFBKF BKF BKFBKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKFBKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKFBKF BKF BKF BKF BKF BKFBKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BK F BKF BKF BK F BKF BK F BKFBKF BK F BKF BKF BKF BKF BKF BK F BKF BKF BKF BK F BKF BK F BK F BKF BK F BK F BKF BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BKFBK F BK F BKFBKFBKF BKF BKF BKF BKF BK F BKFBKF BK F BKF BKF BKF BK F BKF BKF BKF BK F BKF BKF BKF BKF BKF BKF BKF BK F BKF BKF BK F BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BK F BK F BKF BK F BK F BK F BK F BK F BK F BK F BKF BK F BKFBK F BKFBK F BKFBKF BKF BKFBK F BKFBK F BKF BKF BK F BKF BKFBK F BKFBKFBKF BKFBKF BKF BKF BKF BK F BKFBK F BKFBKF BKF BK F BK F BKF BKF BKFBKF BKF BK F BKF BKF BKFBKF BK F BKF BK F BKF BK F BKF BK F BKF BK F BKF BKF BK F BK F BKF BKF BKF BKF BKF BK F BKF BKF BKF BKF BKF BKF BK F BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKFBKFBKF BKF BKFBKF BKF BKFBKFBKFBKF BKF BKF BKFBKFBKF BKFBKF BKF BKFBKFBKFBKF BKFBKF BKFBKF BKF BKFBKF BKF BKFBKF BKF BKF BKFBKFBKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKFBKFBKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BK F BK F BKF BKF BK F BKF BK F BK F BKFBK F BKFBK F BK F BK F BK F BK F BK F BK F BK F BK F BKF BK F BKF BK F BK F BKF BKF BK F BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKFBKF BKFBKF BKFBKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKFBKF BKF BKFBKF BKFBKF BKFBKF BKFBKF BKF BKF BKFBKF BKFBKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF24+0025+0026+00 2 7 + 0 0 28+ 0 0 29 + 0 0 30+0031+003 2 + 0 0 PRC: 23+4 2 . 7 2 PCC: 24+ 0 5 . 9 1 PRC: 2 4 + 4 1. 9 3 PRC: 2 4 + 8 2 . 9 6 PCC: 25+58.36PCC: 25+73.91PRC: 25+88.35PCC: 26+12.01PRC: 26+33.96PCC: 26+85.14PCC: 27+26.15PCC: 27+57.03PRC : 2 7 + 9 4 . 7 5 PCC: 28+10.57PCC: 28+43.17PRC: 28+73.34PCC: 29+20.14PCC: 29+58.00P R C : 3 0 + 0 3 . 4 2 PR C : 3 0 + 3 7 . 3 7 PRC: 30 + 4 8 . 2 2 PC C : 3 0 + 7 9 . 3 6 PCC: 31+14 .19PCC: 31+67.29PCC: 3 2 + 1 8. 2 5 PRC: 32+53.65 STATI O N: 25+32 MAT C HLI N E STATION: 31+65MATCHLINENo.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 20' 20100 40 60 PLAN VIEW (1" = 20' HORIZ.)JDHNAEJDHJDH03/20/2020NOT FORCONSTRUCTIONSEALISSUED FOR:80% PERMITTING BT 4 FURNISH AND INSTALL BOULDER TOE PER DETAIL, FIELD LOCATED PER PROJECT ENGINEER BT 5 FURNISH AND INSTALL BOULDER TOE PER DETAIL, FIELD LOCATED PER PROJECT ENGINEER BAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNCARTOOGECHAYE CREEK REPAIR25+32.00 - 31+65.00SUEG I S SURVEYING GNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-19257 SAMUEL ASHE DRIVEASHEVILLE, NC 28805PHONE: 919.600.4790WEB: WWW.JENNINGSENV.COMNC FIRM #: P-1932 PROJ: 4519014 DWG: 4519025E.DWG SHEET: 11 of 15 DATE: 2020/03/20 G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:40:20 PM, AutoCAD PDF (General Documentation).pc3 BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKFBKFBKF BKFBKF BKF BKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKFBKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BK F BKF BK F BKF BKF BKF BKF BKF BK F BK F BKF BKF BK F BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BK F BKF BKF BKF BKF BKF BKF BKF BKF BK F BKF BKF BKF BKF BKF BKF BKF BKF BK F BK F BKF BK F BKF BK F BKF BK F BKF BKF BKFBK F BK F BK F BK F BK F BKFBKFBKF BKF BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BKF BK F BK F BK F BK F BKF BKF BK F BK F BK F BKF BK F BK F BK F BKF BK F BK F BK F BKF BK F BKF BK F BKF BK F BK F BKF BKF BK F BKF BKF BK F BK F BKF BKF BKF BK F BK F BK F BK F BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BK F BK F BK F BK F BKF BKF BKF BK F BKF BKF BKF BK F BKF BKF BKF BK F BKF BKF BKF BKF BK F BKF BK F BKF BKF BKF BKF BKFBK F BKFBK F BKF BK F BKF BKF BK F BKF BKF BK F BK F BKF BKF BKF BKF BKF BKF BKF BKF BK F BK F BK F BKF BK F BK F BK F BK F BKF BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BKF BK F BK F BK F BK F BK F BK F BK F BKFBK F BKFBK F BK F BKFBK F BK F BKF BKFBKF BKF BK F BKF BKF BK F BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKFBKFBKFBKF BKFBKF BKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKFBKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BK F BK F BKF BKF BKF BK F BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BK F BKF BKF BK F BKF BK F BKF BKF BKF BK F BK F BKF BKF BKF BKF BKF BKF BK F BKF BK F BKF BK F BK F BK F BK F BKFBKF BKFBK F BKFBK F BK F BK F BK F BK F BK F BK F BK F BKF BK F BK F BK F BK F BK F BKF BK F BK F BK F BKF BK F BKF BK F BKF BK F BKF BK F BKF BK F BK F BKF BK F BKF BKF BK F BK F BKF BK F BK F BK F BK F BKF BKF BKF BKF BKF BKF BK F BK F BK F BK F BKF BK F BK F BKF BKF BKF BKF BKF BK F BK F BKF BKF BKF BK F BKF BKF BK F BKF BKF BK F BKF BKF BKF BKF BK F BKF BK F BKFBK F BKFBK F BKFBK F BKFBK F BKF BK F BKF BKF BK F BKF BKF BKF BKF BK F BK F BK F BK F BK F BK F BK F BK F BKF BKF BK F BK F BKF BKF BK F BKF BK F BK F BK F BKF BK F BKF BK F BK F BK F BKF BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BK F BKF BK F BK F BK F BKF BKF BK F BKFBKF BKF BKF BKFBK F BKF BKF BK F BKF BKF BKF BKF BK F BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF BKF 30+0031+0032+00 33 + 0 0 34+003 5 + 0 0 36+00 37+0 0 38+00 38+50 P C C : 2 9 + 5 8 . 0 0 PRC: 30+03.42 PRC: 30+37.37 PRC: 30+48.22PCC: 3 0 + 7 9. 3 6 PCC: 3 1 + 1 4 . 1 9 PCC: 31+67 .29PCC: 32+18.25PRC: 32+53.65PRC: 32+78.69PCC: 3 3 + 7 4. 3 6 PRC: 3 4 + 3 5. 2 5 PCC: 35+02.09PRC: 3 5 + 5 2 . 0 8 PCC: 35+86.80PRC: 36+24.63PRC: 36+89 .64PCC: 37+46 .50PCC: 37+85.97EP: 38+49.71STATION : 31+65MATCHLINE STATION: 37+99MATCHLINENo.