Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0000088_Modification_20200210
Initial Review INITIAL REVIEW Reviewer Thornburg, Nathaniel Is this submittal an application? (Excluding additional information.)* r Yes r No Is this a complete application?* Complete App Date r Yes r No 01 /10/2020 Project Number* WQ0000088 Applicant/Permittee Aqua North Carolina Applicant/Permittee 4163 Sinclair Street Address Is the owner in BIMS? Is the facility in BIMS? r Yes r No r Yes r No Owner Type Facility Name Governor's Club WWTP County Fee Category Fee Amount Signature Authority Signature Authority Title Signature Authority Email Document Type (if non -application) Email Notifications Does this need review by the hydrogeologist?* r Yes r No Regional Office CO Reviewer Admin Reviewer Below list any additional email address that need notification about a new project. Email Address Comments to be added to email notification Comments for Kendall Comments for RO Comments for Reviewer Comments for Applicant Submitted Form Project Contact Information Rease provide information on the person to be contacted by MB Staff regarding electronic subnittal, confirmation of receipt, and other issues. ........................................................................................................................................................................................................................................................................................................................................................................ Name * Ben Clawson Email Address* bclawson@mesco.com Project Information Submittal Type* r New Permit Application r Renewal r Annual Report r Other Permit Type * r Wastewater Irrigation r Other Wastewater r Closed -Loop Recycle r Single -Family Residence Wastewater Irrigation Is a paper copy of the application being submitted? r Yes r Nor N/A Permit Number WQ0000088 currently has project Applicant\Permittee * Aqua North Carolina Applicant/Permittee 4163 Sinclair Street Address* Facility Name * Governor's Club WWTP Phone Number* 919-772-5393 r Modification (Major or Minor) r Additional Information r Residual Annual Report r High -Rate Infiltration r Reclaimed Water r Residuals r Other Please provide comments/notes on your current submittal below. Additional digester at the Gov Club Facility. Existing digester is in very poor shape and this project is an emergency addition to help facility meet treatment requirements. Please attach all information required or requested for this submittal to be review here. Application Formt Engineering Rans, Specifications, Calculations, Etc.) G19121-Governors Club WWTP-Complete 25.88M6 Submittal.pdf Upload only 1 FDF document. NL@iple documents must be combined into one R7F file. For new and modification permit applications, a paper copy may be required. If you have any questions about what is required, please contactthe reviewer or Tessa Monday. If a paper --polka*-ion is required, be advised, applications accepted' far pre -review until both the paper and eIect-c-,i_ co1)ies nave been received. The paper copy shall include the following: o Application Form o All relevant attachments (calcs, soils report, specs, etc.) o One full-size engineering plan set o One 11x17" engineering plan set o One extra set of specifications o Fee (if required) MallinE address: ❑iuision of Water Resources1 Division of Water Resources Non -Discharge Branch I Non -Discharge Branch 1617 Mail Service Center 1 Aft: Nathaniel Thornburg, 91° Floor, Cfice #942W ----------------------------------------------------------- ----------------------------------------- Raleih, NC 27699-1617 512 N. Salisbury St. Far questions or problems contact Tessa Monday attessa.monday@ncdenr.Qov or 919.707.3560. * W By checking this box I acknowledge that I understand the application will not be accepted for pre -review until the paper copy (if required) and fee (if required) have been received by the Non -Discharge Branch. I also confirm that the uploaded document is a single PDF with all parts of the application in correct order (as specified by the application). Signature Submission Date 2/10/2020 State of North Carolina D11 R Department of Environment and Natural Resources Division of Water Resources :: 15A NCAC 02V — RECLAIMED WATER SYSTEMS — GENERATION Division of Water Resources INSTRUCTIONS FOR FORM: RWG 11-13 & SUPPORTING DOCUMENTATION Please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of additional information requested. Failure to submit all of the required items will lead to additional processing and review time for the permit application. For more information, visit the Water Quality Permitting Section's Non -Discharge Permitting Unit web site at: h yp: //portal. ncdenr. org/web/wglaps/lau General — This application shall be used for projects involving the generation of reclaimed water that is to be utilized in either a conjunctive or non -conjunctive manner. Non -conjunctive use means that the reclaimed water utilization activity is required to meet the wastewater disposal needs of the generating facility. Conjunctive use means that the -proposed utilization option is not required to meet the wastewater disposal needs of the generating facility, and that other permitted utilization/disposal alternatives -are also available. Unless otherwise noted, the Applicant shall submit one original and two copies of the application and supporting documentation. Do not submit this application without an associated Reclaimed Water Project Information form (FORM: RWPI). A. Reclaimed Water Generation Application (FORM: RWG 11-13) (All application packages): ® Submit the completed and appropriately executed Reclaimed Water Generation (FORM: RWG 11-13) application. Please do not make any unauthorized content changes to this form. If necessary for clarity or due to space restrictions, attachments to the application may be made, as long as the attachments are numbered to correspond to the section and item to which they refer. ® The facility name in Item I1.1. shall be consistent with the facility name on the plans, specifications, agreements, etc. ® The Professional Engineer's Certification on Page 9 of this form shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 9 of this form shall be signed in accordance with 15A NCAC 02T .0106(b). The application must be signed by a principal executive officer of at least the level of vice-president or his authorized representative for a corporation; by a general partner for a partnership or limited partnership; by the proprietor for a sole proprietorship; and by either an executive officer, an elected official in the highest level of elected office, or other authorized employee for a municipal, state, or other public entity.An alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). ❑ If this project is for a renewal without modification, use the Non -Discharge System Renewal (FORM: NDSR) application. B. Property Ownership Documentation (All Application Packages involving new or expanding generation systems): ❑ Per 15A NCAC 02U .0201(e) or 15A NCAC 02U .0202(fl, the Applicant shall provide written documentation of ownership for all property containing the reclaimed water generation equipment, reclaimed water storage units, and 5-day upset units. Documentation shall consist of one (or more) of the following: ® Legal documentation of ownership (i.e., GIS, deed or article of incorporation), or ❑ Written notarized intent to purchase agreement signed by both parties with a plat or survey map, or ❑ An easement running with the land specifically indicating the intended use of the property and meeting the requirements of 15A NCAC 02L .0107(fl, or ❑ A written notarized lease agreement signed by both parties, indicating the intended use of the property, as well as a plat or survey map. C. Wastewater Chemical Analysis (For new or expanding generation systems treating Industrial Waste): ❑ Per 15A NCAC 021J.0201(g) or .0202 h provide a complete Division certified laboratory chemical analysis of the effluent to be irrigated for the following parameters (For new facilities, an analysis from a similar facility's effluent is acceptable): ❑ Ammonia Nitrogen (NH3-N) ❑ 5-day BOD (BODO ❑ Total Dissolved Solids ❑ Calcium ❑ Magnesium ❑ Total Kjeldahl Nitrogen (TKN) ❑ Chemical Oxygen Demand (COD) ❑ Nitrate Nitrogen (NO3-N) ❑ Total Organic Carbon ❑ Chloride ❑ pH ❑ Total Phosphorus ❑ Coliphage (Type 2 reclaimed water only) ❑ Phenol ❑ Total Trihalomethanes ❑ Clostridium perfringens (Type 2 reclaimed water) ❑ Sodium ❑ Total Volatile Organic Compounds ❑ Fecal Coliform or E. coli ❑ Sodium Adsorption Ratio (SAR) ❑ Toxicity Test Parameters INSTRUCTIONS FOR FORM: RWG 11-13 & SUPPORTING DOCUMENTATION Page 1 of 4 D. Engineering Plans (All Application Packages): ® Per 15A NCAC 02U .020l(c) or .0202 c , submit standard size and 11 x 17-inch plan sets that have been signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The engineering plans shall include the following items: ❑ Table of contents with each sheet numbered. ❑ A general location map with at least two geographic references, a vicinity map, fencing around treatment and storage facilities. ❑ A process flow diagram showing all flow, recycle/return, aeration, chemical, and wasting paths. (For conjunctive facilities, include only those treatment units, in addition to existing units, that are needed to produce reclaimed water.) ❑ Plan and profile views of all treatment and storage units, including their piping, valves, and equipment (i.e., pumps, blowers, mixers, diffusers, flow meters, etc.), as well as their dimensions and elevations. (For conjunctive facilities, include only those treatment units, in addition to existing units, that are needed to produce reclaimed water. ❑ Auxiliary power supply. (Non -conjunctive systems only.) ❑ A hydraulic profile from the treatment plant headworks to the point where reclaimed water is released to the distribution system. (Non -conjunctive systems only.) ❑ Plans shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final specifications. However, the plans --may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. E. Specifications (All Application Packages): ® Per 15A NCAC 02U .0201(c) or .0202 c , submit specifications that have been signed, sealed and dated by a North Carolina licensed Professional Engineer. ® At a minimum, the specifications shall include the following items: ❑ Table of contents with each section/page numbered. ❑ Detailed specifications for each treatment and storage unit, as well as all piping, valves, equipment (i.e., pumps, blowers, mixers, diffusers, flow meters, etc.), audible/visual high water alarms, liner material, etc. (For conjunctive facilities, include only those treatment units, in addition to existing units, that are needed in order to produce reclaimed water.) ❑ Site Work (i.e., earthwork, clearing, grubbing, excavation, trenching, backfilling, compacting, fencing, seeding, etc.) ❑ Materials (i.e., concrete, masonry, steel, painting, method of construction, etc.) ❑ Electrical (i.e., control panels, transfer switches, automatically activated standby power source, etc.) ❑ Means for ensuring quality and integrity of the finished product, including leakage, pressure and liner testing. ❑ Specifications shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final specifications. However, the specifications may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. F. Engineering Calculations (All Application Packages): ® Per 15A NCAC 02U .0201(c) or .0202 c submit engineering calculations that have been signed, sealed and dated by a North Carolina licensed Professional Engineer. ® At a minimum, the engineering calculations shall include the following items: ❑ Hydraulic and pollutant loading calculations for each treatment unit demonstrating how the designed effluent concentrations in Application Item V.I. were determined (NOTE: "black box" calculations are unacceptable). (For conjunctive facilities, include only those treatment units, in addition to existing units, that are needed to produce reclaimed water.) ❑ Sizing criteria for each treatment unit and associated equipment (i.e., blowers, mixers, flow meters, pumps, etc.). (For conjunctive facilities, include only those treatment units, in addition to existing units, that are needed in order to produce reclaimed water.) ❑ Total and effective storage calculations for each storage unit. ® Friction/total dynamic head calculations and system curve analysis for each pump used. ❑ Manufacturer's information for all treatment units, pumps, blowers, mixers, diffusers, flow meters, etc. ❑ Flotation calculations for all treatment and storage units constructed partially or entirely below grade. INSTRUCTIONS FOR FORM: RWG 11-13 & SUPPORTING DOCUMENTATION Page 2 of 4 G. Water Balance (For Non -Conjunctive application packages that include new or modified reclaimed water storage units to be located on the property of the reclaimed water generator): ❑ Per 15A NCAC 02U .0202(k), submit a water balance that has been signed, sealed and dated by a qualified professional and includes at a minimum: ❑ The water balance should be run over at least a two year iteration, should consider precipitation into and evaporation from all open atmosphere storage impoundments, and should use variable number of days per month and include: ❑ Precipitation based on the 80`h percentile and a minimum of 30 years of observed data. ❑ Potential Evapotranspiration (PET) using the Thornthwaite method, or another approved methodology, using a minimum of 30 years of observed temperature data. ❑ Soil drainage based on the geometric mean of the in -situ KsAT tests in the most restrictive -horizon and a drainage coefficient ranging from 4 to 10% (unless otherwise technically documented). ❑ Other factors that may restrict the hydraulic loading rate when determining a water balance include: ❑ Depth to the SHWT and lateral groundwater movement. ❑ Nutrient limitations and seasonal application times to ensure reclaimed water is applied at appropriate agronomic rates. ❑ Note: Guidance on completing a water balance for non -conjunctive systems is available in the Water Balance Calculation Policy. H. Residuals Management Plan (All Application Packages with new, expanding or replacement wastewater treatment systems): ® Per 15A NCAC 02U .0802, submit a Residuals Management Plan that shall include, at a minimum: ❑ A -detailed explanation of how generated residuals (including trash, sediment and grit) will be collected, handled, processed, stored, and disposed. ❑ An evaluation of the treatment facility's residuals storage requirements based upon the maximum anticipated residuals production rate and ability to remove residuals. NOTE: Per 15A NCAC 02U .0402(n), a minimum of 30 days -of residual storage shall be provided for non -conjunctive reclaimed water systems. ❑ A permit for residuals utilization or a written commitment to the Applicant from a Permittee of a Department approved residuals disposal/utilization program that has adequate permitted capacity to accept the residuals or has submitted a residuals/utilization program application. NOTE: Per 15A NCAC 02U .0202(j), a written commitment is not required at the time of this application; however, it shall be provided prior to operation of any permitted facilities herein. ❑ If oil/grease removal and collection are a designed unit process, submit an oil/grease disposal plan detailing how the oil/grease will be collected, handled, processed, stored and disposed. NOTE: If an on -site restaurant or other business with food preparation is contributing wastewater to this system, an oil/grease disposal plan shall be submitted_ I. Distribution System Monitoring Plan (All application packages): ® Include a distribution system monitoring plan for verifying that reclaimed water standards (15A NCAC 02U .0301) will be met at the utilization site(s). At a minimum, the following items shall be included: ❑ Specify the sampling locations within the distribution system that will provide data representative of the reclaimed water delivered to users. ❑ The number of sampling locations should be equivalent to approximately 25 percent of the service connections -to the reclaimed water distribution system; or 5 locations, whichever is fewer. In no case shall fewer than two locations be sampled. ❑ Monitoring shall include samples of: fecal coliform, pH, and total residual chlorine. INSTRUCTIONS FOR FORM: RWG 11-13 & SUPPORTING DOCUMENTATION Page 3 of 4 Site Map (All Application Packages): ® Non -Conjunctive Systems ❑ Per 15A NCAC 02U .0202(d), submit standard size and 11 x 17-inch site maps that have been signed, sealed and dated by a North Carolina licensed Professional Engineer and/or Professional Land Surveyor. ❑ For clarity, multiple site maps of the facility with cut sheet annotations may be submitted. ❑ At a minimum, the site map shall include the following: ❑ A scaled map of the site with topographic contour intervals not exceeding 10 feet or 25 percent of total site relief and showing all facility -related structures and fences within the wastewater treatment and storage areas. ❑ The location of all wells (including usage and construction details if available), streams (ephemeral, intermittent, and perennial), springs, lakes, ponds, and other surface drainage features within 500 feet of all treatment and storage sites. ❑ Setbacks as required by 15A NCAC 02U .0701(a) and (b). ❑ Site property boundaries within 500 feet of all treatment and storage units. ❑ All habitable residences or places of public assembly within 500 feet of all treatment and storage units. ❑ Conjunctive Systems ❑ Per 15A NCAC 02U .0201(d), submit standard size and 11 x 17-inch site maps that have been signed, sealed and dated by a North Carolina licensed Professional Engineer and/or Professional Land Surveyor. ❑ For clarity, multiple site maps of the facility with cut sheet annotations may be submitted. ❑ At a minimum, the site map shall include the following: ❑ A scaled map of the site showing all facility -related structures and fences within the wastewater treatment and storage areas. ❑ Location of features in 15A NCAC 02U .0701(a) and (b), to the extent needed to determine compliance with setbacks. K. Education Program (All New Generators) ❑- Per 15A NCAC 02U .0501, provide documentation of a program of education and approval for all reclaimed water users. At a minimum this material shall include: ❑ Defmition of reclaimed water. ❑ Information on the proper use of reclaimed water. ❑ Examples of improper uses of reclaimed water. ❑ Clarification that reclaimed water is not for drinking. ❑ Clarification that reclaimed water cannot be discharged to surface waters and should not be allowed to runoff from the utilization areas. ❑ Address any other environmental and/or public health protection measures. ❑ Methods to be used to provide employees educational material in a language they can understand. ONE ORIGINAL AND TWO COPIES OF THE COMPLETED APPLICATION AND SUPPORTING DOCUMENTATION SHALL BE SUBMITTED TO: NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER RESOURCES WATER QUALITY PERMITTING SECTION NON -DISCHARGE PERMITTING UNIT By U.S. Postal Service: 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1617 TELEPHONE NUMBER: (919) 807-6464 By Courier/Special Delivery: 512 N. SALISBURY STREET RALEIGH, NORTH CAROLINA 27604 FAX NUMBER: (919) 807-6496 INSTRUCTIONS FOR FORM: RWG 11-13 & SUPPORTING DOCUMENTATION Page 4 of 4 I. CONTACT INFORMATION: 1. Applicant's name: Aqua North Carolina, Inc. 2. Signature authority's name: Michael A. Melton (per 15A NCAC 02T .0106) Title: Engineering Manager 3. Applicant's mailing address: 4163 Sinclair St. City: Denver State: NC Zip: 28037- Telephone number: 104) 489-9404 Email Address: MAMeltonkAquaAmerica.com 4. Consulting Engineer's name: Ben Clawson License Number: 033710Firm: Municipal Engineering Services Mailing address: 68 Shipwash Drive City: Garner State: NC Zip: 27529- Telephone number: (919) 772-5393 Email Address: bclawson@mesco.com II. FACILITY INFORMATION 1. Reclaimed water generating facility name: Governor's Club WWTP Facility's physical address: 12222 Morehead Road City: Chapel Hill State: NC Zip: 27517- County: Chatham 2. Facility Coordinates: Latitude: 35' 50' 14" Longitude: -79' 01' 47" Datum: NAD83 Level of Accuracy Unknown Method of Measurement Navigation quality GPS 3. USGS Map Name: Farrington, NC 4. Information for nearest waterbody a: Stream Index No.: 16-41-4-241) Stream Classification: WS-IV; NSW a To determine the waterbody stream index number and its associated classification, download the current classifications list at the following web address: http://portal.ncdenr.or web/wq/s/csu/classifications. 5. Facility status: Existin 6. Reclaimed water utilization will be: ® Non -Conjunctive —reclaimed water utilization is required to meet the wastewater disposal needs of the facility. Conjunctive — reclaimed water option is not necessary to meet the wastewater disposal needs of the facility and other wastewater utilization or disposal methods are available at all times (15A NCAC 02U .0103(3)). For Conjunctive, what is the alternate wastewater disposal method? ❑ NPDES Permit No. ❑ Other (specify): FORM: RWG 11-13 Page 1 of 9 III. INFORMATION ON RECLAIMED WATER GENERATION: 1. What is the origin of the influent (i.e., school, residential, hospital, municipality, industry, etc.)? Residential 2. Reclaimed water generating capacity for this project: 300,000 Max Average Daily gallons per day (GPD) 3. What is the wastewater type? ® Domestic or Industrial (See 15A NCAC 02T .0103(20)) Is there a Pretreatment Program in effect? ❑ Yes or ❑ No Has a wastewater chemical analysis beery submitted in accordance with Instruction C? ❑ Yes or ❑ No 4. How was the influent flow rate determined? ❑ 15A NCAC 02T .0114 or ® Representative Data 5. Hasa flow reduction been approved under 15A NCAC 02T .0114(f) ❑ Yes or ®No 6. Provide the required information in the table below to document design flow pursuant to 15A NCAC 02T .0114: Establishment Type Daily Design Flow' No. of Units Flow Flow established previously, and part of existing permit 119,333 gal/day (Historical Avg) GPD gal/ GPD gal/ GPD gal GPD gal GPD gal/ GPD Total GPD IV. TREATMENT AND STORAGE UNIT SETBACKS (15A NCAC 02U .0701) 1. Provide the actual minimum distance in feet from the treatment units, storage units, and utilization areas to each item listed (distances greater than 500 feet may be marked N/A): Treatment Units/ Final Effluent Storage Setback Parameter 5-day Upset Storage Units Required Actual Required Actual Any habitable residence or place of assembly under separate 100 200 ft ownership or not to be maintained as part of the project site Any private or public water supply source 100 NA 100 Surface waters (streams — intermittent and perennial, 50 280 It 50 perennial waterbodies, and wetlands) Any well with exception of monitoring wells 100 NA 100 Any property line 50 —70 50 2. Do the treatment and storage units comply with all setbacks found in the river basin rules (15A NCAC 213 .0200)? ® Yes or ❑ No If no, list non -compliant setbacks: All proposed treatment units comply with all respective setbacks 3. Are any setback waivers required in order to comply with 15A NCAC 02U .0701? ❑ Yes or ®No ✓ If yes, have these waivers been written, notarized signed by all parties involved and recorded with the County Register of Deeds? ❑ Yes or ❑ No ✓ If yes, has the required Non -Discharge Wastewater System Waiver (FORM: NDWSW) been included with this application package? ❑ Yes or ® No FORM: RWG 11-13 Page 2 of 9 FORM: RWG 11-13 Page 3 of 9 V. RECLAIMED WATER CHARACTERISTICS: 1. Complete the table below by filling in the estimated influent concentrations and design effluent characteristics (15A NCAC 2U .0301): Estimated Design Effluent Design Effluent Geometric Mean Design Effluent g Daily Maximum Parameter Influent Monthly Average Concentration Actual Required Actual Required Actual Required BOD5 250 m /1 0.5 mg/1 10 mg/1(Type 1) 5 m I (T e 2) 777 m 1 15 mg/1(Type 1) 10 m 1(T e 2) TSS 150 mg/1 1.44 mg/1 5 mg/1(Type 1) 5 m /i (T e 2) mg/1 10 10 mg/1(T�e 2) ( ) NH3-N 15 in 0.62 mg/1 4 mg/1(Type 1) mg/l 6 mg/1(Type 1) 2 (Type l 1 mg/1 e 2) mg/1 NO3-N mg/1 26.91 mg/1 NOz-N mg/1 mg/1 Total Nitrogen 25 mg/1 mg/1 4 mg/1(wetland au mentation only) Total Phosphorus 2.0 mg/1 mg/1 1 mg/1(wetland augmentation only) TKN mg/1 Turbidity �.10 z 2.03 NTU NTU 5 NTU (Typypee)) Fecal Coliforms OR E. Coli ❑ 10,000/100 ml /100 ml 14/100 ml (Type 1) 3/100 ml (Type 2) 6.49/100 ml 25/100 ml (Type 1) 25/100 ml (Type 2) (choose one) Coliphage - (Type 2 only) /100 ml /100 ml 51100 ml (Type 2) /100 ml 25/100 ml (Type 2) Clostridium perfmgen - (Type 2 only) /100 ml /100 ml 5/100 ml (Type 2) /100 ml 25/100 ml (Type 2) 2. Have calculations or historical data been provided to justify the design effluent values shown in Item V.I. above? (See Application Instruction F)? ® Yes ❑ No ✓ If No, please explain: Historical data was used for monthly effluent averages Owner supplied data for estimated influent concentrations based on industry standards and sampling at other similar plants sites owned and operated by Aqua NC. FORM: RWG 11-13 Page 4 of 9 VI. RECLAIMED WATER SYSTEM DESIGN CRITERIA (15A NCAC 02U .0401 or .0402) 1. Plan sheet number where instrumentation for continuous monitoring/recording for turbidity/particle count is shown: N/A 2. Plan sheet number where instrumentation for continuous flow recording is shown: N/A 3. What is the method of preventing public access to the treatment facility and five day upset basin? existing perimiter fence ✓ Plan sheet number where restricted access method is shown: 4. Is there an automatically activated standby power supply onsite? ® Yes ❑ No ✓ If Yes, plan sheet number where standby power supply is shown: Existing Gen ✓ If No, what other means will be used to prevent improperly treated wastewater from entering the storage, distribution, or utilization system? 5. Will a certified operator of a grade equal or greater than the facility classification be on call 24 hrs/day? ® Yes or ❑ No 6. What classification of reclaimed water does the generator intend to provide per 05A NCAC 02U .0301)? ❑ Type 1 — 15A NCAC 02U .0301(b); or Type 2 - 15A NCAC 02U .0301(a) -(Note: Type 2 required for indirect contact irrigation of food chain crops where the food product will not be peeled, skinned, cooked or thermally processed prior to human consumption.) Are the following design criteria met for Type 2? ✓ Dual disinfection systems containing both UV disinfection and chlorination (or equivalent dual disinfection processes) provided pursuant to 15A NCAC 02U .0401(h) or .0402 ? ® Yes ❑ No ✓ Has documentation been provided to show that the combined treatment and disinfection processes are capable of the following pathogen reductions pursuant to 15A NCAC 02U .0401(i) or .0402 r ? ➢ log 6 or greater reduction of E. coli ❑ Yes ❑ No ➢ log 5 or greater reduction of Coliphage ❑ Yes ❑ No ➢ log 4 or greater reduction of Clostridium perfringens ❑ Yes ❑ No ❑ Other —15A NCAC 02U .0301(c) —reclaimed water will be produced by an industrial facility, will be used at the facility in the industry's process, use area has no public access, and the use will not result in employee exposure. Items VI.7.—VI.15. are for NON CONJUNCTIVE SYSTEMS — If you checked "Conjunctive" in Item II.6., skip to Section VII: 7. Is aerated flow equalization provided with a capacity of at least 25% of daily system design flow? ® Yes or ❑ No ✓ If no, how does the Applicant intend on complying with 15A NCAC 02U .0402(b)? 8. Are dual facilities provided for all essential treatment units? ® Yes or ❑ No Note: This refers to any unit process whose loss would likely render the facility incapable of meeting require performance criteria including aeration, clarification, filtration, disinfection, pumps, blowers, etc. (See 15A NCAC 02T .0103(16)) ✓ If no, how does the Applicant intend on complying with 15A NCAC 02U .0402(c)? 9. Is automatic flow diversion to a 5-day upset pond provided in the event of plant upset? ® Yes or ❑ No 10. Does the treatment facility include any bypass or overflow lines? ❑ Yes or ® No If yes, describe what treatment units are bypassed, why this is necessary, and where the bypass discharges: 11. Are multiple pumps provided wherever pumps are used? ® Yes or ❑ No ✓ If no, how does the Applicant intend on complying with 15A NCAC 02U .0402(k)? FORM: RWG 11-13 Page 5 of 9 VI. RECLAIMED WATER SYSTEM DESIGN CRITERIA (Continued) 12. Are any treatment or storage units located within the 100-year flood plain? ❑ Yes or ® No ✓ If Yes, which units are affected? (Note that water tight seals or a minimum of two feet protection from the 100-year floodplain is required.) ✓ If No, then provide the distance to the nearest flood zone: —535 (feet); and provide the typical elevation at the edge of the flood zone: 252.8 (feet) 13. How many days of residuals storage are provided? —53 days (Note: 30 days required per 15A NCAC 02U .0402(n)) 14. If an influent pump station is part of the proposed facility (i.e., within the wastewater treatment plant boundary), does the influent pump station meet the design criteria in 15A NCAC 02T .0305(h)? ❑ Yes, ❑ No, ® N/A — To be permitted separately, or ❑ N/A — Gravity fed VILDESIGN INFORMATION FOR NEW OR MODIFIED PORTIONS OF THE TREATMENT FACILITY 1. Type of treatment system (extended aeration, MBR, SBR, etc): extended aeration 2. Provide the requested treatment unit and mechanical equipment information (For conjunctive facilities, include only those treatment units, in addition to existing units, that are needed to produce reclaimed water): a. PRELIMINARY/PRIMARY TREATMENT: ❑ New Units, ❑ Modified Units ® N/A Treatment Unit Number of Units Manufacturer or Material Dimensions (ft) / Spacings (in) Volume (gallons) Plan Sheet I Number Specification Page Number Select Select Select Select Select Select b. SECONDARY / TERTIARY TREATMENT ❑ New Units, ❑ Modified Units ® N/A Treatment Unit Number of Units Manufacturer or Material Dimensions (ft) Volume (gallons) Plan Sheet Number Specification Page Number Select N/A Select Select Select Select Select Select FORM: RWG 11-13 Page 6 of 9 VH. DESIGN INFORMATION FOR NEW OR MODIFIED PORTIONS OF THE TREATMENT FACILITY (Continued) C. DISINFECTION ❑ New Units, ❑ Modified Units ® N/A Treatment Unit Number of Units Manufacturer or Material Dimensions (ft) Volume (gallons) Plan Sheet Number Specification Page Number Select N/A Select Select Select ➢ If chlorination is the proposed method of disinfection, specity detention time provided: minutes (NOTE: : 30 minutes minimum required), and indicate at what treatment unit chlorine contact occurs: ➢ If ultraviolet (UV) light is the proposed method of disinfection, specify the number of banks: number of lamps per bank: and maximum disinfection capacity: GPM. d. RESIDUALS TREATMENT ❑ New Units, ® Modified Units ❑ N/A Treatment Unit Number Manufacturer Dimensions (ft) Volume Plan Sheet Specification of Units or Material (gallons) Number Page Number Retrofit Existing General Spec. Aerobic Digester 1 Tank l 1' x 4l' — 27,000 S1 & D1 12.0 & 13.0 Select Select C. PUMPS ❑ New Units, ® Modified Units ❑ N/A Location Number of Pumps Purpose Manufacturer / Type Capacity Plan Sheet Number Specification Page Number GPM TDH Proposed Digester Tank 2 Convey flow from Digester to EQ ABS / Submersible type 130 20 S1 & D1 Special Equipment - 1 f. BLOWERS ❑ New Units, ❑ Modified Units ® N/A Location No. of Blowers Units Served Manufacturer / Type Capacity (CFM) Plan Sheet Number Specification Page Number Utilizing Exis. Units FORM: RWG 11-13 Page 7 of 9 VII. DESIGN INFORMATION FOR NEW OR MODIFIED PORTIONS OF THE TREATMENT FACILITY (Continued) g. MIXERS ❑ New Units, ❑ Modified Units ® N/A Location No. of Mixers Units Served Manufacturer / T e Power (h) Plan Sheet Number Specification Pa a Number N/A h. FLOW METERS, OTHER RECORDING DEVICES & RELIABILITY ❑ New Units, ❑ Modified Units ® N/A Device Number of Units Maximum Ca acit Manufacturer Location Plan Sheet Number Specification Page Number Select N/A Select Select Select Select Select i. DISTRIBUION PUMP / DOSING TANK (IF APPLICABLE): ❑ New Units, ❑ Modified Units ® N/A Plan Sheet I Specification Reference Reference FORM: RWG 11-13 Page 8 of 9 VHI. DESIGN INFORMATION FOR EARTHEN STORAGE IMPOUNDMENTS: 15A NCAC 02U .0402 IF MORE THAN ONE IMPOUNDMENT PROVIDE ADDITIONAL COPIES OF THIS PAGE AS NECESSARY. 1. Are there any earthen reclaimed water storage impoundments located at the generator site? ® Yes or ❑ No ✓ If no, then skip the remaining items in Section VIII. 2. What is the storage impoundment type? 5-day upset 3. Storage Impoundment Coordinates (degrees, minutes, seconds): Latitude: _° Longitude: Datum: Select Level of accuracy: Select Method of measurement: Select 4. Do any impoundments include a discharge point (pipe, spillway, etc)? ❑ Yes or ❑ No ✓ If Yes, has the required NPDES permit been obtained to authorize the discharge of reclaimed water? ❑ Yes or ❑ No ➢ Provide the NPDES permit number , or the date when NPDES application was submitted: 5. Are subsurface drains present beneath or around the impoundment to control groundwater elevation? ❑ Yes or ❑ No 6. Is the impoundment designed to receive surface runoff? ❑ Yes or ❑ No ✓ If yes, what is the drainage area? ftZ, and was this runoff incorporated into the water balance? ❑ Yes or ❑ No 7. Will the reclaimed water be placed directly into or in contact with GA classified groundwater? ❑ Yes or ❑ No If yes, has the Applicant provided predictive calculations or modeling demonstrating that such placement will not result in a contravention of GA groundwater standards? ❑ Yes or ❑ No 8. What is the depth to bedrock from the earthen impoundment bottom elevation? ft ✓ If the depth to bedrock is less than four feet, has the Applicant provided a liner with a hydraulic conductivity no greater than 1 x 10.7 cm/s? E] Yes, ❑ No or ❑ N/A Has the Applicant provided predictive calculations or modeling demonstrating that surface water or groundwater standards will not be contravened? ❑ Yes or ❑ No ✓ If the earthen impoundment is excavated into bedrock, has the Applicant provided predictive calculations or modeling demonstrating that surface water or groundwater standards will not be contravened? ❑ Yes, ❑ No or ❑ N/A 9. If the earthen impoundment is lined and the mean seasonal high water table is higher than the impoundment bottom elevation, how will the liner be protected (e.g., bubbling, groundwater infiltration, etc.)? 10. If applicable, provide the specification page references for the liner installation and testing requirements: 11. If the earthen impoundment is located within the 100-year flood plain, has a minimum of two feet of protection (i.e., top of embankment elevation to 100-year flood plain elevation) been provided? ❑ Yes or ❑ No or ❑N/A 12. Provide the requested earthen impoundment design elements and dimensions: Earthen Impoundment Design Elements11 Earthen Impoundment Dimensions Liner type: ❑ Clay I ❑ Synthetic Top of embankment elevation: ft ❑ Other ❑ Unlined Liner hydraulic conductivity: cm/s Freeboard elevation: ft Hazard class: Select Toe of slope elevation: ft Designed freeboard: ft Impoundment bottom elevation: It Total volume: ft, gallons Mean seasonal high water table depth: ft Effective volume: ft, gallons Embankment slope: Effective storage time: days Top of dam water surface area: ft2 Plan Sheet Reference: Freeboard elevation water surface area: ftZ Specification Section: Bottom of impoundment surface area: ft2 FORM: RWG 11-13 Page 9 of 9 Professional Engineer's Certification: T, Ben Clawson attest that this application for Governor's Club WWTP Digester Tank Improvements has been reviewed by me and is accurate, complete and consistent with the information supplied in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge, I further attest that to the best of my knowledge the proposed design has been prepared in accordance with this application package and its instructions as well as all applicable regulations and statutes. Although other professionals may have developed certain portions of this submittal package, inclusions of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: in accordance with NC General Statutes 143-215.6A and 143-215.6I3, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine .not to exceed $10,000 as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature-, and date: 2Q7 S L ° O�� �D.aa�C, Applicant's Certification (signing authority must be.in compliance with 15A NCAC 02T .0106): I, Michael A. Melton En ineerina Manager (signing authority name -PLEASE PRINT) (title) attest that this application for Governor's Club W WTP (facility name) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. 1 also understand that if all required pacts of this application package are not completed and that if all required supporting information and attachments are not Included, this application package will be returned to me as incomplete. I further certify that the applicant or any affiliate has not been convicted of an environmental crime, has not abandoned a wastewater facility without proper closure, does not have an outstanding civil -penalty where -all appeals have been exhausted or abandoned, are compliant with any active compliance schedule, and do -not have any overdue annual fees under Rule 15A NCAC 02T .0105. Note: In accordance with NC General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 er lation. Signature; Ad.,U.- Date; . lao 13- FORM: RWG 11-13 Page 11 of 9 CALCULATIONS & SUPPORTING DOCUMENTATION Chatham County, North Carolina FOR AQUA, North Carolina December 2019 Revised Feb 2020 Originating Office: PO Box 97 Garner, NC 27529 Phone: 919-772-5393 Fax: 919-772-1176 Corporate License No.: C-0281 Digester The Governor's Club WWTP is experiencing an emergency situation regarding the existing Digester. This existing unit process is close to a structural failure as the side walls on the steel tank are close to a breaking -point. Because of this possible failure operators cannot fill the tank over — 40% of its total height. To address this issue Aqua NC wishes to construct an emergency digester that will act as an additional unit for the facility and give them the needed digester volume to properly treat residuals from the process. Once this additional emergency digester is online it will allow Aqua to address the older structure and work towards correcting the structural issues so it can be brought back into full operation. This project proposes the addition of one Digester tank, 11' x 4 1' with 8' depth. This proposed structure will have a volume of approximately 27,000 gallons based on 2' of freeboard. The existing Digester tank has larger dimensions and has a volume of approximately 45,000 gallons for the Governor's Club WWTP. The current condition of this existing digester only allows for it to be filled roughly 40% full making the usable volume approximately 18,000 gallons. This along with the additional emergency digester will allow the facility to utilize the originally intended total volume for these digesters. The long term plan will be for Aqua NC to restore the older digester structure and allow for full utilization of the existing structure with the additional digester being used to allow for operation flexibility by Aqua NC. Two submersible pumps will be -used to convey flow from this new Digester tank to the existing EQ basins that are part of the existing package plant. Design calculations and sizing information for these two new submersible pumps designated for the Digester tank is on the following sheet. It should be noted the spreadsheet results were for a flow condition of 130 gpm @ 13 ft. TDH, but the design for the pump was upsized to 20 ft. TDH for easier pump selection for Aqua NC. This will also allow for future conditions of increased pipe roughness within the discharge line. This new Digester tank will require aeration; -and to provide needed aeration for this new unit a new air line will be extended from the -existing blowers to the new Digester tank. Subsequent calculations show that -the existing blowers onsite are sufficient to provide the additional digester with enough needed air. Aerobic Digester Calculations - Retrofit Governor's Club WWTP , Chapel Hill NC 0.30 Permitted Flow, mgd 250 influent BODs, mg/l 5 Effluent BODs, mg/1 626 Influent BODs, Ibs/day 13 Effluent BODs, Ibs/day 613 Pounds of BODs removed/day 398 Sludge Production per day (assume 65% of BODs(ibs) removed) Assume the following_ Min. Temp =15' C (Winter). Max. Temp = 250 C (Summer) MCRT (sludge age) must be a minimum of 40 days @ 20" C and 60 days @ 15° C to comply with 503 Regs. Reaction Rate Coefficient, Kd = 0.06 d-1 @ 15° C Volatile fraction of Digester suspended solids - 0.80 Sludge Concentration in digester is 2.0% 1. Compute the volume of sludge to be disposed of per day. Ws 8,34#/gat Ps 398 Ws = weight of dry solids, lb. 0.8 Ps = Assumed suspended solids concentration of return sludge in percentage 5972 Q = influent average flowrate to digester, gpd 319 Total mass of Volatile Suspended Solids (VSS) lbs/d 2. Compute the sludge age required for winter conditions and the percent volatile solids reduction under summer (maximum) conditions. Use chart figure 12-2S "Wastewater Treatment and Disposal - Metcalf and Eddy - Third Edition) Winter: 15" C @ 60 degree-day 15 x 60 = 900 (45% VSS reduction from chart) 143 VSS Reduction (winter) tbs. Summer 25° C @ 60 degree-day 25x60=1500 (52% VSS reduction from chart) 166 VSS Reduction (summer) tbs. 3. Determine Volume of Digester V= Qi (Xi +Y SO X (Kd Pv+ 1/0 c 36939 V = volume of aerobic digester, gals. 4938 V = volume of aerobic digester, cu.ft.. 5972 Qt = influent average flowrate to digester, gpd I! 8,000.00 IXi = influent suspended solids, mg/I 0 Y = fraction of the influent BODs-consisting of raw primary sludge (decimal) 250 Si influent BODs, mg/l j 20,000.00 X = digerster suspended solids, mg/I ! 