Loading...
HomeMy WebLinkAbout20200402 Ver 1_USACE_EMAIL_AUTHROIZATION_202003241 Joey Lawler From:Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.Beecher@usace.army.mil> Sent:Wednesday, February 5, 2020 7:12 AM To:Joey Lawler Cc:Wells, Emily; Chad.Coburn@ncdenr.gov; DePalma, Alicia; Moody, Todd; Bynum, Pinkney; Stroupe, Matthew B Subject:RE: Update to PNG Emergency Gas Line Leak - Line 99 Attachments:PCN Form.pdf Joey, We can put this project under a NWP 12 (Utility Line) for a after the fact permit. Keep in mind even with the NWP 12 if forested wetlands are impacted, those impacts may have to be mitigated for. (if the impacted area is going to remain as a mowed and maintained easement) Sounds like Ms. Wells is ok with the additional 30' wide easement. I'll go ahead and attach the PCN (Pre-construction Notice), so you can start working on the after the fact permit application. Get the work done, then we'll deal with the permit action. Just make sure to keep impacts to a minimum, monitor for RCW trees and habitat, and install silt fence and erosion control measures where necessary. Thanks for checking in with me, Gary -----Original Message----- From: Joey Lawler [mailto:JLawler@smeinc.com] Sent: Monday, February 3, 2020 11:03 AM To: Beecher, Gary H CIV USARMY CESAW (USA) <Gary.H.Beecher@usace.army.mil> Cc: Wells, Emily <emily_wells@fws.gov>; Chad.Coburn@ncdenr.gov; DePalma, Alicia <Alicia.DePalma@duke- energy.com>; Moody, Todd <Todd.Moody@duke-energy.com>; Bynum, Pinkney <Pinkney.Bynum@duke-energy.com>; Stroupe, Matthew B <Matthew.Stroupe@duke-energy.com> Subject: [Non-DoD Source] Update to PNG Emergency Gas Line Leak - Line 99 Gary - as a follow-up to my call of late last week: It looks as though PNG will need to acquire an additional 30' of temporary workspace adjacent to their existing 20' maintained easement. Apparently their easement directly abuts the cleared DOD railway easement to the west - so they cannot use any of it and will need to use the wooded area to the east. To conduct the work and install the by-pass (the line is a one-way feed to Southport) they will need the additional 30' for approximately 300' south of the leak and 100' 2 to the north, as depicted by the attached KMZ. Since that area consists of wetlands, approximately 0.27 acre will be temporarily impacted. They plan to use an existing, well-maintained access road to come in from Funston Rad SE. Depending on the condition of the pipe, they may need to extend the 30' back to the access road, but this is not anticipated at this point. We visited the site Thursday and I conducted a more-thorough assessment for potential RCW. I did not observe any nesting trees within the 30' area. Most of the pine trees were smaller loblolly, although some larger pond pines were present in the wetland area. Otherwise, the understory of the area they need to clear consists of relatively dense, pocosin-like vegetation. The high ground areas further north towards the existing access road could be considered foraging habitat, but much of the area has been disturbed already, and the trees are not that large. I have attached some photos, as requested. Because the project will now involve mechanized land clearing of forested wetlands, we would typically provide a PCN in advance. However, per our previous conversation, we intend to submit the PCN "after-the-fact" if necessary. Given the urgency of this project and the proximity of the leak to important government infrastructure (the DOD railroad), Piedmont plans to begin work as soon as possible. They have assigned an experienced full-time environmental inspector to the project, and will comply with the applicable conditions of NWP-12 and GC 4133, including restoration of the affected area upon completion. Please let me know what additional information you may need in the interim, or if you need to conduct a site visit. Otherwise, we will document all associated wetland impacts and conduct a post-construction review of the area for compliance. Thanks again for your continued assistance with this important project - j ________________________________ Joey Lawler, PWS Natural Resources Project Manager <Blockedhttp://www.smeinc.com/> S&ME 9751 Southern Pine Blvd. Charlotte, NC 28273 O: 704.523.4726 3 M: 704.604.6474 Blockedwww.smeinc.com <Blockedhttp://www.smeinc.com/> LinkedIn <Blockedhttps://www.linkedin.com/company-beta/43081/> | Twitter <Blockedhttps://twitter.com/sme_engineering> | Facebook <Blockedhttps://www.facebook.com/sme.engineering/> This electronic message is subject to the terms of use set forth at Blockedwww.smeinc.com/email <Blockedhttp://www.smeinc.com/email> . If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email.