Loading...
HomeMy WebLinkAbout20052066 Ver 1_General Correspondence_20051214ENVIRONMENTAL PROFESSIONALS INC. PLANNING FOR A BETTER ENVIRONMENTDecember 9, 2005 North Carolina Division of Water Quality Attn: Cyndi Karoly, Supervisor 401 Wetlands Certification Unit 1650 Mail Service Center F:aieigli, :vC ~7oyy-i6~v Dear Ms. Karoly, C 5 - ~ t_o to This letter is with reference to your correspondence of November 22, 2005 regarding DWQ Project #OS-2066 Corolla Bay, Phase 1,Currituck County. Your letter requested that the information submitted show all wetland impacts, including fill slopes on the site plan. You also inquired whether the lots could be built without additional wetland fill. In response to this inquiry, I contacted the engineering firm, Coastal Engineering & Surveying, Inc., which is responsible for the site plan design that was submitted. Attached you will fmd their correspondence indicating that the proposed plan submitted does incorporate all wetland impacts, including the fill slopes and right-of--way. They also clarify that the lots shown on the plans can be built without additional fill. You also asked that lot impacts for Phase 2 of the development be addressed. We have been coordinating with Coastal Engineering & Surveying, Inc. to consider alternative subdivision layout and design for Phase 2. As the letter from the engineers indicate, that plan has not been finalized and so we are unable to provide you with information that would be reliable regarding Phase 2. We hope that this information is sufficient for you to continue processing of the permit so that we may proceed with the development of Phase 1. Sincerely, Enviro ental Profession ,Inc. ~~~~~~~ eorge H. Wood, CE , PWS cc: Coastal Engineering & Surveying (Via Facsimile: 261-1333) Mr. Eric Avery (Via Facsimile: 453-4145) ~z3 ~E:~t r~~~ ~~ ,{ nn ..~ ";* ~" N~ti FR B?ZQRlGF~ P.O. BOX 3368 KILL DEVIL HILLS, NORTH CAROLINA 27948-3368 252-441-0239 FAX: 252-441-0721 • EMAIL: environmentalpro~earthlink.net ---~--~ .,. ~g ~ a. _. ~ .n~= ~ _ .~. ;v~ ~p~`''a~ ~~ ,; ~'°a..~' ~~d~~ ~ is r {~ ~~~i ~`? .. ~ i ~~.~~ ~ T !". ! ~ J ;. ~,.~..,,,.g, . , ,... _. . ,.. , .. ..;~ z .-_ December 2, 2005 Mr. George Wood President Environmental Professionals, Inc. 1404 S. Virginia Dare Trail Kill Devil Hills, NC 27948 Re: Corolla Bay Phase I DWQ comments. Dear Mr. Wood: ~~~ a ~X ~ S~~ ~ t~ a~~ ~~~ ~ ~~ . ~' e ~~y ~ ,: Thank you for forwarding the comments from the Division of Water Quality concerning the Wetland Fill Map for Corolla Bay. We have shown all of the wetland impact on the plan provided. We have accounted for the area of all fill slopes and right of way. All of the proposed lots shown on the plan can be built upon without additional fill. This development will include a central wastewater treatment plant, so the required usable lot area is minimized. We have not completed the layout and design for phase II, therefore we are not able to provide you with impacts at this time. Please feel free to contact me if you have any further questions. Sincerely: Coastal Engineering a~td~Surveying, Inc. ~~ ! ~ r ,~ r i ~ )' Carlos F Ey omez P.E. P.L.S. President