0,06 Kd = reation-rate constant d-1 0.80 Pv = volatile fraction of the digester suspended solids (decimal) 60 8c = solids retention time (sludge age),d i 4. Determine Oxygen Requirements ! VSS Reduction x 2.3 (Oxygen requirements, lb 02/lb solids destroyed) ! a. Winter 330 lb 02/d ,E b. Summer 381 1 b 02/d 5. Comoute the volume of air required at standard conditions Theoretical air requirement, assuming that air contains 23.2 percent oxygen by weight. lb 02/d (0.075 lb/41-0) (0,232) Volume of air ft'/d a. Winter 18,960.41 W/d b. Summer 21,909.81 ft'/d Assuming an oxygen transfer efficiency of 10%, the air requirements for winter are: Volume of air 0.10(1440 min/d) 132 ft3/min and for summer are: 152 ft3/min 6. Compute the air requirement per 1000 ft3 of digester Volume: Air Req'd (summer) (Vol/1000 ft3)/ 10, 30.81 fe / 10 W W min. 7. Analyze Total and effective Storage for the Proposed Digester Dimensions of proposed Digester Tank 41 Length (ft) 11 width (ft) 8 Total Height (ft) Total Storage Utilizes Total Tank cu. Ft x 7.4805 = gal 3609 Total Storage (cu. Ft) 26989.64 Total Storage (gal) Normal operating practices will allow for some level of freeboard between water level and top of tank. Effective Storage will leave 24" of freeboard, making total effective height 6 feet. 6 Effective Height (ft) 2706 Effective Storage (cu. Ft) 2024223 Effective Storage (gal) cu. Ft x7.4805 = gal Force Main Diameter (in) = 3 Equivalent Force Main Length (ft) = 64 Hazen-wilhams; C Factor = 120 Minimum Required Pump Rate (GPM) = 0 Design Pumping Rate (GPM) = 130 GPNI Pressure Head' at Connection "All On" (feet) - Static Head (feet) Pump On" TDO (feet) velocW (fps) Pump Head (feet) 2.3 21. 12 4.5 �2m 18 9.1 16:1 25Q 10: 22 113 Pump Impeller Diameter. r5.75 inch. florsepowedziu:: Voltagc.F.230* 0�base,, U. 25 20 iN ice 5 50 i Gov Club Digester Pump and Force Main System Curve 100 150 Flow (GPM) 200 250 -ate Pump Head 1 Pump On Customer Project name : Default Pump Performance Datasheet Encompass 2.0-19.5.6 :_ ... Operating Conditions -- Liquid FlLiquid ow, rated : 130.0 USgpm Liqtype pe : Water Differential head I pressure, rated (requested) : 20,00 ft Additional liquid description Differential head I pressure, rated (actual) : 20.31 ft Solids diameter, max : 0.00 in Suction pressure, rated I max : 0.0010.00 psi.9 Solids diameter limit ; 3.00 in NPSH available, rated : Ample Solids concentration, by volume : 0,00 % Frequency : 60 Hz Temperature, max : 68.00 deg F Performance Fluid density, rated / max : 1.000I 1.000 SG Speed, rated : 1750 rpm Viscosity, rated t3' : 1.00 cp Impeller diameter, rated : 5,75 in Vapor pressure, rated : 0:34 psi.a Impeller diameter, maximum : 7.50 in Material Impeller diameter, minimum : 5.54 In Matenal selected :-Standard Efficiency : 45,82 % Pressure Data NPSH required I margin required : - i 0.0a ft Maximum working pressure : 11.36 psi g nq (imp, eye flow) t S (imp. eye flow) : 41 I - Metric units Maximum allowable working pressure : NIA Minimum Continuous Stable Flow : 57.90 USgpm Maximum allowable suction pressure : NIA Head, maximum, rated diameter : 26.25 It Hydrostatic test pressure : NIA Head rise to shuteff : 31.25 % Driver 8, Power Data (a@ lax density) Flow, best eft. point : 233.0 USgpm ; Driver sizing spec rfication :Rated power Flow ratio, rated I BEP : 55.79 % Margin over specification 0.00 19 Diameter ratio (rated I max) : 76.67 % Service factor : 1,00 Head ratio (rated dia I max din) : 40.59 % power, hydraulic : 0.66 hp Cq/ChiCe/Cn [ANSI/HI 9.6.7-20101 : 1.00 / 11001 1,00 i 1.00 Power, rated : 1-43 hp Selection status : Acceptable Power, maximum, rated diameter : 1.53 hp Minimum recommended motor rating : 2.00 hp 11.49 kW 80 72 64 S6 48 N 40 Q3 32 24 16 8 0 Flow - USgpm 0 CLEARWATER, INC, PHONE: (828) 855-31B2 - FAX: (828) 855-3183 PO BOX 1469 • HICKORY, NC 28602 r GOVERNOR'S CLUB WWTP DIGESTER TANKADDITION AQUA NORTH CAROLINA CHATHAM COUNTY, NORTH CAROLINA Aqua North Carolina Inc. Engineering Manager - Michael A. Melton 4163 Sinclair St. Denver, NC. (704) 489-9404 Engineer Municipal Engineering Services Company, P.A. Garner, NC - Boone, NC FINAL DESIGN I as A— rax caysiaucncx ?eEss o�>'% ma by Professional Eni (Garner orroejer 1 G17096.2 1 VICINITY MAP L ABBREVIATIONS ® 0 0 0 z �- ME N at CM1 P ill , 0 W A ABC AREAMP%. AGGREGATE BASE LOURBE IMUM R z AC ACREs M�N US 4 u Oy UN, roeVco - APIP ATE FLOOR MJ MECHANICAL JOINTFRU °o a Na ABBVAPIR'ARCH ASSEMBLYNORTH o W OF T_S'oRTAT ONRESOURCES — .R. z N W o z NI BLDG FoC POP BU HIT NORR BOTTOM NTG NOT NCINTE MNIIENR NORTH CAROL NA ANUFHENACTURERS TUBERSENVIRONASSOCIATENT AND ION SCAL ® Q N a z N AS CENTERC-C CENTER TO R� a NORTH a W MINUTEOF CUP OPER TRIC ELECopERAT ON ] o a 11G CURB AND GUTTER OR OPENING ® SITECH ❑ I CHORD CURB NLET PCTURF z ¢ o OLD CENTER LNE OF DITCH am — PIPE ON.TURN ouT § W D m Co CONSTRUCTIONINST CLEAN OUT P:op Oo_ DOLE PRO NTOS" �•, LL �N 'ON' CONCRETE CONNECT P:F POUND: asoUUAEFGOT gNGENEINLH - W((� �DSELPIPE CCs,ULV CULRERACONN REEDCA ICALINTERSECTION o A GLF PAT PACEMENT POINT OF—TICAL TANGENCY LEGEND \\))\\)) DI "uR"'uRERCP DROPINLET RD LEDLONLRETEPIRE ROAD SYMBOLS LINE TYPES Q Z DIP DUCTILE IRON PIPE Do" RED. REp'D. REpu RED PROP. EXIST. ______________ GRAVEL J DWG(5). DRAVNNG(S) RR RT V RAILROAD RIGHT OS O BAN. MANHOLE CLEAN OUT -o-e 4 SIGN ROAD SIGN ASPHALT CONCRETE DITCH O a Z RA EACH ® DRAIN INLET w POWER POLE - — —o„e— — —o„e- ELECTRIC -OH Z U LEA TONIN SO SECONDARY CLARIFIER , ® DOUBLE DRAIN INLET a GUY POLE FENCE Q J = Q MENT MANHOLE � STY. I.IANHOLE a LIGHT POLE — — —ss— — GAB —ss— SE\VER m .GF.IE IXISTING - — — — - SERVICE-SSS'C Q Q EDTMENT �. D O RLAR ED END SECTION BLOW OFF © MAILBOX — — —/M— — -------------- —iM— FORCE MAIN STORM J O U Y V z Z FLAFFEC END SECTIONION :FT SQUARE FEET HYDRYNT _-- --- WATERLINE Q FH FI F�NELEVATFES MBLV BE HYDRANTFHA TOR FLOwINDICA /SH Sp c SHEETE SPEC FI AT ION ® O ��zz,, AIR RELEASE VALVE ?a5 ``uuss'' �µM�, w`L£C ,,,\\\RRReedaa--- TREE SER\/ICE-1VTR CONTOUR -MAJOR I-- O � O Z FLEX FLEX 'L' :E 'AT' ROAD w w VALVE BUSH — — — — — — — CONTOUR -MINOR -LJ Z Z EWER MANHOLE • a LIETER VALVE BOX ss SEWER w O ACE CURB STANDARDFEET11 s VALVE BOX - — — — - SE\VER-SERVICE w ry C FUT FUTURE STL SIN ELss SIDEWALK . a REDUCERANCREASER Ulo EXISTING IRON PIPE —:::::— STORM r^ V GA GET GIG-- GAULO EN TO TOP IF CURB JiI SURVEY CONTROL — -- WATERLINE WATERSERVICE !O!nn V Q G IRLVNl RATING TEE, CROSS CONSTRUCTION CENTERLINE GGI V GATE OF ® INLET PROTECTION — LIMIT OF DISTURBANCE U HI oaan HIA_ DUTY H EXAGONAL T, LET Top OF STAN TEMPORARY MENTTRA INDEX OF DRAWINGS HOT IT GH L—L L SHEET DRAWING DESCRIPTION HGY HCAL IGHWAY uGE UV NDERG GROUND ELECTRIC UROOLET U NO. NO. 1 T-1 COVER SHEET INv. INIHES) VATION "PPE 2 T-2 INDEX OF DRAWINGS } T—} CONSTRUCTION SEQUENCE z U HE K JUNCTION Box —COEFFICIENT VFD VARIABLE FREQUENCY DRIVE 4 S-1 SITE PLAN 5 D-1 DIGESTER PLAN AND SECTION Z � � UP 'OUN DIE) C, o US LONG HE INT -1ON — WELC..REFABRic ssoPHG4LT gQ�l� Z LOT LEFT LOW WATER LEVELY, YARD Y YH VR YARD INLET YARD HYDRANT YEAR y, EAL� FINAL DESIGN7 xor RELEASED FCR CONSRN1C110N G170B8.I GENERALNOTES 1. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IM MEDIATELY SHOULD ANY FIELD CONDITIONS BE ENCOUNTERED THAT VARY FROM THE INFORMATION PROVIDED IN THE CONTRACT DOCUMENTS. ]. LOCATIONS OF SHOWN UTILITIES ARE APPROXIMATE. CONTRACTOR SHALL SE RESPONSIBLE FOR FIELD VERIFYING EXACT LOCATION AND ELEVATION OF ALL UTILITIES PRIOR TO ANY EXCAVATION FOR THE PROJECT. NO SEPARATE MEASUREMENT OR DIRECT PAYMENT WILL BE MADE FORTHIS WORKANDALL COST SHALL BE INCLUDED IN THE PRICE BID FOR THE ITEM TO WHICH IT PERTAINS. 3. BURIED TELEPHONE CABLES (FIBER OPTICS AND CONVENTIONAL) ARE KNOWN TO VARY DUE TO INSTALLATION TECHNIQUES. THE CONTRACTOR SHALL SE FULLY RESPONSIBLE FOR COORDINATING WITH THE UTILITY COMPANY TO DETERMINE SPECIFIC CABLE LOCATIONS. THE ENGINEER MUST BE NOTIFIED OF THE EXACT LOCATIONS AND ELEVATIONS OF THE CABLES. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WTH THE LOCAL ELECTRIC UTILITY COMPANY ANY ADDITIONAL SUPPORT OF EXISTING ELECTRIC UTILITY POLES AS REQUIRED FOR THE EXCAVATION. GENERALNOTES (b) CROSSING A WATER MAIN OVERA SEWER. WHENEVER IT IS NECESSARY FORA WATER MAI N TO CROSS OVERA SEWER, THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 18 INCHESABOVE THE TOP OF THE SEWER UNLESS LOCAL CONDITIONS OR BARRIERS PREVENTAN 181NCH VERTICAL SEPERATION--IN WHICH CASE BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THATARE EQUIVALENT TO WATER MAIN STANDARDS FORA DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. (c) CROSSI NG A WATER MAIN UNDER A SEWER. WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDERA SEWER, BOTH THE WATER MAIN AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WTH JOINTS THATARE EQUIVALENT TO WATER MAIN STANDARDS FORA DISTANCE OF 10 FEET ON EACH SI DE OF THE POI NT OF CROSSING. A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POI NT OF CROSSING. T. RELATION OF SANITARY SEWERS TO STORM SEWERS Is)A 241INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND SANITARY SEWER OR FERROUS PIPE SHALL BE PROVIDED. 8. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION SIZE AND 5. REGULATIONS AND CODES, SHALL BE CONSISTENT WTH NCDOT, NCDER TYPE OF ALL UNDERGROUND UTILITIES PRIOR TOANY EXCAVATION WHETHER REQUIREMENTS AND STATE BUILDING CODE. SHOWN ON THE PLANS OR NOT. THE CONTRACTOR SHALL BE RESPONSIBLE FORTHE RELOCATION (AS OI RECTEO BY THE ENGINEER) OF ANY CONFLICTING 6 RELATION OFWATERMAINSTOSEWERS UNDERGROUND UT LITIES,IF REQUIRED, AT NO ADDITIONAL COST TO THE Is) LATERAL SEPARATI ON OF SEWERS AND WATER MAINS. WATER MAINS SHALL BE OWNER. IT IS AOVI SABLE THE CONTRACTORVISIT THE SITE PRIOR TO BIDDING LAIDAT LEAST 10 FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, AND BECOME FAM ILIAR WTH THE SITE AND ANY POTENTIAL CONFLICTS. UNLESS LOCAL CONDITIONS OR BARRIERS PREVENTA 10-FOOT LATERAL SEPARATION- -IN WHICH CASE(1)THATWATERMAINISLAIDINASEPARATE 9. THECONTRACTORIS RESPONSIBLE FORALL SITE LAYOUTS AND STAKING AND TRENCH, WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAINAT LEAST THE COSTS SHALL SE INCLUDED IN HIS BID. 18 INCHES ABOVE THE TOP OF THE SEWER', OR DENR-PUBLIC WATER SUPPLY SECTION 15A'. 18C.0900 (]) THE WATER MAI N IS LAI D IN THE SAME TRENCH AS THE SEWER WTH THE WATER MAI N LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAI N AT LEAST 181 INCHES ABOVE THE TOP OF THE SEWER. SEEDING SPECIFICATIONS SP-1 FYI ed 3:1 n Weeper le a. -..in, a nµYwre Bader P.-At beading). (Leant Ae oM 9 1) -6 an of NI bout ant u.all. Ill alMning ak., .Ws, large .lode and Wan debris to rnnon .The Mope. y)r eaugrro Lope feces by malip gmun ]-1 inane, all 3)t nai ... to the ly Lope. apes ca rot. rannmendnd by ell SP I'll slope, 11 or slespn (te Volay ceaYrp). 1) Le lad, uncnnpalnd .rlar. Rem.e Inge chat, .ski osari lntpzn esgenllYhafdr.n r9nmmmdndsaY aai ]n'grod 3) Geol up Inge cl.s and rose into a I.a, urd- seedbed 4) Rake to loam .aae Yen prbr to opplNnp seed 5P-4 serf.. l o1 lope, 0-b peal is not uses (grossed all 1) Rem.e rah antl sell y) AI rme and Altxber aI rate, rlo-dal by sal tell, yrrcoa I_, and incnpaAnc into se lop 6' .'An a III Oil PI., a rotary tile,. 3) Ill Inge float antl nose into a I.es, unit,, lendDea 4) Rak. Io knsen adore YSI P", Io aWlong seat SEEDING NETHDDS ISM W-1 Fit Mopes Meepn lam 3:1 (pal.- seedy. Ua hyaadie beeanq eadpment k appp bend and ferti se,. a .a. A, aI 45 ID/1,0ao Ill and nubs takiln. W-g Gentle to not dopes a temporary anangs 1) lo.ticM and at Ice raommeMed .le .Ns, a cycln, attder, nap VA_. a mlfnaln aedor. ]) Role bend sit. Ind ail and b0by pock Io seaNia 91 Temporary Seeding Recommendations (Late Winter and Early Spring) ban egl(a RWc III Are (,rein) ago tl leape.so 50 (R. n Rndmwb ona 0ocM01 Hairy ..ry in I not 1. Grit annual lespndaa elan deal"un of lercpaary tow a no to acme aeyane Yrc. SEF01Y ...a. Fe, lS Noy15 (obm 2- kit) i. i �d, i lath' zsoD feel) Peri I emeltl Hen an 1 Apr 15 SGf AUExWE Fdl. rccnn v of tor apply R.00a lo/arcround g agiaullurtl rmnlnne end T50 So la/I—one ID-ta-to Intilae . ill rx APNY 4,Wo lb/art aVo.. Anchor ill by Iak'n9 .ill o"i netbi w o mule, ancaoriAs loll. A all bloc. vat nroalty a can to.... ,de, ane,oing lad. MULCH NO NU-1 st, dopes (.1 or groln} In raid -.mane,, late .1 or ester, ."y lad G/1,000 .1. gees Mr., c.er .ifl ""Ins I,wn el.e.oaa ran . b er-m W.yr�all aae es Ib. / NU-R Hpga-monklnnoc ueg,tation and temparny � gee Apply W /I.- .f. (4a00 IN/arc) grab se, a. antl lad .dh a1 .I./ay. o"Wn (11 ga1.11.000 af.} 11- Goss-fnea ch... I- aosaw at n the channtl. almd Iq the e,ama bank, to the Ngheat WeulWed depth e Oantl secure arcnd'n, I. Al-c Ins's spnisonian. of .., al.1 aopNY 1. lb./I.- .1 gran .- .d .ales Al,.GI gtl./.y. (11 gsll .1.) oV.1 NAINTENANCE fNAT NA-1 Refedxix. in IV. .sits, or enly liing In. fatal fear. No. NA-3lnapeWaata rVoir -1, and lion% -till n 1.1, .inb, W In. Itlb.ng ynr .ill 1. IN/me 10-1111D (&51a./1,00a 4f.), u. real to a het. of 3-4 MA-4 lm nee .ith 10-10-tee In lee, if gr.th a rot fuly NA-5 Top am eon sD b./doe (IIA/1.ow al.) a", in 111- d rover is neetlnd III Ind lon.ing rommer, .nand .ill 10 Ill R.. bapedna Temporary Seeding Recommendations Tempaory Seeding Reeommend,tions (Summer) Seee'ne ubw again Rate (Ib/acre) ..an mile, Ittl III M Pennant and lb-ol.s. o a rob.aul. . a rate of 5a Ib/.. Fol. recanmen.f an, W not Ine a :I 2.000 b/ocre W.nd ogri.lntl meslne and Teo Il 10 IM110 1Mixer. ill= Apply 4,1100 B/.re in- AXJXM stra. a scaling .ill asphab, n Ian% or r- oncia,sa lob A ask bIVV se, nenly slroghf Rellbbsil 5 11, a not Idly Va k. RaVV. relnlirzc and mulch on,s lNY fall er.bn n other damage. NC Department of Tar.pntatian Permanent Seeding Specifications Pnmbnrol n.bn 4anVW Mtll tr p .Abbd as to.. A) All den.b. ore. ell . armed to ryNoal act.. ono q.. o d. In of 3 in- inn lop Z i.- Mtll be p-a. k pra.lde a .,it- bond. Na1D L'me sh.ld tr bVind belle pl.ng (b) Lme. .eo, and infirm anal) be aV..'An nice egupmmt Io glob anil dslribution W than rAeond . In, hand -Dude, melnod is nol olo eonle. the Wilo.inq ale rates ane Fe, TS al theRyal�t feaue fa n epgind en me So It. Penaeala RnNagaa so lb1 More. Leapeaso o Ib. serbro sat lba s-10-10 Fnfirzn 4.000 Ian Aptouuetl Lim.taro WIE: III tested it artiGnd and sh l be .od. Seed tadifik on be pauldnd to the a".fYW Fnginm pro I. us,. (c) saVed on. anon be cullpased to Trm aeeannd and cow and. (it) Gtln Mm all be bpplind .n ceded ,rob be a nNleh. No a e, s. Mdl be .ebb •hlnn I.. by a - it pop%.pp-. a aanieued ps o1 slra. a pem1 .1 , as uI.. camas, is npnt. (a) N cknd dl be to.dh oaphalt bIniciml to hold sal. inhDb Gro (1) gte, batment slay be .ed in arm .here sleep grades (mne Inn IDX) sou U. of Yle meld, InWfilg.a 6bergm .mg a aoepf.11 ante, tl.Vt M.la be nsltllnd before muNling. Temporary Seeding Recommendation (Fall) Send. species Role Ib/one) Rre (gran) 1]0 Aug. IS - a- IS C.;taillINn aAd Pindmml - Aug. 15 - tea 30 to. uyu era W ax leafs or oPN, 2.000I1 a WkWt.,bl Ii.slon, and 1000 b/ocrc 10-10 10 Ind rzn All,94A00 a/oarc afro n9 l.k A All NIl en aso n.b. can be oral be much ancharng 1 ,a/. a relnl. a.m 1 nros .Vialrec-, 1..1. t .Ns, 50 /oarc of nitra,m a Naar. II it is ad Io olent kmpawy a Par Yoe I.j memea .ill 5D In/w roe (Pnonanf and ea.arytal Pbin) of Anean (Nanntaina) InpetlexaeinRlate FeNIwY or GENERALNOTES 10. THE CONTRACTOR AGREES THAT IN ACCORDANCE WTH GENERALLY ACCEPTED CONSTRUCTION PRACTICES THE CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO THE NORMAL WORKING HOURS. THE CONTRACTOR FURTHER AGREES TO DEFEND INDEM NI FY AND HOLD OWNERAND ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL ORALLEGED IN CONNECTION WTH THE PERFORMANCE OF WORK ON THIS PROJECT. EXEMPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE ENGINEER. 11. ALL EXISTING UTILITIESAND IMPROVEMENTS THAT BECOME DAMAGED DURING CONSTRUCTION SHALL BE COMPLETELY RESTORED TO THE SATISFACTION OF THE OWNER AND ENGINEERAT THE CONTRACTOR'S SOLE EXPENSE. 12 THE CONTRACT DRAW NGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE AND DO NOT INDICATE THEM ETHOD OF CONSTRUCTION. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES, INCLUDING, BUT NOT LIMITED TO BRACING AND SHORING. OBSERVATION VISITS TO THE SITE BY THE ENGI NEERAND/OR THE ENGINEER'S REPRESENTATIVE(S) SHALL NOT INCLUDE INSPECTION OF THE PROTECTIVE MEASURES OR THE CONSTRUCTION PROCEDURES. 13. ALL WORK WTHIN NCDOT RIGHT-OF-WAY SHALL CONFORM TO THE LATEST EDITION OF NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES ANDTHEAPPROVEDENCROACHMENTAGREEMENT. 14. DURING THE PROGRESS OF THE WORK, THE CONTRACTOR SHALL KEEP THE WORK AREA AND ADJACENT AREAS FREE FROM ACCUMULATIONS OF WASTE MATERIAL, RUBBISH AND OTHER DEBRIS TO THE SATs SFACTION OF THE ENGINEER. 15. THE CONTRACTOR SHALL REM OVE AND PROPERLY REINSTALL ANY FIXTURES, FENCES, AND/OR OTHER STRUCTURES THAT MAY INTERFERE WTH CONSTRUCTION OF THE PROJECT TO THE SATISFACTI ON OF THE ENGINEER, AND THE COSTS FOR SUCH SHALL BE INCLUDED IN HIS BID. 16 THE CONTRACTOR IS URGED TO VISITAND FAMILIARIZE THEMSELVES WITH THE JOB SITEAND TO COMPLETELY READAND UNDERSTAND THE CONTRACT DOCUMENTS PRIORTO SUBMITTING A BID. I SOIL EROSION AND SEDIMENT CONTROL NOTES 1. THE CONTRACTOR SHALL BE RESPONSIBLE AT NO ADDITIONAL COST TO THE OWNER, FOR MAINTENANCE OF ALL EROSION CONTROL MEASURES UNTIL SUCH TIME AS THEAPPROPRIATE STATE, COUNTY, OR MUNICIPALAUTHORITY RELEASES THE SITE AT WHICH TIME THE CONTRACTOR SHALL REM OVE ALL TEMPORARY EROSION CONTROL MEASURES AS DIRECTED BY THE ENGINEER. ]. CONSTRUCTION AND MAINTENANCE OF ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WTH THE CORRESPONDING SECTIONS OF THE STATE OF NORTH CAROLI NA EROSI ON AND BE DIM ENT CONTROL PLANNI NG AND OESI GN MANUAL, LATEST EOITI ON. 3. ALL APPLI CABLE EROS I ON AND SEDIMENT CONTROL PRACTICES SHALL BE IN PLACE PRI OR TO ANY GRADING OPERATI ON AND/OR INSTALLATION OF PROPOSED STRUCTURES OR UTILITIES. 4. APPLI CABLE EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE LEFT IN PLACE UNTIL CONSTRUCTION IS COMPLETED AND/OR THE AREA I S STABILIZED. 5. THE CONTRACTOR SHALL PERFORM ALL WORK, FURNISH ALL MATERIALS AND I NSTALL ALL MEASURES REQUIRED TO REASONABLY CONTROL SOIL EROSION RESULTING FROM CONSTRUCTION OPERATIONS AND PREVENT EXCESSIVE FLOW OF SEDIMENT FROM THE CONSTRUCTION SITE. 6 ALL CATCH BASI N I NLETS WI ILL BE PROTE CTED ACCORDI NG TO THE CERTI FI ED PLAN. T. ALL STORM DRAINAGE OUTLETS WLL BE STABI LIZ ED, AS REQUIRED, BEFORE THE DISCHARGE POINTS BECOME OPERATIONAL. 8. A COPY OF THE CERTIFIED SOIL EROSI ON AND SEDIMENT CONTROL PLAN MUST BE MAINTAINED ON THE PROJECT SITE DURING CONSTRUCTION. 9. EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE INSTALLED ACCORDING TO THE CONTRACT DOCUM ENTS AND AS DIRECTED BY THE ENGINEER. ALL DEVICES SHALL BE MAINTAINED SUCH THAT THEY FUNCTION AS INTENDED & AND DESIGNED BY THE MANUFACTURE. 10. PROVIDE SEEDING AND MULCHING ONALL DISTURBED AREAS WTHIN 14 CALENDAR DAYS OF DISTURBANCE. 11. TOTAL DISTURBED AREA = LESS THAN 1 ACRE I STABILIZATION TIME FRAME g Pe erU kes scale b li rib me Fraep NigM1 pualiry Waser(HgW)Zo y slp _ teelser than 3:3 Gays Hslopes are la'or less in nelgnt antl are perbmnzs 3a ban areanaarca Slopes or flatter 4oays inlengtn Allr wind slopes flatter Man 4:1 all Uaeyz(elm ptforzlopev'greaterd,sr erfor parfmeters a. HLAM nee) UTILITY NOTES 1. TYPICAL MINIMUM DEPTH OF COVER FOR BURIED PIPELINE SHALL BE 3 FEET UNLESS OTHERWISE SHOWN OR SPECIFIED. ]. MAINTAIN ]'-0" MINIMUM CLEARANCE BETWEEN ALL EXISTING PIPES CROSSED, UNLESS OTHERWISE NOTED. 3. ALL FITTINGS SHALL BE MECHANICAL JOINT, DUCTILE IRON AND COMPACT FITTINGS UNLESS NOTED OTHERWISE. 4. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN BYPASS PUMPING OF SEWER AS CALLED OUT IN SEQUENCE CONTAINED IN SPECIFICATIONS. THE COST OF BYPASS PUMPING SHALL BE INCLUDED IN THE CONTRACTORS COST FOR THE BID 5. ALL WORK TO COMPLY WTH NCDEQ AND CHATHAM COUNTY REGULATIONS AND CODES. CONSTRUCTION SEQUENCE I 1. OBTAIN ALL PERTINENT PERMITS ]. CLEARAREAS NECESSARY TO CONSTRUCT TEM PORARY EROSION DEVI CES AROUND THE SITE TO CONTAI N ALL RUNOFF DUE TO CONSTRUCTION. 3. INSTALL ALL EROSION CONTROL DEVICES. 4. ANY AND ALL LAND DISTURBED DURING ONE WORKDAY SHALL BE STABI LIZED BY THE END OF THAT SAME DAY.ANY DITCHES DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO EXISTING CONDITION AND SEEDED AND MULCHED AS NECESSARY. 5. COM PLETE CONSTRUCTION AND APPLY PERMANENT SEEDI NG PER SCHEDULE. APPLY STRAW AND ASPHALT TACK TO ALL SLOPES 6 MAINTAIN ALL EROSION CONTROL DEVICES UNTIL PERMANENTVEGETATION HAS BEEN ESTABLISHED. T. COORDINATE ALL ROAD CLOSINGS AND DETOURS WTH NCDOTAND TOWN OF CHAPEL HI LL. 8. MAINTAIN DETOURS, CLOSINGS AND TRAFFIC CONTROL AT ALL TIMES IN ACCORDANCE WTH NCDOT'S M.0 T.C.D. 9. SEE CONTRACT SPECIFICATIONS DOCUMENT FOR PROJECT SPECIFIC CONSTRUCTION SEQUENCE. anrslrH CAndz'n'i E' sAL ME E �edN j` 8 al) FINAL DESIGN NDT RELEASED FQg CONSiRUCiI!]N reoea rsmea. G170915.2 ��RTY LR1E E%15PNG � �NE EY1511NG S SHED SHED IT/ I 1 1 I I I I I �I II I EXISTING GRAVEL I I I II4 BEND (ANGLED FEE-) 4 FLANGED 90 BEND TANK , PIPE SUPPORTS I Al i EE LED I I SEE SNEET D-1 4 LINE T. I I I I I EO BASIN I & 2 I I i / NEW 4 INFLUENT LINE FROM CLARIFIER / AIR oISTRIBu LoO NE I EXISTING GRAVEL A— / 90' BEND T va"ER BLOy(R R� FLAN BEND FLANGED — BP9N X� PERPTION 4' FLANGED - BEND BEND AID DIATRIEFT RE RE 4" FLANGED WE VERTICAL BEND (ANGLED DON) ] 4 FLANGED 90 BENDS TANK A A \ LITTER BOX v1, 0 S TE IN TING All H EAo\ \\ PIPINGAENETING �/SISTER �\ G.PPoGwR MT G,nk�F�ER p% pCS aANE KS PGT TRGO� LATER 1RW� 5PN0 F sPNO FwSER Gw TwPy" FwT� BP V(=V' U;WPSN RP vwU -4 FLANGED AIR DISTRIBU LINE INFLUENTLEND \- LINEN FROM CLARIFIER/ �lv __--_ _- /II /II /II EXISIING FENCE / /II PROPOSED SITE LAYOUT SCALE 1' - 10' PROCESS FLOW SCHEMATIC N.T.S OpfS3/o'.'ny SEAL y. FINAL DESIGN NOT RELEASED FOR CONSIRIICIION 1 GI7096.2 1 AGGEx r�,G �A�� PUMP HOIST N.T.S. NEW 4'1 DISCHARGE PIPING TO EO BAS (HATCHED PORTIONS OF PIPE WILL BE 4"0 FLEX EDP REINFORCE MENTHORD COMPLETE WI'BASEDTH AWITHNSI/AHELD- C1110/A21.10 STANDARD CLASS 125 FLANGED FIT ON EACH E 4m WELDED PIPE NIPPLE INSIDE AND OUTSIDE OF TANK WALL FOR WATERTIGHT CDNNECTION� 2) REOUIRED A (2) QUICK GGNNECT FITTING FGR SLUDGE REMOVAL m PLUG VALVE W HAND WHEEL OPERATTH OR (TIP) (2) REQUIRED NEW DROPS Ho WELDED PIPE NIPPLEWITH F LANCED D WALLCONNECTED FOR WATERTIGHTI CONNEC71ON (2) REDDIRE D .0 PLUG VALVE WITH HAND WHEEL OPERATOR (TIP) (2) REGURED EXISTING GBIGUND PIPE SUFPOP7 L� BEr uaE AS NEEDeD anS ED "ATE L u..N. 1NICK STESTEEL RATE i x wxu. wA)u/, N.GGED STEEL GUSSET OBA�N L;N& 2DACCESS STARGAT P AS NEEDEIE D S NEW DECANT SUBMER IBLE UMP fE" (ALREADY CONNECTED MODNTING BRACKET$SSLIDEPRAILS W/ TO SIDE OFT TANK) I�-I■—I��I II I■III■I■III II --- �............ . LEIII m SLUDGE UNEE� -F�ANNED VERTICAL �EGI ING 24 WALKWAY PLAN VIEW SEE DETAIL THIS SHEET 3/8" _ ),_D. GAS (HATCHED PORTIONS OF PIPE WILL BE 4N0 FLEXIBLE EDPM TUBE. TIRE CHORD BRAIDED WITH HELD WIRE EINFDROEMENT COMPLETE WITH AD S - NEW PUMP HOIST C110/A21.10 STANDARD CLASS 1" FLANGED FITTING SEE DETAIL THIS SHEET ON EACH END) 4'0 X 4"0 FLANGED TEE AT F aIca VERTICAL u VALVE AT EACH 4FLANGED BENDS D DROP WITH LEVER (POINTED DOWN) OPERATOR (TYPICAL FOR 6) W SE 4 AIR LI 45RTICAL FLANGED SECTION A —A ELEVATION VIEW W/ a/e.. _ �._D.. MOUNTINGNBRAC ETS TSLIDE RAILS FAIL ANSITO FLOOR VA WELDED ANGLE FBOLT, ATTACH CA LES, ANDAT,. CUTS AND WASTE" —ACCESS STARWAL (ALREADY CONNECTED IS SIDE OF TANK) EXISTING RELOCATED TANK PIPE AS NEE PORTS — EXISTING GROUND COMPACTED ,#ST STONE RASE(TIP) MIKIEUN DR, oENITH TINK SAIDM LL .1 TO MPLFTFLH L HEL CONP<o oHi ssx Q a �l� C11gQ ' �' H C'J z 's Ww Dln\``1� GAWP FINAL DESIGN Nor RELEASED roe caysTRucnav '°°'E°'"°""°Ea G77G96.2 PROJECT SPECIFICATIONS A ! D • L Chatham County, North Carolina •M DECEMBER 2019 Final Specifications — NOT RELEASED FOR CONSTRUCTION J SEAL � Originating Office: PO Box 97 Garner, NC 27529 Phone: 919-772-5393 Fax: 919-772-1176 Corporate License No.: C-0281 GENERAL SPECIFICATIONS: 1.0 Clearing and Grubbing 1-5 2.0 Structures — Excavation and Backfill 1-10 3.0 This Section Not Used 1 4.0 Site Work 1-17 5.0 This Section Not Used 1 6.0 This Section Not Used 1 7.0 Gravity Sewers, Conduits and Drains 1-26 8.0 This Section Not Used 1 9.0 Concrete and Reinforcing 1 -25 10.0 Manholes, Inlets, Catch Basins, Vaults & Drainage Structures 1-10 11.0 Inside Process Piping 1-27 12.0 Miscellaneous Metalwork 1--20 13.0 Structural Steel 1-11 14.0 This Section Not Used 1 15.0 Electrical Motors 1-3 16.0 Electrical 1-37 17.0 Restoration and Clean -Up 1-2 SPECIAL EQUIPMENT SPECIFICATIONS: 1.0 Submersible Pump to Digester 1-5 w 1.01 GENERAL 1.01.1 SCOPE OF WORK. Page t (a) All labor, materials, equipment, tools, and services required for the work under this section shall be furnished and performed in compliance with the following General Specification, the Project Specifications which precede all General Specifications and the Contract drawings. (b) This General Specifications designated as Section 1.0 CLEARING AND GRUBBING covers the description of work generally utilized and the specifications for performing such work. The Project Specifications and the Contract Drawings designate the specific work to be performed under the Contract. The inclusion of items of material or work within this Specification does not necessarily constitute their use on this Project, (c) The Contractor shall accept conditions at the site of the work as found and shall assume the risk of any variation of the condition of site or buildings thereon which may occur subsequent to signing of the Contract. The Contractor must assume the risk of meeting, and the Contract price shall include, the cost of removal of quicksand, hardpan, boulders, clay, rubbish, unforeseen obstacles, underground conduits, gas pipe, drain tile, trees, roots, timber or masonry structures, railroad tracks, pavements and sidewalks and the delay or damage occasioned by the same, whether or not these obstacles are shown on the Contract Drawings. No claim for an amount of money beyond the Contract price of the work will be entertained or allowed on account of existing conditions. (d) The work of clearing shall consist of the cutting of all vegetation and removal of debris. All timber within the clearing and grubbing limits shall become the property of the Contractor to cut and dispose of unless noted otherwise in the Project Specifications. The work of grubbing shall consist of the removal and satisfactory disposal of all vegetation and all surface debris., (e) The work of clearing and grubbing shall also include the removal and satisfactory disposal of crops, weeds, and other annual growth; the removal and satisfactory disposal of fences, steps, walls, building foundations, and other rubble and debris and the filling of holes and depressions in compacted lifts. This work shall also be performed in all non wooded areas between the construction limits and the limits of the project right of way or easements shown on the project plans upon which seeding and mulching, sprigging, or sodding is to be performed. (f) Clearing and grubbing operations shalt be completed at the beginning of the project and sufficiently in advance of grading operations as may be necessary to prevent any of the debris from the clearing and grubbing operations from interfering with the excavation or embankment operations. Rev. 08/00 SECTION 1 Page 2 1.01.2 CLEARING (a) Existing pavements, foundations, structures and similar work encountered which will interfere with the new construction operations shall be demolished and removed. All existing construction and obstructions in areas to be occupied by new buildings or structures shall be removed as indicated on the Contract Drawings. All pipe and sewer services shall be sealed during demolition. All such existing construction and obstructions shall be disposed off the project site unless otherwise noted. (b) The Engineer will designate all areas of growth or individual trees which are to be preserved due to their desirability for landscape or erosion control purposes. When the trees to be preserved are located within the construction limits, they will be so shown on the plans or designated by the Engineer. (c) In embankment areas where the depth of the embankment exceeds 6 feet in height, unless otherwise directed by the Engineer, sound trees shall be cut at a height of not more than 6 inches above natural ground. When trees are to be cut outside of construction limits and the Engineer has designated that the area is not to be grubbed, the trees shall be cut off reasonably close to the natural ground surface. In swamp areas, trees may be out off to approximately 6 inches above low water level. (d) Branches of trees which overhang the roadbed or obstruct sight distances and which are less than 16 feet above the elevation of the finished grade shall be trimmed or cut in a manner that will not endanger the health of the tree. Cut surfaces more than 1 inch in diameter shall be covered thoroughly with an asphaltum base tree paint, 1,01.3 GRUBBING (a) The work of grubbing shall be performed on all areas cleared, with the following exceptions; (1) In embankment areas, when the depth of embankment exceeds 6 feet in height, sound stumps shall be cut off no more than 6 inches above the existing ground level and not grubbed. Unsound or decayed stumps shall be removed to a depth of approximately 2 feet below the natural ground surface. (2) When authorized by the Engineer, stumps outside of construction limits may be allowed to remain in place. Such stumps shall be cut off reasonably close to the natural ground surface. (3) Stumps in swamp areas shall be cut off to approximately 6 inches above low water level and not grubbed. Rev. 08t00 SECTION 1 Page 3 (4) Grubbing will not be required in areas where waste or unsuitable material is to be deposited unless such areas are to become a part of future construction. (b) All areas where piles are to be driven shall be grubbed regardless of fill height In graded and/or planted areas, all obstructions shall be removed to a point 12 inches below proposed ground level, (c) Within the areas between construction limits and the limits of clearing and grubbing, all holes and other depressions shall be filled, in compacted lifts and the area brought to sufficiently uniform contour that subsequent mowing operations will not be hindered by irregularity of terrain, This work shall be done regardless of whether the irregularities were the result of the Contractor's operations or were originally existing. 1.01.4 BURNING (a) All brush, roots, stumps, tree limbs, timber and other vegetation, shall be disposed of by the Contractor either by burning the vegetation within the area cleared or by disposal in locations obtained by the Contractor and approved by the Engineer, (b) When the vegetation is disposed of by burning, all burning shall be done in such a manner as to prevent injury to property within or outside of the project limits. Burning shall be in strict compliance with all local, state, and federal laws, ordinances, and regulations, The securing of necessary burning permits shall be the responsibility of the Contractor. All burning shall be under the constant care of competent watch -person, Burning shall be thorough and shall not be permitted to smolder and result in dense smoke, (c) When the timber and debris are to be disposed off in locations off the right- of-way and out of sight of the project, the Contractor shall furnish the Engineer, before final acceptance of the project, a written release from the property owner, or his authorized agent, granting the servitude of his lands, 1.01.5 PROTECTION OF VEGETATION TO REMAIN The Contractor shall conduct his operations in a manner to prevent limb, bark, or root injuries to trees, shrubs: or other types of vegetation that are to remain growing and also to prevent damage to adjacent property. When any such injuries unavoidably occur, all rough edges of scarred areas shall first be made reasonably smooth in accordance with generally accepted horticultural practice, and the scars then thoroughly covered with an asphaltum base tree paint Any such plants that are damaged by any construction operations to such an extent as to destroy their value for shade or their landscape purposes, shall be cut and disposed off by the Contractor, without extra compensation, when so directed by the Engineer. Rev. 08/00 SECTION I - Page 4 1.01.6 PROTECTION OF PROPERTY (a) Necessary arrangements shall be made by the Contractor with all persons, firms/corporations owning or using any poles, pipes, tracks or conduits, etc., affected by the work included under this Section to maintain and protect such facilities. The cost of any such protection shall be paid by the Contractor and included in the Contract price. (b) Excavated materials shall be deposited in areas designated by the Engineer. The Contractor shall not deposit excavated materials on pavements, sidewalks or grass plots, except on authorization of the Engineer, and then only when adequate temporary provisions have been made for passage and protection/safety of pedestrians and vehicles. Adequate bridging and planked crossings must be provided and maintained across all open trenches for pedestrians and vehicles. (c) The Contractor shall protect all adjacent property which might be disturbed during the progress of the work. The Contractor will be held liable for any damage which may result to neighboring property from operations performed under this section. (d) Where excavation or demolition is to be carried on adjacent property or construction owned by others, the Contractor shall give due and legal notice to such owner and shall take all steps necessary to protect adjacent construction from damage arising out of his operations; and the Contractor shall protect the Owner named in the Contract and his agents from any and all claims arising due to work covered in this section. 1.011 EROSION (a) All work under this section shall be performed in a manner which will cause a minimum of soil erosion. The Contractor shall perform such erosion control work, temporary or permanent, as may be directed by the Engineer, indicated on the Contract Drawings, or required by local regulations in order to satisfactorily minimize erosion resulting from clearing and grubbing and other construction operations. (b) Failure on the part of the Contractor to perform the required erosion control measures, including in a timely manner, will be just cause for the Engineer to direct the suspension of clearing and grubbing and other construction operations at the Contractor's own time and cost. The suspension will be in effect until such time as the Contractor has satisfactorily performed the re- quired erosion control work. In the event the Contractor fails to perform the directed work within a reasonable length of time, the Engineer may have the work performed by others. See General Conditions 13.09 NEGLECTED WORK BY CONTRACTOR, Rev. 08100 SECTION 1 Page 5 1.02 MEASUREMENT FOR PAYMENT ,AND COMPENSATION (a) All measurement of clearing and grubbing will be made horizontally. (b) Work performed in cleaning up non -wooded areas shall be in accordance with Section 1.01. However, the removal of weeds, vines, plant stalks, loose rock, and small scattered trees will be considered as a minor and incidental part of the work of clearing and grubbing and no measurement or payment will be made for such work. (c) On lump sum contracts, and on lump sum items in a unit price contract, no separate measurement or payment will be made. On unit price contracts and on unit price items in a lump sum contract, measurement will be made based on the actual surface area cleared and grubbed at the unit price allowed in the proposal. On -site borrow areas, approved by the Owner and the Engineer, shall be cleared and grubbed, and paid for in the above manner. (d) When the Contractor is required to furnish borrow sources; material sources, or waste areas, or when the Engineer permits the Contractor to obtain borrow or deposit waste on any area within the right of way in lieu of borrow and waste areas which were to have been furnished by the Contractor, no measurement of clearing and grubbing will be made for such areas. 1.03 NEGLECTED WORK BY CONTRACTOR If the CONTRACTOR should neglect to prosecute the Work in accordance with the Contract Documents, including any requirements of the progress schedule, the OWNER, upon written notice to the CONTRACTOR, after three (3) days from receipt of such notice by the CONTRACTOR and without prejudice to any other remedy he may have, may make good such deficiencies and the cost thereof (including compensation for additional professional services) shall be charged against the CONTRACTOR if the ENGINEER approves such action, in which case a Change Order shall be issued incorporating the necessary revisions in the Contract Documents including an appropriate reduction in the Contract Price. If the payments then or thereafter slue the CONTRACTOR are not sufficient to cover such amount, the CONTRACTOR will pay the difference to the OWNER. Rev. 08/00 SECTION 1 : A 2.01 GENERAL, 2.01.1 SCOPE OF WORK Page 1 (a) All labor, materials, equipment, tools, and services required for the making of all excavations for structures, the placing of backfill for structures and general site grading required in the Contract shall be furnished and per- formed in compliance with the following General Specification, the Project Specifications which precede all General Specifications and the Contract Drawings. (b) This General Specification designated as Section 2,0, Structures - Excavation and Backfill, covers the description of methods usually employed in excavation and backfill for structures and general grading operations. The Project Specifications and the Contract Drawings designate the specific work, the lines, grades and details and the excavation and backfill for structures to be constructed under this Contract, The inclusion of items of material or work within this Specification does not necessarily constitute their use on this Project. Excavation includes loosening and removing; transporting, storing and disposing of items whose removals are not specified under another contract section and which are necessary to be removed for the construction and completion of all work under the Contract. Excavation shall be made to the widths and depths shown on the plans or as specified herein. When rock is encountered, excavation shall be performed in accordance with the section headed "ROCK EXCAVATION". The term "Excavation" shall be deemed to cover the price bid for any and all items including "excavation" for any or all of the following operations: (1) Removing, storing and rehandling of all paving materials of any name and nature. (2) Sheeting, sheet piling, shoring and bracing including driving, and removing. (3) Ditching, pumping, coffer damming, or bailing or other methods of disposing of water. (4) Refilling of all ditches, pits, sump areas, and the compaction of all fill materials. (5) Maintenance and protection of traffic. (6) Protection of all sidewalks, trees, shrubs, structures, underground conduits or the replacement thereof. Rev. 02197 SECTION 2 Page 2 (7) Temporary paving, fencing, warning lights, traffic guards for direction and control of traffic during rush hours. The term "Earth" as used herein shall include all materials except rock requiring blasting and larger than twelve (12) cubic feet but shall specifically exclude all ledge and bed rock. The term "Spoil` includes material not used or not suitable for use as backfill or fill. The term "Backfill" includes acceptable materials for backfilling of all excavations and ditches up to the original ground surface. The term "Embankments" shall include fills constructed of selected materials above the original surface of the ground to the compaction specified herein. 