E)IGESTER TANKA001TION
AQUA NORTH
CHATHAM COUNTY, NORTH CAROLINA
Aqua North Carolina Inc.
Engineering Manager - Michael A. Melton
4163 Sinclair St.
Denver, NC.
(704) 489-9404
Engineer
Municipal Engineering Services Company, P.A.
Garner, NC - Boone, NC
FINAL DESIGN
NOT RELEASED FOR CONSTRUCTION
by
Professional Engineer
(Garner Office)
0
z
T
N
kD
L�
0�
N
�0
W
�N
Cb
W
wN
Z
00
Z
z
14
2
3:
a
0
0o
fn
a
rna°
N
1�1
z
�
N
'�
O
U
w
Uj
O
N
C]
k0
00
m
1
C]
Z
N
L3
Z)
Z
J�Z
z
LiW Ln
Q
U]Li
w
ZO
Z
U_
W
L9
W
p
m
J
U
�
d'
�
Z
�
2
N
Q
['7
X
O
o]
W
EL
=
�
En
ko
EL
SCALE:
NOT TO SCALE
DATE:
1017119
DRWN. BY:
R. MOSS
CHKD. BY:
B. aAMIN
PROJECT NUMBER
G17096.2
DRAWING NO.
SHEET NO.
T-1
1
ARRDC\/IATInK1Q
@
AT
A
AREA
A.B.C.
AGGREGATE BASE COURSE
AC
ACRE
A.D.
ALGEBRAIC DIFFERENCE
A.F.F.
ABOVE FINISHED FLOOR
APPROX.
APPROXIMATE
ARCH.
ARCHITECTURAL
ASSY.
ASSEMBLY
B-B
BACK TO BACK
BEAR.
BEARING
BLDG.
BUILDING
BOC
BACK OF CURB
BOT.
BOTTOM
CENTERLINE
CB
CATCH BASIN
C-C
CENTER TO CENTER
CF
CUBIC FEET
CFM
CUBIC FEET PER MINUTE
C&G
CURB AND GUTTER
CH
CHORD
CI
CURB INLET
CLD
CENTER LINE OF DITCH
CL.
CLASS
CMP
CORRUGATED METAL PIPE
CNST
CONSTRUCTION
C.O.
CLEAN -OUT
CO.
COMPANY
COL
COLUMN
CONC.
CONCRETE
CONN
CONNECTION
CPP
CORRUGATED PLASTIC PIPE
CSP
CORRUGATED STEEL PIPE
CULV.
CULVERT
°
DEGREE(S)
0
DELTA ANGLE
O / DIA.
DIAMETER
D
DEPTH/DEEP
Dc
DEGREE OF CURVATURE
DET
DETAIL
DI
DROP INLET
DIP
DUCTILE IRON PIPE
DN
DOWN
DWG(S).
DRAWING(S)
E
EAST
EA.
EACH
EIP
EXISTING IRON PIN
EL/ELEV
ELEVATION
ELEC.
ELECTRICAL
EOP
EDGE OF PAVEMENT
ESMT
EASEMENT
EX/EXIST
EXISTING
F.D.
FLOOR DRAIN
FES
FLARED END SECTION
FFE
FINISHED FLOOR ELEVATION
FH
FIRE HYDRANT
FHA
FIRE HYDRANT ASSEMBLY
FI
FLOW INDICATOR
FLEX.
FLEXIBLE
FLG.
FLANGE
FM
FORCE MAIN
FOC
FACE OF CURB
FT
FEET
FUT
FUTURE
GA
GAUGE
GAL.
GALLON
GALV.
GALVANIZED
GEN
GENERATOR
G/L
GUTTER LINE
GV
GATE VALVE
HD
HEAVY DUTY
HEX.
HEXAGONAL
HOR(IZ).
HORIZONTAL
HP
HIGH POINT
HWL
HIGH WATER LEVEL
HWY.
HIGHWAY
ID
INSIDE DIAMETER
I.E.
INVERT ELEVATION
IN
INCH(ES)
INV.
INVERT
IC,110111100.7Zia 91410►11
L
LENGTH
LB
POUND(S)
LD
LIGHT DUTY
LF
LINEAR FEET
LG
LONG
LP
LOW POINT
LT
LEFT
LWL
LOW WATER LEVEL
MAX.
MAXIMUM
MECH.
MECHANICAL
MFR.
MANUFACTURER
MH
MANHOLE
MIN.
MINIMUM
MI
MILE
MJ
MECHANICAL JOINT
#/NO.
NUMBER
N
NORTH
NC
NORTH CAROLINA
NCDOT
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION
NCDENR
NORTH CAROLINA DEPARTMENT ENVIRONMENT AND NATURAL RESOURCES
NEMA
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
N.I.C.
NOT IN CONTRACT
NTS
NOT TO SCALE
O.C.
ON CENTER(S)
O.D.
OUTSIDE DIAMETER
OHE
OVERHEAD ELECTRIC
OPER
OPERATION
OPNG
OPENING
PC
POINT OF CURVATURE
PERM.
PERMANENT
PI
POINT OF INTERSECTION
PITO
POINT OF INTERSECTION - TURN OUT
PL
PROPERTY LINE
PP
POWER POLE
PROP.