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:HORIZONTAL SCALE: 1" = 20' 20100 40 60 PLAN VIEW (1" = 20' HORIZ.)JDHNAEJDHJDH03/20/2020NOT FORCONSTRUCTIONSEALISSUED FOR:80% PERMITTING BT 5 FURNISH AND INSTALL BOULDER TOE PER DETAIL, FIELD LOCATED PER PROJECT ENGINEER BAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNCARTOOGECHAYE CREEK REPAIR31+65.00 - 37+98.00SUEG I S SURVEYING GNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-19257 SAMUEL ASHE DRIVEASHEVILLE, NC 28805PHONE: 919.600.4790WEB: WWW.JENNINGSENV.COMNC FIRM #: P-1932 PROJ: 4519014 DWG: 4519025E.DWG SHEET: 12 of 15 DATE: 2020/03/20 G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:42:25 PM, AutoCAD PDF (General Documentation).pc3 No.DESCRIPTIONAPVDBYDATEDSGN:DR:CHK:APVD:DATE:JDHNAEJDHJDH03/20/2020NOT FORCONSTRUCTIONSEALNAME START STA END STA SIDE RT 1 9+84.30 11+64.35 W RT 2 13+22.23 16+41.74 W RT 3 14+72.83 16+42.81 E RT 4 24+76.76 26+13.73 E RT 5 30+84.09 33+54.35 W BOULDER TOE PROTECTION NOTES BANKFULL STAGE BANKFULL BENCH WITH EROSION CONTOL MATTING RIVER COBBLE TOE PROTECTION WIDTH MIN. = 12.0 FT BOULDER STACK BANKFULL STAGE BOULDER TOE PROTECTION DETAILED PLAN LIVE STAKES, TRANSPLANTS AND / OR CONTAINERIZED PLANTINGS LIFT SETBACK = 2.0 FT LAYER OF LIVE BRANCHES AND TOPSOIL (TYP.) LIFT HEIGHT= 1.0 FT 6" - 1' (TYP.) 5% (TYP.) SOIL BACKFILL (TYP.)700 GRAM COIR EROSION CONTROL MATTING SELECT GRAVEL BACK FILL FOR FIRST SOIL LIFT UNDISTURBED GROUND OR PREVIOUS FILL EXCAVATION / FILL LIMITS NON-WOVEN GEOTEXTILE BOULDER TOE PROTECTION DETAILED PROFILE - SECTION A - A' NOT TO SCALE RIVER COBBLE TOE PROTECTION MAXIMUM HEIGHT OF BOULDER TOE = 6 FT RIVER BED DIAMETER VARIES LIVE BRANCH NOT TO SCALE (TYP. 1/2" TO 1") GRADE B A N K A T 3 : 1 T O B K F S T A G EFLOW AA' 1.A 2.5 - 3.5 FT THICK BEDDING COURSE CONSISTING OF WELL GRADED RIVER COBBLES SHALL BE INSTALLED BELOW THE BOULDER FOUNDATION TO THE ELEVATION OF THE STREAM BED. 2.FOOTER BOULDERS SHALL BE INSTALLED IN ROWS ABOVE THE RIVER COBBLE TOE PROTECTION. BOULDERS MAY BE MINED AND REUSED ONSITE. FOOTER BOULDERS SHALL BE 3.0' X 3.0' X 5.0' +/- 0.5'. 3.HEADER BOULDERS SHALL BE INSTALLED ATOP THE FOOTER BOULDERS. ALL BOULDERS SHALL FIT TIGHTLY TOGETHER. HEADER BOULDERS SHALL BE INSTALLED WITH A 1.0 FT SETBACK FROM THE FRONT EDGE OF THE FOOTER BOULDERS. BOULDERS MAY BE MINED AND REUSED ONSITE. HEADER BOULDERS SHALL BE 3.0' X 3.0' X 5.0' +/- 0.5'. 4.GRAVEL LEVELING BASE SHALL BE INSTALLED ABOVE THE HIGHEST ELEVATION OF THE FOUNDATION BOULDERS BEFORE THE SOIL LIFTS ARE INSTALLED. 5.THE SOIL BACKFILL USED FOR LIFTS AND TOPSOIL USED FOR LAYERING WITH THE LIVE BRANCHES SHALL BE FREE OF ANY LARGE ROOTS OR WOODY DEBRIS AND SHALL GENERALLY BE FREE FROM ANY GRAVEL OR COBBLE MATERIAL. 6.SOIL BACKFILL SHALL BE COMPACTED SUCH THAT FUTURE SETTLING WILL BE KEPT TO A MINIMUM; YET, NOT SUCH THAT THE UNDERLYING BRUSH IS DISPLACED OR DAMAGED. 7.THE TOP OF THE BACKFILL FOR THE FIRST LIFT SHALL BE SLOPED AT APPROXIMATELY 5% AWAY FROM THE STREAM. 