2.01.2 SHOP DRAWINGS (a) Attention is directed to the provisions in the General Conditions of the Contract requiring the submission to the Engineer of descriptive details and of shop and setting drawings. On Structures - Excavation and Backfiil operations, which include the installation of cofferdam work, such submission shall include drawings and details of the cofferdam proposed, 2.02 CONSTRUCTION METHODS 2.02.1 GENERAL (a) The Contractor shall accept conditions at the work site as found and shall assume the risk of any variation of the condition of site or buildings thereon which may occur subsequent to signing of the Contract. The Contractor must assume the risk of meeting, and the Contract price shall include, the cost of removal of quicksand, hardpan, boulders, clay, rubbish, unforeseen obstacles, underground conduits, gas pipe, drain tile, trees, roots, timber or masonry structures, railroad tracks, pavements and sidewalks and the delay or damage occasioned by the same, whether or not these obstacles are shown on the Contract Drawings, No claim for an amount of money beyond the Contract price will be entertained or allowed on account of the character of the ground in which the excavation is made unless rock as defined here- inafter is encountered and removed. (b) The location of utilities systems and structures as shown on the Contract drawings has been selected to provide the least possible interference with existing utilities and facilities. The Owner reserves the right to make minor variations in the location of proposed work during the construction. No extra payment will be allowed the Contractor for such shifts in alignment or location. Rev. 02/97 SECTION 2 (c) GoUo investigation data may be available upon request ofthe Engineer. When available it is presented only for the general information of the Contractor as stated in the General Conditions of the Contract. If, after excavation is made, conditions are disclosed which are unsuitable for the type offoundations shown on the Contract Drawings, the Contractor shall perform additional excavation, drive foundation pi|aw, or take other measures as directed by the Engineer. Any such work ordered will be paid for under provisions of Article 14 in the General Conditions of the Contract or adContract Unit Prices, However, the Contractor iereminded that the costs for all compaction tests, etc. shall beapart ofhis Contract bid, 2�2.2 PROTECTION OFPROPERTY (a) Necessary arrangements shall bemade by the Contractor with all persons, firms, corporations owning using any poles, pipes, tracks orconduits, etc.. affected by construction included under this 8acbnn to maintain and protect such facilities during construction. The cost oYany such protection shall bo paid bvthe Contractor and included iOthe Contract price. (b) In the event that any existing gas pipes, water pipes, conduits, sewers, 0e drains, poles nrother utilities are blocked orinterfered with by construction uparotiono, the Contractor shall maintain them in continuous operation, and restore them to the mmmo condition as they were prior to the start of the project, all at no additional compensation. (c) Excavated materials shall badeposited inareas designated bythe Engineer. The O0ptro�or shall avoid depositing excavated materials on pavements, sidewalks or grass p|ots, except on authorization of the Engineer, and then only when adequate temporary provisions have been made for passage and pndon8nn of pedestrians and vehicles. Adequate bridging and planked crossings must be provided and maintained across all open trenches for pedestrians and vehicles. (d) The Contractor shall ahma up or otherwise protect all fences, buildinga, walls, walks, curbs orother property adjacent toany excavation, which might be disturbed during the progress ofthe work. The Contractor will be held liable for any damage, which may result to neighboring property from excavation, baokfi||orgrading operations performed under this Section, (e) Where excavation Vrdemolition is to be carried on adjacent to property or construction owned by others, the Contractor shall give due and written legal notice to such owner and shall take all ohopa necessary to protect adjacent construction from damage arising out ofhis operations; and he shall the Owner named in this Contract and his agents from any and all claims arising from excavation ordemolition operations, Rev.O2/B7 SECTION_2 (a) The Contractor shall take all steps necessary, such as ditching, diking, pumping, well pointing and bailing, construct necessary drains and channels to keep the excavation clear of ground water, sewage or storm water, during the progress of the work and until the finished work is safe from injury. Water shall not be allowed to rise over and come in contact with masonry, concrete or mortar, until at least 24 hours have elapsed after placement of same, and no stream shall be allowed to flow over such work without the Engineer's permission- (b) Adequate measures and protection shall be provided for vaults, reservoirs, tanks, basements, etc., from effects of possible uplift due to storm or ground water where buoyancy might lift structures or floor failures which may occur during construction. 2.02.4 EXCAVATION (a) Excavation shall include the loosening, loading, removing, transporting and disposing of all materials„ wet or dry, necessary to be removed- to construct all work included in this Section, to the lines, grades and locations shown on the Contract Drawings. Excavated materials shall be piled in locations that will not interfere with construction operations. (b) Excavation for structures shall conform to the depth and dimensions necessary for the proper installation of all structures detailed on the Contract Drawings. Unless specifically directed by the Engineer, excavation shall not be carried below the elevations indicated on the Contract Drawings. Where any excavation is made below the elevations indicated on the Contract Drawings, the excavations, if under slabs, shall be restored to the proper elevation with compacted well -graded granular foundation material conforming to NC Department of Transportation standard gradation for size 67 stone, or if under, footings, the depths of the walls or footings shall be increased at no additional expense to the Owner. In any event, the operations necessary to correct an excess of excavation shall meet with the approval of the Engineer. If deemed necessary, concrete shall be used to correct unauthorized excavations. No compensation will be allowed for any unauthorized excavation, slides, falls or cave-ins. (c) The Contractor shall furnish and install all temporary sheeting, shoring, timbering, bracing and steel sheet piling required to maintain the excavation in a condition to permit the safe and efficient installation of all items of Contract work. Upon completion of the various Contract items, all temporary forms, shores and bracing shall be removed. While being withdrawn all vacancies left by the sheeting and bracing shall be carefully filled with sand and compacted or puddled as directed by the Engineer. Rev, 02/97 SECTION 2 Page 5 (d) Under certain conditions, sheeting and bracing may be ordered by the Engineer to be left in place. Any sheeting so ordered left in place will be paid for on the basis of the Contract unit price for such work. if no Contract unit price is established for this work, payment will be established in accordance with provisions for Extra Work in the General Conditions of the Contract. (e) Sheet piling indicated on the Contract Drawings to be placed for the purpose of retaining the stability of soil adjacent to excavations shall be driven to lines and grades indicated thereon and left in place. When so noted, depth of penetration, type and weight of piling shall be as designated on the Contract Drawings. Cost of such permanent sheet piling shall be included in the Contract lump sum price. (f) When soil materials encountered in any excavation are determined by the Engineer to be unsuitable for structural foundations, the Contractor shall furnish and place granular foundation material of well -graded crushed stone and gravel backfill conforming to NC Department of Transportation standard gradation for size 67 stone, in 6 inch layers, as directed by the Engineer. The cost of additional excavation and disposal of excavated materials shall be merged into the Contract unit price for granular foundation material. If no Contract unit price is established for this work, payment will be made in accordance with the provisions for Extra Work in the General Conditions of Contract. (g) All areas to be excavated or regraded shall have topsoil stripped and deposited in stockpiles convenient to the areas, which are subsequently to receive application of topsoil. Topsoil shall be used exclusively for finished grading as specified in Section 4.0, Site Work. (h) Unsuitable and surplus excavated material and debris not incorporated in the project shall be disposed of by the Contractor at his own expense outside the limits of the Project site or as directed by the Engineer. (i) if private land is used as a spoil site, the Contractor shall obtain written permission from the owner of the land, or his agent, and provide the project Owner with a certified copy of such agreement. (j} When, for any reason, the work is left unfinished for extended periods, all trenches and excavations shall be filled and all roadways and sidewalks left unobstructed with their surfaces in a safe and satisfactory condition. (k) When it is necessary to haul material over the streets or pavements, the Contractor shall provide suitable tight vehicles so -as to prevent deposits on the streets or pavements. In all cases where any materials are dropped from the vehicles, the Contractor shall clean up the same as often as directed and keep the crosswalks, streets, and general pavement clean. Rev. 02197 SECTION 2 Page 6 (1) Surface of the ground in streets and elsewhere shall in all cases be left in as good a condition as it was prior to the commencement of the work. Curbs, gutters, and culverts disturbed on account of the work of the Contractor shall be repaired and restored. The work of restoring and repairing shall be as specified in the General Specification Section 17.0, Clean-up and Restoration, the Project Specifications and the Contract Drawings, 2.02.6 ROCK EXCAVATION (a) Wherever the word 'Rock" appears, it shall be interpreted to mean any material encountered of a uniform hardness of three (3) in the scale of mineral hardness and/or any material which cannot be removed from its original position with a 300 hp (minimum), 70,000 lb. working weight (minimum) dozer with a rock ripping attachment, in good condition, without continuous drilling and blasting. The Contractor will be responsible for proving, by demonstration and photographic evidence that slate, shale, sandstone or other hard material encountered cannot be removed with heavy equipment without continuous drilling and blasting. Other materials shall not be classed as rock, although it may be more economical to remove same by blasting. Boulders will not be classified as rock unless larger than 112 cubic yard. (b) Should rock be encountered in the excavation, it shall be removed by blasting or other approved methods. Where blasts are made, the excavation shall be carefully covered with suitable brush, timber or matting to prevent danger to life and property. The Contractor shall secure all permits required by Law for blasting operations and any additional hazard insurance required, the cost of such permits and insurance to be borne by the Contractor. The Contractor shall strip the rock of over -burden, such stripping to be done in sections and approved by Engineer. No blasting shall be done by the Contractor until he has notified the Engineer and until the necessary cross -sections of the top of the rock have been taken. No loaded holes shall be left unattended or overnight without approval from the Engineer. Blasting will not be permitted within 25 feet of completed pipelines or structures nor will it be permitted within 25 feet of any existing structure, pipeline or conduit. Adequate warning and danger signals shall be given before firing dynamite explosives. Adequate records shall be kept by the Contractor of all explosives kept at the site of the work. All explosives shall be used and handled, stored and exploded in conformance with all state and local laws and regulations. (c) Materials classified as "Rock" in these Specifications, if encountered, shall be excavated to the grade of the bottom of structures to be installed unless specifically shown on the Contract Drawings to be removed to a greater depth. After such rock is removed the excavation, when required, shall be backfilled with clean low -void sand or other non- compressible fine low -void material satisfactory to the Engineer, and consolidated to place the top surface at the grade established on the Contract Drawings for the bottom of the structure. The cost of furnishing, placing and consolidating of such fill material shall be entered as the unit price for granular foundation material, except in Proposals where this item does not appear. In these cases, this cost shall be merged in the unit price bid for rock excavation, In Proposals that do not have a rock clause the cost for rock excavation and fill material Rev. 02197 SECTION 2 Page 7 shall be considered to be unclassified and shall be merged with the lump Sum bid for the Project. 2.02.6 BACKFIL.L.ING, EMBANKMENT AND CUT AREAS (a) All backfiiling shall be made to lines and grades shown on the Contract Drawings. Backfill adjacent to and under structures, foundations and concrete slabs shall be placed in horizontal layers not in excess of 6 inches in thickness, loose measurement, with optimum moisture content required for maximum compaction. Backfill under structures, foundations and concrete slabs shall be made using well -graded sands or sand and gravel mixtures subject to approval of the Engineer. Vibratory methods shall be used for compaction. Each horizontal layer shall be compacted to 100% of maximum dry weight density in pounds per cubic foot as determined by the Standard Proctor Compaction Test, unless otherwise specified by the Engineer or the Contract documents. A minimum of two (2) tests and not less than one (1) test for each 15,000 square feet of area shall be taken for each three (3) feet. All tests shall be at the Contractor's expense. (b) Embankments shall be constructed to established lines and grades at the locations shown on the Contract Drawings and as directed by the Engineer. Embankment material shall be natural soil free from excessive moisture or deleterious materials. Embankments shall be obtained from materials at the site or acceptable borrow pits. In either case, acceptable materials shall be well graded from fine to coarse with a very minimum of silt. The entire surface to be covered with embankment shall be stripped of all topsoil before any embankment material is placed. (c) Embankments and fills for general site grading shall be made using cohesive or cohesionless materials, as approved by the Engineer, Before any Embankment or fill is placed, the entire area shall be cleared, as previously specified. If embankments and fills are constructed in winter, snow and ice shall be removed from the area. The site shall be thoroughly plowed before any fill is placed to insure a proper bonding of the materials. So far as is practicable, each layer shall extend the entire length of the embankment or fill. They shall be constructed in layers not exceeding 6 inches in thickness. Sheepsfoot rollers shall be used to compact all soils except sands or gravels and shall have a weight on each row of feet of not less than 200 nor more than 500 pounds per square inch of foot surface, Pneumatic- tired rollers or vibrators shall be used to compact sands and gravels and shall be so constructed that the weight per tire shall be not less than 1,000 pounds nor more than 2,000 pounds. Pneumatic -tired rollers shall have a width of not less than four (4) feet, Where required to do so in order to properly compact the soil, the Contractor shall add sufficient water during rolling and tamping to assure consolidation of the fill materials, Unless specifically shown otherwise on the Contract Drawings or specified differently herein, all embankments shall be compacted in accordance with method "C" of ASTM D698 (Standard Proctor Compaction Test) to the following minimum percentages expressed as a percent of maximum density at optimum moisture content: Rev.02/97 SECTION 2 Under Roadways and parking areas (except the upper three feet) and water holding embankments Under proposed structures and the upper three feet under roadways and parking areas Areas not otherwise specified --- 95 percent of maxi- mum dry density and 90 pounds per cubic foot dry density --- 100 percent of maxi- mum dry density and 95 pounds per cubic foot dry density ---- 90 percent of maxi- mum dry density Page 8 Compaction curves shall be developed for each type of soil proposed for use in embankment. The development of the curves from the standard density or compaction test shall be done at or by an approved testing laboratory at the Contractor's expense. Not less than one (1) test for compacted density shall be taken on each three (3) feet for each 10,000 square feet of embankments and fills for general site grading. (d) All materials required for backfili, embankment or fill in excess of that available on the site shall be obtained by the Contractor from other sources as approved by the Engineer. All costs thereof shall be merged in the Contract price for the project. (e) Backfiil shall not be placed against structure walls until the concrete has: (1) Attained a strength of 3,000 pounds per square inch. (2) Intermediate floors and/or framing levels have been poured. (f) Backfill shall be brought up evenly on each side of buried structures such as tunnels, galleries, pump stations, wet wells, etc., to prevent imposing unbalanced forces against these structures. (g) Where slabs are to be poured on soil, it shall be the Contractor's responsibility to take all precautions and necessary steps to facilitate the placing of concrete, i.e.; well pointing, trenching and dewatering, placement of a concrete mud slab, etc., as required. All such costs shall not be paid for as separate items, but shall be merged into the applicable lump sum or unit price items listed for the project. (h) Cut areas where roadways, drives or structures are to be located shall be scarified to a depth of six (6") inches. These areas shall then be compacted and tested in the same manner and to the same extents as embankment areas or as specified by Section 2.02.6(c) of these General Specifications or as modified by the Project Specifications. 2.02.7 SITE GRADING (a) Upon completion of construction operations, the entire site within limits designated in the Project Specifications or indicated on the Contract Drawings shall be brought to the finished rough grades indicated on the Rev.02197 SECTION 2 Page 9 Contract Drawings. All surfaces shall be smoothed and left in condition to permit placing of topsoil. The Contractor's attention is directed to other sections of these General Specifications, the Project Specification and the Contract Drawings covering the placing of topsoil, grassing and erosion control. 2.03 MEASUREMENT FOR PAYMENT AND COMPENSATION 2.03.1 LUMP SUM CONTRACTS AND LUMP SUM ITEMS (a) On lump sum contracts and lump sum items in a unit price contract, no separate measurement or payment will be made for excavation (except where allowed for rock), or for dewatering, temporary sheeting, backfill or final grading, 2,03.2 UNIT PRICE CONTRACTS AND UNIT PRICE ITEMS On unit price contracts and on unit price items in a lump sum contract, measurement for payment and compensation will be as follows: (a) EXCAVATION Measurement for payment will be made from the ground surface to the bottom of the slab, and within a vertical plane around the perimeter of the structure, which is 3 feet distant from the extreme edge of the base slab. Compensation will be at the unit price per cubic yard named in the Contract for material removed, computed on the basis defined above, which shall cover removing material, backfill, grading and the removal of excess excavated material from the site. (b) ROCK EXCAVATION - Rock excavation will be measured from the average top surface of the rock to a plane coincidental with the bottom of the structural slab or as noted on the Contract Drawings and to a vertical plane around the perimeter of the structure, measuring three (3) feet outside the extreme limit of the base slab. Compensation will be made at the Contract unit price for rock removed, computed on the basis defined above, which shall cover removal of rock, dewatering if required, and the removal of excess excavated material from the site. (c) SHEETING AND BRACING LEFT IN PLACE - Temporary timber sheeting and bracing ordered left in place will be measured on the basis of the actual quantity of lumber left in place, computed on nominal lumber sizes. Compensation will be made on the basis of the Contract unit price per thousand feet board measure (MFBM), which shall include the furnishing and placing of material and all cutting, splicing, bracing and spiking or bolting. Rev.02/97 SECTION 2 ( Page 10 ! (d) GRANULAR FOUNDATION MATERIAL - Compensation for sand and gravel or crushed stone foundation material ordered placed will be based ! upon the Contract unit pdoa for such material, multiplied by the actual | tonnage orcubic yards placed. Such compensation shall include the cost cf namnvoi and disposal of excavated material, wet or dry, and the furnishing, i placing and compacting of refill material. Granular foundation material | specifically shown on the Contract Drawings or called for in the Project � �'` � Gpeo0ooUnnm, such as sand and gravel |oyeno under slabs, and at relief valve locations, will be paid for as granular foundation material where a unit � phce oxista. DUhamv|se the cost qfsuch material shall be included in the appropriate lump sum item. / (6 EV\CKF|LL|NG AND EMBANKMENT -TherewiU be no direct payment for this item. Payment stthe contract unit prices for the various items listed above in this Section 2.03.2 ahoU be full compensation for all work covered by this item. Rev. 02197 SECTION 2 Page I GENERAL SPECIFICATIONS SECTION 3.0 THIS SECTION NOT USED Page 1 GENERAL SPECIFICATIONS 4.0 SITE WORK 4.01 GENERAL 4.01.1 SCOPE OF WORK (a) All labor, materials, equipment, tools and services required to fulfill the requirements of this Contract for Site Work shall be furnished and installed in compliance with the following General Specification, the Project Specifications, and the Contract Drawings, (b) The General Specification designated as Section 4.0 Site Work covers the description of work and materials generally utilized in site work and erosion control and the specification for performing that work.. The Project Specifications and the Contract Drawings designate specific work to be performed under the Contract. The inclusion of items of material or work within this Specification does not necessarily constitute their use on this Project. (c) Cited examples are used only to denote the quality standard of product desired and does not restrict bidders to a specific brand, make, manufacturer or specific name. They are used only to set forth and convey to bidders the general style, type, character, and quality of product desired. Equivalent products will be acceptable. 4.02 CLEARING AND GRUBBING (a) Clearing and grubbing of the site shall be in full conformance with Section 1.0, Clearing and Grubbing, of the General Specifications. The limits of clearing and grubbing and specific details concerning the work shall be as set forth in the Project Specifications and the Contract Drawings. (b) All trenches, ditches, and holes resulting from the work of this section shall be filled with clean earth and compacted to the level of the surrounding elevations. 4.03 GRADING 4.03.1 EXCAVATION (a) GENERAL (1) Excavation shall include the loosening, loading, removing, transporting, and disposing of all materials, wet or dry, necessary to be removed in order to meet the lines, grades and elevations shown on the Contract Drawings. The Contractor must assume the risk of meeting and the Contract price shall include the cost of removal of quicksand, hardpan, boulders, clay, rubbish, unforeseen obstacles, underground conduits, gas pipe, drain tile, trees, roots, timber or masonry structures, railroad tracks, pavements, and sidewalks; and the delay or damage occasioned by the same, whether these obstacles are shown on the Contract Drawings or not. Rev. 9/09 SECTION 4 Page 2 (2) No claim for any amount of money beyond the Contract price of the work will be entertained or allowed on account of the character of the ground in which the excavation is made unless rock as defined hereinafter is encountered and removed, and only then when rock appears as a unit price item. The quantities for payment shall be determined on the basis established in Section 4.08 of this General Specification. (3) The location of existing piping and underground utilities, such as gas mains, water mains, electric duct lines, telephone conduits, etc., as shown on the Contract Drawings as approximate. The Owner does not assume responsibility for the possibility that during construction utilities other than those shown may be encountered, or that actual location of those shown may be different from the locations designated on the Contract Drawings. (4) At the locations wherein detailed positions of these facilities become necessary to the new construction, the Contractor shall, at his own expense, furnish all labor and tools to either verify and substantiate the record drawing location, or definitely establish the position of the facilities. (5) Necessary arrangements shall be made by the Contractor with all persons, firms, corporations owning or using any poles, pipes, tracks, or conduits, etc., affected by the construction of this Project, to maintain and protect such facilities during construction with the cost of such protection paid by the Contractor and included in the contract price. In the event that any existing gas pipes, water pipes, conduits, sewers, the drains or poles are blocked or interfered with by the excavation required on this project, the Contractor shall maintain them in continuous operation, and restore them to the same condition as they were prior to the start of construction of this Project, all at no additional compensation. (6) Excavated material shall not be placed on grass plots unless there is no other suitable place to put it. Excavated material shall be placed on pavements or sidewalks only on the explicit approval of the Engineer. (7) Sidewalks and pavements must in no case be blocked or obstructed by excavated material, except on the authorization of the Engineer, and then only when adequate provisions have been made for a satisfactory temporary passage of pedestrians and vehicles. Adequate bridging and planked crossings must be provided and maintained across all open trenches for pedestrians and vehicles. Barriers, lights, flares, and watchmen shall be provided and maintained by the: Contractor at all excavations, and embankments at no additional compensation, as provided in the General Conditions of the Contract. Rev. 9t09 SECTION 4 Page 3 (8) Topsoil shall be stripped and stockpiled on the job site. Topsoil shall be removed to the depth of fertility, except that in no instance shall topsoil be stripped below a depth of 12 inches. Topsoil shall be stripped only when friable. Topsoil shall be free of clay, stones 2" and larger, and debris. Upon completion of construction, topsoil is to be distributed as set forth in the Project Specifications and Contract Drawings. (9) Excavated material shall be deposited so as to interfere as little as possible with the execution of the whole work or its several parts, and in such manner that for each purpose the most suitable material may be placed in its final position but not in a manner to interfere with the satisfactory carrying out of the work. Such material as cannot be placed in its final position in fills and embankments shall be removed to a temporary spoil bank, from which it shall later be taken and placed in embankment or fills. (10) Unsuitable and surplus excavated material not incorporated in the improvement shall be disposed of by the Contractor at his own expense unless otherwise designated in the Project Specifications, or on the Contract Drawings. (11) If private land is used by the Contractor as a spoil site, the Contractor shall obtain written permission from the Owner or Agent of the land agreeing to its use for this purpose, and provide the project Owner with a certified copy of such agreement. (12) All cuts shall be brought to the grade and cross section shown on the Contract Drawings, or established by the Engineer, prior to final inspection and acceptance by the Engineer. (b) UNDERCUT (1) Undercut excavation shall be in accordance with Section 225-4 of the STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES, North Carolina Department of Transportation, published Jan 2002. (2) The backfilling of undercut excavation shall be in accordance with Section 4.03.2 (EMBANKMENT) of these General Specifications. (3) Backfilling of undercut excavation shall not be a pay item unless specifically called for in the Project Specifications. The cost of backfilling- shall be included in the cost of undercut excavation. (c) SUBGRADE (1) The Contractor shall be responsible for preparing and maintaining the subgrade in a condition suitable for installation of the cohesive soil liner unless specificially agreed otherwise. (2) Before beginning construction of the base liner system, the project engineer shall visually inspect the exposed surface to evaluate the suitablity of the subgrade and document that the surface is properly prepared and that the elevations are consistent with the approved engineering plans. Rev. 9/09 SECTION 4 Page 4 (3) At a minimum, the subgrade shall be proof -rolled at cut sections utilizing a fully loaded tandem dump truck or equivalent. If movement of the subbase is observed under the wheels, the section of movement will be repaired or removed and replaced with suitable fill material. This newly placed fill material will then be tested for proper density and moisture. (4) All fill soils shall be placed in no more than eight (8") inch thick loose lifts with a maximum six (6") inches of compacted lift. The soils shall be compacted to at least 95% of the Standard Proctor maximum dry density (ASTM D-698) and at or near optimum moisture content using approved compaction equipment. The fill subgrade shall be tested for density and moisture content at one (1) test pr six (6") inches of compacted lift for each 10,000 square feet, or fractions thereof, of compacted fill. If an area fails, it shall be repaired or replaced with suitable compacted soils and retested. 4.03.2 EMBANKMENT (a) GENERAL (1) Embankment includes the transporting, placing, compacting and testing of suitable fill material as indicated in the Project Specifications and on the Contract Drawings. It shall include the preparation of the areas upon which the embankment is to be constructed; the formation, compaction, stability, and maintenance of the embankment; the placing and compacting of approved material within areas where unsuitable material has been removed; and the placing and compaction of embankment materials in holes, pits, and other depressions within the area. (2) Only suitable materials shall be used in the construction of embankments and backFills. No frozen material, roots, sod, or other objectionable material shall be incorporated or placed in the embankments or backfills. The top 6 inches of any embankment shall not contain any material larger than will pass a 3 inch sieve except where written permission is given by the Engineer, (b) EMBANKMENT PREPARATION (1) Before embankment construction is begun, all vegetation and rubbish shall be removed from the area within the limits of the embankment. This material shall be disposed of as directed by the Engineer, or required by these Specifications. Mowed sod may be plowed and left in place where the height of the embankment to be constructed is greater than 6 feet, unless otherwise noted. (2) Where embankments are to be placed and compacted on hillsides, or when new embankments are to be compacted against existing embankments, or when embankments are built in part widths, the slopes that are steeper than 4:1 shall be loosened or plowed to a minimum depth of 6 inches or, if in the opinion of the Engineer, the nature of the ground is such that greater precautions should be taken to bind the fill to the original ground, then benches shall be cut in the existing ground. Rev. 9/09 SECTION 4 Page 5 (3) All portions of the surface upon which an embankment is to be placed shall be thoroughly plowed or scarified and all cleavage planes broken up before beginning the embankment. (c) EMBANKMENT FORMATION (1) The material shall be deposited and spread in successive, uniform, approximately horizontal layers of not more than 6 inches in depth, loose measurement, for the full width of the cross section, and shall be kept approximately level by the use of effective spreading equipment. Each layer of the embankment shall be thoroughly compacted as hereinafter specified. Hauling shall be distributed over the full form during the construction of the embankment, The embankment shall be properly drained at all times. (2) Where embankments are to be constructed across ground which will not support the weight of trucks or other hauling equipment, the first layer of the embankments may be constructed by dumping successive truck or other equipment loads in a uniform distributed layer of a thickness not greater than that necessary to support the trucks or hauling equipment while placing subsequent layers. The remainder of such embankments shall then be constructed in layers as above specified. (3) Where it is necessary to place embankment material in a swamp or in water, unsuitable surge material shall be kept in a fluid state or removed to prevent any of this material from being trapped in or under the embankment. (4) No rock lifts shall be placed within 2 feet of the finished grade. No rock or broken pavement shall be placed in embankments where piles are to be placed or driven. (5) In valleys, ravines, and at the foot of slopes on side hills, a limited amount of end or side dumping will be allowed, when permitted by the Engineer, to form a satisfactory base in the formation of the embankment, after which the layers shall be constructed parallel with the finished grade as hereinbefore specified. (d) EMBANKMENT COMPACTION (1) All embankment material shall be compacted as specified herein unless otherwise stipulated by the Contract or directed by the Engineer. Compaction equipment used by the Contractor shall be adequate to produce the required compaction and produce a uniformly constructed embankment with all layers uniformly bound to all preceding layers. (2) One compaction test shall be made for each 10,000 square feet of fill three (3) feet deep. Compaction shall be accomplished with other than heavy machinery where that machinery may cause damage to facilities. See Section 2.0: Structures - Excavation and Backfill. Rev, 9109 SECTION 4 Page 6 (3) All fill shall be compacted in accordance with method "C" of ASTM D698 (Standard Proctor Compaction Test) to the following minimum percentages expressed at a percent of the maximum density at optimum moisture content: Under Roadways and parking areas (except) the upper three feet) and water holding embankments Under proposed structures and upper three feet under roadways and parking areas Areas not otherwise specified (e) MAINTENANCE ----- 95 percent of maximum dry density and 90 pounds per cubic foot dry density ----- 100 percent of maximum dry density and 95 pounds per cubic foot dry density 90 percent of maximum dry density (1) The Contractor shall be responsible during construction and until final acceptance for the maintenance of all embankments made under the Contract, (2) During construction and until final acceptance the Contractor shall construct temporary or permanent earth berms along the outer edges of the top surface of the embankment, construct temporary ditches, shape the embankment surface to provide for the drainage of surface runoff along and throughout the length of the embankments, and use any other methods necessary to maintain the work covered by this section so that the work will not contribute to excessive soil erosion. (3) The Contractor shall replace, at no cost, any portion of embankments which have become displaced or damaged due to carelessness or neglect on the part of the Contractor, (4) All embankments shall be brought to the grade and cross section shown on the Contract Drawings, or established by the Engineer, prior to final inspection and acceptance, 4,03.3 ROCK EXCAVATION (a) Wherever the word "Rock" appears, it shall be interpreted to mean any material encountered of a uniform hardness of three (3) in the scale of mineral hardness and/or any material which cannot be removed from its original position with a 300 Hp (minimum), 70,000 lb. working weight (minimum) dozer with a rock ripping attachment in good condition without continuous drilling and blasting will be considered rock, provided that the Contractor proves by demonstration and photographic evidence that slate, shale, sandstone or other hard material encountered cannot be removed with heavy equipment without continuous drilling and blasting. Other materials shall not be classed as rock, although it may be more economical to remove same by blasting. Boulders will not be classified as rock unless larger than 1/2 cubic yard. Rev. 9/09 SECTION 4 Page 7 (b) Should rock be encountered in the excavation, it shall be removed by blasting or other approved methods. Where blasts are made, the excavation shall be carefully covered with suitable brush, timber or matting to prevent danger to life and property. The Contractor shall secure all permits required by Law for blasting operations and any additional hazard insurance required, the cost of such permits and insurance to be borne by the Contractor. The Contractor shall strip the rock of over -burden, such stripping to be done in sections and approved by the Engineer. No blasting shall be done by the Contractor until he has notified the Engineer and until the necessary cross -sections of the top of the rock have been taken. No loaded holes shall be left unattended or overnight without approval from the Engineer. Blasting will not be permitted within 25 feet of completed pipe lines or structures nor will it be permitted within 25 feet of any existing structure, pipe line or conduit. Adequate warning and danger signals shall be given before firing dynamite explosives. Adequate records shall be kept by the Contractor of all explosives kept at the site of the -work. All explosives shall be used and handled, stored and exploded in conformance with all state and local laws and regulations. (c) Materials classified as "Rock" in these Specifications, if encountered, shall be excavated to the grade of the bottom of structures to be installed unless specifically shown on the Contract drawings to be removed, to a greater depth. After such rock is removed, the excavation, when required, shall be backfilled with clean low -void sand or other non -compressible fine low -void material satisfactory to the Engineer, and consolidated to place the top surface at the grade established on the Contract Drawings for the bottom of the structure. (d) The cost of furnishing, placing and consolidating of such fill material shall be entered as part of the embankment unit price bid, except in proposals that do not have unit prices, in which case it becomes part of the Lump Sum Base Bid. in Proposals that have unit price schedules, the cost of removing and disposing of rock shall be entered as Rock Excavation. In Proposals that do not have unit prices, the cost for Rock Excavation shall become part of the Lump Sum Base Bid. 4.04 FINAL GRADING (a) The following tolerances from the established grades will be permitted, unless otherwise specified by the Project Specifications. 1) general site grading: plus or minus 0.20 foot 2) subgrade under structures, roadways and parking areas: plus or minus 112 inch (b) Slope grade away from building walls and grade entire areas outside of building to smooth uniform surface. Finish grades, not otherwise indicated, shall be uniform levels or slopes between points where levels are given or between such points and existing finish grades. Abrupt changes in scapes shall be rounded. Should figures for finish elevations conflict with finish contours shown, the figures shall govern. (c) Topsoil shall then be spread on the ground areas and shall be smoothed down to a loose depth of not less than three inches. Areas to receive topsoil shall be scarified 12" deep and all construction debris picked out and hauled off before spreading of topsoil. After topsoil has been spread, the entire area shall be left smooth and all stones, roots, debris, etc., measuring 2" and larger shall be removed. Topsoil Rev, 9109 SECTION 4 Page 8 required, over the amount in the stockpile, shall be furnished by the Contractor at the unit cost as set forth in the Contract Documents. 4.05. EROSION AND SEDIMENT CONTROL. 