PROPOSED
PS
POINT OF SWITCH
PSF
POUNDS PER SQUARE FOOT
PSI
POUNDS PER SQUARE INCH
PT
POINT OF TANGENCY
PT
POINT
PVC
POLYVINYL CHLORIDE
P.V.C.
POINT OF VERTICAL CURVATURE
P.V.I.
POINT OF VERTICAL INTERSECTION
PVMT
PAVEMENT
P.V.T.
POINT OF VERTICAL TANGENCY
R
RADIUS
RCP
REINFORCED CONCRETE PIPE
RD
ROAD
RED.
REDUCER
REQ'D.
REQUIRED
R.O.W.
RIGHT OF WAY
RR
RAILROAD
RT
RIGHT
S
SOUTH
SAN
SANITARY
S.C.
SECONDARY CLARIFIER
SCH
SCHEDULE
SDMH
STORM DRAIN MANHOLE
SEC
SECONDS
SECT.
SECTION
SED.
SEDIMENT
SEW
SEWER
SF
SQUARE FEET
SHT. / SH.
SHEET
SPEC.
SPECIFICATION
SQ.
SQUARE
SR
STATE ROAD
SS
STAINLESS STEEL
SSMH
SANITARY SEWER MANHOLE
STA.
STATION
STD.
STANDARD
STL
STEEL
S/W
SIDEWALK
T/C
TOP OF CURB
TEL.
TELEPHONE
TEMP.
TEMPORARY
TK
THICK
T/G
TOP OF GRATING
T.O.
TOP OF
T/S
TOP OF SLAB
TST
TEMPORARY SEDIMENT TRAP
T/W
TOP OF WALL
TYP.
TYPICAL
U/G
UNDER GROUND
UGE
UNDER GROUND ELECTRIC
UV
ULTRAVIOLET
V
VALVE
VC
VERTICAL CURVE
VCP
VITRIFIED CLAY PIPE
VERT.
VERTICAL
VFD
VARIABLE FREQUENCY DRIVE
W
WIDTH
W
WEST
W/
WITH
WD
WIDE
WL
WATER LEVEL
W/L
WATERLINE
WSE
WATER SURFACE ELEVATION
WWF
WELDED WIRE FABRIC
YD YARD
YI YARD INLET
YH YARD HYDRANT
YR YEAR
NOVEh MM Alk
Chapel Hill
iF333 � a,
,4 CarrbDfn
University of
0 Norlh Carolina
at Chapel Hill
7431
&fi
yT
West Campus UNC Finley Gal€ Club
+'arc•'-`� i
masorp Farm
PLiserve
n
Dogwood
r434 fAcr�ps r, M
m t.�
T 939�
Fizvfl
151�
7�1
LEGEND
SYMBOLS
PROP.
EXIST.
�S
SAN. MANHOLE
•
O
CLEAN OUT
®
DRAIN INLET
'
®
DOUBLE DRAIN INLET
Q
STM. MANHOLE
D
FLARED END SECTION
O
BLOW OFF
HYDRANT
®
OA
AIR RELEASE VALVE
H
VALVE
•
METER VALVE BOX
•
m
VALVE BOX
REDUCER/INCREASER
TEE, CROSS
vao7 eo
4
SIGN
ROAD SIGN
-- POWER POLE
- GUY POLE
0 LIGHT POLE
FM'R MAILBOX
TREE
BUSH
EIP® EXISTING IRON PIPE
-$- SURVEY CONTROL
® INLET PROTECTION
The ❑owm
Nz
Old Cltatharn (10
Gol(Maintenance
LINE TYPES
GRAVEL
ASPHALT
CONCRETE
DITCH
„'v:�RE r•u
NORTH
— OHE—
— —OHE
ELECTRIC -OH
FENCE
- G
G-
GAS
- SS-
-SS-
SEWER
-
SERVICE -SS
FM
Ft`,
FORCE MAIN
STORM
WATERLINE
SERVICE-WTR
CONTOUR -MAJOR
CONTOUR -MINOR
SS
SEWER
SS
-
-
SEWER -SERVICE
STORM
W
W
WATERLINE
WATER SERVICE
FINAL DESIGN
NOT RELEASED FOR CONSTRUCTION
CONSTRUCTION CENTERLINE
LIMIT OF DISTURBANCE
INDEX OF DRAWINGS
SHEET DRAWING DESCRIPTION
NO. NO.
1 T-1 COVER SHEET
2 T-2 INDEX OF DRAWINGS
3 T-3 CONSTRUCTION SEQUENCE
4 S-1 SITE PLAN
5 D-1 DIGESTER PLAN AND SECTION
L9q
■
m
M
z
m
N
I.,
L�
N
W
0)
0N )
k0
m
W
wN
°°
Z
zZ
nO
EL
IJ
o
�
m
Lna
rna°
=
N
�1
z
�
N
`�
U
W
W
O
N
U002
k0
m
L3
Z
N
U
=1
Z
J
W
W
Z
Z
W
In
Q
La
<
Q
W
Z
Z
W
U_
O.
W
L9
w
�
°
m
J
U
't
�
Z
�
2
m
a
m
X
o
m
W
EL
=0
1n
a
l0
i
J
o
CL
O � Q
U
o
Q
Uz z
oz oz
zui z�
�� QO
Lu W � U
ro
v � y
TQT
U
Z
0
E
o_ �
LJ
z
W _
o �
Q
Q)
W
z
w
W
m
H
0
SCALE: AS SHOWN
DATE: 1017119
DRWN. BY: R. MOSS
CHKD. BY: B. CLAWSON
PROJECT NUMBER
G17096.2
DRAWING NO. SHEET NO.