8.PLACE A LAYER OF TOPSOIL AND LIVE BRANCHES ON TOP OF EACH SOIL LIFT SUCH THAT APPROXIMATELY 6 INCHES TO 1 FOOT OF EACH LIVE BRANCH WILL BE EXPOSED AND THE REMAINDER (2' TO 4') OF EACH LIVE BRANCH WILL BE COVERED BY THE NEXT SOIL LIFT. 9.PLACE A LAYER OF 6.5 FEET WIDE GEOCOIR DEKOWE 700 EROSION CONTROL BLANKET, OR EQUIVALENT, ON TOP OF THE TOPSOIL AND LIVE BRANCHES SUCH THAT 2.5 FEET OF THE BLANKET WILL BE BURIED BELOW THE NEXT SOIL LIFT. ALLOW THE REMAINING 4.5 FEET OF BLANKET TO HANG OVER THE PRECEDING SOIL LIFT OR COIR FIBER LOGS. 10.PLACE A LAYER OF 6.5 FEET WIDE NON-WOVEN COIR MATTING OVER THE EROSION CONTROL BLANKET TO THE SAME LIMITS. 11.SOIL CAN BE COMPACTED BY STACKING A PIECE OF 2 X 6 SAWN LUMBER EDGEWAYS UP TO THE LIFT HEIGHT SPECIFIED IN THE STRUCTURE TABLE AND SECURING WITH WOODEN STAKES TO PROVIDE A RIGID BACKSTOP FOR COMPACTING SOIL LIFT. 12.PLACE SOIL BACKFILL UP TO THE LIFT HEIGHT SPECIFIED OF NO GREATER THAN 1.0 FT BEING CAREFUL NOT TO PUSH/PULL OR TEAR THE FABRIC PREVIOUSLY PLACED. 13.THE TOP OF THE SOIL BACKFILL SHALL BE FLAT WITHIN THE LIFT SETBACK DISTANCE SPECIFIED IN THE STRUCTURE TABLE. BEYOND THE LIFT SETBACK DISTANCE, THE SOIL BACKFILL SHALL BE SLOPED AT AN APPROXIMATE 5% SLOPE AWAY FROM THE STREAM. 14.TOP DRESS THE SOIL LIFT WITH TOPSOIL FROM THE FACE OF THE SOIL LIFT BACK INTO THE FLOODPLAIN AT LEAST 4FT. 15.REMOVE THE SAWN LUMBER AND WOODEN STAKES FROM THE FACE OF THE SOIL LIFT AND WRAP THE FACE AND TOP OF THE SOIL LIFT USING THE WOVEN AND NON-WOVEN COIR MATTING HANGING OVER THE PREVIOUS LIFT/COIR FIBER LOGS. 16.THE EROSION CONTROL FABRIC SHALL BE PULLED AS TIGHT AS POSSIBLE WITHOUT TEARING OR EXCESSIVELY DISTORTING THE FABRIC. 17.SECURE THE EROSION CONTROL AND NON-WOVEN MATTING IN PLACE BY STAKING THE END OF THE EROSION CONTROL FABRIC WITH WOODEN STAKES ON 1.5-FOOT CENTERS. 18.BEGIN CONSTRUCTION OF THE NEXT SOIL LIFT BY REPEATING THE PREVIOUS NOTES STARTING WITH NOTE 11. 19.THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS-SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED OR APPROVED BY THE ENGINEER. ISSUED FOR:80% PERMITTING BAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNCARTOOGECHAYE CREEK REPAIRBOULDER TOESUEG I S SURVEYING GNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-19257 SAMUEL ASHE DRIVEASHEVILLE, NC 28805PHONE: 919.600.4790WEB: WWW.JENNINGSENV.COMNC FIRM #: P-1932 PROJ: 4519014 DWG: 4519025E.DWG SHEET: 13 of 15 DATE: 2020/03/20 G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:44:58 PM, AutoCAD PDF (General Documentation).pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:CARTOOGECHAYE CREEK REPAIRFORD CROSSINGJDHNAEJDHJDH03/20/2020NOT FORCONSTRUCTIONSEALSUEG I S SURVEYING GNIREENIGNECHARLOTTE OFFICE: 201 W 29TH STREET,CHARLOTTE NC 28206KINSTON OFFICE: 1308 HWY 258 N, KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153WEBSITE: WWW.LDSI-INC.COM | NC FIRM #: C-19257 SAMUEL ASHE DRIVEASHEVILLE, NC 28805PHONE: 