4.06.1 GENERAL (a) The Contractor shall provide erosion and sediment control as detailed in the Project Specifications and the Contract Drawing, during the period of construction. The Contractor shall protect and maintain all temporary erosion and sediment control features required by construction of this project. Maintenance is to include, but is not limited to, removal of sediment as it accumulates in and around structures and basins, maintenance of temporary diversion swales, which will include, regrading and seeding, if deemed necessary by the Inspector or the Engineer. (b) Temporary erosion control measures shall include but not be limited to the use of temporary berms, dikes, dams, drainage ditches, silt basins, silt -ditches, slope drains, structures, vegetation, mulches, mats, netting, gravel, or any other methods or devices that are necessary. Temporary erosion control measures may include work outside the right of way or construction limits where such work is necessary as a result of construction such as borrow operations, haul roads, plant sites, equipment storage sites, and disposal of waste or debris. The Contractor shall be liable for all damages to public or private property caused by silting or slides originating in waste areas furnished by the Contractor. Materials for temporary erosion control measures shall have been approved by the Engineer before being used or shall be as directed by the Engineer, Erosion control measures installed by the Contractor shall be acceptably maintained by the Contractor. (c} The sediment and erosion measures implemented on this project are subject to periodic review by the State of North Carolina Department of Natural Resources and Community Development and are to be kept in operating condition at all times. All erosion control measures are subject to the requirements of the NC Sedimentation Pollution Control Act. (d) The sequence of construction shall be as set forth in the Project Specifications and the Contract Drawings. (e) At the conclusion of project construction, the Contractor shall completely remove and dispose of all temporary erosion and sediment control measures, unless otherwise specified in the Project Specifications of the Contract Drawings. Temporary diversion swales shall be regraded to the lines and grades shown on the Contract Drawings. (f) During the application of fertilizer and of asphalt binding material, or other approved binding materials which may cause damage, adequate precautions shall be taken to prevent damage to traffic, structures, guardrails, traffic control devices, or any other appurtenances. The Contractor shall either provide adequate covering or change methods of application as required to avoid such damage. When damage occurs the Contractor shalt repair it, including any cleaning that may be necessary, at his own expense. Rev. 9/09 SECTION 4 4.05.2 TEMPORARY SILT FENCE (a) The Contractor shall construct a temporary silt fence for retention of silt, The Contractor shall construct the temporary silt fence at locations shown on the Contract Drawings or as directed by the Engineer. (b) Fabric shall be a minimum of 32" high, have 14 gauge wire mesh, with 6 inch spacing. (c) Posts -- Posts must be steel. Steel posts shall be five feet in length and shall be of the self -fastener angle steel type. No more than three feet of any post, shall protrude from the ground, Extra posts if needed; will be considered an incidental addition to the silt fence and no additional payment will be made for them. (d) Silt barrier shall be a synthetic filter fabric, or a pervious sheet of polypropylene, nylon, polyester, or polyethylene yarn, certified by the manufacturer as meeting the requirements of the NO Department of Environment,_ Health and Natural Resources, Division of Land Resources, "Erosion and Sediment Control Planning and Design Manual", (e) The Contractor will be required to maintain the silt fence in a satisfactory condition for the duration of the project or until its removal is requested by the Engineer and shall remove and dispose of silt accumulations at the silt fence when so directed by the Engineer. After vegetation is established, the Engineer shall determine if the silt fence is to be removed or to be left in place. if the temporary silt fence is removed, it will become the property of the Contractor, but the contractor will also be required to dress up and seed and mulch the area to give a pleasing appearance as directed by the Engineer, (f) All dressing up, seeding and mulching, required in the above paragraph shall comply with this General Specification Section 4.0 and all applicable requirements of the "Seeding and Mulching" provisions included herein. (g) After the temporary silt fence has served its purpose at one location, it may be used at other temporary locations providing it is still in satisfactory condition. (h) Pay items associated with the use of the temporary silt fence shall be as allowed by Section 4.08 of this specification. 4.06 PERMANENTCOVER 4.06.1 GROUND PREPARATION (a) Areas to be seeded shall have been cleared, grubbed and graded. Excessively wet areas shall be allowed to dry; dry areas shall be lightly sprinkled the day before seeding is accomplished. Operations shall be accomplished during favorable weather conditions except that no seed shall be sown on frozen and crusted soil. All seeded areas shall be mulched. Rev. 9/09 SECTION 4 Page 10 (b) Ground having a slope steeper than 3:1 shall not be prepared for seeding; seed, lime and fertilizer shall be applied as specified in paragraph 4.06.2.(b). (c) Ground having a slope not steeper than 3:1, shall be plowed to a depth not less than four inches for shoulders and embankments, not less than six inches for front and back slopes of cuts and for level areas, and not less than six inches for waste areas having unstable materials. After having been plowed, areas shall be disced and harrowed, to the depth of plowing in a manner which will pulverize the soil. Surface of the disced and harrowed area shall present a smooth, uniform, loose appearance; large clods, rock, stumps, roots larger than 112 inch in diameter, and debris shall be removed. if topsoil is to be applied to the area, such preparation by plowing, discing, and harrowing, is to be done prior to the application of the topsoil. (d) With soil material reasonably uniform, apply lime, fertilizer, and nitrogen as follows: Lime - Apply at rate of 2 tons per acre, unless otherwise noted. Fertilizer - (10-10-10) @ 18-23 IbsJ1000 sq. fit. Nitrogen - Topdress with 30-50 pounds of nitrogen 30-60 days after planting only when needed to increase plant growth and cover. (e) When hydraulic seeder is to be used, soil preparation is not required. When conventional seeding is to be done, no preparation is required if the soil material is loose and has not been sealed by rainfall. On smooth undisturbed cut slopes, the surface will require pitting, trenching or scarifying to provide a place for seed to lodge and germinate. 4.06.2 SEEDING (a) LEVEL AREAS AND SLOPES NOT STEEPER THAN 3:1 (1) Seed shall be sown within 24 hours after ground preparation has been completed, and .with either mechanical seed drills or rotary hand seeders; seeds of approximately the same size may be mixed and sown together_ If seeds are sown with rotary hand seeders, seeded areas shall be lightly raked. Seeded areas shall be rolled and sprinkled before applying mulch. (2) Mulch shall be applied to rolled and sprinkled areas by either hand - spreading or mechanical methods. Applied mulch shall be neither thinner than 3/4 inch nor thicker than 1-1l2 inches (approximately 1-112 to 2 tons per acre). (3) All mulched areas (not hydroseeded) shall be tacked at the.rate of 150-200 gallons of tack per ton of mulch. (4) Lime may be spread by any means that will deliver an even distribution of lime over the area to be seeded. No spotting or heavy deposits will be allowed. The lime shall be applied at the Rev. 9l09 SECTION 4 Page 11 rate of 2 tons per acre unless otherwise noted by the Project Specifications. (5) Fertilizer shall be applied to limed areas. Fertilizer (10-10-10) shall be applied at the rate of 18-23 lbs./1,000 sq. feet. (b) SLOPES STEEPER THAN 3:1 (1) This work shall be accomplished by hydroseeding and liming. Hydroseeding shall consist of mixing fertilizer, seed, and wood cellulose fiber mulch with water and applying the mixture as a slurry. Rate of application shall ensure that the fertilizer (10-10- 10) will be applied at a rate of 18-223 lbs./1,000 sq. feet, that the seed will be applied at the rate specified in paragraph 4.062(c) and that the applied mulch will be neither thinner than 3/4 inch nor thicker than 1-1/2 inches (approximately 1-1/2 to 2 tons per acre). Slurry shall be spread uniformly over the area and within one hour after having been mixed, and shall be agitated while being applied. (2) Liming shall consist of mixing lime with water and applying the mixture as a slurry. Rate of application shall ensure that the lime will be applied at the rate of two (2) tons per acre. Slurry shall be spread uniformly over the area immediately after hydroseeding has been accomplished. (c) APPLICATION (1) Apply seed uniformly by broadcasting with a cyclone seeder, close drilling or cultipacker seeder. Normal depths for covering seed range from 1/4" for rye grass to 1 inch for small grain. Firm the soil after planting with a cultipacker or suitable equipment except where seed is applied with a hydraulic applicator. (2) When a hydraulic seeder is used, the seed and fertilizer are mixed in a slurry and applied in one operation. The seed must not remain in the slurry with fertilizer for more than one hour. 4.06.3 NC DEPARTMENT OF TRANSPORTATION (DOT) - PERMANENT SEEDING Permanent erosion control shall be performed as follows: (a) Ali disturbed areas shall be dressed to typical sections and plowed to a depth of 5 inches. The top 2 inches shall be pulverized to provide a uniform seedbed. NOTE: Lime should be applied before plowing operation, (b) Lime, seed, and fertilizer shall be applied with necessary equipment to give uniform distribution of these materials. The hand -bucket method is not acceptable. Following are rates and kinds of these materials to be applied per 75 Ibs. Ky 31 Fescue 50 Ibs. Pensacola Bahiagrass 50 lbs. Korean Lespedeza 1,000lbs. 5-10-10 Fertilizer Rev. 9109 SECTION 4 Page 12 4,000 lbs. Agricultural Limestone NOTE: Only tested and certified seed shall be used. (c) Seeded area shall be cultipacked to firm seedbed and cover seed. (d) Grain straw shall be applied over seeded areas as a mulch. No bare ground shall be visible when riding by a mulched area if proper application is achieved. Thick clumps of straw are not permissible as a uniform coverage is expected. See 4.06.2(a)(2) for rates. (e) Mulched area shall be tacked with asphalt sufficient to hold straw in place. See 4.06.2(a)(3) for rates. (f) Ditch treatment shall be- used in areas where steep grades (more than 10%) could cause ditch erosion. Use of jute mesh, excelsior matting, or fiberglass roving is acceptable. Ditch treatment should be installed before mulching operation. 4.07 MATERIALS - 4.07.1 TOPSOIL (a) Topsoil shall be fertile, friable, loamy soil having neither less than two percent nor more than 30 percent organic matter as determined by loss on ignition of samples which have been oven -dried to a constant weight at 212 degrees F. Soil shall be free from subsoil, heavy and stiff clay, coarse sand, stones larger than two inches in their largest dimension, toxic amounts of acidic and alkaline substances, roots, brush, sticks, coarse litter, and other substances which would interfere with mixing, planting, and maintenance. (b) Topsoil shall be taken from reasonably well -drained, arable land which has not supported tobacco growth during the previous three years, and which is not supporting the growth of Johnson grass or Kudzu. Topsoil shall be taken from and transported through areas which are free from infestations of fire ants, white fringed beetles, and Japanese beetles. (c) Topsoil shall not be taken below the depth of fertility, except that in no instance shall topsoil be stripped below a depth of 12 inches. Topsoil shall not be stripped when it is in frozen, muddy, or non -friable condition, (d) Topsoil shall be stripped and embanked on -site for replacement on all graded areas prior to re -seeding, 4.07.2 SEED (a) Seed shall satisfy the requirements of the North Carolina Department of Agriculture, No seed will be accepted having a date of test more than six months prior to the date of sowing. (b) Seed which has become wet, moldy, and otherwise damaged will not be acceptable, Rev. 9/09 SECTION 4 Page 13 4.07.3 NITROGEN Nitrogen shall be either in granular or liquid form and shall be of commercial grade. Nitrogen shall be furnished in new, clean, sealed, and labeled containers; labels shall clearly show manufacturer's name, brand name, and the weight and guaranteed analysis of contents. 4X7.4 LIME Lime shall be agricultural type. Total carbonates shall be not less than 85 percent, by weight. Not less than 90 percent shall pass a No. 10 Sieve, and not less than 25 percent shall pass a No, 100 Sieve. 4.07.6 FERTILIZER Fertilizer shall be uncaked granular type, and either 10:10:10, 4:12:12, 6:12:12, or 5-10:15. Fertilizer shall satisfy the requirements of the North Carolina Department of Agriculture. 4,07.6 MULCH (a) Areas Not Steeper than 3:1 Mulch shall be either threshed rye, oat, or wheat straw or Bermuda grass hay, and shall have a moisture content of not more than 12 percent. Mulch shall be free from noxious weed seeds, soil, sawdust, mildew, leaves, and substances toxic to vegetation. Material for holding mulch in place shall be asphalt or other approved binding material. (b) Areas Steeper than 3:1 Mulch shall be wood cellulose fiber, shall contain no germination and growth - inhibiting factors, shall be green to allow visual metering in its application, and shall have the property to be evenly dispersed and suspended when agitated in water. When mulch is sprayed uniformly on the surface of the soil, the fibers shall form an absorbent cover, allowing percolation of water to the underlying soil, Mulch shall be packaged in moisture -resistant bags which have the net weight of the package plainly shown. Properties of mulch shall be as follows: Nominal Values Properties in Percent Moisture Content Organic Matter (Oven Dried Basis) Ash Content pH Water Holding Capacity (Grams of Water/100 Grams Fiber) 4.07.7 JUTE NET 9.0 + 3.0 99.2 + 0.8 0.8 + 0.2 4,8 + 0.5 1150 Minimum (a) Jute net shall be heavy, uniform cloth woven of single jute yarn, which if 36 to 48 inches wide, shall weigh an average of 1.2 pounds per linear yard. The jute net shall be as manufactured by Erosionet, Holdgro, Weedchek, Curlex or equal. Rev. 9/09 SECTION 4 Page 14 4.07.8 GEOTEXTILE FABRIC FOR ROADWAYS (a) Geotextile fabric underlining the access roads shall be a non -woven needle -punched fabric with the following minimum properties: 1) Weight 8.0 oz/yd2 ASTM D-5261 2) Grab Strength 205 lbs, ASTM D4632 3) Grab Elongation 50% ASTM D4632 4) Trapezoidal Tear Strength 80 lbs. ASTM D4533 5) Puncture Strength 105 lbs. ASTM D-4833 6) Permittivity 1.2 sec' ASTM D-4491 7) Flow Rate 95 gailmin/ft.2 ASTM D-4491 8) Mullen Burst Strength 360 psi ASTM D-3786 9) Apparent Opening Size (AOS), maximum 0.180mm (80 us sieve) ASTM D-4751 10) UV Resistance after 500 70% ASTM D-4355 hrs, (% Strength -Retained) 4.07.9 GEOTEXTILE FABRICS FOR EROSION CONTROL Geotextile fabric underlying the rip -rap medium in the diversion ditches, spillways, etc., shall be woven monofilament-fabric with the following minimum properties. 1) Wide Width Tensile Strength (Ibs/ft) 2,700/MD 1,740/CD ASTM D-4595 2) Grab Tensile Strength (lbs) 370/MD 250/CD ASTM D-4632 3) Grab Tensile Elongation (%) 161MD 15/CD ASTM D-4632 4) Trapezoidal Tear Strength (lbs) 100/MD 60/CD ASTM D-4533 6) Mullen Burst Strength (psi) 480 ASTM D-3786 6) Puncture Strength (lbs) 120 ASTM D-4833 7) Apparent Opening Size (AOS), max. 0.212mm (70 US Sieve) ASTM D-4751 8) Percent Open Area (°fo) 4-6 COE -- 22125-86 9) Permittivity (sec l) 0.28 ASTM D-4491 10) Flow Rate (gal/min/fe) 18 ASTM 0-4491 11) UV Resistance after 500 hrs, (% Strength Retained) 90 ASTM D-4355 12) Mass/Unit Area (oz/yd) 6,0 ASTM D-5261 13) Thickness (mils) 13 ASTM D-5199 14) Permeability (cm/sec) 0.01 ASTM D-4491 4.07.10 SYNTHETIC MAT LINING FOR DIVERSION DITCHES Extended -terns degradable erosion control blanket shall be constructed with a 70% agricultural straw and 30% coconut fiber matrix and have a functional longevity of approximately 24 months (NOTE: functional longevity may vary depending upon climatic conditions, soil, geographic location, and elevation), The straw and coconut fibers shall be evenly distributed over the entire area of the mat, The blanket shall be covered on the top with a heavyweight polypropylene netting having ultraviolet additives to delay breakdown and an approximate 0.625 x 0.625 inch (1.59 x 1.59 cm) mesh size. The blanket shall Rev_ 9/09 SECTION 4 Property Thickness Resiliency Mass per Unit Area Water Absorption Swell ECTC Guidelines Stiffness/Flexibility Light Penetration Smolder Resistance MD Tensile Strength MD Elongation TD Tensile Strength TD Elongation Page 15 be covered on the bottom with a lightweight polypropylene net having a 0.50 inch x 0.50 inch (1.27 cm x 1.27 cm) mesh size. The blanket shall be sewn together on 1,50 inch (3.81 cm) centers with degradable thread. The following list contains further physical properties of the erosion control blanket. Test Method Typical ASTM D5199/ECTC 0,34 in (8,64 mm) ECTC Guidelines 75% ASTM D6475 11.44 oz/yd2 (388 g/m) ASTM D11171ECTC 200% 30% ASTM D13881ECTC 1.11 oz-in (12,397 mg -cm) ECTC Guidelines 11.70% ECTC Guidelines Yes** ASTM D5035 205,20 Ibs/ft (2.99 kN1m) ASTM D5035 28.00% ASTM D5035 152A0 Ibs/ft (2.22 kN1m) ASTM D503-5 23.10% "Material is smolder resistant according to the specified test MD — Machine Direction TD -- Transverse direction 4.08 MEASUREMENT FOR PAYMENT AND COMPENSATION 4,08.1 GENERAL If any or all of the work to be performed under this contract is on a unit price basis, the actual number of units of each unit price item of work actually performed may be more or less than the number stated in Bidding Schedule of the Proposal, or included in the Contract, but no variation in the Contract unit price will be made on that account. Payment will be made only for the actual number of units incorporated in the work, or for the actual number of units of work performed, and at the Contract unit price for each such unit with measurement for payment made as defined in the following paragraphs. Measurement for payment of work done on a unit price basis will be as follows:. 4.08.2 CLEARING AND GRUBBING Unless otherwise specified in the Project Specifications or the Contract -Drawings, the payment for Clearing and Grubbing shall be as specified in Section 1, Clearing and Grubbing, of these General Specifications. 4.08.3 GRADING (a) When provided for by a Unit Price Proposal, excavation shall be paid for at the Contract Unit price per cubic yard, which price shall be full compensation for the excavation and formation and compaction of embankments, furnishing water for moisture control, disposal of surplus materials, preparation and completion of subgrades, shoulders, ditches, channels, ramps, dikes, and other appurtenances and incidentals necessary to complete the work and all haul within the specified "Free Haul Limit"_ Rev. 9109 SECTION 4 Page 16 (b) Embankment shall not be a pay item unless specifically called for in the Project Specifications, The cost of embankments shall be included in the cost of excavation, except that required amount, over that which is available from excavation, which will be paid for at the Contract unit price per cubic yard of borrow. (c) When not provided with a Unit Price Proposal, the Contractor shall merge the cost of all excavation and embankment work with the Lump Sum Base Bid Item. (d.) The quantity of excavation to be paid for will be the actual number of cubic yards of materials, measured in their original position and computed by the average end area method, which have been acceptable excavated in accordance with Contract Specifications and Drawings. Final cross sections will be taken after the excavation has been completed except that the plan typical sections will be used for the final cross sections where, in the opinion of -the Engineer, the work has been constructed in reasonably close conformity to the plan typical section, 4.08.4 UNDERCUT EXCAVATION (a) Undercut excavation shall be as defined by Section 4.03.1(b) of this Specification. When provided for by a Unit Price Proposal, undercut excavation shall be paid for at the Contract Unit price per cubic yard, which price shall be full compensation for the excavating and hauling of this material; for the disposal of the excavated material; for furnishing any disposal areas that may be necessary; for the backfilling and compacting of suitable material to replace undercut excavation; and for the furnishing of all labor, equipment, tools and incidentals necessary to complete the work. (b) Undercut excavation will be measured on a box cut section to widths and depths as directed by the Engineer. (c) When not provided with a Unit Price Proposal, the Contractor shall merge the cost of all undercut excavation work with the Lump Sum Base Bid item or the Unit Price Item for Excavation. 4.08.6 ROCK EXCAVATION Rock excavation shall be as defined by Section 4,03.3 of this Specification. Rock excavation shall be paid for at a unit price rate provided a Unit Price Proposal is utilized, If the Proposal is not Unit Price, the cost of all rock excavated and removal shall be merged with the Lump Sum Base Bid Item, 4.08.E FINES GRADING This item shall not be paid for as a separate pay item, but shall be included in the cost of grading. 4.08.7 EROSION CONTROL Except for the items shown bsOew for "Temporary Silt Fence" other items used for erosion control shall be paid for at the Contract Unit price per item utilized in erosion control, unless otherwise specified in the Project Specifications, Rev. 9/09 SECTION 4 Page 17 4.08.8 TEMPORARY SILT FENCE When provided for by the proper item in a Unit Price Proposal, the quantity of temporary silt fence to be paid for under this item shall be the actual number of linear feet of fence installed in place and accepted. Such price and payment will be full compensation for the work as described in the above paragraphs, including but not limited to furnishing all materials, tools, equipment and all incidentals necessary to complete the work. When a Unit Price Proposal for this item is not available, all costs for placing, maintaining and removing all temporary silt fences and deposited silt materials shall become part of the Lump Sum Base Sid. 4.08.9 SILT ACCUMULATIONS (a) When provided for by the proper item in a Unit Price Proposal, the removal and disposal of silt accumulations shall be paid for at the Contract Unit Price per cubic yard of "Drainage Ditch Excavation". (b) When a Unit Price Proposal for this item is not available, all cost for the removal and disposal of silt accumulations shall become part of and be considered to be incidental to the work covered by "Temporary Silt Fence." 4.08.1 0 GRASSING (a) This item shall be paid for at the contract unit price per square yard. The Contract unit price shall be full compensation for ground preparation, furnishing and planting seeds, plant establishment and any incidental items necessary to obtain an acceptable ground cover. (b) All measurement of permanent seeding will be made horizontally. 4.08.11 TESTS (a) Tests for compaction of cohesive and non -cohesive soils, which shall be conducted by a testing laboratory approved by the Engineer, shall not be paid as a separate item; but shall be merged into either the lump sum or unit price items, as applicable. (b) All cost of these tests shall be paid by the Contractor. 4.09 NEGLECTED WORK BY CONTRACTOR If the CONTRACTOR should neglect to prosecute the Work in accordance with the Contract Documents, including any requirements of the progress schedule, the OWNER, upon written notice to the CONTRACTOR, after three (3) days from receipt of such notice by the CONTRACTOR and without prejudice to any other remedy he may have, may make good such deficiencies and the cost thereof (including compensation for additional professional services) shall be charged against the CONTRACTOR if the ENGINEER approves such action, in which case a Change Order shall be issued incorporating the necessary revisions in the Contract Documents including an appropriate reduction in the Contract Price. If the payments then or thereafter due the CONTRACTOR are not sufficient to cover such amount, the CONTRACTOR will pay the difference to the OWNER. Rev, 9/09 SECTION 4 Page 1 GENERAL, SPECIFICATIONS SECTIONS 6.0 — 6.0- THESE SECTIONS NOT USED 7.01 GENERAL 7.01.1 SCOPE OF WORK (a) All labor, materials, equipment, tools and services required for the furnishing, installation and testing of -all gravity sewers, conduits, and drains required on this Contract shall be furnished and installed in compliance with the following General Specification, the Project Specifications and the Contract Drawings. (b) This General Specification designated as Section 7.0 covers the description of materials generally utilized in sewer and drain construction and the installation of such materials. The Project Specifications and the Contract Drawings will designate the specific work, the materials, the lines, grades and details and the construction methods to be employed on the furnishing and installation of all Sewers, Conduits, and Drains on this Contract. The inclusion of items of material or work within this Specification does not necessarily constitute their use on this Project. 7.01.2 SHOP DRAWINGS (a) Attention is directed to the provisions in the General Conditions of the Contract requiring the submission to the Engineer of descriptive details and of shop and setting drawings. On Sewer and Drain installations, such submission shall include the following even though items proposed to be furnished conform to the exact description stated in the General or Project Specifications; (1) Full details of pipe, fittings, specials, joints and the assembly thereof. (2) Joint materials and details. (3) Reinforcing steel bending and setting drawings: 7.01.3 STANDARDS (a) Where materials and methods are indicated in the following Specifications as being in conformance with a standard_ specification, it shall refer in all cases to the latest edition of the specification and shall include all interim revisions, Listing of a standard specification without further reference indicates that the particular material or method shall conform with such listed specification. Rev. 03f11 SECTION 7 7.02 CONSTRUCTION MATERIALS 7.02.1 GENERAL All materials and equipment shall be furnished bvunestablished and reputable manufacturer or supplierAll materials and equipment shall benew and shall be offirst class ingredients and construction, designed and guaranteed b}perform the service required and shall conform with the following Standard Specifications. Cited examples are used only to denote the quality standard of product desired and does not restrict bidders to m mpwniOo brand, make, manufacturer owspecific name. They are used only boset forth and convey to bidders the Qwnmma| style, type, ohmrmnter, and quality qfproduct desired. Equivalent products will be acceptable. 7.02.2 CLAY PIPE (a) CLAY DRAIN TILE -ASTM C4. (b) STANDARD STRENGTH, EXTRA STRENGTH AND PERFORATED CLAY SEWER PIPE 'A8TMC7OO� 7,02.3 CONCRETE PIPE (a) CONCRETE DRAIN TILE '/STMC412. 8d CONCRETE SEWER PIPE-A8TM {14 and Concrete with minimum cement content of0.5sacks per cubic yard ofconcrete. All pipe specified to beASTMC-14pipe shall babid oVClass 2,"B"wall pipe with C-dngrubber gasket joints un|oea otherwise noted by the Project Specifications. Joints may be either with or without shoulders on the tongue. Joints shall meet A8TK8C443. kd REINFORCED CONCRETE CULVERT STORM DRAIN AND SEWER PIPE 'ASTM C78 with circular reinforcement, wall Mhicknen ` or as designated in Project Specifications or Drawings, and concrete with minimum cement content of6.5sacks per cubic yard ofconcrete. The class of pipe shall be as required by the Project Specifications and/or Contract Documents, All pipe specified to be /STK8 C-78 pipe shall be bid as Class 3' "8" wall pipe with O'hng rubber gasket joints un|noa otherwise noted by the Project Specifications. Joints shall have opposing shoulders designed to meetASTK8 O'443 and suitable for pipe meeting AGTK8 C-361 and /&AWAC-3O2. (e) REINFORCED CONCRETE LOW HEAD PRESSURE PIPE -A8TM O361 with circular reinforcement and concrete with minimum cement content Vf 6,5 sacks per cubic yard of concrete. (f) REINFORCED CONCRETE CYLINDER PIPE 'AWWAC30OorC301. Rev. 03/11 {EC3lKJW.7 — Page (g) REINFORCED CONCRETE SUBAQUEOUS CYLINDER PIPE -AVVVVA C300VrC301. Steel lugs for draw bolts shall belocated onthe springlineat the ends of each pipe. Draw bolts with Units ehe|| be supplied to pull the pipe together subaqueoue|y. (h) FLARED END SECTIONS (FE8)'FESshall beused onall concrete storm drain pipes unless specifically noted otherwise bvtheP `wo Specifications. All flared end sections (FE8) shall be of the same- material amthe pipeline, 7.024DUCTILE IRON PIPE All ductile iron pipe shall- conform toAVVVVACi51, deou GU unless otherwise noted inthe Project Specifications and/or the Contract Drawings. All joints shall beofthe Push -On type, vo|eao otherwise noted in the Project Specifications mod/orContract Drawings, 7,02.5 P�.c'GRAV[TY SEWER PIPE All P.V.C. Gravity Sewer Pipe shall conform to ASTM O'8034 and F-879 in accordance with ASTM D-1784, 7�2.6 HIGH DENSITY POLYETHYLENE PIPE HOPE pipe shall be produced from a high molecular weight, high denshy, polyethylene naoin' meeting the requirements of AGTM D8350, "Standard Specification for Polyethylene (PE) Plastic Pipe and Fitting KUohsha|o". Resin material obmU be listed by PP| in the m3n)a of the manufacturer and obaU be based on testing in accordance with ASTyN D2887. "Standard Tent Method for Obtaining Hydrostatic Design Basis for Thermoplastic Pipo''. HDPE pipe aheU conform to A8TM D3035. "Standard Specification for Polyethylene (PE) Plastic Pipe (DF-PR)Based onControlled Outside Diameter" orASTyN F714D3085 "Standard Specification for Polyethylene (PE) Plastic Pipe (OR-PR)Based onOutside Oinmetsr". The thickness and pressure class of HDPE pipe required for the installation and operating conditions during the expected service life of the force main shall he determined in accordance with AVVVV8C00S' "Polyethylene (PE) Pressure Pipe and Fittings, 4"—G3".for Water Diotribubon". Fittings for HDPE pipe shall conform to ASTM D3281 "Standard specification for Butt Fusion of Polyethylene(PE)Plastic Fittings for PEPlastic Pipe and Tubing" and shall be manufactured by injection mu|diog, e combination of extrusion and machining, orfabrication for HDPE pipe material, Rev, 03/11 SECTION 7 Page 4 Force mains of HDPE pipe shall be joined by the thermal butt fusion process and shall be performed in accordance with ASTM A2657 "Standard Practice for Heat Fusion Joining of Polyolefin Pipe and Fittings" and the manufacturer's recommendations during installation. 7.02.7 FIBERGLASS REINFORCED PIPE All fiberglass reinforced pipe shall be a composite pipe consisting of a P.V.C. interior core around which layers of roving fiberglass are wound and epoxy bonded in accordance with ASTM D2996. The pipe shall be constructed in 20 foot sections, shall be 150 psi pressure rated and shall pass the ASTM D1599 test for burst pressure. The pipe joint shall be of an integral bell with a spigot end capable of accepting cast iron or ductile iron pipe creating a water tight joint with a rubber ring gasket. 7.02.8 CORRUGATED METAL PIPE All corrugated metal pipe shall be furnished in accordance with the requirements of the Project Specifications, the Contract Drawings, and Federal Specification WW-P-445B. Corrugated metal pipe used for storm drain shall be mitered on all free - discharging ends unless specifically noted otherwise by the Project Specifications, 7.02.9 CORRUGATED POLYETHYLENE PIPE All corrugated polyethylene pipe shall be furnished in accordance with ASTM F405 and F667, and AASHTO M252 and M294. 7.02.10 JOINTING MATERIALS (a) CEMENT MORTAR shall be composed of one (1) part Portland cement and two (2) parts clean torpedo sand. Where pipe is to be laid in wet sand, the Contractor shall use one-third (1/3) natural cement and two-thirds (2/3) Portland cement in lieu of 100% Portland cement in preparing the joint mortar or add an approved waterproofing agent to the mortar. (b) RUBBER GASKETS - ASTM- C443. Shape and design satisfactory to the Engineer. (c) MECHANICAL JOINTS - ASA A21.11. (d) GASKET TYPE JOINTS FOR BELL AND SPIGOT CAST IRON PIPE shall be similar and equal to American "Fastite," U.S. "Tyton," Claw "Bell -rite" or equal. (e) FACTORY FABRICATED RESILIENT MATERIAL JOINTS FOR CLAY PIPE ASTM C425, Rev. 03/11 SECTION 7 Page 5 (f) CORRUGATED METAL PIPE JOINTS shall be as specified by Section 7.03.3(c)(9) unless otherwise noted by the Project Specification. (g) All joints used on Fiberglass Reinforced Pipe shall be Mechanical Joints conforming to ASA A21.11 unless otherwise noted in the Project Specifications or Contract Drawings, 7.02.11 MATERIAL TESTING (a) Attention is directed to the provisions in the General Conditions of the Contract requiring the inspection and testing of materials to be incorporated in work included under this Contract, by a Testing Laboratory employed and paid by the Contractor, unless otherwise noted by the Project Specifications. (b) All materials to be incorporated in the Construction required under this Contract shall be subject to inspection and testing. Specimens up to 0.5 percent of the total number of each size of pipe furnished shall be tested, except that in no case shall less than two (2) specimens be tested. The laboratory making such tests shall furnish to the Engineer three (3) certified copies of the tests. No pipe shall be laid before these reports are approved by the Engineer. (c) Under the following items, the pertinent tests required are: (1) Clay Pipe -Where the total quantity required on this Contract, including all pipe sizes, is less than 1,000 feet, visual inspection at the site for conformance with ASTM 04 and C700. Where the total quantity required on this Contract including all pipe sizes is more than 1,000 feet, tests shall be by an, independent laboratory per ASTM C301 for conformance with ASTM 0700, Drain the shall be tested per ASTM C4. (2) Concrete Pipe - Where the total quantity required on this Contract, including all pipe sizes, is less than 1,000 feet, visual inspection at site for conformance with ASTM C14, C412, and C444. Where the total quantity required on this Contract, including all pipe sizes, is more than 1,000 feet, tests shall be by an independent laboratory per ASTM C14, C412, and C444. (3) Reinforced Concrete Pipe - Where the total quantity required on this Contract, including all pipe sizes, is less than 1,000 feet, visual inspection at the site for conformance with ASTM C76, Where the total quantity required on this Contract, including all pipe sizes, is more than 1,000 feet, tests shall be by an independent laboratory per ASTM C76, Section 9.0. In sizes 30 inches and larger, strength and amount of reinforcing may be determined by crushing tests on concrete cores taken from the pipe in accordance with ASTM C497. (4) Reinforced Concrete Cylinder Pipe - Where the total quantity required on this Contract, including all pipe sizes, is less than 1,000 feet, visual inspection at the site for conformance with AWWA C300 or C301. Whem the total quantity required on this Contract, including all pipe Rev. 03/11 SECTION 7 Page 6 sizes, is more than 1,000 feet, tests shall be by independent laboratory per AWWA C300 or C301. (5) Reinforced Concrete Low -Head Pressure Pipe - Where the total quantity required on this Contract, including all pipe sizes, is less than 1,000 feet, preliminary hydrostatic joint tests, concrete cylinder tests and visual inspection at the site for conformance with ASTM C361. Where the total quantity required on this Contract including all pipe sizes, is more than 1,000 feet, preliminary hydrostatic joint tests, followed by hydrostatic tests on 0.5 percent of the number of each size required and concrete cylinder tests by an independent laboratory per ASTM C361. (6) Corrugated Metal Pipe All corrugated metal pipe furnished shall be tested in accordance with the requirements set forth in Section 4, "Quality Assurance Provisions", of Federal Specification WW-P-405B. All pipe sampling shall be as stated in Federal Specification MIL-STD- 105. A certification from the manufacturer will be accepted when filled out on the form enclosed as part of these Contract Documents. (7) Corrugated Polyethylene Pipe - All corrugated polyethylene pipe furnished shall be tested in accordance with the test procedures described in AASTO M252 and 294, and ASTM 405 and 667. The supplier shall include a certification form indicating the passage of the tests as performed by the manufacturer on all projects where the total project amount is 1,000 feet or more. (8) Reinforcing -Certified mill tests for conformance with ASTM Al and A305. (9) Ductile Iron Pipe Fittings - Where the total quantity required on this Contract, including all pipe sizes, is less than 200 tons, each piece shall bear the manufacturer's serial number and shall be certified by the manufacturer for conformance. (10) P.V.C. Gravfty Sewer Pie - Where the total quantity required on this Contract, including all pipe sizes, is less than 1,000 feet, visual inspection at the site for conformance with ASTM D3034 shall apply. Where the total quantity required on this Contract, including all pipe sizes, is more than 1,000 feet, test shall be made by an independent laboratory as per ASTM D3034. The sampling frequency shall not be less than one (1) sample per lot. (11) High Density Polyethylene Pipe (HDPE) — Tests to be performed shall include those specified in ASTM D3350. Resin material shall be tested in accordance with ASTM D2837. (12) Fiberglass Reinforced Pipe - Where the total quantity required on this Contract, including all pipe sizes, is less than 1,000 feet, visual inspection at the site for conformance with ASTM D2996 shall apply. Where the total quantity required on this Contract, including all pipe sizes, is more than 1,000 feet, tests shall be by an independent laboratory as per ASTM D2992 and D2996, The sampling frequency shall not be less than one (1) sample per lot. Rev. 03111 SECTION 7 Page 7 7.03 CONSTRUCTION METHODS 7.03.1 TUNNELING (a) Excavation in tunnels made beneath existing structures, across railroad rights -of -way, existing pavements and sidewalks for the installation of pipe or conduits, shall be of sufficient size, height and width to permit the installation of the pipe, to permit proper bracing of the tunnel section, and to permit ample room for the prosecution of the work and safety of the workmen. (b) All tunnels shall be lined with full circle metal liner plates of sufficient strength to meet the loading conditions. Goading for highway and pavement tunnels shall be based upon continuous load carrying structures for the height of cover under H-20 loading; and loading for railroad tunnels shall be based upon continuous load carrying structures for the height of cover under Cooper E-70 loading. In no case shall liner plates for H-20 loading have a section modulus less than .0736 in. and for Cooper E-70 loading less than .0918 in. Linear plates for railroad tunnels shall be galvanized and bituminous coated. (c) All work performed beneath existing structures, across railroad rights -of -way, and under pavements shall be performed in accordance with the requirements of the parties or agencies having jurisdiction over these locations. The Contractor shall contact the parties or agencies prior to starting work and shall meet all requirements of the parties or agencies in regard to methods of construction and the safety precautions to be taken in performing the tunnel work. All costs involved in meeting these requirements shall be paid for by the Contractor and no additional compensation will be allowed. (d) At the Contractor's option, with the written approval of the Engineer, and with consent of the parties or agencies having jurisdiction; corrugated metal pipe, reinforced concrete pipe or steel pipe may be jacked or bored in place as a casing pipe in lieu of a liner plate tunnel under the following conditions: (1) That the Contractor is responsible for all approvals from the parties or agencies- having jurisdiction, that the Contractor furnish complete details of the methods to be employed for approval and that the work shall be performed under the following conditions:_ (2) Corrugated metal pipe shall be fabricated from corrugated galvanized sheets, number eight (8) gauge U.S.S., or as specified in the Project Specifications or Contract Drawings with base metal made by the open hearth process. Rivets shall be made of the same material as the base metal, thoroughly galvanized. The base metal sheets shall be galvanized on both sides by the hot dip process, at the rate of not less than two (2) ounces per square foot of metal, or one (1) ounce on each side. Corrugated pipe shall be specially fabricated for a jacking installation, with sections fabricated for field riveting. The pipe shall be furnished in lengths to suit the Contractor; however, the sections should be as long as is possible for the Contractor to conveniently handle and install, and shall be bituminous coated inside and outside for railroad crossings. Reinforced concrete pipe shall be of the tongue and groove type, conforming to ASTM Rev. 03/11 SECTION 7 Page 8 Designation C76, unless otherwise shown on the Contract Drawings and/or designated in the Project Specifications. (3) A suitable approach trench shall be opened long enough to accommodate the length of pipe units to be placed, and wide enough to provide sufficient working room. Guide timbers or rails for keeping the pipe on line and grade shall be installed in the bottom of the trench, and heavy timber backstop supports installed at the rear of the trench to take the thrust of the jacks. A timber bearing or "pushing frame" shall be built and furnished to fit or match the end of the pipe to be jacked, so that the pressure of the jacks will be evenly distributed over the end of the }pipe. Two (2) hydraulic jacks of sufficient power shall be used to apply pushing or jacking pressure. Excavation shall be carried on from inside the pipe, eight (8) to twelve (12) inches ahead of the lead pipe. Excavation at the top and sides shall be approximately one (1) inch greater than the outside periphery of the pipe. Bottom excavation shall be accurately cut to line and grade. Adjoining sections of corrugated iron pipe shall be made with cement mortar and jute from the inside. Adjoining sections of steel pipe shall be welded. Pipe shall be jacked on successive shifts until completed, this to guard against the "freezing of the line" due to settlement and compaction of surrounding soil. 7.03.2 BORING (a) lines installed under highways or railroads shall be performed by boring where permitted and/or indicated by the Contract Drawings. Where boring is required, the Contractor will be paid the unit price bid in the proposal for each linear foot of pipe, so placed, of the type bid upon in the proposal. In placing pipe in bored tunnels, any annular space exceeding one -quarter inch in width between pipe and tunnel shall be grouted. The cost of grouting shall be an integral part of the price submitted in the proposal for the type and size of pipe required by the installation. The Engineer may require "Boring or Tunneling" under objects or pavings not indicated on the plans, but required in the best interest of the Owner; in which case the payment for each linear foot required will be made at the unit price given in the proposal or at the unit price as established by Article 11 of the General Conditions. The Contractor shall install casings in accordance with the fallowing requirements: (1) General The Contractor shall be required to notify the Department of Transportation or the appropriate Railroad Association of the contemplated construction and shall verify or secure the necessary permits for performing the work. Rev. 03/11 SECTION 7 (2) Carrier Pipe Carrier line pipe and joints under Highways and Railroads shall beductile iron pipe as per Section 7.02.5 of this specification unless noted CB Casing Pipe The casing pipe shall be spiral welded or smooth xwyU steel pipe unless noted otherwise bythe Project Specifications. All casing pipe shall have o minimum yield strength of 35.000 psi. All casing pipe and joints shall bmofleakproof construction, capable of withstanding the intended loaAa. The inside diameter of the casing pipe shall be otleast four (4) inches greater than the largest outside diameter of the carrier pipe's joints or couplings. |nall cases, the casing pipe shall belarge enough tnallow the carrier pipee-un be namoved. The required m-inimum vvaU thickness for casing pipes used under highways shall beasfollows: Pipe Sizes (O.D.) Wall Thickness 12W 0188 16" 0.250 1G" 0,250 20" 0.250 24' 0.250 30" 0.312 361' 0.375 48" MOO The required minimum wall thickness for casing pipes used under railroads shall be as follows: Pipe Sizes (O.D.) Wall Thickness 12" 0,281 Under14" 0,188 14" 0.219 18" 0.281 18" 0250 20" 0.281 22" 0,312 24" 0,375 26" O�375 28" 0.408 3011 0A6Q 82" 0A88 84" 0.460 36" 0,531 38" 0,600 40" 0.500 421` 0.5DO 48" 0.888 Rev. 03/11 SECTION 7 Page 10 if casing pipe used under railroads is installed without an exterior protective coating, increase the wall thickness on the appropriate size 0.063 inches. The protective coating shall be at least a single coal - tar primer coat, followed by a single application of hot coal - tar enamel 3l32 inches thick plus a bonded 15 pound felt wrap. (4) Installation All work on borings shall be under the supervision of the appropriate District Engineer or his authorized representative, who shall be notified at least 5 days before actual work of installation is begun. Pipelines shall be installed under Highways or Railroads by boring or jacking, if practicable. The casing pipe shall be installed by dry boring and jacking. As the dry boring operation progresses, each new section of the encasement pipe shall be butt welded to the section previously jacked into place. The bor- ing auger shall not be of a greater diameter than the O.D. of the encasement (plus protective coating where applicable). Voids are to be filled with a 1:3 Portland cement grout at sufficient pressure to insure that no settlement will occur. In the event that an obstruction is encountered during the dry boring operation, the auger is to be withdrawn, the excess pipe cut off and capped, and the void completely filled with 1:3 Portland cement grout at a minimum of 25 psi prior to moving to another boring site. All boring operations shall be conducted at all times in such a manner so as not to create a hazard nor to impede the normal flow of traffic. Where the ends of the casing pipe are below grade, they shall be bricked up with a four inch (4") Schedule 40 PVC drain at the low end. The drain shall have washed No. 57 stone covering its outlet. Where the ends of the casing are at or above ground surface and above high water level, they may be left open, provided drainage is afforded in such a manner that leakage will be carried away from any railroad, highway or structure. See items 7.03.1(d)(1), (2) and (3) for additional information pertaining to the jacking procedure. 