T-2 1 2
■ IN M
GENERAL NOTES
1. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY SHOULD ANY
FIELD CONDITIONS BE ENCOUNTERED THAT VARY FROM THE INFORMATION
PROVIDED IN THE CONTRACT DOCUMENTS.
2. LOCATIONS OF SHOWN UTILITIES ARE APPROXIMATE. CONTRACTOR SHALL BE
RESPONSIBLE FOR FIELD VERIFYING EXACT LOCATION AND ELEVATION OF ALL
UTILITIES PRIOR TO ANY EXCAVATION FOR THE PROJECT. NO SEPARATE
MEASUREMENT OR DIRECT PAYMENT WILL BE MADE FOR THIS WORK AND ALL
COST SHALL BE INCLUDED IN THE PRICE BID FOR THE ITEM TO WHICH IT
PERTAINS.
3. BURIED TELEPHONE CABLES (FIBER OPTICS AND CONVENTIONAL) ARE KNOWN
TO VARY DUE TO INSTALLATION TECHNIQUES. THE CONTRACTOR SHALL BE
FULLY RESPONSIBLE FOR COORDINATING WITH THE UTILITY COMPANY TO
DETERMINE SPECIFIC CABLE LOCATIONS. THE ENGINEER MUST BE NOTIFIED OF
THE EXACT LOCATIONS AND ELEVATIONS OF THE CABLES.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE
LOCAL ELECTRIC UTILITY COMPANY ANY ADDITIONAL SUPPORT OF EXISTING
ELECTRIC UTILITY POLES AS REQUIRED FOR THE EXCAVATION.
5. REGULATIONS AND CODES, SHALL BE CONSISTENT WITH NCDOT, NCDER
REQUIREMENTS AND STATE BUILDING CODE.
6. RELATION OF WATER MAINS TO SEWERS
(a) LATERAL SEPARATION OF SEWERS AND WATER MAINS. WATER MAINS SHALL BE
LAID AT LEAST 10 FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS,
UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 10-FOOT LATERAL
SEPARATION-- IN WHICH CASE: (1) THAT WATER MAIN IS LAID IN A SEPARATE
TRENCH, WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST
18 INCHES ABOVE THE TOP OF THE SEWER; OR DENR-PUBLIC WATER SUPPLY
SECTION 15A: 18C.0900 (2) THE WATER MAIN IS LAID IN THE SAME TRENCH AS
THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF
UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF THE
WATER MAIN AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER.
SEEDBED PREPARATION (SP)
SP-1 Fill slopes 3:1 or steeper to be seeded with a hydraulic seeder
(permanent seeding).
1) Leave the last 4-6 inches of fill loose and uncompacted, allowing
rocks, roots, large clods and other debris to remain on the slope.
2) Roughen slope faces by making grooves 2-3 inches deep,
perpendicular to the slope.
3) Spread lime evenly over slopes at rates recommended by soil
tests.
SP-2 Fill slopes 3:1 or steeper (temporary seedings).
1) Leave a loose, uncompacted surface. Remove large clods, rocks,
and debris which might hold netting above the surface. 2) Spread
lime and fertilizer evenly at rates recommended by soil tests.
3) Break up large clods and rake into a loose, uniform seedbed.
4) Rake to loosen surface just prior to applying seed.
SP-4 Gentle or flat slopes where topsoil is not used (grassed ditches)
1) Remove rocks and debris.
2) Apply lime and fertilizer at rates recommended by soil tests;
spread evenly and incorporate into the top 6" with a disk, chisel
plow, or rotary tiller.
3) Break up large clods and rake into a loose, uniform seedbed.
4) Rake to loosen surface just prior to applying seed.
SEEDING METHODS (SM)
SM-1 Fill slopes steeper than 3:1 (permanent seeding).
Use hydraulic seeding equipment to apply seed and fertilizer, a
wood fiber mulch at 45 Ib./1,000 s.f., and mulch tockifer.
SM-2 Gentle to flat slopes or temporary seedings.
1) Broadcast seed at the recommended rate with a cyclone
seeder, drop spreader, or cultipacker seeder.
2) Rake seed into the soil and lightly pack to establish good
contact.
Temporary Seeding Recommendations
(Late Winter and Early Spring)
Seedina Mixture
species
Rate (lb/acre)
Rye (grain)
120
Annual lespedeza
50
(Kobe in Piedmont and
Coastal Plain, Korean in Mountains)
Omit annual lespedeza when duration
of temporary cover is no to
extend beyond June.
SEEDING DATES
Mountains - Feb.15
- May15 (above 2500 feet)
- Feb. 1
- May 1 (below 2500 feet)
Piedmont - Jan. 1
- May 1
Coastal Plain - Dec. 1
- Apr. 15
SOIL AMENDMENTS
Follow recommendations of soil tests or apply 2,000 lb/acre ground
agricultural limestone and 750 lb/acre 10-10-10 fertilizer.
MULCH
Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt,
netting, or a mulch anchoring tool. A disk blades set nearly straight
can be used as mulch anchoring tool.