919.600.4790WEB: WWW.JENNINGSENV.COMNC FIRM #: P-1932 DATE: 2020/03/20 PROJ: 4519014 DWG: 4519025E.DWG SHEET: 14 of 15 ISSUED FOR:80% PERMITTING ≥G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:45:20 PM, AutoCAD PDF (General Documentation).pc3 No.DESCRIPTIONAPVDBAR IS ONE INCH ON ORIGINAL DRAWING 0 1" DATE: PROJ: DWG: VERIFY SCALE SCALE AS SHOWNBYDATE DSGN:DR:CHK:APVD:DATE:NOT FORCONSTRUCTIONSUEG I S SURVEYING GNIREENIGNE LDSICHARLOTTE OFFICE: 508 WEST 5TH ST., SUITE 125, CHARLOTTE NC 28202KINSTON OFFICE: 1308 HWY 258 N., KINSTON NC 28504PHONE: 704.337.8329 | FAX: 704.308.3153 | WEBSITE: WWW.LDSI-INC.COMNC FIRM #: C-1925SURVEYING SOLUTIONS FOR A CHANGING WORLDSEALPROPOSED SLOPE WITH ECMPLAN VIEW TUBELING EX. SLOPE ECM FIRMLY PACK SOIL AROUND THE BASE OF THE TUBELING, SO THAT NO AIR POCKET REMAIN. NOTES: 1.SEE PLANTING SCHEDULE FOR DESIRABLE SPECIES AND SIZE. 2.SPACE AT 3.0' O C. (TRIANGULAR SPACING). 3.ALL TUBELINGS SHALL COMPLY WITH THE RECOMMENDATIONS AND REQUIREMENTS OF ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK." 4.CUT AND FOLD BACK SLOT IN MAT TO INSTALL TUBELING. SEAL SLOT WITH COMPOST AND STAPLE. ALLOW 6" DIAMETER AROUND TUBELING WITH NO ECM. 5.PLANT THE ROOT BALL SLIGHTLY DEEPER THAN IT WAS IN THE TUB. TOP OF SLOPE 3 ft 3 ft FLOW 45° 6 INCH MINIMUM TO REMAIN ABOVE GROUND. GENERAL PLANTING NOTES: SEEDING TEMPORARY & PERMANENT ·PERMANENT SEED MIX SHALL BE ERNST SEED NORTH CAROLINA MOUNTAIN RIPARIAN MIX OR EQUIVALENT ·SEEDING SHALL BE IN ACCORDANCE WITH CONSTRUCTION SPECIFICATION 006 - SEEDING, SPRIGGING, AND MULCHING. ·DELIVERY TICKETS SHOWING QUALITY AND QUANTITY OF MATERIALS SHALL BE FURNISHED TO THE ENGINEER (1) WEEK PRIOR TO USING MATERIALS FOR APPROVAL. ·AREAS TO BE SEEDED SHALL BE DRESSED TO A SMOOTH, FIRM SURFACE. ON SITES WHERE EQUIPMENT CAN OPERATE ON SLOPES SAFELY, THE SEEDBED SHALL BE ADEQUATELY LOOSENED (4 TO 6 INCHES DEEP) AND SMOOTHED. DEPENDING ON SOIL AND MOISTURE CONDITIONS, DISKING OR CULTIPACKING, OR BOTH, MAY BE NECESSARY TO PROPERLY PREPARE A SEEDBED. WHERE EQUIPMENT CANNOT OPERATE SAFELY, THE SEEDBED SHALL BE PREPARED BY HAND METHODS BY SCARIFYING TO PROVIDE A ROUGHENED SOIL SURFACE SO THAT BROADCAST SEED WILL REMAIN IN PLACE. ·FERTILIZER, LIME, AND OTHER SOIL AMENDMENTS SHALL BE APPLIED AS SPECIFIED IN SPECIFICATIONS. THE FERTILIZER AND SOIL AMENDMENTS SHALL BE THOROUGHLY INCORPORATED INTO THE SOIL IMMEDIATELY FOLLOWING SURFACE APPLICATION. ·ALL DISTURBED AREAS SHALL BE SEEDED WHEN THEY ARE EXPECTED TO BE BARE OF GROUND OVER FOR MORE THAN 15 CALENDAR DAYS; WHERE ACTIVE CONSTRUCTION IS NOT BEING UNDERTAKEN, OR AS DIRECTED BY THE ENGINEER/INSPECTOR. THESE AREAS SHALL BE SEEDED (TEMPORARY SEED MIX) AT THE END OF EACH DAY UNLESS OTHERWISE DIRECTED BY THE ENGINEER/INSPECTOR. ·SEEDING (PERMANENT SEED MIX) SHALL BE ACCOMPLISHED WITHIN TWO (2) DAYS AFTER FINAL GRADING IS COMPLETED AND APPROVED BY