7.03.3 HORIZONTAL DIRECTIONAL DRILLING (a) The contractor shall provide, install and construct in place, the high -density polyethylene (HDPE) pressure pipe at highway and stream crossings where shown on the drawings. (b) Work included under this section: (1) General site/access preparation necessary for construction operations. (2) Assembly of HDPE pipe, (3) Hydrostatic testing of HDPE pipe prior to installation (Contractor's Option). (4) Erection of drilling equipment. Rev. 03l11 SECTION 7 Page 11 (5) Drilling of a small diameter pilot hole along the alignment defined on the drawings, (6) Reaming the pilot hole as specified herein to a diameter suitable for installation of the HDPE pipe. (7) Pulling the assembled HDPE pipe through the reamed hole along with the detector wire. (8) Hydrostatic pressure testing of HDPE pipe after installation. (9) Cleanup and final restoration of all work areas. (10)Prevention of offsite sedimentation and surface water contamination and in accordance with the laws governing the construction and _the permits for the installation. (c) Industry Standards (1) The horizontal directional drilling method shall be mechanical with fluid assistance. Pneumatic, water jetting, jacking, and boring method will not be permitted, (2) The HDPE pressure pipe shall be installed by horizontal directional drilling in accordance with the best industry practice and the Project Manual. (d) Submittals (1) Certification of pipe material from the pipe manufacturer for compliance with the specifications. (2) Description of the arrangement of directional drilling including method of monitoring and controlling line and grade, schedule, and procedure of installation. (3) Technical data for the drilling equipment. (4) Product information, material specifications and handling procedures for drilling fluid and bentonite/drilling mud. (5) Final as-buiits giving depth obtained by drilling contractor plotted along the ground lines established by Owner at a scale of V = 100' on the horizontal and at a scale of V = 2" on the vertical. (6) Submission of Engineering Report comparing predicted maximum pullback force versus maximum tension on the pipe and percent elongation. The report shall provide an Engineer's opinion that the pullback force used will not damage the pipe. The procedures used to support this opinion will conform to pipe manufacturer's data and methodology. Full backup data will be provided. The report shall be sealed by a Professional Engineer registered in North Carolina and submitted in triplicate. (e) Materials High Density Polyethylene (HDPE) pressure pipe as specified on the Construction Drawings. (f) Field Tests (1) Prior to installation, the Contractor shall at his expense to hydrostatically test the pipe -line to determine the integrity of the butt fusion joints, This Rev. 03/11 SECTION 7 Page 12 shall not be considered an alternative to the hydrostatic testing required after installation. (2) Following installation,'the HDPE pipe shall be tested in accordance with the specifications herein. (g) Availability of Land The Owner has obtained certain easements for the work as shown on the plans. Additional easements if needed are to be provided by the Contractor and the costs shall be included in the Bid. (h) Execution (1) The HDPE pipe shall be handled in accordance with the manufacturer's recommendations, Chains, hooks, or cable slings shall not be used to handle the pipe. Care shall be used to protect the pipe from scarring, gouging, or excessive abrasion. The directional drilling procedure shall Include provisions to guard against electrical shock such as ground cables, hot boots, gloves and any additional devices deemed necessary. In addition, the drilling equipment shall include an alarm system capable of detecting electrical current as it nears electrical lines. (2) All joints at the ends of directionally drilled runs shall be fusion bonded to the adjacent pipe section. Mechanical couplings are not permitted. Fusion bonding may be accomplished through the use of butt fusion, sock fusion or electro fusion coupling techniques. (3) The composition of all drilling fluid used shall be submitted for review prior to utilization. The fluids shall be inert and of no risk to the environment. No fluid will be approved or utilized that does not comply with permit requirements and environmental regulations. The drilling fluid should remain in the bore hole to increase the stability of the surrounding soil and to reduce the drag on the pulled pipe. Disposal of drilling fluid and all other spoils shall be the responsibility of the Contractor and shall be conducted in compliance with all relative environmental regulations, right-of-way and work space agreements under permit requirements. Drilling fluid returns at locations other than the entry and exit points shall be minimized. The Contractor shall immediately clean up any drilling fluid that inadvertently surfaces. Excess drilling fluid shall be disposed of at a pre -approved location found by Contractor. The Contractor is responsible for transporting all excess fluids and other spoils and legal disposal of all such waste products and soil materials. Under no circumstances will drilling fluid be discharged to any stream or surface waters. All such fluids or slurries are to be removed from the site at project completion. (4) The Contractor shall investigate at his own cost the subsurface conditions at the crossing locations. (5) The Contractor shall be responsible for obtaining, transporting, and storing water for the drilling process. Upon completion of the pipe installation, the drilling pit and receiving pit shall be backfilled as specified. Restoration of any disturbed area shall be restored in accordance with specifications. Rev. 03111 SECTION 7 Page 13 (i) Pilot Hole Chilling (1) The pilot hole shall be drilled along the path shown on the drawings and to the following tolerances: Vertical Location Plus or minus 6 inches Horizontal Location — Plus or minus 3 feet, restricted to the minimum distance from highway structures or other underground structures. (2) Creaming Diameter shall be performed to 1,5 times the O.D. of HDPE pipe being installed. The pipe shall be prepared to facilitate connection to the remainder of the pipeline being installed. 0) As -Built Survey (1) At the completion of the pilot hole drilling, the Contractor shall provide to the Engineer a tabulation of coordinates referenced to the drilled entry point which accurately describes the location of the pilot hole. The Contractor shall provide tabular depths of the line at 50' horizontal stations and in addition will provide a profile plot as described above. The ground lines are to be shown on these plans. (k) Stress Analysis (1) The Contractor is required to provide a stjbmittal which confirms the HDPE pipe will not be overstressed during construction. The submission by the Contractor shall cover the three critical stages of construction which are 1) pre -installation procedure testing, 2) pullback, and 3) post installation testing. The stresses placed upon the pipe are dependent on the Contractor's methods and equipment which are not known to the Owner at the time of the bid. The stresses at each stage of construction must be considered acting individually and in combination. The report shall address all of the following. Stresses resulting due to the spanning between rollers prior to pullback, the hydrostatic testing pressures, pulling forces during installation, radius of curvature as the pipe enters the ground, the drill profile curvature, and external pressures in the drilled hole. (1) Pre -Installation (1) Hoop and longitudinal stresses resulting from hydrostatic testing are calculated. (2) Using the known distance between rollers as the free spanning distance, the maximum hogging and sagging moments must be calculated. Considering the greater of these two moments, the maximum spanning stress shall be calculated. Note: During hydrostatic testing the pipeline will be full of water; therefore, the additional weight of water must be included in these calculations. (m) Pullback (1) The spanning stresses calculated above also apply to this installation phase. Rev. 03/11 SECTION 7 Page 14 (2) The theoretical pulling force must be determined in order to provide the stresses that will result. An assumed down -hole friction factor of 1,0 is required to provide conservative results and to include the effect of the pipeline being pulled around a curve. The maximum predicted pulling force should then be used in calculating the resulting_ longitudinal stress, (3) Allowing for a 10% drilling tolerance, leads to the use of a radius of curvature 90% of the design radius when calculating the longitudinal curvature stresses. (4) External pressure from static head in the drilled 'hole and/or overburden pressures must be considered. It is required that the static head resulting from the maximum anticipated drilling fluid density shall be used with a factor of safety of 1.5 to provide conservative estimates of the resulting hoop and longitudinal stresses. (n) Post -installation— Hydrostatic Testing (1) The longitudinal curvature stresses calculated above are to be used again here. (2) External pressure stresses from (m) (4) apply. (3) Hoop and longitudinal stresses resulting from the required final hydrostatic test are to be calculated. (o) Allowable Stresses (1) The individual and combined stresses at each stage of construction and those for the in-service conditions must be determined and compared with allowable limits set by the HDPE manufacturer. The Contractor's engineer's report shall certify that all of the above conditions were considered and will not result in failure of pipe. (p) Environmental Safety of the Drilling Process (1) The contractor shall at all times comply with the permit conditions. (2) Slurry Composition — The Contractor shall provide the Material Safety Data Sheet (MSDS) for all products utilized in slurries and shall be familiar with and able to document legal disposal of all unused slurry materials. (3) Containment. The Contractor shall provide containment pits to contain the drill slurries. If settling processes are used to allow discharge of excess slurry water then the Contractor shall obtain the necessary permits for such discharge and shall provide them prior to site mobilization. (4) Recycling Slurry — To the extent practical, the Contractor shall minimize generation of waste slurry by recycling. (5) Slurry and Cuttings Disposal -- Waste slurry and cuttings shall be removed from the site and legally disposed of upon project completion. If requested by the Engineer, the contractor will provide a manifest indicating the receiver of the waste and the disposal method. (6) Return to Pre -construction Elevations and Contours — The Contractor shall return all disturbed areas to pre -construction elevations and contours and seed and mulch as specified. (7) At all times the Contractor shall comply with the approved sedimentation and erosion control plan and the storm water permits, if applicable. Rev. 03/11 SECTION 7 Page 15 (q) Connection to Other Pipes (1) At the termination of HDPE piping, the Contractor shall install a mechanical joint adapter or a flanged joint adapter for the purpose of connecting directly to ductile iron pipe in a fully restrained condition. The final 10' section of the HDPE pipe at each terminal end shall be laid to a flat grade to facilitate connection to ductile iron pipe without undue stress at the joints. Connections with significant deflections shall not be permitted. For connections into manholes, the Contractor shall ensure that HDPE is proper restrained and of sufficient length to maintain a connection into the manhole after the pipe has relaxed. 7.03.4 PIPELINE INSTALLATION (a) GENERAL (1) The Engineer shall provide on the Contract Drawings a horizontal layout for the proposed pipeline construction along with a minimum of one (1) bench mark every 2,000 feet of line length. The Contractor shall be responsible for verifying the accuracy of any and all bench marks prior to use. No claim for extra work will -be allowed for alleged inaccuracy of any bench mark. (2) It shall be the Contractor's responsibility to protect the original line and bench marks set by the Engineer. Should this information become destroyed or damaged, the cost of the replacement will be borne by the Contractor. (3) All Clay Pipe, Concrete Pipe, and Corrugated Metal Pipe shall be laid in conformance with the ASTM standard for installing vitrified clay pipe, ASTM C12. This specification shall be strictly conformed to unless otherwise noted by the Project Specifications. The bedding type shall be Class C unless otherwise noted. This bedding requires the use of granular materials equivalent to the N.C. Department of Transportation gradation size 67, or equal, unless otherwise noted by the Project Specifications or required by the ENGINEER on site because of local conditions. All extruded A.B.S. Truss Pipe, PVC Pipe and Fiberglass Reinforced Pipe shall be laid in conformance with the ASTM standard for installing flexible thermoplastic pipe ASTM D2321. This specification shall be strictly conformed to unless otherwise noted by the Project Specifications or required by the ENGINEER on site because of local conditions. The pipe shall be bedded to the ASTM C12 specification for Class C bedding unless otherwise noted. See Section 8.0 Pipeline - Trench Excavation and Backfill of the General Specifications for additional information. (4) The junction of two or more sewers shall be made in strict conformance with the Contract Drawings. The cost of all connections shall be included in the contract price for the new sewers unless otherwise specifically provided in the Contract. Rev. 03/11 SECTION 7 Page 16 (5) New sewer connections with old existing sewers shall be made within a manhole. Where an old manhole exists at the point of connection of new and old sewers, it shall be repointed and any loose bricks or blocks in the walls of the old existing manhole shall be relaid. The cost of such work shall be included in the Contract price for new main sewer unless other payments are specifically provided for in the Project Specifications. (6) Where no old manhole exists at the point of connection, a new manhole shall be constructed of the size and type shown on the Contract Drawings. Payment for such additional manholes will be made at the unit price in the Contract for new manholes, which price shall include all work necessary to make the connection. (7) Connections of new sewers to existing sewers, when encountered in - construction and not shown on the Contract Drawings, shall be made where ordered by the Engineer. Such connection shall be made within a manhole, except for house sewer and drain connections. When such sewer connections are made within an existing manhole, any added work involved will be paid for in accordance with the procedure outlined in the General Conditions of the Contract. If the Engineer orders such connections to be made in a new manhole, such new manhole will be paid for at the prices established in the Contract, which price shall include all work necessary to make the connection. (8) When connections are made with sewers carrying sewage or water, special care must be taken that no part of the work is built under water. A flume or dam must be installed and pumping maintained, if necessary, to keep the new work in the dry until completed and concrete or mortar has set up. (9) Junctions for future sewer connections, where indicated on the Contract Drawings, shall be bricked off at the ends or otherwise sealed off in a manner satisfactory to the Engineer; the cost to be merged in the Contract price for manholes or sewers. (10) No pipe shall be laid upon a foundation in which frost exists; nor at any time when the Engineer shall deem that there is danger of the formation of ice or the penetration of frost at the bottom of the excavation. The pipe shall be fitted together and matched so that there shall be no shoulder or unevenness along the inside bottom half of the pipe, and so that alignment and slope are correct. No pipe shall be laid until the preceding length has been completely aligned and secured. Joints shall not be completed until sufficient pipe has been laid in advance to insure against injuring the finished joints. When jointed in the trench, the pipe shall form a true and smooth line of sewer. Pipe shall not be trimmed except for closures, and pipe not making a good fit shall be removed. Where slight defects occur and the use of the pipe is approved by the Engineer, defects shall be placed in the top of the sewer. Temporary bulkheads shall be placed in all open ends of sewer lines whenever pipe laying is stopped for more than 8 hours, When sections of line between manholes have Rev. 03111 SECTION 7 Page 17 been completed, an inspection shall be conducted and all deficiencies corrected. This inspection does not constitute acceptance. (b) PIPE LAYING (1) Each pipe shall be laid on an even, firm bed, so that no uneven strain will come to any part of the pipe. Particular care shall be exercised to prevent the pipes bearing on the sockets. Bell holes for bell and spigot pipe shall be dug at each point as hereinbefore specified. Each pipe shall be laid in conformity with the line and grades given by the Engineer, and in the presence of the inspector. The bell -end of the pipe shall be laid upgrade. Subgrade preparation shall be such that each pipe spigot will be entered in the receiving pipe bell in such a manner that the joint packing can be freely inserted at ail points of the joint circumference, special care being taken to provide adequate joint space at the bottom of the joint without raising the pipe off of the trench bottom for packing insertion. No portion of the weight of the spigot end of the pipe shall be transmitted to the receiving pipe bell through the joint packing. Before each piece of pipe is lowered into the trench, it shall be thoroughly inspected to insure its being clean. Each piece of pipe shall be lowered separately. No piece of pipe or fitting which is known to be defective shall be laid or placed in the lines, If any de- fective pipe or fitting shall be discovered after the pipe is laid, it shall be removed and replaced with a satisfactory pipe or fitting without additional charge, In case a length of pipe is cut to fit in a line, it shall be so cut as to leave a smooth end at right angles to the longitudinal axis of the pipe. (2) The interior of the sewer shall, as the work progresses, be cleaned of all dirt, jointing material and superfluous materials of every description. On small pipe sewers, where cleaning after laying may be difficult, a swab or drag shall be kept inside the pipeline and pulled forward past each joint immediately after its completion. When laying of pipe is stopped for any reason, the exposed end of such pipe shall be closed with a plywood plug fitted into the pipe bell, so as to exclude earth or other material, and precautions taken to prevent floatation of pipe by run-off into trench.. (3) All pipes shall be completely shoved home. On pipe of the tongue and groove type, 30" in diameter and larger, pressure must be applied to the center of each pipe as it is laid by a winch and cable or other mechanical means properly set and operated to insure that the spigot is all the way home in the socket, and that the sewer joint is of uniform size throughout the circumference of the pipe. (4) Laying holes in pipe, if used, shall be tapered and shall be plugged before backfiiling with a tapered concrete plug set in mortar or mastic. Rev. 03111 SECTION 7 Page 18 (5) Pipes laid in tunnel or casing pipe shall be supported on suitable blocks cut or grouted into position to place the invert of the sewer or drain at the slope and to the elevations indicated on the Contract (drawings. (6) On pipes laid in tunnel or casing pipe, the space between the casing pipe and tunnel lining shall be either backfilled with fine low void sand thoroughly rammed or flushed into place, backfilled with Class "C" concrete or left unbackfilled as designated in the Project Specifications. If left unbackfilled, each end shall be suitably bulkheaded to protect against entrance of foreign material, (7) All Gravity Flow Pipeline shall be Installed using a laser for control of vertical and horizontal alignment. The Contractor shall follow accepted practices in the utilization of the laser. A certified laser operator shall be present on the job at all times. Care shad be exercised to assure that the alignment control range of the instrument is not exceeded; but in no case, shall the range exceed 500 feet. Care shall be taken to prevent vibration of or direct sunlight on the instrument. Where present, a blower shall be provided to purge glue vapors from the pipe. An air velocity meter shall be provided so that the velocity of air in the pipe will not be great enough to cause the light beam to be distorted. The Contractor shall coordinate the work to minimize the number of take downs and set ups at each point. Periodic checks of the laser shall be made to assure that alignment is maintained. (c) PIPE JOINTS (1) General - In all jointing operations the trench must be dewatered when joints are made and kept dewatered until sufficient time has elapsed to assure efficient hardening of the jointing material. Bell and spigot, or tongue and groove ends of the pipe shall first be wiped clean before actual jointing operations are started. The type of joint to be installed in each location of the several following types specified shall be as specifically designated on the Contract Drawings and/or the Project Specifications. (2) Cement Mortar and Jute Joints - Joints between consecutive pipes made with jute and Portland Cement Mortar shall be constructed as follows; a. On bell and spigot pipe, or variations thereof, plastic mortar shall be spread in the bottom one-third of the bell of the pipe previously laid. A closely twisted gasket of jute of proper thickness and of sufficient length to span around the pipe and lap at the top shall then be squeezed into the mortar. The spigot of the next pipe shall be entered and shoved home. After the pipe has been thoroughly bedded to line and grade, the jute gasket shall be caulked into the annular space with a suitable caulking tool in such manner as to seal the joint against leakage, The remainder of the space shall be completely filled with plastic mortar beveled off with the outside of the pipe. The joint in pipes 30" or larger in Rev. 03/11 SECTION 7 Page 19 diameter shall also be pointed and smoothed from the inside after the pipe has been laid. b. On tongue and groove type pipe, the jute shall be firmly attached to the middle of the tongue of each pipe in one continuous length with a compatible rubber cement having adhesive properties. Plastic mortar shall be placed on the edges of the upper half of the tongue of the pipe to be laid and the lower half of the socket of the pipe previously laid; the pipe then aligned, forced home and graded. Sufficient mortar shall be placed on each pipe so that the space between the two pipes shall tend to become filled by the sliding action of the socket when the pipe is forced into place. All beveled surfaces of the adjacent tongue and voids in both- the inside and the outside shall be completely filled with mortar. The inside shall be troweled smooth for pipes 30" in diameter and larger. The finished joint shall not be greater than one (1) inch in width. (3) Bituminous and Jute Joints, Mastic Type - Joints between consecutive pipes made with jute and a bituminous joining compound shall be constructed as follows. Jute and bituminous joining compound shall be applied in the same manner as that specified for cement mortar and jute joints. (4) Bituminous and Jute Joints, Poured Type - Joints between consecutive bell and spigot pipe made with jute and a bituminous joining compound, poured in place, shall be constructed as follows: The bell and spigot of pipes to be joined together shall first be painted with a bituminous prime coat to insure adherence of the poured filler to the sides of the pipe. With pipe at grade and butted, the jute shall be caulked into position in such a manner as to leave a uniform space all around. The joint shall be made in one pour using a joint runner. (5) Rubber Gasket and Bituminous Joints - Joints between consecutive bell and spigot or tongue and groove pipe made with a rubber gasket and compatible bituminous compound of a type recommended by the gasket manufacturer shall be constructed as follows: The gasket shall be fitted over the tongue or spigot of each pipe, the space behind the gasket filled with the bituminous compound on tongue and groove joints, and the pipe entered into the bell or groove and shoved home. The remainder of the joint space shall be filled with bituminous compound in the same manner as that specified for mortar and jute joints. (6) Ductile Iron Pipe Joints. a. General - Before any joints are made or the spigot of pipes placed in the bells, the spigots, bells, gaskets and glands shall be thoroughly cleaned and all foreign materials removed from their surfaces. Rev. 03111 SECTION 7 Page 20 b. In joining bell and spigot pipe and fittings, the spigot of each pipe shall be properly seated in the bell of the next adjacent piece and adjusted so as to give a uniform space for the joint, which shall be made with braided hemp or jute, fiber packing, or rubber gasket, and with lead as designated in Project Specifications. The packing shall be long enough to completely encircle the pipe, and shall be thoroughly driven into the bell so as to leave a space of at least 2112 inches in depth to be filled with lead. Each joint must be made in one pour. In making lead joints, the melting pot shall be kept near the joint to be poured, and dross shall not be allowed to accumulate in the melting pot. Lead joints shall be thoroughly caulked by competent mechanics and in such a manner as shall secure tight joints without overstraining the iron of the bells. c. In joining mechanical joint pipe and fittings, the gland, followed by the gasket, shall be placed over the plain end of the pipe, the gasket and socket brushed with soapy water and the pipe inserted into the bell. The gasket shall then be pushed into position so that it is evenly seated in the bell and the gland moved into position against the face of the gasket. The bolts shall be inserted and made finger tight. The bolts shall then be tightened up with a ratchet wrench to complete the joint. d. In joining gasket type pipe and fittings, the gasket shall be seated evenly around the inside of the bell in the groove or recess provided and the inside of the gasket lubricated with lubricant furnished by the joint manufacturer. The spigot of the next pipe shall be aligned with the bell and started into the bell until it contacts the gasket. The joint shall then be completed by forcing the spigot past the gasket until it makes contact with the base of the socket. Pressure to force the spigot home shall be applied by means of a bar, a special lever or a mechanical jack -type assembly tool. (7) Factory -Fabricated Resilient Material Joints for Clay Pipe - In joining clay pipe with factory -fabricated resilient material joints, the bell and the spigot of the pipes shall be thoroughly cleaned, the joint material assembled on the spigot if it is made up of more than one part, the joint material or both bell and spigot coated with lubricant or adhesive, furnished by the joint manufacturer, the spigot entered into the bell and the pipe forced home by means of a bar or mechanical pipe puller. (8) Rubber Gasket Joints for Reinforced Concrete Low Head and Cylinder Pressure Pipe -In joining pipes of these types, the ends of the pipes shall be thoroughly cleaned and the gasket furnished with the pipe placed in the groove or recess on the spigot, the gasket coa- ted with a compatible bitumastie compound of a type recommended by the gasket manufacturer, the spigot entered into the bell and pipe forced home by means of a bar or mechanical winch. The remainder of the joint shall be filled with bituminous compound in the same manner as that specified for mortar and jute joints. Rev. 03/11 SECTION 7 Page 21 (9) Corrugated Metal Pipe Joints - Unless allowed by the Project Specifications, only gasketed standard and two-piece bands and the o-ring gasketed hugger -type connection will be allowed. The ends of the pipes shall be cleaned thoroughly to accept the gasket. All gaskets shall be lubricated with a lubricant furnished by the pipe manufacturer to ease assembly and promote uniform tightening of the connection to the torque specified by the pipe manufacturer. Upon tightening the connector bands, if the friction offered by pipe coatings, gaskets, etc., preclude proper pull-up of the gasket, the contractor shall utilize wooden levers to aid the compression of the bottom two-thirds of the band. (10) Corrugated Polyethylene Pipe Joints - In joining this pipe, all surfaces shall be cleaned of foreign debris and lubricated for assembly. All joints shall be water -tight rubber gasketed PVC Series 35 coupler joints, All joints are assembled by push -on techniques, (11) Truss Pipe, Solid Wall Laterals and Accessories - In joining this pipe, the surfaces to be solvent welded shall be thoroughly cleaned of all foreign material. Primer shall be utilized and generously applied to all joining surfaces followed immediately with the application of cement. The joint shall then be made to prevent set-up of cement. In making joints of this type, the pipe shall receive a 1/4 arc rotation while seating the spigot end into the bell. After the joint is made, every effort shall be taken not to disturb the pipe. (12) PVC Sewer Pipe - PVC Sewer Wipe shall be jointed as per Section 7.03.3(c)(6)d above. The Contractor is cautioned that all cut ends are to be beveled prior to assembly. (13) Fiberglass Pipe -Fiberglass Pipe shall be jointed in the same manner as the PVC Sewer Pipe above. 7.03.5 CONNECTIONS FOR SERVICE PIPES (a) GENERAL (1) Service Connections for house sewer andlor drain connection openings shall be provided in the main sewers as shown on the Contract Drawings or as designated in the Project Specifications. The exact location shall be as directed by the Engineer during construction. (2) Unless otherwise shown on the Contract Drawings or so designated in the Project Specifications, all sewer connection openings on bell and spigot pipe shall be wye or tee branches, with the outlet being four (4) inches in internal diameter. All sewer connection openings on concrete pipe of the tongue and groove type shall be cast in place with the shape, size and dimension of the opening corresponding to the bell end of a standard suer pipe four (4) inches in internal diameter. Wye or tee branches shall be located at the points designated by the Engineer. Wye branches shall be so installed that the lower lip of the branch is not more than 2 inches below the outside top of the pipe. Tees may be Rev.. 03/11 SECTION 7 Page 22 installed with the branch vertical or rotated, depending on specific site situations. After installation, wye or tee branches shall not be covered with backfill until determination and record has been made by the Engineer of the location of each with reference to the nearest manhole downstream therefrom, and the direction in which the wye faces. (3) All connection openings shall be closed with a vitrified the or concrete disk or stopper securely held in place with the same joint material as that specified for main sewer, unless otherwise noted on the Contract Drawings. (b) CONSTRUCTION (1) All excavation shall be carried out in compliance with the specifications, (2) Service connection made to the sewer prior to backfiiling shall not be installed in the pipe trench as vertical risers except as approved in writing by the Engineer, but shalt be laid on a slope not exceeding 2 feet vertical to 1 foot horizontal, and not less than 118 inch per foot, cut back into the trench bank in such a manner that the service connection pipe shall have a solid bearing on undisturbed earth as stipulated for pipe sewers. The service pipe shall make such a horizontal angle with the sewer line that a proper connection with the wye or tee branch of slant is obtained without trimming the pipe and with no danger of jute or jointing material being forced into the sewer. The first length of pipe shall not make a total angle with the branch or slant greater than four inches in two feet, and the wye branch or slant shall be installed in such a manner as to fit the alignment of the branch service line as closely as possible. Where vertical risers are specified or ordered by the Engineer, riser pipes shall be supported to prevent an excessive_ load being applied to the main sewer pipe, and encased in Class "C" concrete with a minimum thickness of 6 inches, as shown on the plans, specified or ordered by the Engineer. (3) Wye and Tee branches for bell and spigot: pipe, with less than 8 feet from the surface of the ground to the center of the branch, shall be laid horizontally with a slight fall across the branch. Connection openings on concrete pipe of the tongue and groove type shall be laid with the opening in the upper quarter of the pipe. (4) When the distance from the center of the connection openings is more than 8 feet from the ground surfaces, the connection openings shall be raised by means of riser pipes to a point less than 8 feet from the ground surface. ripe risers for single connections shall be laid at an angle of from 45 Degrees to 60 Degrees with the horizontal depending on the side slope of the sewer trench, and shall be laid in undisturbed soil. Pipe risers for double connections shall be installed vertically with a double "T" branch at the top with the branches placed crosswise of the main sewer. All openings shall be plugged with clay or concrete disks or stoppers. Riser pipes and joints shall be of the same type as specified for the main sewer. Rev_ 03111 SECTION 7 Page 23 (6) When sidewalks are available opposite the sewer being constructed, the Contractor shall notch the street side of the walk directly opposite each opening left in the sewer for connection to building drains. Where walks are not available for such marking, the Contractor shall place a hardwood stake on the property line directly opposite each opening left in the sewer. The hardwood stake shall be topped with a brass marker labeled "Sewer". If the Contract Drawings so stipulate, the sewer connections shall be extended to the RAN or as noted, plugged and provided with a clean out. In this case, the requirements for measured locations, notching sidewalks, stakes, etc. shall be omitted. Also, the Contractor shall locate and keep a record of all opening locations by measurement to the nearest downstream manhole. Such record shall be delivered to the Engineer monthly during progress of the work. 7.04 COMPLETION OF CONTRACT 7.04.1 TESTS (a) GENERAL - It is the intent of these specifications to secure pipelines with a minimum amount of leakage. All ductile iron, reinforced concrete cylinder pipe, reinforced concrete pressure pipe and truss pipe shall undergo hydrostatic pressure tests as herein described. All other gravity pipe lines, except clay pipe, shall be tested for infiltration and/or for exfiltration. All clay pipelines shall be air tested and tested for infiltration as described below. Unless otherwise noted by the Project Specifications, no infiltration or extra filtration testing will be performed on piping used to transport storm water, (b) HYDROSTATIC PRESSURE TESTS (1) When a stretch of pipe and appurtenances has been completed, and before the pipe or joints are covered, the Contractor shall furnish proper appliances and facilities for testing and draining the same, without injury to the work or surrounding territory. He shall test by filling the pipe with clean water in the manner described under exfiltration tests; however, in no case shall there be any visible leakage, Water for making tests shall be furnished by the Contractor at his expense. (2) Any defects, cracks, or leakage that may develop, or that may be discovered either in the joints or in the body of the pipe, shall be promptly made good by the Contractor, at his own expense, and to the satisfaction of the Engineer. (3) Upon written permission of the Engineer, the system may be backfilled prior to testing, it being understood that the Contractor assumes the risk of re -excavating to the pipe in the event the system fails to meet the requirements of the pressure test. Rev. 03/11 SECTION 7 Page 24 (c) INFILTRATION TESTS (1) Infiltration is not allowable. The joints shalt be tight and visible leakage in the joints or pipe barrel shall be repaired at the Contractor's expense by any means found to be necessary, and with the Engineer's consent. (d) EXFILTRATION TESTS (1) In areas where ground water is not encountered during sewer construction, the Contractor shall furnish and install all necessary materials, equipment, shall supply water, etc., and run exfiltration tests as hereinafter described before the sewer is accepted. The joints shall be tight and leakage shall be repaired by any means found to be necessary. (2) To check the amount of exfiltration, the ends of each section of sewer between manholes shall be plugged with watertight bulkheads, Inserted in each bulkhead, at the top of the sewer pipe, shall be a 2 inch pipe, with an elbow, extending 4 feet vertically in the upper manhole and to the same elevation in the lower manhole. Air in the sewer pipe shall be exhausted by filling the 2 inch upper manhole pipe to a height of 4 feet of water. Using measured containers, the water shall be poured into the upper 2 inch pipe as needed to maintain a constant head of 4 feet in the upper pipe for a period of thirty minutes, not allowing the lower pipe to overflow. (e) Air Tests (1) Unless site conditions are such that the site to be tested is submerged in groundwater, all clay pipes shall be air tested in accordance with ASTM C828. In conditions where this test is not used; the pipe shall undergo infiltration tests as outlined by 7,04.1(c). With the consent of the Engineer, the air test may be utilized in lieu of the hydrostatic test covered in the above sections for other types of pipe. This substitution shall only be considered for pipe 12" in diameter and smaller. (f) Deflection Tests (1) Deflection tests shall be performed on all pipe installations. The test shall be conducted after the final backfill has been in place at least 30 days to permit stabilization of the soil/pipe system. As an alternative to waiting 30 days to permit stabilization of the soil/pipe system, the Engineer will accept certification from a soil -testing firm verifying that the backfill of the trench has been compacted to at least 95% maximum density. (2) No pipe shall exceed a deflection of 5 percent. If deflection exceeds 5 percent, replacement or connection shall be accomplished in accordance with requirements in the approved specifications. (3) The rigid ball or mandrel used for the deflection test shall have a diameter not less than 95 percent of the base inside diameter or average inside diameter of the pipe depending on which is specified in Rev. 03111 SECTION 7 Page 25 the ASTM Specification, to which the pipe is manufactured. The pipe shall be measured in compliance with ASTM D 2122 Standard Test Method determining Dimensions of Thermoplastic Pipe and Fittings. The test shall be performed without mechanical pulling devices. 