MAINTENANCE
Refertilize if growth is not fully adequate. Reseed, refertilize and mulch
immediately following erosion or other damage.
GENERAL NOTES
(b) CROSSING A WATER MAIN OVER A SEWER. WHENEVER IT IS NECESSARY FOR A
WATER MAIN TO CROSS OVER A SEWER, THE WATER MAIN SHALL BE LAID AT
SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 18
INCHES ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR
BARRIERS PREVENT AN 18 INCH VERTICAL SEPERATION--IN WHICH CASE BOTH
THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS
MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN
STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF
CROSSING.
(c) CROSSING A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A
WATER MAIN TO CROSS UNDER A SEWER, BOTH THE WATER MAIN AND THE
SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS
THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10
FEET ON EACH SIDE OF THE POINT OF CROSSING. A SECTION OF WATER MAIN
PIPE SHALL BE CENTERED AT THE POINT OF CROSSING.
7. RELATION OF SANITARY SEWERS TO STORM SEWERS
(a) A 24 INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER
AND SANITARY SEWER OR FERROUS PIPE SHALL BE PROVIDED.
8. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION, SIZE, AND
TYPE OF ALL UNDERGROUND UTILITIES PRIOR TO ANY EXCAVATION WHETHER
SHOWN ON THE PLANS OR NOT. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE RELOCATION (AS DIRECTED BY THE ENGINEER) OF ANY CONFLICTING
UNDERGROUND UTILITIES, IF REQUIRED, AT NO ADDITIONAL COST TO THE
OWNER. IT IS ADVISABLE THE CONTRACTOR VISIT THE SITE PRIOR TO BIDDING
AND BECOME FAMILIAR WITH THE SITE AND ANY POTENTIAL CONFLICTS.
9. THE CONTRACTOR IS RESPONSIBLE FOR ALL SITE LAYOUTS AND STAKING AND
THE COSTS SHALL BE INCLUDED IN HIS BID.
SEEDING SPECIFICATIONS
MULCH MU
MU-1 Steep slopes (3:1 or greater). In mid -summer, late fall or
winter, apply 100 Ib./1,000 s.f. grain straw, cover with netting
and staple to the slope. In spring or early fall use 45 lb. /
1,000 s.f. wood fiber in a hydroseeder slurry.
MU-2 High -maintenance vegetation and temporary seedings. Apply 90
Ib./1,000 s.f. (4000 lb./acre) grain straw and tack with 0.1
gal./s.y. asphalt (11 gal./1,000 s.f.).
MU-3 Grass -lined channels. Install excelsior mat in the channel,
extend up the channel banks to the highest calculated depth
of flow, and secure according to manufacture's specifications.
On channel shoulders, apply 100 Ib./1,000 s.f. grain straw and
anchor with 0.1 gal./s.y. (11 gal./1,000 s.f.) asphalt.
MAINTENANCE (MA)
MA-1 Refertilize in late winter or early spring the following year. Mow
as desired.
MA-3 Inspect and repair mulch and lining. Refertilize in late winter of
the following year with 150 lb./acre 10-10-10 (3.5 Ib./1,000
s.f.). Mow regularly to a height of 3-4 inches.
MA-4 Top dress with 10-10-10 fertilizer if growth is not fully
adequate.
MA-5 Top dress with 50 lb./acre (1 Ib./1,000 s.f.) nitrogen in March.
If cover is needed through the following summer, overseed with
50 lb./acre Kobe lespedeza.
Temporary Seeding Recommendations
Temporary Seeding Recommendations
(Summer)
Seeding Mixture
species Rate (lb/acre)
German millet 120
In the Piedmont and Mountains, a small -stemmed Sudangrass may be
substituted at a rate of 50 lb/acre
SEEDING DATES
Mountains - May 15 - Aug.15
Piedmont - May 1 - Aug. 1
Coastal Plain - Apr. 15 - Aug. 15
SOIL AMENDMENTS
Follow recommendations of soil tests or apply 2,000 lb/acre ground
agricultural limestone and 750 lb/acre 10-10-10 fertilizer.
MULCH
Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt,
netting, or a mulch anchoring tool. A disk blades set nearly straight
can be used as mulch anchoring tool.
MAINTENANCE
Refertilize if growth is not fully adequate. Reseed, refertilize and mulch
immediately following erosion or other damage.
NC Department of Transportation Permanent Seeding
Specifications
Permanent erosion control shall be performed as follows:
(a) All disturbed areas will be dressed to typical sections and plowed
to a depth of 5 inches. The top 2 inches shall be pulverized
to provide a uniform seed.
NOTE: Lime should be applied before plowing.
(b) Lime, seed, and fertilizer shall be applied with necessary
equipment to give uniform distribution of these materials. The
hand -bucket method is not acceptable. The following are rates
and kinds of these materials to be applied per acre:
75 lbs. Ky 31 Fescue
50 lbs. Pensacola Bahiagross
50 lbs. Korean Lespedezo
40 lbs. Sericea
500 lbs. 5-10-10 Fertilizer
4,000 lbs. Agricultural Limestone
NOTE: Only tested and certified seed shall be used. Seed certification
shall be provided to the District Engineer prior to use.
(c) Seeded area shall be cultipacked to firm seedbed and cover seed.