THE ENGINEER. ·FERTILIZER SHALL BE APPLIED AT THE RATE OF 1,000 LBS. PER ACRE. THE FERTILIZER SHALL BE 10-10-10, OR EQUIVALENT. LIME SHALL BE APPLIED AT THE RATE OF TWO (2) TONS PER ACRE. MULCH SHALL BE APPLIED AT A RATE OF TWO (2) TONS PER ACRE. ALL SOIL AMENDMENTS SHALL BE THOROUGHLY INCORPORATED, AS SPECIFIED IN SECTION 5 OF THIS CONSTRUCTION SPECIFICATION. THE AREA SHOULD THEN BE SMOOTHED AND ANY DEBRIS LARGER THAN 3 INCHES IN DIAMETER OR WHICH WOULD INTERFERE WITH MOWING SHALL BE REMOVED FROM THE SURFACE. A CYCLONE SEEDER, DRILL OR CULTIPACKER SEEDER SHALL BE USED TO APPLY THE SPECIFIED SEED EVENLY ON THE FRESHLY PREPARED SEEDBED. WHEN SEED IS BROADCAST, A CULTIPACKER OR OTHER APPROPRIATE EQUIPMENT SHALL BE USED IMMEDIATELY FOLLOWING SEEDING TO INCORPORATE THE SEED. LIVE STAKES ·LIVE STAKES SHALL BE IN ACCORDANCE WITH CONSTRUCTION SPECIFICATION 402 - LIVE STAKES. ·THREE (3) WEEKS PRIOR TO INSTALLATION OF LIVE STAKES CONTRACTOR SHALL SUBMIT A ROPOSED HARVESTING AND CONSTRUCTION SCHEDULE, INCLUDING SOURCE OF SUPPLY OF LIVE CUTTING, TO PROJECT ENGINEER FOR REVIEW AND APPROVAL. NO WORK SHALL BE PERFORMED UNTIL PROJECT ENGINEER APPROVES THE SOURCE AND SCHEDULE. HARVESTING, TRANSPORTING, AND INSTALLATION SHALL TAKE PLACE WHEN PLANTS ARE DORMANT (DECEMBER 1 THROUGH APRIL 1). IF DUE TO CONSTRUCTION SCHEDULING LIVE STAKES CANNOT BE USED BASED ON THE TIMEFRAMES SET ABOVE, LIVE TUBELINGS OF THE SAME SPECIES MAY BE SUBSTITUTED WITH APPROVAL FOR THE PROJECT ENGINEER. ·PLANT MATERIALS SHALL BE FROM SOURCES THAT ORIGINATED WITHIN PLANT HARDINESS ZONES OR 8. LIVE CUTTINGS FOR LIVE STAKES SHALL BE 0.75 INCHES TO 2.0 INCHES IN DIAMETER AND 3 FEET IN LENGTH. SIDE BRANCHES SHALL BE REMOVED AND BARK LEFT INTACT PRIOR TO INSTALLATION. BUDS ON THE STAKES SHALL BE ORIENTED IN AN UPWARD POSITION. CONTRACTOR SHALL SCRAPE A PORTION OF THE CAMBIUM LAYER OFF EACH LIVE STAKE AT THE BASAL END APPROXIMATELY TWO (2) INCHES IN LENGTH BY 0.25 INCHES WIDE TO STIMULATE ROOT GROWTH. THE BASAL ENDS SHALL BE DIPPED IN A ROOT STIMULATING GROWTH HORMONE APPROVED BY THE PROJECT ENGINEER. THE BASAL ENDS SHALL BE TAPERED TO A POINT FOR EASY INSERTION INTO THE SOIL. THE TOP SHALL BE CUT SMOOTH AND SQUARE. ·THE TOPS OF THE LIVE STAKES SHALL BE PAINTED WITH LATEX TREE MARKING PAINT TO ENSURE CORRECT PLANTING DIRECTION. MARK SPECIES WITH DIFFERENT COLORS. LIVE STAKE CUTTINGS SHALL CONSIST OF THE SPECIES AS LISTED ON THE CONSTRUCTION DRAWINGS. ·LIVE STAKE INSTALLATION - LIVE STAKES SHOULD BE INSTALLED FROM DECEMBER 1- MAY 1. DRIVE LIVE STAKES INTO THE GROUND SO THAT SEVENTY-FIVE PERCENT (75%) OF THE STAKE IS BELOW THE GROUND SURFACE. FOR EASY INSERTION INTO THE SOIL THE BOTTOM END OF THE STAKE SHOULD BE CUT AT AN ANGLE OF 30 TO 45 DEGREES. TO ENSURE A FLAT SURFACE FOR HAMMERING INTO THE SLOPE, THE TOP SHOULD BE CUT AT 90-DEGREE ANGLE. FOR LARGER BRANCHES THE USE OF PRUNING SHEARS OR