7.04.2 RESPONSIBILITY (a) GENERAL (1) Sewers must be built so as to remain true to line and grade. The inclining grade of the bottom of the sewer after completion shall be such that after flooding, the flood water will drain off so that no remain- ing puddle of water will be deeper than one-half (112) of an inch on pipe thirty-six (36) inches internal diameter or smaller, and three- quarters (314) of an inch on pipe larger than thirty-six (36) inches internal diameter. Any section of pipe that does not comply with specifications at any time previous to final acceptance of the work shall be replaced or relaid at the Contractor's expense. (2) The Contractor will be held strictly responsible that all parts of the work shall bear the load of the backfill. If cracks one -hundredth (1/100) of an inch develop in the pipe within one year from the date of final acceptance of the work, the Contractor will be required to replace, at his expense, all such cracked pipe. To this end, the Contractor is advised to purchase pipe under a guarantee from the manufacturer, guaranteeing proper service of sewer pipe under condi- tions established by the Contract Drawings, Contract Specifications, and local conditions at the site of the work. 7.05 MEASUREMENT FOR, PAYMENT AND COMPENSATION 7.05.1 GENERAL If any or all of the work to be performed under this Contract is on a unit price basis, the actual number of units of each unit price item or work performed may be more or less than the number stated in the Bidding Schedule of the Proposal, or included in the Contract, but no variation in the Contract unit price will be made on that account. Payment will be made only for the actual number of units incor- porated in the work, or for the actual number of units of work performed, and -at the contract unit price for each such unit with measurement for payment made as defined in the following paragraphs. Measurement for payment of work done on a unit price basis will be as follows: 7.06.2 FITTINGS AND SPECIALS Unless otherwise specifically provided in the Project Specifications the cost of furnishing and placing specials and fittings shown on the Contract Drawings and/or called for in the Project Specifications shall be merged in the unit prices for the pipelines, and will not be paid for separately. Rev. 03/11 SECTION 7 Page 26 7.06.3 GRAVITY SEWERS, CONDUITS, CULVERTS, AND DRAINS (a) Measurement of gravity sewer lines, conduits, culverts and drains will be made along the centerline of the line, whether curved or straight, measured in place. The payment for gravity pipelines and related items that are presented in unit price schedules _and requested on a depth of cut basis shall be the depth of cut obtained by subtracting the perpendicular distance along the centerline of the structure or pipeline's flow line or invert from the natural ground surface or top of structure. (b) Linear measurements on sewers of thirty-six (36) inches or less internal diameter will be made straight through the manholes. On sewers larger than thirty-six (36) inches internal diameter, measurement will start and terminate at the inside face of manholes. (c) Measurement on catch basin sewer connection leads will be made from the centerline of basins to the centerline of the manholes or sewers. Measurement of sewer leads between inlet boxes and catch basins wilt be made from the inside wall of the inlet box to the centerline of the catch basin. Half traps and running traps will be included in the above measurement and will not be paid for separately. 7,05.4 DUCTILE IRON PIPE AND FITTINGS FOR RAISING OR LOWERING WATER MAINS Measurement for payment will be made only for raising or lowering those water mains which lie within the area to be occupied by the sewer, conduit or structure. 7.05.5 RELOCATION OF WATER SERVICE PIPES Measurement for payment will be made only for relocating those water service pipes which lie within the area to be occupied by the sewer, conduit or structure. Rev. 03/11 SECTION 7 Page 1 GENERAL SPECIFICATIONS SECTION 8.0 THIS SECTION NOT USED Page 1 GENERAL SPECIFICATIONS 9.01 GENERAL 9.01.1 SCOPE OF WORK (a) All labor, material, equipment, tools and services required for the furnishing and installation of all concrete, both precast and cast in place, reinforcing steel and appurtenances for structures and structural frames required on the Contract shall be furnished and installed in compliance with the following General Specifications, with the Project Specifications, and with the Contract Drawings. (b) This General Specification section, designated as Concrete and Reinforcing, covers the description of materials generally utilized in precast and cast in place reinforced concrete construction and the installation of such materials. The Project Specifications and the Contract Drawings designate the specific work, its locations and the construction methods to be used on all Concrete and Reinforcing Steel installations under this Section. The inclusion of items of material or work within this Specification does not necessarily constitute their use on this Project. 9.01.2 SUBMITTALS (a) SHOP DRAWINGS - Attention is directed to the provisions in the General Conditions of the Contract requiring submission to the Engineer of descriptive details and of shop and setting drawings. On Concrete and Reinforcing Steel installations such submission shall include the following, even though items proposed to be furnished conform to the exact description stated in the General or Project Specifications. (1) Bar lists, bending details and setting drawings for all reinforcing. (b) PRODUCT DATA - Manufacturers descriptive data and details shall be submitted on the following products: (1) Admixtures. (2) Joint Materials. (3) Reinforcing Steel support chairs, (4) Form Ties. (5) Forms, if fabricated off the site. (6) Reinforcing Mesh. (7) Vapor barriers. (8) Floor and Slab Hardeners. (9) Non -Slip aggregate. (10) Curing Materials. (11) Fiber Reinforcing Materials. (12) Precast structures. Rev. 03/09 SECTION 9 Page 2 (c) ix proposed for each different concrete mix required for the project shall be submitted. The report shall include the following: (1) Name ofconcrete producer, (2) Name ornumber ofmix. (3) Description, source and quantities ufall ingredients. (4) VVater/uerUentraUo. (G) {Bump. (6) Air content. (7) Specified compressive strength. (Q) Average compressive strength bytest and age oftest. (d) signed hvmanufactures indicating that materials comply with requirements shall be submitted for each of the following items tnheused: (1) Cement (2) Aggregates (3) Reinforcing Steel (e) the following materials shall besubmitted, unless otherwise specified in the Project Specifications: (1) Coarse Aggregate, (2) Fine Aggregate, (f) directed bvthe Engineer, the concrete producer ohoU submit written description of production ability, including facilities, personnel and a list of similar completed projects. 9.01.3 QUALITY ASSURANCE (a) Routine testing of materials and concrete for compliance with the Specifications shall be the responsibility nfthe Contractor. The Contractor shall - engage and pay anindependent testing laboratory hoperform quality control tests eo required bythe Contract Documents. All tests and the manner |nwhich they are conducted shall basatisfactory hothe Engineer. The testing laboratory shall have prior approval from the Engineer, (b) CONCRETE PRODUCER QUALIFICATIONS - The concrete producer shall have not less than 5 years experience in the production of structural concrete and shall have previously supplied concrete for not less than 5 projects similar in scope of this (c) TESTING AGENCY QUALIFICATIONS - The testing agency shall provide evidence to the Engineer that an inspection of its facilities within the previous 12 months was made by the Cement and Concrete Reference Laboratory of the National Institute of Standards and that any deficiencies noted in the report of that inspection have been Rev, 03/09 SECTION 9 Page 3 9.01.4 STANDARDS (a) Where materials and methods are indicated in the following specifications as being in conformance with a standard specification, it shall refer in all cases to the latest edition of the specification and shall include all interim revisions. Listing of a standard specification without further reference indicates that the particular material or method shall conform to such listed specification. (b) The following reference specifications shall govern the work covered by this Section, unless otherwise noted or detailed: American Concrete Institute ACI-211.1 Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete ACE-211.2 Standard Practice for Selecting Proportions for Structural Lightweight Concrete ACI-301 Specifications for Structural Concrete for Buildings ACI-304 Guide for Measuring, Mixing, Transporting, and Placing Concrete ACI-305 Recommended Practice for Hot Weather Concreting ACI-306 Recommended Practice for Cold Weather Concreting ACI-308 Recommended Practice for Curing Concrete ACI-309 Guide for Consolidation of Concrete ACI-315 Manual of Standard Practice for Detailing Reinforced Concrete Structures ACI-318 Building Code Requirements for Reinforced Concrete ACI-347 Recommended Practice for Concrete Formwork Concrete Reinforcing Steel Institute CRSI Manual of Standard Practice American Society for Testina and Materials A 82 Specification for Cold -Drawn Steel Wire for Concrete Reinforcement A 185 Specification for Welded Steel Wire Fabric for Concrete Reinforcement A 496 Specification for Deformed Steel Wire for Concrete Reinforcement A 497 Specification for Welded Deformed Steel Wire Fabric for Concrete Reinforcement A 615 Specification for Deformed and Plain Billet -Steel Bars for Concrete Reinforcement C 33 Specification for Concrete Aggregates Rev. 03109 SECTION 9 Page 4 American Society for Testing and Materials ... continued C 39 Test for Compressive Strength of Cylindrical Concrete Specimens C 94 Specification for Ready -Mixed Concrete C 150 Specification for Portland Cement C 309 Specification for Liquid Membrane -Forming Compounds for Curing Concrete C 1059 Specification for Latex Agents for Bonding Fresh to Hardened Concrete D 1751 Specification for Performed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types) D 1752 Specification for Performed Sponge Rubber and Cork Expansion Joint Fillers for Concrete Paving and Structural Construction -9.01,5 DELIVERY, STORAGE AND HANDLING (a) STORAGE - Cement and aggregates shall be stored in such a manner as to prevent deterioration or intrusion of foreign matter. Liquid admixtures shall be protected from freezing and from settling out of solution. Any deteriorated or damaged material shall not be used for concrete. (b) DELIVERY OF REINFORCING BARS - Reinforcing bars shall be delivered without bending. (c) DELIVERY OF CONCRETE - Revolution counters shall be in operation for all concrete discharged for use on this project, 9.02 CONSTRUCTION MATERIALS 9.02.1 GENERAL All materials and fabricated items shall be furnished by an established and reputable manufacturer or supplier. All materials and fabricated items shall be new and shall be of first-class ingredients and construction and guaranteed to perform the service required and shall conform to the following standard specifications. Cited examples are used only to denote the quality standard of product desired and does not restrict bidders to a specific brand, make, manufacturer or specific name. They are used only to set forth and convey to bidders the general style, type, character, and quality of product desired. Equivalent products will be acceptable. 9.02.2 CONCRETE MATERIALS (a) PORTLAND CEMENT - Portland cement shall conform to Specifications for Portland Cement ASTM C-150 and shall be Type 1, except, where high early strength concrete is called for, cement shall be Type I11. Rev. 03109 SECTION 9 Page 5 (b) CONCRETE AGGREGATES (1) Concrete aggregates shall conform to ASTM C33, Specifications for Concrete Aggregates. Aggregates failing to meet these requirements but producing concrete of the required quality as shown by special test or actual service may be used where authorized by the Engineer. (See Table 1, Grading of Fine and Coarse Aggregate for Concrete). (2) The maximum size of the aggregate shall be not larger than 1/5 of the narrowest dimension between sides of the forms within which the concrete is to be cast nor larger than 314 of the minimum clear spacing between reinforcing bars, or between reinforcing bars and forms. For unreinforced slabs, the maximum size of aggregate shall be not larger than 1/3 of the slab thickness. (3) Coarse Aggregate shall consist of clean gravel or crushed stone, free from soft or elongated pieces and deleterious substances. (4) Fine aggregate shall consist of sand having clean, hard, durable grains free from deleterious substance. Sand shall be tested for impurities in accordance with ASTM C 40 and shall be rejected for exposed work if it shows a color darker than the reference color. A soundness test shall be conducted in accordance with ASTM C 88.. (c) ADMIXTURES - Admixtures shall be measured and dispensed according to the manufacturer's recommendations. (1) AIR ENTRAINING R Air entraining admixtures shall conform to ASTM C 260 "Specifications for Air -Entraining Admixtures for Concrete. (2) WATER REDUCING - Water reducing admixtures shall be composed essentially of water soluble reacting products of an amine and an organic acid, and shall not contain lignosulfonic acid, its derivatives or calcium chloride. Admixtures shall conform to ASTM C 494, Types A, D or E, dependent on the necessity for providing retarding or accelerating characteristics to the mix. (3) OTHER - Other admixtures shall conform to appropriate ASTM Standards. Their use shall be approved by the Engineer. (d) MIXING WATER - Preferably, water used in mixing concrete shall be fresh, clean and potable. Nonpotable water may be used if mortar cubes made with the water in question have 7 and 28 days strengths equal to those of companion specimens in which potable water was used. 9.02.3 REINFORCING (a) BARS -Intermediate grade, deformed -ASTM A615, grade 60. (b) WELDED FABRIC AND COLD DRAWN WIRE - ASTM A82, A185, A496 and A497. Rev. 03/09 SECTION 9 Page 6 9.02.4 JOINTING MATERIALS (a) WATER STOPS - Ribbed or corrugated and manufactured from virgin polyvinyl chloride material. In construction joints - "Durajoint' type 7 as manufactured by W. R. Grace and Co., Bometals, Vinylex, Greenstreet or equal. (2) In expansion joints - "Durajoint" type 7C as manufactured by W. R. Grace Co., Bometals, Vinylex, Greenstreet or equal. (b) EXPANSION JOINTS MATERIAL - Resilient premolded self- expanding cork conforming to ASTM D 1752 or asphalt -saturated cellulosic fiber conforming to ASTM D 1751. (c) SEALANT - Gray polysulfide joint seater "Hornflex" as manufactured by W. R. Grace and Co., BASF Sonneborn NP-2, Pecora Dynatrol 11, Tremco Dymeric or equal. (d) FOR PRECAST CONCRETE ITEMS - The joints between sections shall be of the tongue and groove design sealed with a vulcanized butyl rubber elastomeric compound which meets Federal Specification No. SS-S-00210 and which has a temperature service range of -65 degrees F to +200 degrees F, Unless otherwise specified joints will be grouted. (e) EPDXY JOINT FILLER FOR FLOORS - Semirigid, 100 percent solids, epoxy resin with a Shore A hardness of 80 per ASTM D 2240. 9.02.5 FLOOR TREATMENT MATERIALS (a) LIQUID FLOOR HARDENER — BASF Sonneborn Lapidolith, Dayton Superior Burke o lith, Symons Buff Hard, or approved equal. (b) SHAKE�ON FLOOR HARDENER - Factory -graded, packaged, rustproof, nonglazing, abrasive aggregate of fused aluminum oxide granules or crushed emery with emery containing not less than 50 percent aluminum oxide and not less than 24 percent ferric oxide; unaffected by freezing, moisture and cleaning materials, 9.02,6 CONCRETE CURING MATERIALS (a) CURING PAPER— Concrete curing paper shall meet ASTM C171,Type I. (b) FILM -Polyethylene film conforming to ASTM C 171. (c) ABSORPTIVE COVER - AASHTO M 182, Class 2, burlap cloth, weighing approximately 9 ozJsq. yd. (d) LIQUID MEMBRANE FORMING CURING COMPOUND - Wax free resin type, capable of retaining 95% of the moisture for the specified curing period and conforming to ASTM C-309, Type 1, and containing a red fugitive dye. Curing compound applied to surfaces to be left permanently exposed to view shall not cause permanent discoloration or otherwise adversely affect the appearance of these surfaces. Rev. 03/09 SECTION 9 Page 7 9.02.7 GROUT (a) NONSHRINK GROUT FOR GROUTING COLUMN AND EQUIPMENT BASE PLATES - Non-metallic aggregate grout capable of developing full strength without vertical confinement, and requiring no cutting or capping of shoulders. Grout shall be composed of 114 inch maximum size coarse aggregate; cement, sand and water in same proportions as specified for Class B concrete, added in accordance with the manufacturer's recommendations. All non -confined portions of this grout mixture shall be removed and replaced with general purpose grout for final acceptance. This requirement is in effect unless deleted by the Project Specification. (b) GENERAL PURPOSE GROUT - Composed of equal parts of sand and cement, with water sufficient to produce required consistency. 9.02.8 BONDING AGENT (a) BONDING AGENT - Non-redispersibie acrylic emulsion conforming to ASTM C 1059, Type 11. 9.02.9 DRAINAGE FILL UNDER SLABS ON GRADE NC Department of Transportation, Division of Highways Standard Size No. 5 stone, unless shown otherwise on the Contract Drawings. 9.02.10 VAPOR BARRIIE R UNDER SLABS ON GRADE Vapor barrier must conform to the requirements of ASTM E154. 9.02.11 PRECAST CONCRETE STRUCTURES (a) FINISH - All finished precast units shall be neat and smooth in appearance. The concrete surface shall be dense and free of holes, voids, honeycombs, or other irregularities. Precast units having a mottled, uneven, or discolored appearance will be rejected. The finish requirements for the precast concrete will be the same as for cast in place concrete. (b) IDENTIFICATION - Each precast structure shall have date of casting stamped or painted on it. If multiple castings are to be erected together, each section shall be numbered to facilitate assembly, alignment and sequence of erection. (c) CURING Precast units shall be subjected to any one of the methods of curing described below or to any other method or combination of methods approved by the Engineer that will give satisfactory results. The precast units shall be cured for a sufficient length of time so that the concrete will develop the specified compressive strength in 28 days or less. (1) Steam Curing - Precast units shall be placed in curing chamber, free from outside drafts, and cured in a moist atmosphere maintained by the injection of steam for such time and such temperature as may be needed to enable the units to meet the strength requirements. The curing chamber shall be so constructed as to allow circulation of steam around the entire unit. (2) Water Curing - Precast units may be water -cured by covering with water - saturated material or by a system of perforated pipes, mechanical sprinklers, porous hose, or by any other approved method, that will keep the units moist for a minimum of 5 days after casting. Rev. 03/09 SECTION 9 Page 8 (3) The manufacturer may, at his option, combine the methods above as long as the required concrete compressive strength is attained. (4) A sealing membrane may be applied and should be left intact until the required strength requirements are met. The concrete at the time of application shall be within 90 degrees F. of the atmospheric temperature. All surfaces shall be kept moist prior to the application of the compounds and shall be damp when the compound is applied. This method shall not be used on surfaces to be painted, surfaces to receive a bituminous membrane or surfaces which are to receive a finish treatment of any kind. 9,02.12 CONCRETE MIXES (aa GENERAL - Mix designs shall be prepared by an independent testing laboratory in accordance with the following requirements, (b) COMPOSITION - Concrete shall be composed of Portland cement, fine aggregate, coarse aggregate, water and admixtures as specified herein. (c) WORKABILITY - The proportions of the concrete shall produce a plastic mixture that will work readily, with the placement method used, into the corners and angles of the forms and around reinforcement without segregation or bleeding. Maximum slump shall be 4 inches for concrete to be consolidated by mechanical vibrators and -5 inches for concrete to be consolidated by other means. Concrete containing a high range water reducing admixture shall have a maximum slump of 4 inches before adding the admixture and 8 inches with the admixture. (d) STRENGTH - The proportions of the concrete shall produce concrete which has the compressive strength required. Unless specified otherwise in the Project Specifications or noted otherwise on the Contract Drawings, all cast in place concrete shall have the compressive strength at 28-days listed below for its class. (e) CLASSES - The classes of cast -in -place concrete are as follows - Class Compressive Strength, psi Application A 4,000 Footings and slabs on grade B 4,000 Supported slabs, beams, columns and walls C 4,000 fillets, cradles and filling voids or backfilling and sidewalks, pedestrian ramps, etc D 4,000 Concrete pavement E 4,000 Curb and gutter (f) AGGREGATE - Coarse aggregate shall be used in each Class of concrete in the greatest amount consistent with required workability. The ratio of sand to total aggregate shall be from 33 to 42 percent by weight based upon surface dry material, unless a higher percentage is authorized by the Engineer due to character of coarse aggregate. Over- sanded mixtures will not be accepted. Minor changes in aggregate proportioning shall be made during the progress of the work to adjust for changes in aggregate gradations. (g) AIR CONTENT - Concrete for flatwork, curbs, stairs, platforms and ramps which will be exposed to precipitation, and at other locations as indicated in the Project Rev. 03109 SECTION 9 Page 9 Specifications or on the Contract Drawings, shall be air entrained. The total air content shall be as follows: Nominal maximum size of Total air content, Coarse aggregate, inches percent by volume Y 5-9 3l 4-8 1 3.5 - 6.5 1% 3-6 Concrete for floors to receive a steel trowel finish shall not be air entrained. (h) ADMIXTURES - Except as noted on the Contract Drawings, all cast in place concrete shall contain an approved water reducing admixture conforming to ASTM specification C 494. Admixture Types A, D, E or F may be used, dependent on the necessity for providing retarding or accelerating characteristics to the mix. The use of calcium chloride in concrete is prohibited. The admixture shall be used and dispensed according to the recommendations of the manufacturer. Proportioning and mixing shall be as recommended by the manufacturer. (i) ADDITIONAL WATER - The addition of water to plant mix concrete is discouraged. At any time when additional water is to be added to plant mix concrete, the Contractor shall supply the Engineer with documentation to prove that the total amount of all water in the mix is not exceeding the plant mix design or in the event of no specific plant mix design, not exceeding the allocations as provided herein. If on -site additions of water are requested, all necessary materials to substantiate the maximum amount of field added water shall be made available to the Engineer prior to any concrete pour. ACI-304 R-89 refers. (j) MIX DESIGN - Proportions of concrete mixes shall be determined according to ACI 301 based on field tests or trial mixes. (1) TRIAL MIXES - Where required, an advance design of each concrete mix required shall be made by an independent Testing Laboratory in accordance with ACI 211A, for normal concrete, or ACI 211.2, for lightweight concrete, to attain the properties of strength, slump and entrained air content. Advance tests of each class of concrete where required shall be made in accordance with ASTM C31 by an Independent Testing Laboratory. Four standard 6 inch compression cylinders, one to be tested at 7 days and two at 28 days, per ASTM C39, shall be made with the proportioning and materials proposed to be used on this Contract. The slump shall not be less than the greatest slump expected to be used in the structures. Test specimens shall be made before beginning operations, using the consistencies suitable for the work and in accordance with ASTM Method of Making and Curing Concrete Compression and Flexure Test Specimens in the Laboratory (ASTM C192). Tests shall be conducted according to ASTM Method of Test for Compressive Strength of Molded Concrete Cylinders (ASTM C39). A curve shall be established to represent the relationship between the water cement ratio and the minimum 28 day compressive strength or earlier strength at which the concrete is to receive its full working load. The range of values on the curve shall include all the compressive strengths called for by these Contract Documents. The curve shall be established by at least three points, each point denoting average values from at least four test specimens. The water cement ratio shall Rev. 03/09 SECTION 9 Page 10 correspond to a strength sufficiently high as to ensure that none of the strength tests shall have values less than the specified strength. The tests made on the aggregates as required above may be made a part of these tests if suitably referenced on the reports which shall be issued at 7 and 28 days. These tests shall be repeated if necessary because of changes in materials or unsatisfactory results. Unfavorable results of actual pours may necessitate redesign of Mixes. 9.02.13 CONCRETE MIXING (a) BATCHING - All concrete and mortar materials shall be measured in conformance with ASTM C 94. (b) MIXING CONCRETE (1) Mixer - The mixing of concrete shall be done in a batch mixer of approved type or in ready -mix equipment conforming to ASTM C 94. The volume of the mixed materials for each batch shall not exceed the manufacturer's rated capacity of the mixer. All concrete mixers, stationary or transit mix, shall be equipped with revolution counters in proper working order.. (2) Mixing Time - Concrete shall be mixed until there is a uniform distribution of the materials and shall be discharged completely before the mixer is recharged. For job mixed concrete, the mixer shall be rotated at the speed recommended by the manufacturer and mixing shall be continued for at least one minute after all materials are in the mixer. For mixers larger than 1 cubic yard capacity, the minimum mixing time shall be increased 15 seconds for each additional one-half cubic yard of concrete capacity.For job mixed concrete, the mixer shall be rotated at a speed recommended by the manufacturer. Each batch of one cubic yard or less shall be mixed for at least one minute after all materials are in the mixer. The mixing time shall be increased by 15 seconds for each additional cubic yard or fraction thereof. The entire batch shall be discharged before the mixer is recharged. If job mixed concrete is used, all equipment and methods of mixing employed must be approved by the Engineer. (c) COLD WEATHER SATCHING - Procedures in ACI-306, "Recommended Practice for Cold Weather Concreting", shall be followed. When the temperature is below 40 degrees F or is likely to fall below 40 degrees F during the 24-hour period after placing, adequate equipment shall be provided for heating the concrete materials. No frozen materials or materials containing ice shall be used. Temperature of the separate materials, including the mixing water, when placed in the mixer shall not exceed 140 degrees F. When placed in forms the concrete shall have a temperature between 60 degrees F and 90 degrees F. (d) HOT WEATHER. EATCHING - Procedures in ACI-305, Recommended Practice for Hot Weather Concreting, shall be followed. Concrete temperature shall not exceed 900 F prior to placement.. (e) MIXING MORTARS - The mixing of mortars and grouts shall conform to the requirements for Mixing Concrete as stated above. Rev, 03109 SECTION 9 Page 11 9.03 CONSTRUCTION METHODS 9.03.1 PREPARATION OF EQUIPMENT (a) Before placement, all equipment for mixing and transporting the concrete shall be cleaned and all debris and ice shall be removed from the places occupied by the concrete. Forms- shall be thoroughly wetted (except in freezing weather) or oiled, and masonry filler units that will be in contact with concrete shall be well drenched (except in freezing weather). The reinforcement shall be thoroughly cleaned of ice, dirt, rust, scale or other coatings. (b) Water shall be removed from place of deposit before concrete is placed unless otherwise permitted by the Engineer, All laitance and other unsound material shall be removed from hardened concrete by sand blasting, chipping or wire brushing before additional concrete is added. 9.03.2 INSPECTION After the reinforcing steel is in place and all formwork completed, and at least 48 hours before placing concrete (unless shorter notice is specifically permitted), the Contractor shall notify the Engineer that the work is ready for his inspection. The Engineer will then inspect the work The Contractor shall have capable men on the job who shall assist the Engineer in inspecting the work and who shall make all changes in the work required by the Engineer prior to placing the concrete. 9.03.3 WATERTIGHT STRUCTURES All concrete structures shall be made watertight. The Contractor shall use all means necessary to produce structures that are absolutely watertight against hydraulic pressure both from inside and from outside. Concrete walls, etc„ that show seepage or damp spots will not be accepted until this condition is corrected. No waterproofing ingredients shall be added to the concrete mix unless approved by the Engineer. Should contractor cracks occur in the concrete work, the Contractor shall make such repairs as necessary to produce a watertight structure. 9,03.4 FORMWORK (a) Construction - Forms shall be constructed to conform to the shape, form, line and grade indicated on the Contract Drawings; shall be mortar tight and shall be maintained sufficiently rigid to prevent deformation under load. Forms for exposed concrete surfaces shall be faced with smooth plywood, Exposed wall surfaces shall include interior and exterior concrete surfaces, beams, columns, slabs, and all tank, chamber and tunnel walls except those in contact with earth.. All exposed corners shall be chamfered 3/4 inch, unless otherwise noted on the Contract Drawings. Unlined forms may be used for concrete work not exposed to view upon completion of the Project. Forms shall be coated with a nonstaining mineral oil. Absolutely, under no condition, will the coating of reinforcing or form ties with the form release oil be tolerated. The Contractor shall be completely responsible for the design and the structural safety of the formwork, shoring and bracing and shall provide a reasonable factor of safety in all designs. An adequate amount of wafers, stiffeners and braces shall be used to ensure straight walls upon stripping of forms. (b) Alignment -Edges of form panels in contact with concrete exposed to view in the finished work shall be flush within 1/32 inch. Forms for plane surface areas shall be such that the concrete will be plane within 1 /8 inch in 4 feet. Leading edges of Rev. 03/09 SECTION 9 Page 12 concrete at top of walls and other exposed locations shall lie within 1/4 inch as measured from a 10 foot template, (c) Removal - Forms shall be removed in such a manner as to insure the complete safety of the structure. Beam and girder side forms, columns and wall forms may be removed as soon as the concrete has attained sufficient strength to sustain its own weight, but not less than 48 hours subsequent to placement. Supporting forms and shoring for slabs, beams, girders and other structural members shall not be removed until the members have acquired sufficient strength to support safely their own weight and superimposed loads, but in no case less than 14 days, provided sample test cylinders show a strength of not less than 3,000 p.s.i. in- compression when cured under conditions similar to those affecting the structure involved. 9.03.5 FORM TIES (a) The type of form ties proposed to be used shall be approved by the Engineer before installation. Wire ties will not be permitted. Form ties shall be adjustable in length or of proper fixed length and of such type as to leave no metal closer than one and one half inches to the finished concrete surface. Ties shall not leave holes larger than one inch diameter at the surface of concrete. Unless otherwise permitted ties shall be left in place. A plastic cone spacer shall be used at each end of the form tie allowing a full 1 Y2 inch breakback. (b) Removable portion of form ties shall be removed from the concrete immediately after removing the forms. Care shall be exercised to avoid spalling the exposed concrete surfaces. (c) Within 24 hours after forms are removed, holes left by removal of ties shall be patched as specified in 9.03.12. 9.03.6 REINFORCING (a) Reinforcing steel shall be handled and placed in accordance with ACI 315, ACI 318 and the CRSI Manual of Standard Practice. Reinforcing steel, at the time concrete is placed shall be free from rust scale or other coatings that will destroy or reduce the bond. It shall be accurately placed in accordance with the Contract Drawings and shall be adequately secured in position by concrete or metal chairs, spacers and tie wires. (b) Metal reinforcement shall be accurately positioned and secured against displacement by using annealed wire of not less than No, 16 gauge, or suitable clips at intersections, and shall be supported in a manner that will keep all metal away from the exposed surfaces of the wall. Nails shall not be driven into the outside forms to support reinforcement nor shall any other device for this purpose come in contact with the outside form on walls exposed to view after structure is completed. (c) All bars shall lap a minimum of 36 bar diameters. Adjacent sheets of wire mesh shall lap a minimum of 6 inches and be securely wired together. Reinforcing steel in slabs and footings poured against grade shall be supported on precast concrete units spaced at intervals required by the size of reinforcement used and of the proper height to accommodate the proper positioning of the reinforcing. Steel chairs and slab bolsters supporting reinforcing in beams and slabs (on formwork) shall be galvanized or plastic protected. (d) Reinforcement shall be carefully formed to the dimensions indicated on the Contract Drawings. Heating of reinforcement will be permitted only when Rev. 03/09 SECTION 9 Page 13 approved by the Engineer. Field bending of reinforcing bars which project from concrete surfaces is prohibited, (e) Wherever it is necessary to splice reinforcement otherwise than as shown on the Contract Drawings, the character of the splice shall be as specified by the Engineer on the basis of allowable bond stress, and the stress in the reinforcement at the splice. Splices shall not be made at points of maximum stress nor shall adjacent bars be spliced at the same point, Bar splices shall be staggered. (f) The reinforcement shall be protected by the -thickness of concrete indicated in the Contract drawings. Where not otherwise shown, the thickness of concrete over the reinforcement shall be as follows: Location Minimum Cover Where concrete is deposited against the ground without 3,1 the use of forms Where concrete is exposed to weather or to the ground 2". but placed in forms In slabs and walls not exposed to the ground or the 3/41' weather In beams, girders and columns not exposed to the 1-,1/2 round or to the weather In all cases at least equal to the diameter of the bars (g) Exposed reinforcing bars intended for bonding with future extensions shall be protected from corrosion by concrete or other adequate covering, 9.03.7 ANCHORAGE ITEMS, CHASES, SLOTS, INSERTS, PIPING AND CONDUIT SUPPORTS AND GUIDES AND OTHER EMBEDDED ITEMS (a) All pipe chases, cavities, slots, inserts, anchors, etc., required may not be shown on the Contract Drawings. Nevertheless, they shall be provided for before concrete is poured. It shall be the requirement of this Section to notify other Sections or Contractors in due time, so they may provide the essential information as to size and locations and furnish any required embedded items. These embedded items shall be supplied under the other Sections or Contractors, but installed under this Section. (b) Install dovetail anchor slots in concrete work for anchorage of masonry as specified in General Specification, Masonry. (c) Install inserts as required for support of suspended ceilings and other suspended installations, (d) Where items are to be installed later, the space around the fixture shall be made watertight by completely filling with a non -shrink grout. (e) Conduits, pipes, sleeves etc., with the outside diameter not exceeding 113 of the thickness of concrete and spaced not closer than 3 diameters on center may be Rev. 03/09 SECTION 9 Page 14 placed in the center of slabs, walls, beams, columns, etc., when approved by the Engineer. Concrete covering shall be not less than 1" and preferably 2". (f) Piping carrying liquid, air, gas, etc., shall be tested immediately prior to placing concrete and again after concrete has attained its designed strength. 