(d) Grain straw shall be applied over seeded areas as a mulch. No
bare ground shall be visible when riding by a mulched area if
proper application is achieved. Thick clumps of straw are not
permissible, as uniform coverage is expected.
(e) Mulched area shall be tacked with asphalt sufficient to hold straw
in place.
(f) Ditch treatment shall be used in areas where steep grades (more
than 10%) could cause ditch erosion. Use of jute mesh,
excelsior matting, or fiberglass roving is acceptable. Ditch
treatment should be installed before mulching.
Temporary Seeding Recommendations
(Fall)
Seeding Mixture
species Rate (lb/acre)
Rye (grain) 120
SEEDING DATES
Mountains - Aug. 15 - Dec. 15
Coastal Plain and Piedmont - Aug. 15 - Dec. 30
SOIL AMENDMENTS
Follow recommendations of soil tests or apply 2,000 lb/acre ground
agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer.
MULCH
Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt,
netting, or a mulch anchoring tool. A disk blades set nearly straight
can be used as mulch anchoring tool.
MAINTENANCE
Repair and refertilize damaged areas immediately. Topdress with 50
lb/acre of nitrogen in March. If it is necessary to extent temporary
cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and
Coastal Plain) of Korean (Mountains) lespedeza in late February or
early March.
GENERAL NOTES
10. THE CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY
ACCEPTED CONSTRUCTION PRACTICES THE CONTRACTOR WILL BE REQUIRED
TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE
CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT,
INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT
SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO THE
NORMAL WORKING HOURS. THE CONTRACTOR FURTHER AGREES TO DEFEND,
INDEMNIFY AND HOLD OWNER AND ENGINEER HARMLESS FROM ANY AND ALL
LIABILITY, REAL OR ALLEGED IN CONNECTION WITH THE PERFORMANCE OF
WORK ON THIS PROJECT. EXEMPTING LIABILITY ARISING FROM THE SOLE
NEGLIGENCE OF THE ENGINEER.
11. ALL EXISTING UTILITIES AND IMPROVEMENTS THAT BECOME DAMAGED DURING
CONSTRUCTION SHALL BE COMPLETELY RESTORED TO THE SATISFACTION OF
THE OWNER AND ENGINEER AT THE CONTRACTOR'S SOLE EXPENSE.
12. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED
STRUCTURE AND DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE
CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY
RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES,
SEQUENCES AND PROCEDURES, INCLUDING, BUT NOT LIMITED TO BRACING AND
SHORING. OBSERVATION VISITS TO THE SITE BY THE ENGINEER AND/OR THE
ENGINEER'S REPRESENTATIVE(S) SHALL NOT INCLUDE INSPECTION OF THE
PROTECTIVE MEASURES OR THE CONSTRUCTION PROCEDURES.
13. ALL WORK WITHIN NCDOT RIGHT-OF-WAY SHALL CONFORM TO THE LATEST
EDITION OF NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES
AND THE APPROVED ENCROACHMENT AGREEMENT.
14. DURING THE PROGRESS OF THE WORK, THE CONTRACTOR SHALL KEEP THE
WORK AREA AND ADJACENT AREAS FREE FROM ACCUMULATIONS OF WASTE
MATERIAL, RUBBISH AND OTHER DEBRIS TO THE SATISFACTION OF THE
ENGINEER.
15. THE CONTRACTOR SHALL REMOVE AND PROPERLY REINSTALL ANY FIXTURES,
FENCES, AND/OR OTHER STRUCTURES THAT MAY INTERFERE WITH
CONSTRUCTION OF THE PROJECT TO THE SATISFACTION OF THE ENGINEER,
AND THE COSTS FOR SUCH SHALL BE INCLUDED IN HIS BID.
16. THE CONTRACTOR IS URGED TO VISIT AND FAMILIARIZE THEMSELVES WITH THE
JOB SITE AND TO COMPLETELY READ AND UNDERSTAND THE CONTRACT
DOCUMENTS PRIOR TO SUBMITTING A BID.
SOIL EROSION AND SEDIMENT CONTROL NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE AT NO ADDITIONAL COST TO THE
OWNER, FOR MAINTENANCE OF ALL EROSION CONTROL MEASURES UNTIL SUCH
TIME AS THE APPROPRIATE STATE, COUNTY, OR MUNICIPAL AUTHORITY
RELEASES THE SITE AT WHICH TIME THE CONTRACTOR SHALL REMOVE ALL
TEMPORARY EROSION CONTROL MEASURES AS DIRECTED BY THE ENGINEER.
2. CONSTRUCTION AND MAINTENANCE OF ALL EROSION CONTROL MEASURES
SHALL BE IN ACCORDANCE WITH THE CORRESPONDING SECTIONS OF THE
STATE OF NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND
DESIGN MANUAL, LATEST EDITION.
3. ALL APPLICABLE EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN
PLACE PRIOR TO ANY GRADING OPERATION AND/OR INSTALLATION OF
PROPOSED STRUCTURES OR UTILITIES.
4. APPLICABLE EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE LEFT IN
PLACE UNTIL CONSTRUCTION IS COMPLETED AND/OR THE AREA IS STABILIZED.
