HomeMy WebLinkAbout20191658 Ver 2_BR-0002 Revision_20200324 (2)Wanucha, Dave
From:
Turchy, Michael A
Sent:
Tuesday, March 24, 2020 10:46 AM
To:
Wanucha, Dave; Loretta (Lori) Beckwith
Cc:
Hemphill, Jeffrey L
Subject:
BR-0002 Revision
Attachments:
BR-0002 Site 2 Change Comparison.pdf
Sorry, I accidentally attached the entire request in the previous message. Attached is the before vs after
graphic.
From: Turchy, Michael A
Sent: Monday, March 23, 2020 8:32 PM
To: Loretta (Lori) Beckwith <loretta.a.beckwith@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: Hemphill, Jeffrey L <jhemphill@ncdot.gov>
Subject: BR-0002 Revision
Hi Lori and Dave,
I just wanted to give you a heads up that a modification/revision request is heading your way for BR-0002. Our
engineers had concerns with the wall parallel to Buffalo Creek scouring.
The wall has been moved 5 feet further away from Buffalo Creek. They also relocated a cross pipe farther away
from the stream.
Permanent impacts will decrease by T, but temporary will increase by 31 feet.
When I was reviewing this, I had a really hard time trying to see the changes, so I created a "before and after"
drawing comparison and attached to this email.
Feel free to let Jeff or I know if you have any questions.
Thanks,
Michael
Michael Turchy
Environmental Coordination and Permitting
North Carolina Department of Transportation
919 789-1102 mobile
919 707-6157 office
1598 Mail Service Center
Raleigh, NC 27699-1598
1000 Birch Ridge Drive
Raleigh, NC 27610
it all correspondence Cxo and fror�r ffils soirder is sulcjeclo ffic IN C I':"ulc Ic. IRcc;ords I ow and i°r ay be disclosed lo ffilyd Icartio;,,,
1