9.03.8 JOINTS (a) Location - Joints shall be placed at locations indicated on the Contract Drawings. Joints not indicated on the Contract Drawings shall be so made and located as to impair least the strength of the structure. If it becomes necessary to place construction joints at locations not shown on the Contract Drawings, the locations of such joints shall be approved by the Engineer (b) Construction Joints -. Joints shall have continuous keyways as indicated on the Drawings. Where not specifically indicated on the Contract Drawings, the keyways shall be a minimum width equal to the width of the wall divided by 3 and a minimum- depth of 1-5/8 inches. in order to minimize shrinkage, long rows of walls shall not be poured at one time. No more than 80 feet in the horizontal direction shall be poured at one time without a construction joint, unless the Engineer has given written approval of such procedure. Where a joint is to be made, the surface of the concrete shall- be thoroughly cleaned and all laitance removed by sweeping the top of the joint with a stiff broom just before the concrete becomes thoroughly hard. No such joints shall be made without first obtaining the permission of the Engineer in writing. In addition to the foregoing, vertical joints shall be thoroughly wetted and flushed with a coat of neat cement grout, to which has been added an approved bonding agent, immediately before the placing of new concrete. (c) Additional Construction Joints - Such joints shall be so made and located as to least impair the strength of the structure. At least two hours must elapse after depositing concrete in columns or walls before depositing concrete in beams, girders or slabs supported thereon, Beams, girders, brackets, column capitals and haunches shall be considered as part of the floor system and shall be placed integrally therewith. Construction joints in floors shall be located near the middle of the spans of slabs, beams or girders and shall have an adequate keyway. (d) Roadway and Curb and Gutter Joints - The Contractor shall form a 1" expansion joint between all concrete curb and gutter and retaining walls. This expansion joint shall be an impregnated fiber material recessed from the surface one half inch (1/2"). Upon completion of the area work, the 1" x 1/2" joint shall be vacuumed clean and poured full of self -leveling Sikaflex 12SL Sealer. (e) Control Joints - Crack joints shall be sawed as per the Contract Drawings, longitudinally along the centerline of all paving, and at every 15 feet across the pavement and at the joint between the concrete paving and the curb and gutter. All crack joints shall be vacuumed and sealed with BASF SL-2, Pecora NR 200, Tremco THC 900 or approved equal. All sealant shall be applied to a backer rod. (f) Exposed edges of joint material and joint filler shall be capped with a gray polysulfide joint sealer (g) Water Stops - Water stops and expansion joint materials shall be securely anchored to the formwork and reinforcing steel in a manner which will prevent displacement during pouring of concrete. Water stops and expansion joint materials for joints shall be continuous around all corners and intersections. Splices shall be made using an electric splicing tool as recommended by the water stop or expansion joint manufacturer. Heated steel plates or torches for Rev. 03/09 SECTION 9 Page 15 joining water stops will not be permitted. Water stops shall be used in the following locations; (1) All vertical construction joints in walls which in the final project are adjacent to soil. (2) All vertical construction.jc0ts in walls of structures to be kept dry and which are adjacent to water containing compartments, chambers or tanks. (3) All construction joints in slabs on grade unless specifically omitted in the Project- Specifications. (4) All construction joints in wails of water reservoirs. Water stops shall be constructed to the details as shown and noted on the Contract Drawings. (h) Expansion Joints - Expansion joints shall include expansion joint material and water stops of the types designated herein and in locations shown on the Contract Drawings. (i) Precast Structures - Precast structures shall be cast with tongue and groove or male and female type joints and ends. When assembled the joints shall provide alignment that is continuous and uniform without objectionable deviation from the lines shown on the plans or without excessive grouting or sealing of the joints. 9.03.9 PLACING CONCRETE (a) GENERAL (f-) No concrete shall be placed prior to written approval of the Engineer of each design mix proposed (2) No concrete shall be placed except when the Engineer or his representative is present and has approved the work and authorized the placing of the concrete. The Contractor shall afford the Engineer whatever casual labor, platforms or other access as may be required for proper field observation of the concrete work. (3) Field review of the work by the Engineer shall in no way relieve the Contractor of his responsibility to furnish materials and workmanship in full compliance with the Contract Drawings and Specifications. (4) Concrete shall not be placed until all reinforcement is securely and properly fastened in its correct position, nor until form ties at construction joints have been retightened, nor until all bucks, sleeves, castings, hangers, pipe, conduit, bolts, anchors, wire and any other fixtures required to be embedded therein, together with forms for openings to be left in the concrete have been placed and anchored by the Contractor, nor until the forms and reinforcement have been oiled and cleaned respectively as specified. (5) The rate of delivery of concrete for any monolithic unit of a structure shall be that which will permit proper handling, placing, and finishing of the concrete; and shall be so regulated that the maximum interval between the placing of batches at the work site shall not exceed 20 minutes. Rev. 03109 SECTION 9 Page 16 (6) The Concrete shall be placed before the elapsed time, between adding the mixing water to the mix and placing the concrete in the forms, exceeds the following: Air temperature 90 degrees F. and above - 30 minutes Air temperature 80 degrees F. through 89 degrees F. - 45 minutes Air temperature 79 degrees F. and below - 60 minutes and before the drum has revolved 300 revolutions. To ensure mixing at the job site, the drum must be revolved 20 revolutions at mixing speed just before pouring. (7) Concrete is not to be poured on drying green concrete (less than seven (7) days curing time) without direct written -permission of the Engineer. (b) Conveying - Concrete shall be conveyed from the mixer to the place of final deposit by methods which will prevent separation or loss of materials. Equipment for chuting, pumping and pneumatically conveying concrete shall be of such size and design as to insure a practically continuous flow of concrete at the delivery end without separation of the materials, Aluminum pipe and chutes shall not be used, Concrete shall be handled from the mixer to the place of final deposit in carts, buggies or conveyors, and shall not be spouted or delivered by spout or trough from the hoists, or dumped into carts with a free fall from the mixer of more than four (4) feet. Every possible precaution shall be taken to prevent separation or loss of ingredients while transporting the concrete. Delivery carts or buggies shall be kept on temporary runways built over the floor system, and runway supports shall not bear upon reinforcing steel or fresh concrete. The word "conveyors" as used in this specification shall be construed to include concrete pumping machines. (c) Depositing - Before beginning a run of concrete, hardened concrete and foreign materials shall be removed from the inner surfaces of the mixing and conveying equipment. All conveyances, buggies or wheel barrows shall be thoroughly cleaned at frequent intervals during the placing of the concrete, Special care must be exercised to prevent splashing of forms or reinforcement with concrete, and any such splashes or accumulations of hardened or partially hardened concrete on the forms or reinforcement above the general level of the concrete already in place must be removed before the work proceeds. Concrete shall be placed in the forms in such a way as to prevent segregation. All concrete for walls shall be placed through openings in the inside form spaced at frequent intervals or through "elephant trunks" (heavy duck canvas or galvanized iron) equipped with suitable hopper heads. Tremies shall be of variable lengths so that the free fall shall be three (3) to four (4) feet maximum and a sufficient number shall be placed in the forms to ensure the concrete's being kept level at all times, (d) When placing concrete, sufficient illumination shall be provided in the interior of the forms so that the concrete at places of deposit is visible from deck and runways, Concrete shall be spaded and rodded (e) Consolidation - Unless excepted by the Project Specifications, all concrete shall be consolidated by the use of mechanical vibrators operated by experienced workmen under competent supervision. Vibration shall be applied directly to the concrete unless otherwise approved by the Engineer. The intensity of vibration shall be sufficient to cause flow or settlement of the concrete into place. Vibration shall be applied at the point of deposit and in the area of freshly placed concrete. It shall be of sufficient duration to accomplish thorough compaction and complete embedment of reinforcement and fixtures, but not so long as to cause segregation. Supplement vibrating by spading and rodding. By hand in the corners and angles of forms and along form surfaces while the concrete is plastic under the vibrator Faction. No forking or raking shall be permitted. When using Rev. 03/09 SECTION 9 vibrators on floor slabs, the bottom of the vibrator must not be permitted to ride the form supporting the slab. Vibrator must be laid onthe concrete to prevent marring slab forme.Vibratoraand consolidation shall conform huthe requirements ofAC| 389. When forms are namoved, surfaces ohoU be even and denaa, free from aggregate pockets nr"honeynomb." Special omn* shall be taken to secure dense concrete around all inserts. Where the Contract Drawings require concrete fill to placed in concrete masonry units, cavity walls or other similar locations where proper placement and consolidation cannot be made, the concrete may be proportioned with 3/8" maximum aggregate size and the maximum slump increased to 8", provided the minimum strength requirements are maintained. 0 be (Q) Slabs on Grade _ Prior to placing reinforcement, the grade shall be prepared, the 0| compacted, the drainage fill placed and the vapor barrier, material and other embedded items placed aarequired bythe Contract Drawings and other Sections ofthe Specifications. (1) Aminimum thickness fill shall be provided under all slabs ongrade and atother looabnnonoted oothe Contract Drawings unless specifically denoted otherwise on the Contract Drawings. The drainage fill shall be compacted with a vibrating -plate compactor. Compaction testing nfdrainage fill {snot required, (2) Avapor barrier shall be provided under all slabs on grade within building lines and at other locations noted on the Contract Drawings. The vapor barrier shall be placed by lapping all edges a minimum cf4" and sealing continuously with an approved roofing mastic, waterproof tape or equivalent ooatehal. Seal around all piping and other openings through the vapor barrier and turn up edges 2" minimum at the walls and other vertical surfaces. Donot block weep holes. (3) Screed chairs or other objects shall not be permitted to damage or penetrate the vapor barrier Vrwaterproofing embnane. Buggy runways shall beused where concrete hsrequired h)betransported over the vapor barrier or waterproofing membrane, $o/eeds may be net in mounded concrete inlieu ofscreed chairs. (h) Bonding and Grouting -Concmja surfaces against which new concrete is to be laid ehmU be thoroughly cleaned and wetted, In addition, the joint shall be roughened as required to develop an adequate bonding surface. Existing concrete shall have a slurry ofone (i) part cement and three (3) parts sand brushed on prior to pouring new concrete. Horizontal construction joints in walls shall be slushed with at least 2 |nohon ufcement and sand grout just prior to placing new nVDuneba. This grout ohoU be of the same m|Nana as the concrete, but with noonue aggregate omitted. At vertical construction joints, special care shall be taken to work the freshly placed concrete to obtain an adequate amount ofmortar otthe joint. 9.03.10 SURFACE FINISHES (a) General - The finishing of concrete work shall be in accordance with Chapters 1O (b) Walls and Ceilings (1) Unexposed Surfaces - Concrete surfaces below grade adjacent to earth and other nqrfeo*a not exposed to view after construction such as Rev. 03/09 SECTION 9 Page 18 completely enclosed chambers, wet wells, etc., shall be given a rough finish as follows: Fins and rough edges shall be removed, Honeycomb, aggregate pockets, voids over 112 inch in diameter, and holes left by form ties shall be patched as specified in "Patching Concrete" below and damp cured for 48 hours. (2) Exposed Surfaces - Concrete surfaces which are exposed in the finished work for both exterior and interior locations shall be given a smooth finish as follows: Follow all the steps noted above for a rough finish. Upon completion of these steps, apply a smooth finish by thoroughly wetting and then brush -coating the surfaces with cement grout composed by volume of 1 part cement to 2 parts fine aggregate passing the No, 30 sieve and mixed with water to the consistency of thick paint, Grout shall be cork or wood -floated to fill all pits, air bubbles, and surface holes, Excess grout shall be scraped off- with a trowel and the surface rubbed with burlap to remove any visible grout film. The grout shall be kept damp by means of fog spray during the setting period. The finish of any area shalt be completed in the same day and the limits of a finished area shall be made at natural breaks in the finished surface. Smooth finished surfaces shall include, but shall not be limited to the following: a. The full height of walls and surfaces in open tanks, reservoirs and basins. b. Exterior walls of tanks and structures adjacent to earth to one foot below finished grade. c. Interior surfaces in basements, tunnels, pipe galleries, equipment rooms, and above grade areas. d. All surfaces which are to be painted, (3) Rubbed Surface Finish - A rubbed surface shall be provided on surfaces specifically designated in the Project Specifications or noted on the Contract Drawings, The surfaces to be rubbed shall first be thoroughly saturated with water. They shall then be rubbed with a medium coarse carborundum stone until a light paste has been formed which shall fill all voids, and until all form marks, fins, projections and irregularities have been removed. The paste formed by this rubbing shall be left in place and allowed to set. The final finish shall be obtained by a second rubbing with a fine carborundum stone and clean water. This rubbing shall continue until the entire surface is of a smooth texture and uniform color. After the final rubbing is completed and the surface is dry, it shall be lightly brushed or rubbed with burlap to remove the loose powder. The surface shall be left free from powder blemishes, discolorations and objectionable marks. (c) CONCRETE FLOOR AND ROOF SLABS (1) General m Floors shall be level with a tolerance of 1f8 inch in ten feet, except where drains occur, in which case the floors shall be pitched to the drains as indicated on the Contract Drawings. The dusting of wearing surfaces with dry materials will not be permitted. (2) Monolithic Finish - All floor surfaces, including floor surfaces of channels, tanks and structure floors, exposed to view upon completion of Project shall be given a monolithic finish as follows: While the concrete is still green but sufficiently hardened to bear a man's weight without deep imprint, it shall be wood -floated to a true, even plane with no coarse aggregate visible. Sufficient pressure shall be used on the woodfloats to bring moisture to the surface. The concrete shall then be double steel Rev, 03109 SECTION 9 Page 19 troweled to produce a smooth impervious surface. Floor slabs of reservoirs, tanks and basins and roof slabs may be power -machine finished in lieu of steel and hand troweling. Floor slabs receiving a wearing surface, such as asphalt, rubber or vinyl tile, linoleum, cork, etc., may also be power -machine finished. (3) Rough Slab Finish - Floor slabs to receive a separate topping of concrete, terrazzo, quarry tile, etc., shall be given a rough slab finish by screeding with straightedges and floating to produce a reasonably true and uniform surface. This finish shall also apply to structural floor slabs of .channels or flumes to which a membrane waterproofing is to be applied. (d) SIDEWALKS, ROADWAYS, WALKWAYS, AND EXTERIOR PLATFORMS -- Such concrete surfaces shall be wood -floated to a true and even plane and steel troweled. The surface shall then be slightly roughened by dragging burlap across the surface or by other approved means. (e) FLOOR HARDENER - Two coats of liquid floor hardener shall be applied to all concrete floors in buildings not designated to receive other finish or floor covering. -Remove all foreign materials, including mortar, paint, etc., to prevent any foreign materials from showing through the finished surface.One coat shall be applied upon completion of curing of the slab and one coat applied after final painting and other finishes are complete. The final result shall be a transparent appearance which, when subjected to an abrasion test made with a stiff wire brush, shall not dust, but shall polish without showing abrasion. 9.03.11 PROTECTION AND CURING (a) General - Concrete damaged by freezing or flash set drying shall be removed as directed by the Engineer and replaced at the Contractors own expense. (b) Provisions shall be made for maintaining concrete in a moist condition for a period of at least 7 days after placement. For high early strength concretes, however, moist curing shall be provided for at least the first 2 days when concrete and air temperatures are above 50 F; and for longer periods when temperatures are below 50 F. (c) All concrete shall be cured- by one or more methods specified in Chapter 12 of ACI 301. Membrane forming curing compounds shall not be used on any surfaces against which additional concrete or finishing materials are to be bonded. Curing compounds shall not be used on surfaces to receive hardeners. (d) Waterproofing curing paper shall be used for final curing of fiatwork only. When selected for final curing, the paper shall be placed as follows: Unroll curing paper over the entire surface to be cured. Lap ends and edges a minimum of 4" and seal continuously with masking or pressure sensitive tape and provide sufficient weights over paper to prevent separation from concrete surface. (e) Additional care shall be exercised in protecting and curing the concrete topping to prevent rapid loss of moisture at any during and immediately after the curing period. (f) Cold -Weather Requirements - In cold weather the procedures in ACI 306 shall be followed. Whenever the temperature of the surrounding air is below 40 degrees F or when the possibility exists that the temperature will fall below 40 degrees F within the 24-hour period after concrete pouring operations, concrete placed in the forms shall have a temperature between 70 degrees F and 100 degrees F. Rev. 03/09 SECTION 9 Page 20 All concrete shall be maintained at a temperature of not less than 50 degrees F for at least 72 hours and shall be protected from freezing for at least an additional 72 hours or for as much time as is necessary to ensure proper curing of the concrete. The housing, covering or other protection used in connection with curing shall remain in place and intact at least 24 hours after the artificial heating is discontinued. Floor slabs against earth, including slabs of tanks, reservoirs and basins, shall be protected with a covering of suitable insulating material to prevent frost penetration into the subgrade. Such insulation shall be of the non- staining type. No dependence shall be placed on salt or other chemicals for the prevention of freezing. (g) Hot -Weather Requirements - In hot weather adequate measures shall be taken to avoid high temperatures in fresh concrete and to prevent rapid drying of newly placed concrete. The procedures in ACI 305 shall be followed. Additional requirements are as follows: (1) Aggregate stockpiles shall be kept moistened as required. (2) Long water supply lines shall be kept covered or painted white or aluminum. Similar precautions shall be taken with water storage tanks. (3) Subgrades on which concrete is to be placed shall be saturated in advance and then sprinkled just ahead of the placing operation. (4) Fresh concrete shall be shaded as soon as passible after finishing and moist curing shall be started as soon as it can be done without marring surface. 9.03.12 PATCHING CONCRETE (a) Tie Holes - Holes shall be thoroughly roughened and wetted, brush -coated with neat cement grout, and filled with mortar. Mortar shall be a stiff mix of one part cement to two parts fine aggregate passing the No. 16 mesh sieve, and minimum water content. Mortar shall be thoroughly compacted in place and finished flush with adjacent surfaces. When dry, the color of the mortar shall approximately match the adjoining concrete. (b) Defective Concrete (1) If any concrete work is not formed as shown on the Drawings or if for any reason, is out of alignment or level or shows a defective surface, it shall be considered as not conforming with the intent of these Specifications and shall be removed from the job by the Contractor at his expense, unless the Engineer grants permission to patch the defective area. Permission to patch any such areas shall not be considered a waiver of the Engineer's right to require complete removal of the defective work if the patching does not, in his opinion, satisfactorily restore the quality and appearance of the surface. (2) Immediately after removing forms, all concrete surfaces shall be inspected and any poor joints, voids, stone pockets or other defective areas permitted by the Engineer to be patched shall at once be patched before the concrete is thoroughly dry. Defective areas shall be chipped away to a depth of not less than 1" with the edges perpendicular to the surface. Such areas which are to be patched and a space at least 6" wide entirely surrounding them shall be wetted to prevent absorption of water from the patching mortar. The defective areas shall be patched with a mortar containing a special bonding agent mixed and applied in Rev. 03109 SECTION 9 Page 21 accordance with the manufacturers instructions. The mortar shall be made of the same material and of the same proportions as used for the concrete except that the coarse aggregate shall be omitted, The amount of water used in mixing the mortar shall be as little as consistent with the requirements of handling and placing.The mortar shall be thoroughly compacted into place and screeded off so as to leave the patch slightly higher than the surrounding surface. It shall then be left undisturbed for a period of one to two hours to permit initial shrinkage before being finally finished. The patch shall be finished in such a manner as to match the adjoining surface. 9.03.13 PLACEMENT OF PRECAST CONCRETE STRUCTURES Placement of Precast Concrete Structures - The various sections shall be marked for proper alignment during installation. Precast units shall be lifted and placed using lifting eyes, hooks, holes or other methods acceptable to the Engineer, which will not overstress or damage the concrete. Lifting devices or methods that will mar the surface of the concrete shall not be used. Any precast unit which has been cracked, damaged, chipped, scarred or otherwise disfigured shall not be used. Precast structures shall not be loaded, stressed, backfilled or utilized until the concrete has reached its specified compressive strength or has been cast for 28 days. The structure shall not be set in place until it has been cast for 14 days or concrete has reached 75% of its specified compressive strength. Unless otherwise specified, precast structures will be set in wet concrete and supported on blocks to maintain proper position until concrete has set. 9.03.14 FIELD QUALITY CONTROL (a) General - The fallowing listed tests of concrete as placed shall be performed, with results reported to the Engineer: (1) Strength tests. (2) Slump tests. (3) Air content tests. (4) Additional strength tests, if required. (b) Equipment - The following testing equipment shall be available when field testing is conducted: (1) Slump cone. (2) Platform. (3) Concrete molds for cylinders, including machined base if metal molds are used- (4) 5/8" round smooth rod approximately 24" long, one end rounded to a hemispherical tip diameter of which is 5/8". (5) Shovel and wheelbarrow for sampling and transporting of samples. (6) Metal or glass covers for protecting cylinders, (7) Small scoop for use in filling slump cone and cylinder molds. (c) Reporting - The following data shall be reported to the testing laboratory for each group of cylinders: (1) Mix, including amounts and brands of materials used. (2) Specified 28 day compressive strength. Rev. 03/09 SECTION 9 Page 22 (3) Atmospheric temperature at time of pour. (4) Slump. (5) Type and amount of admixtures used. (6) Location of concrete in the structure. (In sufficient detail to identify definitely the pour at any later date) The following data shall be reported by the laboratory to the Engineer and to the Contractor: (1) Data reported to the laboratory, listed above. (2) Unit weight of the cylinder (pounds/cubic feet). (3) Type of break. (4) Percentage of aggregate broken. (5) Breaking load (Ibs.). (6) Breaking stress (lbs./sq. inch). (d) Strength Testing - inuring the progress of the work, and for each different mix of concrete, Sets of four standard 6 inch concrete cylinders shall be made and tested. One set shall be made where less than 50 cubic yards of concrete are placed during each day's operation. An additional set of cylinders shall be made for each 100 cubic yards or major fraction thereof over the first 50 cubic yards. The cylinders of each set shall be molded from the same sample of concrete. For precast concrete items, a set of 4 standard 6" concrete cylinders shall be made and tested for each day's casting of each item. One cylinder shall be tested at 7 days and two at 28 days. Should the Contractor desire to remove shoring and forms before the time stipulated in the Specifications and to subject the concrete to loads of any kind, he will be required to provide an extra set of test cylinders for testing at an agreed upon time to determine whether the cylinder has actually acquired the design strength of the concrete. These test cylinders shall receive, insofar as practicable, the same protection from the elements as given in the portions of the structure which they represent and shall be stored on the site. They shall be moved to the laboratory not more than two days prior to the date of testing. Sampling of concrete for test purposes shall be per ASTM C172. Making and curing of test cylinders shall be per ASTM C31. Testing of specimens shall be per ASTM C39. (1) Sampling - The sampling shall be representative of the batch. (The word batch as here employed shall be understood to refer to one day's pour rather than the contents of one mixer load). It shall consist of portions from different points in the batch. When taken from truck mixers or agitators, the samples shall be taken in three or more regular increments throughout -the discharge of the entire batch. The composite sample shall be mixed with a shovel sufficiently to insure homogeneity and immediately molded into test specimens. The place of molding shall be such that the cylinders will not have to be moved during the first 24 hours. Molding shall be done on a platform or some -other firm, level base not subject to vibration, (2) Size of Specimens - Cylinders shall be 6" in diameter and 12" deep. The mold shall be metal or other nonabsorptive material such as paraffined cardboard, If a metal mold is used it must have a machined base which can be secured to the mold and be watertight. (3) Molding - Place the concrete into the mold three layers of approximately equal volume. Move the scoop around the top edge in placing in order to Rev. 03/09 SECTION 9 Page 23 achieve symmetrical distribution of the concrete, Distribute the concrete further by a circular motion of the tamping rod, Rod each layer with 25 strokes of a 5/8" diameter standard rod (see equipment list). Distribute strokes uniformly over the cross section of the mold, penetrating into the immediate underlying layer. Bottom layer shall be rodded throughout its depth. Where voids are left by the tamping rod, tap sides of the mold to close the voids. After the top layer has been rodded, strike off the surface of the concrete with a trowel and cover with a glass or metal plate to prevent evaporation. Mark number and date on top of cylinder with a nail or similar object. (4) Stora e - Test specimens shall be removed from the molds at the end of 24 hours and stored in a location such that they will be protected from damage. At the end of 48 hours they shall be moved to the laboratory where they shall be placed in a moist room or in a lime saturated water bath until time for testing. The temperature of the moist room or water bath must be controlled between the limits of 60 F and 80 F. All other conditions of curing shall conform to paragraph 7(c) ASTM C31-57. The test specimens cured as above specified shall be the ones used for the standard 7 day and 28 day reports. (5) Transportation - When cylinders are moved to a laboratory they shall be packed in boxes having inside dimensions of 7" x 21" X 13" to contain three cylinders. The box shall be made of 1/2" plywood with a separation partition between cylinders and equipped with a hinged lid, hasp and carrying handle. The cylinder shall be packed completely with excelsior, straw or sawdust and kept damp, In the top of the box place a list showing the data fisted in paragraph "data to be reported to laboratory" above. Fasten the lid securely and tag with a shipping ticket- (e) Slump Testing - Where 25 or more cubic yards of concrete are placed, and as necessary to maintain desired consistency of the concrete, a slump test shall be made. Not fewer than one such test shall be made for each 50 cubic yards of concrete placed at one operation. Such test shall also be made on each sample of concrete used in fabricating strength test specimens. Test specimen shall be formed in a standard 16-gauge, galvanized metal slump cone 12" in height, as described by ASTM C 143-52, (1) Sampling - Samples of concrete for test specimens shall be taken at the mixer or from the truck mixer in the case of ready -mixed and transit - mixed concrete, during discharge. Obtain such samples by passing a receptacle completely through the stream of concrete, at three or more regular intervals throughout the discharge of the entire batch except that samples shall not be taken at the beginning or the end of discharge, The sample shall then be transported in a wheelbarrow or some other suitable conveyance to the place of molding. Mix the specimen with a shovel until the specimen is uniform in appearance. Note location of batch from. which the sample is taken for future reference. (2) Molding - Dampen the cone and place it on a flat, moist, nonabsorbent surface. From the sample, immediately fill the cone in three layers, each approximately 1/3 of the volume of the cone. In placing, move the scoop around the top edge of the cone in order to insure symmetrical distribution of the concrete. Rod each layer with 25 strokes of a 5/8" standard rod (see equipment list), Distribute the strokes across the cross- section on the cone, penetrating the underlying layer. Rod the bottom layer throughout its depth. After the top layer has been rodded, strike off surface of the concrete with a trowel so that the cone is exactly filled. Remove the cone by raising it carefully in a vertical direction. The slump Rev. 03/09 SECTION 9 Page 24 shall then be measured by determining the difference between the height of the cone and the height of the specimen. (f) Air Content Testing - Tests for air content shall be made concurrently with making test cylinders per ASTM C231. (g) Additional Strength Tests - The Engineer shall be telephoned immediately if any questionable tests are discovered. In all cases that test results of concrete cylinders fail to meet the strength requirement established in this Specification, the Contractor shall, at his own expense, make additional compression tests on cored cylinders in accordance with ASTM C42, "Methods of Securing, Preparing and Testing Specimens from Hardened Concrete for Compressive and Flexural Strengths", or make additional load tests in accordance with ACI 318, at the direction of the Engineer. if core tests fail to demonstrate strengths adequate for the intended purposes of the member or members in question, as determined by the Engineer, or if the failure to meet specified strength requirements -occurred in members from which it is impracticable to secure test specimens by the method of ASTM C 42, load tests shall be conducted and their results evaluated in accordance with Chapter 2 of ACI 318, "Building Code Requirements for Reinforced Concrete." If, in the opinion of the Engineer, these alternate strength tests indicate that concrete has been placed which does not meet the requirements established in this Specification, the defective concrete shall be removed and replaced, at the Contractor's expense. Additional tests of the hardened concrete may be required by the Engineer even though the requirements of the Specifications were met when, in the Engineers opinion, there is cause for concern over the adequacy of the structure. 9.04 COMPLETION OF CONTRACT 9.04.1 WATERTIGHTNESS All structures shall be watertight. The Contractor will be required to take such steps as are necessary to correct any and all leakage through floors or walls of structures without additional compensation, 9.04.2 CLEAN-UP Upon completion of all work performed under this Section, all excess materials, storage facilities and temporary facilities shall be removed from the site, Areas which were occupied during construction operations shall be smoothed and left in first-class condition. 9.05 MEASUREMENT FOR PAYMENT AND COMPENSATION 9.05.1 LUMP SUM CONTRACTS AND ITEMS On lump sum contracts and on lump sum items in unit price contracts, concrete and reinforcing steel or precast structures will not be measured for separate payment and no additional allowance will be made for formwork, appurtenances, finishing, placing, protecting, curing or admixtures, if used. 9.05.2 UNIT PRICE CONTRACTS AND ITEMS (a) On unit price items and on unit prices for changes in lump sum items or contracts, measurement and compensation for concrete and reinforcing steel, or precast structures, placed or omitted will be made as follows. Rev, 03/09 SECTION 9 Page 25 (b) Concrete - Measurement in cubic yards for payment or deduction will be made computed from nominal finished dimensions of concrete of each Class and each type of construction on which unit prices are included in the Contract. No additional allowance will be mate for formwork, appurtenances, finishing, protecting, curing or admixtures, if used, (c) Reinforcing Steel - Measurement in pounds for payment or deduction will be made computed on the basis of the theoretical weight per foot of each size of bar multiplied by the length installed or omitted. No additional allowances will be made for accessories or installation. (d) forecast Structures - Measurement for payment or deduction will be made computed on the basis of the number of units of precast structures installed or omitted. No additional allowances will be made for formwork, appurtenances, finishing, curing, placing, or admixtures, if used. Rev: 03/09 SECTION 9 [ (`Page 1 10.01 GENERAL 10.01.1 SCOpEOPWORK (a) All labor, materials, equipment, tools, and services required for the work under this section shall be furnished and performed in compliance with the following General Specifications, the Project Specifications and the Contract Drawings. (b) This General Specification designated as Snction1O.8` Manholes, Inlets, Catch Basins, Vaults, and Drainage GtuxCtureu.covers the materials and the installation ofsuch materials generally utilized for manholes, catch basins, |n|ede and drainage structures, The Project Specifications and the Contract Drawings dea|8ngb* the apeo\fio work, the materials, |noadon, gnsda� details and construction methods to be employed on the furnishing and installation of all o1anho|en, in>eha, mshoh basins and drainage mtnudureo. The inclusion of items of material or work within this Specification does not necessarily constitute their use onthis Project, hd Manholes, inlets, catch basins, vaults, drainage structures and appurtenances constructed andfor installed under the provisions of Section 1U.0; Manholes, Inlets, Catch Basins, Vaults and Drainage Shuotunea, ahoU include: providing and installing all necessary castings; pnoviding, placng, setting and erecting all precast nunoreha structures; providing mnbada|n, placing, setting, erecting and providing form work for built in p|eoo structures; the excavation and baokh|| for all such structures and providing' placing and forming all concrete necessary to build struc- tures, 10,01�2 SHOP DRAWINGS (a) Attention is directed to the provisions in the General Conditions of the Contract requiring the submission to the Engineer ofdescriptive details and of shop and setting drawings. For manhole, catch basin, inlet, vault and drainage structure instaUaUon, such submission shall include the following, even though items proposed to be furnished conform to the exact description stated inthe Project o[General Specifications. (1) Precast concrete joints, joint sealing material and reinforcing details. (2) Full details of all castings or fabricated metals used as part of 10.01.3 STANDARDS Where materials and methods are indicated in the fdkmvino Specifications as being in conformance with a standard specification, it shall refer in all cases to the latest edition ofthe specification and shall include all interim revisions. LisUogof e standard specification without further reference indicates that the particular material or method shall conform with such |ieb*d specification. Where Rev. 1/12 SECTION10 manufacture��or��eo�e�p����wn����m��m���� ^' ~~ / quality expected and in no way is to be construed to preselect the ' Contractor's supplier or equipment. They are used only to denote the i qu«dbv standard of product desired and does not restrict bidders to a | specific brand, make, manufacturer or specific name, They are used only tn set forth and convey to bidders the general style. type, character, and quality ofproduct desired. Equivalent products will be acceptable. | 10.02 CONSTRUCTION MATERIALS 10.02.1 GENERAL All materials and appurtenances shall be furnished by an established and reputable manufacturer or supplier. All materials and appurtenances shall be new and aheU be of first o|aVn ingredients and construction, designed and guaranteed to perform the service required and shall conform to the following standard specifications or shall be the product of the listed manufacturer or similar and equal thereto msapproved bvthe Engineer. 10,022 PRECAST, REINFORCED CONCRETE MANHOLES (a) All precast reinforced conun*ba manhole sections shall nyaetASTM C478. AA8HTD |N199 and NUDOT apeoifioadons, shall be traffic bearing, and designed to withstand an H-20 loading. (b) Manhole steps shall becomposition material, grouted into the side of the manhole structure, The rung orcleat shall project aminimum clear distance of seven (7)inches from the wall of the riser or cone section measured from the point of embedment. Embedment of steps shall be a minimum of four (4)inchoo. (c) Pipe inlets and outlets shall bethrough precast holes fitted with water proof rubber boots with stainless steel tightening bonds. Ifrubber boots are not used, each inlet and outlet pipe shall have u brick masonry oo|(er built around the pipe. (d) Where openings must be md into sides of manhole sections for drop connection, extreme uan* shall be exercised so as not to damage the manhole, The method of cutting these openings shall be approved by the Engineer. All openings cut into sides ufmanholes shall have aminimum of six &8inches clearance between holes and manhole section joints, (e) Eccentric cone sections shall boused where depth ufamanhole will permit it. (f) The top ring of cone sections shall have aflat surface formed to receive the first course of brick masonry or grade ring, (Q) Lifting holes hlsections cfmanholes shall beplugged with grout. Reu1M2 SECTION 10 10.02.3 BRICK QRBLOCK MASONRY FOR MANHOLES, VAULTS, INLETS, CATCH BASINS AND DRAINAGE STRUCTURES (a) Masonry shall include all manholes, vaults, catch basins, inlets and drainage structures of common brick and cement mortar; brick coWrses, where required to bring frames and covers to grade, for vaults, concrete b|Voh or precast concrete pipe and manholes; and the building in ofmetal castings, pipes, sleeves and other items required inthe work, complete asshown, specified and directed. All common brick shall beASTK8 Des: C32-73' Grade K8GurASTyNCO2.Grade SW. (W Mortars shall bemixed in the proportions that follow: 1sack ofmasonry cement (94 lbs.) 3 cubic feet of dry sand (240 lbs.) (1) Masonry cement nhnk be 8dxment Huron, Alpha or equal, A_"3TM CD Sand shall be of graded quality conforming to 'the requirements of ASTM Des'. C144. Water shall be clean potable water, free from injurious mdeleterious materials, ki All bricks shall heof the best quality, hard burned brick, shall bmwhole, sound straight, hard, uniform in structu[e, with true faces and shall be of standard size, (1) Bricks aheU he sampled and tested for absorption in accordance with ASTM0es: C67. Absorption shall not exceed 9%. Certified test reports shall be furnished to the Engineer. (2) The bricks shall beculled and sorted when delivered onthe ground bv experienced men furnished by the Contractor, and all bricks condemned shall be immediately removed from the site of work. b0 When specified,concrete blocks shall Nsused for manhole construction. All concrete block ohoU be of the special type manufactured for manhole construction. Such manhole blocks shall conform to ASTM C139. 