5. THE CONTRACTOR SHALL PERFORM ALL WORK, FURNISH ALL MATERIALS AND
INSTALL ALL MEASURES REQUIRED TO REASONABLY CONTROL SOIL EROSION
RESULTING FROM CONSTRUCTION OPERATIONS AND PREVENT EXCESSIVE
FLOW OF SEDIMENT FROM THE CONSTRUCTION SITE.
6. ALL CATCH BASIN INLETS WILL BE PROTECTED ACCORDING TO THE CERTIFIED
PLAN.
7. ALL STORM DRAINAGE OUTLETS WILL BE STABILIZED, AS REQUIRED, BEFORE
THE DISCHARGE POINTS BECOME OPERATIONAL.
8. A COPY OF THE CERTIFIED SOIL EROSION AND SEDIMENT CONTROL PLAN MUST
BE MAINTAINED ON THE PROJECT SITE DURING CONSTRUCTION.
9. EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE INSTALLED
ACCORDING TO THE CONTRACT DOCUMENTS AND AS DIRECTED BY THE
ENGINEER. ALL DEVICES SHALL BE MAINTAINED SUCH THAT THEY FUNCTION AS
INTENDED & AND DESIGNED BY THE MANUFACTURE.
10. PROVIDE SEEDING AND MULCHING ON ALL DISTURBED AREAS WITHIN 14
CALENDAR DAYS OF DISTURBANCE.
11. TOTAL DISTURBED AREA = LESS THAN 1 ACRE
STABILIZATION TIME FRAME
Table 2: Stabilization Time Frame
Site Area Description
Stabilization
Stabilization Tirt�e Frame Exceptians'
Tirrie Frame
perimeter dikes, swales, ditches and slopes
7 Days
None E
High Quality Water (HQW) Zones
7 Days
None
Slopes steeper than 3:1
7 Days
If slopes are 10' or less in height and are
not steeper than 2:1, 14 days are allowed
Slopes 3:1 or flatter
14 Days
7 days for slopes greater tha n SO' in length
All other areas with slopes flatter than 4:1
14 Days
None (except for perimeters and HQW
zones)
UTILITY NOTES
1. TYPICAL MINIMUM DEPTH OF COVER FOR BURIED PIPE LINE SHALL BE 3 FEET
UNLESS OTHERWISE SHOWN OR SPECIFIED.
2. MAINTAIN 2'-0" MINIMUM CLEARANCE BETWEEN ALL EXISTING PIPES CROSSED,
UNLESS OTHERWISE NOTED.
3. ALL FITTINGS SHALL BE MECHANICAL JOINT, DUCTILE IRON AND COMPACT
FITTINGS UNLESS NOTED OTHERWISE.
4. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN BYPASS PUMPING OF SEWER
AS CALLED OUT IN SEQUENCE CONTAINED IN SPECIFICATIONS. THE COST OF
BYPASS PUMPING SHALL BE INCLUDED IN THE CONTRACTORS COST FOR THE BID
ITEM TO WHICH IT PERTAINS.
5. ALL WORK TO COMPLY WITH NCDEQ AND CHATHAM COUNTY REGULATIONS AND
CODES.
CONSTRUCTION SEQUENCE
1. OBTAIN ALL PERTINENT PERMITS.
2. CLEAR AREAS NECESSARY TO CONSTRUCT TEMPORARY EROSION DEVICES
AROUND THE SITE TO CONTAIN ALL RUNOFF DUE TO CONSTRUCTION.
3. INSTALL ALL EROSION CONTROL DEVICES.
4. ANY AND ALL LAND DISTURBED DURING ONE WORKDAY SHALL BE STABILIZED BY
THE END OF THAT SAME DAY. ANY DITCHES DISTURBED DURING CONSTRUCTION
SHALL BE RETURNED TO EXISTING CONDITION AND SEEDED AND MULCHED AS
NECESSARY.
5. COMPLETE CONSTRUCTION AND APPLY PERMANENT SEEDING PER SCHEDULE.
APPLY STRAW AND ASPHALT TACK TO ALL SLOPES.
6. MAINTAIN ALL EROSION CONTROL DEVICES UNTIL PERMANENT VEGETATION HAS
BEEN ESTABLISHED.
7. COORDINATE ALL ROAD CLOSINGS AND DETOURS WITH NCDOT AND TOWN OF
CHAPEL HILL.
8. MAINTAIN DETOURS, CLOSINGS AND TRAFFIC CONTROL AT ALL TIMES IN
ACCORDANCE WITH NCDOT'S M.U.T.C.D.
9. SEE CONTRACT SPECIFICATIONS DOCUMENT FOR PROJECT SPECIFIC
CONSTRUCTION SEQUENCE.
FINAL DESIGN
NOT RELEASED FOR CONSTRUCTION
L9Q
M
L.,
Z
M
LP
N
o
<`
L\
N
W
0)
�N
ko
W
W
wN
°°
Z
ZZ
O
a
IJ
O
co
Lnarna°
1
=
N
�1
Z
N
��
L�-
U
w
W
O
N
U002
kD
m
L3
Z
N
L3
=1
Z
J
W
w
Z
Z
wa]
Q
Q
w
Z
Z
w
U_
O.
W
w
O
O
m
J
U
�
0
�
�
Z
�
2
m
a
M
X
o
a_
m
W
=
°
in�0
In
a
04
Q
0
SCALE: AS SHOWN
DATE: 1017119
DRWN. BY: R. MOSS
CHKD. BY: B. CLAWSON
PROJECT NUMBER
G17096.2
DRAWING NO. SHEET NO.