POWER SAW MAY BE NECESSARY. ALL BUDS OF THE LIVE BRANCH SHOULD BE FACED UPWARDS DURING TAKING. AS SHOWN IN THE DETAILED PLAN ABOVE. THE CONTRACTOR SHALL USE A DEADPAN HAMMER FOR DRIVING THE STAKE DIRECTLY INTO THE GROUND OR DRIVE A PILOT HOLE, SMALLER IN DIAMETER THEN THE LIVE STAKE, AND THEN DRIVING THE LIVE STAKE INTO THE PILOT HOLE. ·CONTRACTOR SHALL STAGGER SPECIES AS DIRECTED BY PROJECT ENGINEER. ·CONTRACTOR SHALL WARRANTY LIVE STAKES SURVIVAL AT THE END OF YEAR 1 (ONE). SURVIVAL RATE SHALL BE NO LESS THAN 85%, AS ASSESSED BY THE TEST PLOT METHOD DESCRIBED IN THE CONSTRUCTION SPECIFICATIONS. CONTRACTOR AT THEIR OWN EXPENSE SHALL REMEDIATE ANY AREAS FAILING TO MEET 85% MINIMUM. ·THE NRCS PROJECT ENGINEER SHALL MAKE A FINAL INSPECTION WITH THE CONTRACTOR TO ENSURE ALL LIVE STAKES HAVE BEEN INSTALLED ACCORDING TO THE SPECIFICATION, PLANS, AND DETAILS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ALL DEFICIENCIES WITHIN TEN (10) CALENDAR DAYS OF THE INSPECTION. THE NRCS PROJECT ENGINEER AND CONTRACTOR PRIOR TO FINAL COMPLETION SHALL PERFORM A FINAL INSPECTION OF THE CORRECTED ACTIONS. TREE SEEDLINGS ·TREE SEEDLINGS SHALL BE IN ACCORDANCE WITH CONSTRUCTION SPECIFICATION 400 - TREE PLANTING. ·HARVESTING, TRANSPORTING, AND INSTALLATION SHALL TAKE PLACE WHEN PLANTS ARE DORMANT (DECEMBER 1 THROUGH APRIL 1); UNLESS OTHERWISE DIRECTED BY PROJECT ENGINEER. ·CONTRACTOR SHALL WARRANTY TREE SURVIVAL AT THE END OF YEAR 1 (ONE). SURVIVAL RATE SHALL BE NO LESS THAN 85%, AS ASSESSED BY THE TEST PLOT METHOD DESCRIBED IN THE CONSTRUCTION SPECIFICATIONS. CONTRACTOR AT THEIR OWN EXPENSE SHALL REMEDIATE ANY AREAS FAILING TO MEET 85% MINIMUM. ·CONTRACTOR SHALL SUBMIT TO PROJECT ENGINEER FIVE (5) LIVE SEEDLINGS OF EACH SPECIES ABOVE, FOUR (4) WEEKS PRIOR TO PLANTING FOR APPROVAL. CONTRACTOR SHALL NOT PLANT ANY SEEDLINGS UNTIL PROJECT ENGINEER APPROVES OF SUBMITTED SEEDLING STOCK. SUBMITTAL SHALL BE MADE IN AN APPROVED NURSERY TREE BAG ALONG WITH SEEDLING AND NURSERY INFORMATION. SEEDLINGS SHALL BE CLEARLY MARKED FOR IDENTIFICATION PURPOSES. ·NO MATERIAL SHALL BE PLANTED WHEN THE GROUND OR BACKFILL IS IN A FROZEN CONDITION, OR CONDITIONS ARE UNUSUALLY WET, AS DETERMINED BY THE NRCS CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE (COTR). ·ALL SEEDLINGS SHALL HAVE AT LEAST 5 PRIMARY ROOTS 1/10 DIAMETER OR LARGER. ROOTS SHALL BE PRUNED TO A LENGTH OF 8 INCHES, AS NECESSARY. CONTRACTOR SHALL NOT REMOVE LATERAL ROOTS FROM REMAINING PRIMARY ROOT SYSTEM. ·SEEDLINGS SHALL BE PLANTED ON A 12 FT BY 12 FT OR 8 FT BY 8 FT GRID UNIFORMLY YIELDING 302 OR 600 SEEDLINGS PER ACRE DEPENDING ON ZONE. SEEDLINGS SHALL BE PLANTED IN ZONES IN ACCORDANCE WITH CONSTRUCTION DRAWINGS. ·SHALL BE PLANTED IN A HOLE MADE WITH A TREE PLANTING BAR, DIBBLE, MATTOCK, OR OTHER APPROPRIATE TOOL. THE HOLE SHALL BE LARGE ENOUGH TO ACCOMMODATE THE ENTIRE ROOT SYSTEM. EACH SEEDLING SHALL BE