HomeMy WebLinkAbout20052066 Ver 1_General Correspondence_20051214ENVIRONMENTAL
PROFESSIONALS
INC.
PLANNING FOR
A BETTER
ENVIRONMENTDecember 9, 2005
North Carolina Division of Water Quality
Attn: Cyndi Karoly, Supervisor
401 Wetlands Certification Unit
1650 Mail Service Center
F:aieigli, :vC ~7oyy-i6~v
Dear Ms. Karoly,
C 5 - ~ t_o to
This letter is with reference to your correspondence of November 22, 2005 regarding DWQ Project
#OS-2066 Corolla Bay, Phase 1,Currituck County. Your letter requested that the information submitted
show all wetland impacts, including fill slopes on the site plan. You also inquired whether the lots could be
built without additional wetland fill.
In response to this inquiry, I contacted the engineering firm, Coastal Engineering & Surveying, Inc., which
is responsible for the site plan design that was submitted. Attached you will fmd their correspondence
indicating that the proposed plan submitted does incorporate all wetland impacts, including the fill slopes
and right-of--way. They also clarify that the lots shown on the plans can be built without additional fill.
You also asked that lot impacts for Phase 2 of the development be addressed. We have been coordinating
with Coastal Engineering & Surveying, Inc. to consider alternative subdivision layout and design for Phase
2. As the letter from the engineers indicate, that plan has not been finalized and so we are unable to
provide you with information that would be reliable regarding Phase 2.
We hope that this information is sufficient for you to continue processing of the permit so that we may
proceed with the development of Phase 1.
Sincerely,
Enviro ental Profession ,Inc.
~~~~~~~
eorge H. Wood, CE , PWS
cc: Coastal Engineering & Surveying (Via Facsimile: 261-1333)
Mr. Eric Avery (Via Facsimile: 453-4145)
~z3 ~E:~t r~~~ ~~
,{ nn ..~
";* ~" N~ti FR B?ZQRlGF~
P.O. BOX 3368 KILL DEVIL HILLS, NORTH CAROLINA 27948-3368 252-441-0239
FAX: 252-441-0721 • EMAIL: environmentalpro~earthlink.net
---~--~ .,. ~g ~ a.
_. ~ .n~= ~ _ .~.
;v~
~p~`''a~ ~~
,;
~'°a..~' ~~d~~ ~ is r {~ ~~~i ~`? .. ~ i ~~.~~ ~ T !". ! ~ J ;.
~,.~..,,,.g, . , ,... _. . ,.. , ..
..;~ z .-_
December 2, 2005
Mr. George Wood
President
Environmental Professionals, Inc.
1404 S. Virginia Dare Trail
Kill Devil Hills, NC 27948
Re: Corolla Bay Phase I DWQ comments.
Dear Mr. Wood:
~~~ a ~X ~ S~~ ~ t~ a~~ ~~~
~ ~~ . ~' e
~~y ~
,:
Thank you for forwarding the comments from the Division of Water Quality concerning
the Wetland Fill Map for Corolla Bay. We have shown all of the wetland impact on the
plan provided. We have accounted for the area of all fill slopes and right of way.
All of the proposed lots shown on the plan can be built upon without additional fill. This
development will include a central wastewater treatment plant, so the required usable lot
area is minimized.
We have not completed the layout and design for phase II, therefore we are not able to
provide you with impacts at this time.
Please feel free to contact me if you have any further questions.
Sincerely:
Coastal Engineering a~td~Surveying, Inc.
~~ ! ~ r ,~ r
i ~ )'
Carlos F Ey omez P.E. P.L.S.
President