T-3 3
I'
/
/
/
/
L-AI,.,) i /NG FENCE
PROPOSED SITE LAYOUT
SCALE 1 " = 10'
WAS LINE RAS / WAS LINE
w ;
z
' a
V
DIGESTER
AERATION
BASIN #1
PUTTER BOX
AERATION
BASIN #2
; z
N
Q
WAS LINE I Lr- HAS / WAS LINE
�- ------ ----------� --------L-----------------------<------------------------------------
W z SPLITTER BOX
� ,
00 '
z d
V) '
X i
---- ----> AERATION BASIN #3
w
w
z
;
Z
J
J
'
�
w/\
'
'
0
In
Q
�
,
d'
Z i
J i
c�
Q
O
~_
'
U ;
:WAS LINE -----------------
---------
------------ -------------_-------;
XL---------------------------------------------------------------
r---------------------------------------}-
------------------------ - -�
----------- I
1
MECHANICAL
;
BAR SCREEN AND
MECHANICAL SCREEN
TANK 1
30,000 GAL
EQUALIZATION TANK
SP LI TTE
BOX
I
FILTER #1-2
FILTER FILTER UV
TROUGH MEDIA BACKWASH CHAMBER DISCHARGE
' r---- ,
wH , ,� ,
ZU
Qr -�-----� ' '•------>
O�
JZ
=O - -- - A ,
UU
, FILTER
TROUGH MEDIA
' F I
z U r _ _ ��� \-FILTER BACKWASH
Q PUMP
o J _>_ I �_
Z. .---�
= O ,
FILTER
BACKWASH
' FILTER #3 FILTER BACKWASH
-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -}-- - - - - -,
PUMP
i
CLARIFIER #3
z
D
Cn
V
/ RAS / WAS LINE ::E
--------------------------------------------
Li Li
r
z
TANK 2
7-1
-=-------------, 1
•�r_________
30,000 GAL
QUALIZATION TANK
-------------------------<--------------�
NEW DIGESTER
PROCESS FLOW SCHEMATIC
N.T.S.
2) NEW PUMPS
DISCHARGE PUMP
FINAL DESIGN
NOT RELEASED FOR CONSTRUCTION
w
w
z
z
w
IN
Q
d
}
Z
Q
IL
I
0
Ll
z
0
U
Lu
w
w
co
m
w
Q
❑
N
0�
N �
Lp l0
N L�1
L`
� N
0) k0
N
mcb
Z
O w
EL 0]
0 N
0) IL
N L3
O w
N l0 m
L3 00 1
Z N :)
L3Z
OF Z
w wrn
Z w Z
Z w
Q Lo O U_
O J
w m
(3)
m
=
N XO
m
a_
2 ❑
En a
ko
SCALE: AS SHOWN
DATE: 1017119
DRWN. BY: R. MOSS
CHKD. BY: B. CLAWSON
PROJECT NUMBER
G17096.2
DRAWING NO. SHEET NO.
S-1 4
24" MIN. REACH
(STANDARD)
WINCH CABLE
ASSEMBLY 1/4" S.STL.
o�!
160" OVERALL
HEIGHT
/ SAFETY -A
41 HOOK
STATI C
LOOP
49" STAINLESS
STEEL TUBE LIFTING
DAVIT HEIGHT
STAINLESS
STEEL TUBE
MAST
NEW 4"0 DISCHARGE PIPING TO EQ BASINS.
(HATCHED PORTIONS OF PIPE WILL BE 4"0 FLEXIBLE
EDPM TUBE, TIRE CHORD BRAIDED WITH HELIX WIRE
REINFORCEMENT COMPLETE WITH ANSI/AWWD -
C110/A21.10 STANDARD CLASS 125 FLANGED FITTING
ON EACH END)
4"0 WELDED PIPE NIPPLE
WITH FLANGED CONNECTION 0
INSIDE AND OUTSIDE OF TANK _I
WALL FOR WATERTIGHT CONNECTION
(2) REQUIRED I
• STAINLESS STEEL CONSTRUCTION
• PORTABLE WITH SOCKET
• 30 FEET OF STAINLESS STEEL CABLE AND SAFETY HOOK
• HAND WINCH
• 1000 LB CAPACITY
• FINAL LOCATION TO BE DETERMINED BY OWNER
• HOISTS BY THERN, HALLIDAY, BARNES OR PRE —APPROVED EQUAL
• MANUAL WILL BE INCLUDED WITH HOIST.
PUMP HOIST
N.T.S.
0
(2) QUICK CONNECT FITTING J
FOR SLUDGE REMOVAL
4"0 PLUG VALVE WITH
HAND WHEEL OPERATOR
(TYP) (2) REQUIRED
NEW 2"0 S.S.
DROPS
4"0 WELDED PIPE NIPPLE
WITH FLANGED CONNECTION
INSIDE AND OUTSIDE OF TANK
WALL FOR WATERTIGHT CONNECTION
(2) REQUIRED
4"0 PLUG VALVE WITH
HAND WHEEL OPERATOR
(TYP) (2) REQUIRED
QUICK CONNECT FITTING ----
FOR SLUDGE REMOVAL in
I
EXISTING GROUND
101,
PIPE SUPPORTS
AS NEEDED
10"
® ® WEEP HOLE
T__ 3/8" BASE MOUNTED
8» TO 1" THICK STEEL PLATE
1" THICK STEEL PLATE
WELDED TO TOP OF WALL.