PLANTED AT THE SAME DEPTH AS IT GREW IN THE NURSERY. EACH SEEDLING SHALL BE GIVEN A LIGHT TUG TO ENSURE PROPER PLANTING. ANY SEEDLING NOT SNUG MUST BE RESET. SEEDLINGS SHALL BE KEPT MOIST UNTIL PLANTED. SEEDLINGS THAT ARE TO BE PLANTED LATER IN THE DAY SHALL BE KEPT IN THE BAG OR CONTAINER AND LEFT IN A COOL, MOIST, SHADY AREA. SEEDLINGS SHALL BE STORED IN A COOLER THAT MAINTAINS A TEMPERATURE BETWEEN 35 DEGREES AND 55 DEGREES FAHRENHEIT. ·SEEDLINGS MAY BE FIELD STORED IN A SHED, BARN OR DENSE SHADE FOR UP TO 7 CALENDAR DAYS WHEN THE TEMPERATURE ADJACENT TO THE SEEDLINGS CAN BE MAINTAINED FROM 30 DEGREES TO 60 DEGREES FAHRENHEIT THROUGHOUT THE FIELD STORAGE PERIOD. ·INSPECTION OF SEEDLING QUALITY BY THE NRCS SHALL BE PERFORMED UNDER THIS CONTRACT PRIOR TO OR AT THE BEGINNING OF THE PLANTING OF THE SEEDLINGS. THE NRCS SHALL BE GIVEN AT LEAST ONE (1) WEEK NOTICE OF THE ANTICIPATED ARRIVAL OF SEEDLINGS AND PLANTING CREW TO EACH SITE TO FACILITATE THE COMPLETION OF THIS INSPECTION REQUIREMENT. INSPECTION OF THE TREE PLANTING BY THE NRCS SHALL BE PERFORMED UNDER THIS CONTRACT BY MEASURING SAMPLE PLOTS. IN THE EVENT A SAMPLE PLOT FAILS TO MEET CONTRACT REQUIREMENTS, THE CONTRACTOR WILL BE REQUIRED TO RE-WORK THE REPRESENTATIVE AREA PRIOR TO RE-INSPECTION. THE RE-INSPECTION SAMPLE PLOT SHALL NOT BE THE ORIGINAL SAMPLE PLOT. 3 / 4 l e n g t h EXISTING SLOPE OR NEW STAKES 3 4 IN - 2 IN DIA. X 3 FT LENGTH SPACED 3.0 FT O.C. (TRIANGULAR SPACING) ANGLES AT 45° TO DOWNSTREAM FLOW 45° CUT TOP OF SLOPE PLAN VIEW NOTES: 1. ACCEPTABLE SPECIES: SEE CONSTRUCTION SPECIFICATIONS 2. INSTALL PER CONSTRUCTION SPECIFICATIONS. 3. USE 12 IN -3/4 IN REBAR FOR PILOT HOLES PRIOR TO DRIVING LIVE STAKES INTO GROUND 4. DRIVE LIVE STAKE 3/4 OF ITS LENGTH INTO THE GROUND 5. RECUT ANY LIVE STAKE TIPS DAMAGED BY INSTALLATION 6. STAKES TO BE 3 4 IN TO 2 IN DIAMETER, 3 FT LONG 7. 6 INCH MINIMUM TO REMAIN ABOVE GROUND. 3 ft 3 ft FLOW 45° TOE OF SLOPE 6 " M I N . ( T Y P . ) LIVE STAKE DETAILS (NTS) TUBELING DETAILS (NTS)CARTOOGECHAYE CREEK REPAIRPLANTING DETAILS15 4519025E.dwg SHEET: of 17 4519025 2020/03/20 JDHNAEJDHJDH08/09/2019ISSUED FOR:80% PERMITTING INSTALL PLANTS WHERE CROWN IS FLUSH WITH SOIL SURFACE CUT AND REMOVE ANY COVERING AROUND ROOTS GENERAL PLANTING NOTES: 1.DO NOT COMPACT TOPSOIL, TO PROMOTE HEALTHY ENVIRONMENTAL CONDITIONS FOR THE PLANTS. 2.PLANTS OF THE SAME SPECIES SHOULD BE PLANTED IN CLUSTERS, THESE CLUSTERS SHOULD CONTAIN (5) FIVE PLANTS OF THAT SPECIES. NO MORE THAN ONE (1) CLUSTER OR FIVE (5) PLUGS OF THE SAME SPECIES WITHIN A 10 FT BY 10 FT GRID. 3.ALL PLANTS SHOULD BE PLANTED IN THE INDICATED RANGE TO ENSURE SURVIVAL. TYPICAL PLANTING DETAIL (NTS.) AMENDED TOPSOIL (TYP.) 0.5 FT. DEEP EXISTING SOIL TWICE ROOT DIAMETER G:\2019\4519025\09-Construction Drawings\09A - Working Drawings\4519025E.dwg, 3/20/2020 3:45:21 PM, AutoCAD PDF (General Documentation).pc3