WELDED ANGLE SUPPORTS
(2) 1 /4" WELDED STEEL GUSSET
WALL
FLOOR MOUNTED
STAINLESS STEEL
SOCKET
PIPE SUPPORTS
AS NEEDED
16' - 4"
4"0 90° FLANGED
VERTICAL BEND
EXISTING WALL
4"0 45° VERTICAL
FLANGED BEND
4"0 SLUDGE REMOVAL
LINES NEW PUMP HOIST
SEE DETAIL THIS SHEET
NEW PUMP HOIST
SEE DETAIL THIS SHEET
NEW COARSE
BUBBLE
DIFFUSER
ELEV. = 275.02'
16' - 4"
45° 4"0 VERTICAL
FLANGED BEND
4"0 90° VERTICAL
FLANGED BENDS
EXISTING WALL
- 5'
00
NEW DECANT PUMPS W/
MOUNTING BRACKETS, SLIDE RAILS
AND LIFTING CABLES. ATTACH SLIDE
RAILS TO FLOOR VIA WELDED ANGLE
AND S.S. BOLTS, NUTS AND WASHERS.
NEW 4"0 LINE TO
EQ BASIN 1 & 2
IfNEW DECANT SUBMERSIBLE PUMPS W/
MOUNTING BRACKETS, SLIDE RAILS
AND LIFTING CABLES.
24'-8"
4"0 X 4"0 FLANGED TEE
4"0 PLUG VALVE WITH
HAND WHEEL OPERATOR
(TYP) (2) REQUIREDNN' FF
4"0 90° VERTICAL
FLANGED BENDS
41'-0"
PLAN VIEW
3/8" = 1'-0"
4"0 90° VERTICAL
FLANGED BEND
(POINTED DOWN)
4"0 45° VERTICAL
FLANGED BEND
ACCESS STAIRWAY
(ALREADY CONNECTED
TO SIDE OF TANK)
NEW COARSE
BUBBLE DIFFUSER
EXISTING 24" WALKWAY
NEW 4"0 DISCHARGE PIPING TO EQ BASINS.
(HATCHED PORTIONS OF PIPE WILL BE 4"0 FLEXIBLE
EDPM TUBE, TIRE CHORD BRAIDED WITH HELIX WIRE
REINFORCEMENT COMPLETE WITH ANSI/AWWD -
C110/A21.10 STANDARD CLASS 125 FLANGED FITTING
ON EACH END)
■
M
Z
Q
■
M
Lp
�
t0
N
l:
L\
N
0�
0
W
�N
W
Z�
Za
z
0w^
o
°°
f11
a
rn
=
0-
N
1�1
N
U
WASTE ACTIVATED
z
Ln
N
p
w
SLUDGE FROM CLARIFIER
w
p
V
0
m
m
2
u
Z
Ld
N
ZI
Z
PIPE SUPPORTS
AS NEEDED
J
w
z
Q
Z
w
Z
w
Z
w
ul
O
NEW S.S. 4" AIR LINE
W
w
p
m
—
J
Ej
> Fy
0p
EXISTING RELOCATED TANK
M
�
Z
�
2
<X
a
_
aI
a
m
W
_
=
O
rn
co
a
4"0 X 4"0 FLANGED TEE
4"0 90` VERTICAL //[BALL VALVE AT EACH
FLANGED BEND DROP WITH LEVER
NEW S.S. 4"0 AIR LINE[[(POINTED DOWN) OPERATOR (TYPICAL FOR 6)
ol 90° REDUCING
FLANGED BEND
45° 4"0 VERTICAL
I I FLANGED BEND
0
CV
4'-7"
00
24'-8"
SECTION A— A ELEVATION VIEW
3/8$3
W.L. VARIES
4'-7" \ 5-3"
oo�\\\ \\
.00�\\ \\
.00��
ELEV. = 275.02'
4"0 I N FLU EMIV�ITIREACTI VATED
SLUDGE FROM CLARIFIER
1' MIN.
ACCESS STAIRWAY
(ALREADY CONNECTED
TO SIDE OF TANK)
-EXISTING RELOCATED TANK
- PIPE SUPPORTS
AS NEEDED
EXISTING GROUND
6" THICK COMPACTED #57
STONE BASE (TYP)
NOTE:
1. EXCAVATE TOP 1'-6" OF AREA FOR TANK FILL WITH SELECT MATERIAL COMPACTED IN
ACCORDANCE WITH METHOD C OF ASTM D698 (STANDARD PROCTOR COMPACTION) ® 95%
MAXIMUM DRY DENSITY TANK PAD SHALL BE COMPLETELY LEVEL.
FINAL DESIGN
NOT RELEASED FOR CONSTRUCTION
Z
LLJ
a
Of r ^
ui
w
0 Q
Q
Z
Q
J
W
w
> CZ)
m
W
a
0
SCALE: AS SHOWN
DATE: 1017119
DRWN. BY: R. MOSS
CHKD. BY: B. CLAWSON
PROJECT NUMBER
G17096.2
DRAWING NO. SHEET NO.
D-1 1 5