10.02.4 STEPS Structure steps shall be composition material, embedded into masonry a minimum offour (4)inches. The rung or cleat shall project aminimum ofseven (7)inches from the wail ofthe structure measured from the point ofembedment. The minimum cross sectional dimension shall beone (1)inch. The minimum de- sign live load ahoU be e single concentrated load of three hundred (300) pounds. Steps shall bespaced twelve (12)inches apart and aligned verbce||y. Raw 1/12 SECTION 10 Page 4 10.02.5 CASTINGS FOR FRAMES AND COVERS (a) Manhole rings and covers, catch basin frames, grates and covers and other drainage structure castings shall be constructed of cast iron conforming to the latest ASTM Standard Specifications, Serial Designation A 48, for Class 30 Gray Iron Castings, shall be traffic bearing, and designed to withstand H-20 loading. All castings shall be made accurately to the required dimensions, fully interchangeable, sound, smooth, clean and free from blisters, blowholes and/or other defects. Defective castings which have been plugged or otherwise treated shall not be used. All castings shall be thoroughly cleaned and painted or coated with a bituminous paint. Each casting shall have its actual weight in pounds stenciled or painted on it in white paint, The weight of all castings shall be within 5% of the weight shown on the manufacturers' approved shop drawing submittal. Castings will be weighed at random. Those weighing less than the approved minimum weight allowance shall be rejected. All castings shall be true to the manufacturer's approved shop drawing submittal with a tolerance of 1/16 inch. Prior to shipping, the manufacturer shall fit up all casting compo- nents to insure that all castings furnished are of proper fit and free from rattle. Castings which do not have properly fitting lids will be rejected. (b) All castings shall be of the size and weights shown on the plans and as manufactured by the East Jordan Iron Works, Inc., General Foundries, Inc, U.S. Foundry & Manufacturing, or equal. Sanitary sewer manhole covers shall have the word "Sewer" cast on the top in letters 2 inches high. All casting components shall have permanently costed into them the manufacturer's name and approved part number. (c) Manufacturers shall furnish to the engineer for approval, certified tensile test results as performed by an independent testing laboratory at no additional cost to the owner. Warranty documentation and a legal certificate of compliance shall also be provided at this time by the manufacturer. (d) All castings that fail to meet the beforementioned specifications shall be rejected. All associated cost for the furnishing of approved castings shall be the responsibility of the contractor. The approved status of the manufacturers, providing rejected casting components shall be revoked. 10.02.6 HATCHES AND COVERS Hatches and covers for vaults shall be as shown on Contract Drawings and/or as described in Project Specifications, 10.03 METHOD OF CONSTRUCTION 10,03.1 PRECAST CONCRETE MANHOLES (a) Precast concrete "pipe" manholes over 12' in height shall have a precast extended monolithic base section or shall be constructed on Class "C" (2600 PSI) concrete slab foundations. The concrete slab foundations shall be as Rev. 1/12 SECTION 10 Page 5 indicated on the Contract Drawings. The precast base ring section shall be set on the "wet" concrete within two (2) hours of slab pour. Each -precast base section shall have its flat bottom and sides adjoining the bottom, for a vertical distance of not less than (12) inches, wetted and cleaned of dirt, mud and foreign material. Each precast base section shall be brushed, on the flat bottom only, with a slurry of one (1) part cement and three (3) parts sand just prior to being set on the slab. (b) Precast concrete manhole base sections shall be placed on a bed of NCDOT No. 67 stone not less than six (6) inches in depth unless otherwise noted on the Contract Drawings. (c) The joints between sections of manholes shall be of such design that they will be water proof and shall be sealed with mastic or rubber 0-rings. 10.03.2 BRICK OR BLOCK MASONRY MANHOLES, INLETS, CATCH BASINS AND DRAINAGE STRUCTURES (a) All brick or block masonry structures shall be constructed on poured in place concrete bottoms. Concrete for the bottom shall be Class "C" (2500 PSI) and shall have attained full strength before brick or block masonry is started. The bottom slab thickness shall be a minimum of eight (8) inches thick or as shown on the Contract Drawings. (b) The manhole shall be constructed with care being exercised to form the incoming and outgoing appurtenances or pipes into the wall of the structure at the required elevations. (c) The bricks shah be laid in mortar of a kind and quality as above specified. They shall be laid with a "shove joint" and all spaces between bricks shall be solidly and completely filled with mortar. A "Shove Joint" method is obtained by spreading an abundant amount of mortar along the base of the structure and then sliding the masonry unit with a lateral motion causing the mortar to extrude up between the two units and forming a solid joint. (d) The bricks shall be laid to a line with the bed in the line of the radii of the curves. Bricks shall be thoroughly moistened before laying. Each brick shall be completely bedded in mortar at its bottom side and end, in one operation. Joints of face work shall be struck and neatly pointed. Care shall be taken to have the interior surface smooth and regular. The masonry units shall be laid in a workmanlike manner, true to lines and grades indicated on the Con- tract Drawings. All joints shall have a thickness of at least 3/8". Competent masons shall be employed for this work. (e) No masonry shall be erected when the temperature has dropped below 45 degrees F. unless it is rising and at no time when it has dropped below 40 degrees except by permission of the Engineer. Masonry shall not be laid on frozen work. Any work which freezes before the mortar has set shall be removed and replaced at the Contractor's expense. Rev. 1/12 SECTION 10 (f) Unfinished work shall be stepped back for jointing new work, (g) The outside faces of the brick work of each structure shall be neatly plastered with mortar not less than 3/8 inch thick, and trowelled smooth. (h) The Contractor shall provide all necessary forms and centers- required for laying brick masonry. They shall be true to the required curves, shapes and sizes, strong enough to withstand all operations incidental to the placing of the brick work and the face against which the work is to be laid shall be satisfactorily smooth and clean. (i) All fresh work shall be protected from injury of all kinds and any injured work shall be made good by the Contractor in a manner satisfactory to the Engineer. All new work, unless immediately covered with earth, shall be kept moist until the mortar has become hard and will not crack in the sun. (j) The Contractor shall build into the brick masonry the iron steps, the pipes and other objects shown on the Contract Drawings or as directed, and all necessary precautions shall be taken to prevent the pipes and other work from being displaced, broken or deformed. The bricks and mortar shall be tightly packed around the embedded materials so as to prevent leakage and secure perfect adhesion. (k) Concrete block may be used for manhole construction when approved by the Engineer. All concrete block shall be of the special type manufactured for manhole construction, or equal to this type. Such manhole block shall conform to ASTM C139. (1) A "vertical joint" will be used in manhole construction when shaped manhole block is being used. A 1/2-inch minimum joint will be constructed on both the bottom and top of the shaped block. A "vertical joint" is obtained by filling the circular shaped hole, formed by placing the ends of two shaped blocks together, with mortar. The mortar placed in this hole must be compacted with a tool specifically approved by the Inspector. This tool will be kept at the job site and used on all occasions. No substitute for this tool will be permissible. The masonry units shall be laid in a workmanlike manner, true to lines and grades indicated on the Contract Drawings, 10.03..3 BACKIFILL Excavation for manholes, inlets, catch basins, vaults and drainage structures shall be backfilled in the same manner as the adjoining pipelines to which they are connected or a part thereof. All forms, false work, sheeting and bracing shall be removed before backfilling around the structure. Masonry structures shall be allowed to set for a minimum period of 24 hours before backfilling. 10.03.4 INVERTS AND CHANNELS Inverts and channels shall be grouted into bottoms of structures so as to provide smooth transitions for change in direction of flow and change in grade. The channel shall be formed by grouting up to the springline of the pipe and uniformly sloping the bottom, on a slope of not less than 6 nor more than 12 horizontal to 1 Rev. 1/12 SECTION 10 Page 7 vertical, to the sides of the manhole. Bricks may be used to reduce the quantity of grout required on the "shelf' of the invert. At no time shall the Contractor use calcium chloride to speed the setting of the grout. The Contractor shall use hy- draulic grout sealers only with the Engineer's prior approval, 10.03.5 PLACING AND SETTING CASTINGS The castings for the drainage structure shall be set at the required elevation and properly anchored and grouted to the masonry. Where manholes are constructed in paved areas, the top surface of the frame and cover shall be tilted to conform to the exact slope, crown and grade of the existing adjacent pavement. 10.03.6 MANHOLE DIAMETER Internal diameter of manhole shall be sized according to the diameter of the largest pipe exiting the manhole. For nominal size pipe of twenty-four (24) inch diameter or smaller, the internal diameter of the manhole shall be four (4) feet unless otherwise shown on the Contract Drawings. For nominal size pipe greater than twenty-four (24) inch diameter, but equal to or less than thirty-six (36) inch diameter, the internal diameter of the manhole shall be five (5) feet. For nominal pipe sizes larger than thirty-six (36) inch diameter, the internal diameter of the manhole shall be as specified in the Project Specifications or as shown on the Contract Drawings. 10.03.7 MANHOLES, INLETS, CATCH BASINS, VAULTS AND DRAINAGE STRUCTURES OVER EXISTING LINES All structures that will be constructed over existing lines shall have any abandoned, connecting pipe broken out. The pipe openings shall be bricked up and sealed with new flow lines formed as required in the Contract Drawings. 10,03.8 BREAKING DOWN & FILLING OF ABANDONED MANHOLES, CATCH BASINS, ETC. (a) All structures noted to be abandoned shall have all connecting pipe plugged with grout and/or mortar and brick. The top of the structure shall be removed to an elevation of 2 feet below subgrade or below the springline, where noted, and the structure filled with select earth material properly tamped. The Contractor shall dispose of all surplus materials resulting from the abandoning of any structures; however, every effort shall be made to salvage the castings which shall become the property of the Owner, (b) The quantity of abandoned structures broken down, filled in and accepted will be measured and paid for at the contract Lump Sum price per each "Breaking Down and Filling Abandoned Manholes, Catch Basins, and etc. Such prices and payments will be full compensation for all material, plugging pipe openings, breaking down of structures, backfilling, removing of broken materials and other incidentals necessary to complete the work as required. Rev. 1/12 SECTION 10 Page 8 10,03.9 DROP MANHOLES (a) A drop manhole shall be constructed when the difference between the inverts of inlet and outlet pipe is greater than two feet. A drop manhole shall consist of a standard manhole having a drop of pipe, encased in Class "C" concrete constructed on the outside of the manhole as shown on the Contract Drawings. Unless otherwise specified, the fitting and pipe material for the drop shall be cast iron mechanical joint pipe. (b) The pipe specials at the top and bottom of the drop, the straight pipe used in drop and the concrete encasement for the drop shall be included and constructed as part of the unit price for drop manholes. 10.03.10 CLEAN-UP OF STRUCTURES All excess materials, dirt, sand, rock, grout, concrete, forming materials, trash and debris shall be removed from structures and disposed of by the Contractor off the project site unless specific arrangements are made to the contrary with the Engineer. 10.03,11 CAST IN PLACE CONCRETE MANHOLES, CATCH BASINS, INLETS, VAULTS AND DRAINAGE STRUCTURES (a) Cast in place structures shall be constructed as specified in Section 12, Miscellaneous Metalwork and Section 9, Concrete Reinforcing, of the General and Project Specifications and the Contract Drawings. (b) Cast in place structure shall be paid for as part of the Lump Sum Base Bid and shall be complete as specified or shown on the Contract Drawings unless otherwise indicated. 10.04 TESTING All new manholes must be vacuum tested in accordance with the following procedure: 1) The Contractor shall furnish all labor, equipment, and any appurtenant items necessary to satisfactorily perform the vacuum test. All equipment will be approved for vacuum testing. 2) All lifting holes shall be plugged with an approved non -shrink grout. 3) All pipes entering the manhole shall be plugged. The contractor shall securely brace the plugs to keep them from being drawn into the manhole. All service connections tied to manholes shall also be vacuum tested with the manholes. 4) The test head shall be placed inside the top of the cone section of the manhole and the seat inflated in accordance with the manufacturer's recommendations. 5) The vacuum testing equipment shall be manhole vacuum tester. A vacuum of 10- inches of mercury shall be drawn and the vacuum pump shut off. Inflate the compressor band to effect a seal between the vacuum base and the manhole cone section. Connect the vacuum pump to the outlet port with the valve open. With the Rev. 1/12 SECTION 10 Page 9 valves closed, the time for the vacuum to drop to 9-inches of mercury shall not be less than that shown in the following table. Manhole Depth Diameter of Manhole 48" Dia. 60" Dia. 72" Dia. 10 feet or less 60 Sec, 75 Sec. 90 Sec. >10 feet but <15 feet 75 Sec. 90 Sec, 105 Sec. >15 feet 90 Sec. 105 Sec, 120 Sec, (Times shown are minimum elapsed times for a drop in vacuum of 1-inch of mercury). 6) If the manhole fails the initial test, necessary repairs shall be made with an approved non -shrink grout while the vacuum is still being drawn-, Retesting shall proceed and continue until a satisfactory test is accomplished. 10.05 METHOD OF PAYMENT AND MEASUREMENT 10.05.1 MEASUREMENTS OF. MANHOLES Manhole depths shall be measured from the lowest invert to the top of manhole ring. Payment shall be based on a unit price for the depth of manhole built. Each manhole depth shall be as shown on the Contract Drawings. The depth classification shall be as follows: Greater than 0 feet but equal to or less than 6 feet, Greater than 6 feet but equal to or less than 8 feet. Greater than 8 feet but equal to or less than 10 feet. Greater than 10 feet but equal to or less than 12 feet, Greater than 12 feet but equal to or less than 14 feet, Greater than 14 feet but equal to or less than 16 feet. Greater than 16 feet but equal to or less than 18 feet. To be continued in this manner until the depth range covers the deepest manhole in the proposed Project. 10.05.2 MEASUREMENT OF CATCH BASINS, DROP INLETS, CURB INLETS OR ANY OTHER DRAINAGE STRUCTURE Catch basins, drop inlets, curb inlets or any other drainage structures shall be measured from the lowest invert to the inlet point of the structure. Payment shall be based on a unit price for the depth of the structure built. The depth of each structure shall be as shown on the Contract Drawings. Depth classification shall be as follows. Greater than 0 feet but equal to or less than 6 feet. Greater than 6 feet but equal to or less than 8 feet. Greater than 8 feet but equal to or less than 10 feet. Greater than 10 feet but equal to or less than 12 feet. Greater than 12 feet but equal to or less than 14 feet. Rev. 1112 SECTION 10 Page 10 Greater than 14 feet but equal to or less than 16 feet. Greater than 16 feet but equal to or less than 18 feet. To be continued in this manner until the depth range covers the deepest structure in the proposed Project 10.05.3 MEASUREMENT FOR PAYMENT OF MASONRY VAULTS Masonry vaults shall be paid for as Lump Sum unit price items. Rev, 1112 SECTION 10 Page 1 GENERAL SPECIFICATIONS 11.0 INSIDE PROCESS PIPING 11.01 GENERAL 11.01.1 SCOPE OF WORK (a) All labor, materials, fixtures, tools and services required for the furnishing, installation, testing and adjusting of all inside process piping shall be furnished and installed in compliance with the following General Specifications, the Project Specifications and the Contract Drawings. Costs for all piping, valves, installation, testing, etc, unless specifically noted otherwise in the proposal form, will be included as part of the Base Bid. (b) This General Specification designated as Section 1 "r.0, Inside Process Piping, covers the description of materials generally utilized in the process piping and the specifications for the installation of such materials. The Project Specification and the Contract Drawings designate the specific inside process piping work to be installed under this Contract. The inclusion of items of material or work within this specification does not necessarily constitute their use on this Project. (c) In this Specification, the designation inside Process Piping is used to denote exposed piping systems located within or attached to structures and buildings and excludes such systems or portions of such systems which are buried below the surface of the ground or are buried in or below masonry or concrete work. However, Inside Process Piping includes the furnishings and installation of all wall sleeves and thimbles required in concrete or masonry to which Inside Process Piping, gates, and appurtenances are to be connected. it does include piping installations such as those for plumbing (including potable and protected water systems) heating, ventilating, air conditioning or refrigeration, unless anylor all of these items are specifically not to be bid as separate contracts. 11.01.2 SHOP DRAWINGS (a) The attention of the Contractor is directed to the provision in the General Conditions of the Contract requiring submission to the Engineer of shop and setting drawings. Shop drawings and details for Inside Process Piping work shall include pipe sizes, joint details, catalogue -cuts of valves and appurtenances, dimensions, support and hanger details and a complete piping layout, even though items proposed to be furnished conform to the exact details and descriptions stated in the General and Project Specifications. All shop drawings and details shall be reviewed and approved by the Contractor before the drawings are submitted to the Engineer for review. (b) Details on electric motors submitted for approval shall include the following motor data: Rev. 12112 SECTION 11 Manufacturer Nameplate Rated Horsepower, Voltage and RPM NEMA Type Code Letter Guaranteed Locked Rotor Current Guaranteed Full Load Current Guaranteed Full Load Efficiency Guaranteed Full Load Power Factor Outline Drawings and Dimensions 1101-3 VERIFICATION gFCONTRACT DRAWINGS (a) The Contract Drawings indicate the required pipe sizes and the general arrangement for all piping and equipment. Locations shall be vedfied in the field by the Contractor. In the event it should become necessary in some cases to change the location of any of the work due to building construction, the Contractor shall consult with the Engineer before making any changes. Any such changes approved by the Engineer shall be made without added cost to the Owner. Under no circumstances shall the pipe sizes indicated on the Contract Drawings be changed without first having the written approval of the Engineer. (b) The Contractor h ll determine and be responsiblefoxth locations and character of all /noena for hangers, onaeou, aleoveo, and nmor openings in the construction required for the Inside Process Piping work, and shall obtain this information well in advance of the construction progress uoosnot hodelay the work, (t) The attention ofthe Contractor |edirected tothe fact that this Project may also include work ofother trades. The final location of inserts, hangers, etc., required for the Inside Process Piping Installation must be co- ordinated with facilities required for other installations to prevent interference, (d) The Contractor is especially cautioned to install no work that connects to equipment until such time ascomplete shop drawings ofsuch equipment have been approved by the Engineer. Any such work so installed by the Contractor prior to approval of shop drawings will be at the Contractor's risk. 11.01.4 STANDARDS hA Where materials and methods are indicated aabeing in nform with ostandard specification dshall refer inall cases hothe latest edition ofthe specification and shall include all interim rmviniuns. Listing of standard specification without further reference indicates that the particular material or method shall conform with the listed specification. Where mmmnutmctumer(s)mrtrade names appear, itiaonly torepresent alevel ufquality expected and ionmway Tatobmconstrued topreselect the Contractor's supplier orequipment. They are used only tosot forth and convey to bidders the general style, type, character, and quality of product dmmimad' Equivalent products will be acceptable. All equipment shall conform hothe latest revised applicable OSHA Standard. Rev. 12/12 SECTION 11 Page 3 (b) Sheet metal and wire gauges used in Inside Process Piping Specifications are US Standard Gauge for steel sheet, Washburn and Moan Guard for steel wire, and Brown and Sharpe Gauge for non-ferrous sheet and wire. 11.01.5 CATALOG NUMBERS Where manufacturer's catalog and/or figure numbers are given, it is the intent of the Specifications to have the Contractor supply the equipment represented by these numbers. In some cases the manufacturer has revised his catalog and/or figure numbers since publication of this specification, but still produces the item specified. In these incidences the Contractor shall furnish equipment and/or fixtures identical to those originally represented by the catalog_ and/or figure numbers given herein, If a manufacturer has redesigned any of the products specified herein by catalog and/or figure number, the Contractor shall furnish the improved model regardless of whether or not the item retains its original catalog and/or figure number. Where items denoted by catalog and/or figure numbers have been discontinued by the manufacturer, the Contractor shall request one or more equivalent selections from the Engineer. 11.02 CONSTRUCTION MATERIALS 11.02.1 PIPING MATERIALS (a) GENERAL (1) All material and equipment shall be furnished by an established and reputable manufacturer. All material and equipment shall be new and of first-class construction, designed and guaranteed to perform the service required, and shall conform to the following Standard Specifications. Cited examples are used only to denote the quality standard of product desired and does not restrict bidders to a specific brand, make, manufacter or specific name. They are used only to set forth and convey to bidders the general style, type, character, and quality of product desired. Equivalent products will be acceptable. (b) PIPE AND TUBING Pipe and tubing shall conform with the following standard specifications. Cast Iron Pipe for Liquids (See Note 1) ASA A21.1 ASA A21.6 ASA A21.8 Cast Iron Pipe for Gas ASA A21,3 ASA A21.7 ASA A21.9 Cast Iron Soil Pipe (Coated) Federal WW-P-401 ASTM A74 Cast Iron Threaded Pipe Federal WW-P-356 ASA A40.5 Rev. 12/12 SECTION 11 Page 4 Ductile Iron Pipe (See Note 2) AWWA C151 Class 50 Wrought Iron Pipe Federal WW-P-441 ASTM A72 Steel Pipe for Ordinary Uses Federal WW-P-406 ASTM A120 Steel Pipe for Coiling, Bending, Federal WW-P-404 and Flanging ASTM A53 Welded Steel Pipe AWWA C201 AWWA C202 ASTM A134 ASTM A139 Light Weight Spiral Welded Steel Pipe ASTM A211 Stainless Steel Pipe ASTM A312 Copper Water Tube Federal WW-P-799 ASTM B88 Copper Pipe in Standard Sizes Federal WW-P-377 ASTM B42 Red Brass Pipe in Standard Sizes Federal WW-P-351 ASTM B43 Reinforced Concrete Pressure Pipe ASTM C361 AWWA C302 Reinforced Concrete Steel Cylinder Pipe Prestressed: AWWA, C301 Not Prestressed: AWWA C300 Asbestos Cement Pressure Pipe ASTM C296 AWWA C400 Polyvinyl Choride Pipe CS 207 Note 1. Unless otherwise indicated, all cast iron pipe for liquids shall be completely coated with coal -tar pitch varnish: Federal VVW-P-421. Note 2. Dimensions, tolerances and tests of ductile iron pipe shall conform with the applicable standard specification. (2) Gasket Type bell and Spigot Cast Iron Pipe shall conform with the standard specifications herein before specified except that it shall be designated for usewith rubber sea► compression type gaskets. Pipe shall be equal to American "Fastite", U.S. "Tyton" or Clow "Bell-Tite". (c) PIPE FITTINGS (1) Pipe fittings shall conform with the following standard specifications or shall be similar and equal to the product of the listed manufacturer. Where piping is indicated without particular reference to the fittings required, they shall be of the same material and pressure rating as the pipe to which they are attached. Cast Iron Flanges and Fittings: Steel Flanges and Fittings 25 lb. ASA B16b2 125 lb, ASA B16.1 250 lb. ASA B16.2 ASA B 16.5 Rev. 12112 SECTION 11 Cast Iron Bell and Spigot Mechanical Joint Cast Iron Soil Pipe (Coated) Cast Iron Threaded Cast Iron Threaded Drainage Ductile iron Malleable Iron Threaded Steel Welding Flanges for Welded Steel and Light Weight Spiral Welded Steel Pipe Welded Steel Pipe Copper Solder Joint Brass or Bronze Threaded Brass for Flared Copper Tube Compression Sleeve Couplings Viotaulic Couplings and Fittings r Page 5 ASA A21.10 AWWA C110 ASA A21.11 Federal WW-P-401 ASTM A74 ASA B16.4 ASA B16.12 ASTM A445 150 lb. ASA B16.3 300 Ib. ASA B16.15 ASTM A234 AWWA C207 AWWA C208 ASA B 16.22 125 lb. ASA B16.15 250 lb. ASA B16.17 ASA B16.26 Dresser Manufacturing Division Style 38, Smith Blair Type 411, Ford FC4, or equal Victaulic Company of America, Viking, Ynpipe Couplings, or equal (2) Unless otherwise indicated, allfittingsused with cast iron pipe for liquids shall be coated with coal -tar pitch varnish and cement mortar lined in the same manner as hereinbefore specified for the pipe. (3) Welding fittings shall each be stamped with the manufacturer's name or trademark, size, thickness, and ASTM material designation. (4) Gasket Type Bell and Spigot Cast Iron Fittings shall conform with the standard specifications hereinbefore specified except that they shall be designed for use with rubber seal compression type gaskets. Fittings shall be similar or equal to American "Fastite", U.S. "Tyton or Clow "Bell-Tite". (5) Wall Castings and Wall Sleeves shall be as manufactured by James B. Clow and Sons, Fast Fabricators, American Cast Iron Pipe Company, or equal. Wall castings for lines conveying liquids shall be coated on the interior only with coal -tar pitch varnish in the same manner as hereinbefore specified for the pipe. Wall castings and wall sleeves shall be provided with wall collars. (6) Unions for threaded steel, cast iron, or wrought iron pipe shall be malleable iron 300 lb., brass to iron seat, ground joint unions conforming with the specifications of the Association of American Railroads. Unions for copper water tube shall be wrought copper, solder joint, copper to copper unions. Unions for brass pipe shall be 125 lbs., ground joint, brass unions. Rev. 12112 SECTION 11 Dielectric unions shall have insulated unions or flanges. Unions used between dissimilar metals shall be capable of separating the metals in a manner which will prevent the passage of more than 1% of the galvanic current which would exist with metal to metal contact. Union connectors shall be of the same material as the 0 piping to which attached. pressure and temperature ratings shall be no lower than those of the piping system in which installed. (d) ACCESSORY PIPING MATERIALS M\ Welding Electrodes: ASTMA233 Welding Rods: ASTMA25 (2) Solder: ASTM B32 (Grad 50A)-Solder flux shall beof past form having a petrolatum base impregnated with zinc and ammonium chohdea, and shall be as recommended by the manufacturer ofthe fittings. (3) Cement Mortar Lining Cast Iron Pipe and Fittings: ASAA21/4 Coal -Tar Enamel Coatings Steel Water Pipe AWVW\C203 Cement -Mortar Coatings, Steel Water Pipe, 30"and over AVVYVAC2U5 (4) Packing - Jute packing shall be best quality untarred, braided hemp or jute, or a type acceptable to the Engineer. Fiber packing shall be sanitary, non -bacteria breeding paper packing, Rubber packing shall consist of a hollow rubber tube (solid for small sizes), or a solid wedge shaped section. Oakum shall be best quality tarred jute. Jute packing shall not be used on pipe line carrying a potable supply. (5) pipe connections shall be 1116 inch thick flat ring gaskets of cloth inserted rubber: ASA B16,21, except that gaskets for bronze, aluminum, and corrosion resistant flanges shall be full face type. Gaskets for cast iron mechanical joints shall conform to ASA A21.1 1. Gaskets for specialized pipe connections and fittings shall be of the material and type recommended by the connection or fitting manufacturer for the particular service involved, (6) Flange Bolts shall conform with the standard specification for the particular flange or flanged fitting being used eOd/orASA 13311. Bolts and nuts shall becadmium plated. (7) Safety and Relief Valves shall be as manufactured by Crane, Crosby, Apco, [N|opoo' or equal. Valves shall beequipped with try levers and shall bear stamp indicating compliance with the applicable section of the ASN1E Boiler and Pressure Vessel Cod*. Safety valves aho|| be used for gas or vapor service and shall beused for liquid service. Set pressure, relieving capacity, and accumulation shall be as prescribed by the applicable Rev.i2/12 GBCTkON11 Page 7 section of the ASME Code or as indicated on the Contract Drawings and/or in the Project Specifications. (8) Automatic Air Vents for lines carrying water at 10OF or higher shall be as manufactured by Sarco Type 13W, Apco„ Crispin or equal, float controlled automatic air eliminators each equipped with stainless steel; valve head and float mechanism and a 150 psi semi -steel body. (9) Strainers shall be manufactured by Crane, Walworth, Keckley and shall be similar and equal to Crane 988 1/2 (threaded) or 989 1/2 (flanged) Y-pattern sediment separators. Each strainer shall be provided with a 125 lb. iron body. Unless otherwise indicated, screens shall be 20 mesh monel for liquid service and 40 mesh monel packed with Everdur wool for gas service. Connections shall be threaded for pipe sizes 3 inches and smaller and flanged for pipe sizes larger than 3 inches. (10) Floor and Ceiling Plates shall be chromium plated steel designed to hold their position on the pipe by means of springs. (11) Pipe Covering Protectors for exposed pipe shall have non- conducting pipe covering protection saddles no shorter than 12 inches. Protectors for concealed piping shall be as specified for exposed piping but may be shop fabricated. Protectors shall fit snugly around the entire circumference of the insulation. (e) PIPE HANGERS AND SUPPORTS (1) Pipe hangers shall be as manufactured by Crawford, Grinnell, Blaw-Knox, or equal, similar and equal to those shown in the following schedule: Line Type and Size Crawford Figure No. Uninsulated.lines 2" and smaller 104 containing fluids below 140F All insulated lines and uninsulated 11 lines larger than 2" containing fluids below 140F All lines containing fluids at 14 140F or higher (2) Floor mounted pipe supports shall be fabricated from black steel pipe with suitable cast iron saddles or from structural steel. Braces to prevent lateral pipe movement shall be of steel. (3) Hanger rods, concrete inserts, beam clamps, and other pipe hanger accessories shall be fabricated of steel and shall be as manufactured by Crawford, Grinnell, Blaw-Knox, or equal, Rev. 12/12 SECTION 11 Page 8 (4) Expansion bolts shall be of the ring wedge type similar and equal to National Lead Company Cinch Anchors, Hilti, "Thunderstud" by Concrete Fasteners, Inc. or equal. (5) Framing for wall type hangers, trapeze hangers, and tunnel stanchions shall be metal framing systems. Unless otherwise indicated, finish shall be bonderizing plus a coat of corrosion resisting green synthetic primer; attachment to structures shall be by means of inserts for new concrete, surface mounting methods for masonry or existing concrete, and welding or beam clamps for structural steel; pipe support shall be by means of pipe clamps or hangers for piping carrying fluids at temperatures below 140F and by means of rollers for those at 140F or higher; pipe supporters shall be of sufficient size to permit insulation to run continuously through the hanger. All exposed ends of framing members shall be provided with end caps. (f) INSULATION (1) Pipe insulation used for Inside Process Piping work shall conform with the following: Cellular 85% Calcium Glass Magnesia Silicate Federal Specification HH-1-551 HH-1-554 HH-1-523 Maximum Conductivity Btu/Z(hr.) (sq. ft) 0A1 at 0.38 at 0.42 at (F) per inch 100F 200E 200F Density, lb./cu. ft. 8 to 10 10 to 12 10 to 12 Compressive strength, psi 100 70 at 5% 150 at 5% deformation deformation (2) Vapor Barriers required for pipe insulation shall consist of aluminum foil faced on both sides with draft paper. Moisture transmission rating shall be lower than 0.5 perm. Vapor barrier jackets shall be factory applied. (3) Pipe insulation not requiring a vapor barrier shall be provided with a factory applied 6 ounce canvas jacket. (4) Plastic Pipe Coatings used for condensation and corrosion control shall be J. W. Martell "NoDrip" PDM Industries, Inc, Viadix Corporation, or equal. (g) GAUGES AND THERMOMETERS (1) Pressure and Vacuum Gauges shall be Ashcroft, Marsh, Crosby, or Trerice bourdon tube gauges with the pressure ranges indicated on the Contract Drawings and/or in the Project Specifications, or approximately double the normal operating pressure if not otherwise indicated. Gauges shall be provided with dustproof cases, gauge piping, gauge cocks, and dials not smaller than 4 1/2 inches in diameter, Gauges shall conform with ASA B40.1, Grade A. Gauges measuring fluids at temperatures above Rev. 12/12 SECTION 11 150F shall be provided with siphons. Gauges subjected to pulsating pressures shall be provided with dampeners or be oil filled. Gauges utilized for measuring pressures on raw sewage, raw water, sludge and colloidal or fibrous material shall be equipped with proxy diaphragm to prevent contact of the material with the gauge or tube. (2) Thermometers shall be as manufactured by American, Moeller, Palmer, Trerice, Weksler, or equal. Dial type thermometers shall be mercury actuated, stainless steel construction with a dial at least 4 112 inches in diameter and either capable of being rotated to any angle for maximum readability from the floor or of the remote bulb type as indicated on the Contract Drawings. Industrial type thermometers shall be red reading mercury type having a 9 inch scale and capable of being rotated to any angle for maximum readability from the floor; however, if the approved manufacturer can supply only the fixed type, the Contractor shall install, subject to the approval of the Engineer, that fixed type of the following arrangement that will provide maximum readability from the floor; straight; 90 degree back angle; 90 degree right or left side; reclined or inclined; right side or left side oblique. Accuracy shall be within 1 % of scale range. Provide a stainless steel separable well for each thermometer. Temperature range shall be as indicated on the Contract Drawings andlor in the Project Specifications, or 0 to 240 F. for dial type, or 30 to 240 F. for industrial type if not otherwise indicated. 11.02.2 VALVES AND GATES (a) GENERAL (1) Marking and identification of valves shall conform with MSS SP-25 with the information either cast on the valve or shown on a permanently attached plate. Valve dimensions shall conform with ASA B16.10 where applicable. Unless otherwise indicated, valves 3 inches and smaller shall be all brass or bronze, and valves larger than 3 inches shall be iron body, bronze mounted. Unless otherwise indicated, gate, globe, angle, and check valves 3 inches and smaller shall be provided with threaded connections, those larger than 3 inches shall be provided with connections as indicated on the Contract Drawings and/or in the Project Specifications. Connections shall conform with the following: Threaded ASA B2.1 Bell and Spigot ASA A21.10 Mechanical Joint ASA A21.11 Flanged Cast Iron 25 lb. ASA B16b2 125 lb. ASA B16.1 250 lb. ASA 1316.2 Flanged Steel ASA B16.5 (2) Manual operators located higher than 6 feet above the operating floor shall be provided with chain or extension operators. Lock shield valves shall be furnished with operating keys. Rev. 12112 SECTION 11 Page 14 (3) All valves shall: be of ample strength to withstand and operate satisfactorily under the working pressures and shall be subject to the test pressures, both expressed in pounds per square inch given in the following table. The class of valve to be used on each service shall be as specified elsewhere herein or in the Project Specifications. Cold Water Working Test Pressure Glass of Valve Pressure- psi psi A 150 300 B 50 100 C 25 50 (4) After the valves have been set they shall be tested for satisfactory operation with the pipe lines by the Contractor. (b) GATE VALVES (1) Each gate valve over 3 inches in size shall be of the double -disc type, except as hereinafter specified, with either non -rising stem or outside screw and yoke as designated in the Project Specifications and shall be designed to take full pressure on either face. Valves shall be constructed with bolted bonnets suitable for utilizing "0" ring stem seals. Stems shall be fabricated of brass or bronze with lathe -cut half V-pattern threads. Gate valves shall be equipped with standard handwheels, operating nuts, extension stems, a combination of extension stems and handwheels or operating nuts, spur gearing, be vel gearing or chain operators as designated in the Project Specifications or shown on the Contract Drawings. Valves shall open by turning counterclockwise. Extension stems shall be provided with bronze bushed brackets at intervals not exceeding 10 feet. (2) Gate valves installed in a horizontal position in a horizontal fine which are designed for working pressures lower than 150 lbs., in sizes 20 inches and larger, shall be equipped with bronze rollers running on bronze or integral cast iron tracks in the body; those which are designed for 150 lbs. working pressure, in sizes 16 inches or larger, shall be equipped with bronze rollers and bronze tracks secured to the body. Valves in sizes 20 inches and larger having working pressure of 150 lb., and those 16 inches and larger with a working pressure of 150 lb., which are installed in vertical or inclined lines shall be equipped with hard babbitt tracks secured to the valve body and bonnet to support the lower disc during operation. (3) When so indicated in the Project Specifications, manually operated gate valves 16 inches and larger shall be equipped with by-passes. By-pass valve shall be of the same type as the main valve and shall have the stem in a vertical position unless otherwise indicated. Sizes shall be as follows: Rev. 12/12 SECTION 11 Page 11 ;Main Valve By -Pass Valve 'Size - Inches Size - Inches 16 to 20 3 24 and 30 4 36 and 42 6 48 and larger 8 (4) Gate valves 3 inches in size and smaller shall be 125 lb, bronze, rising stem, double wedge disc, union or screwed bonnet type. Valves shall be of a design to permit repacking under pressure. Unless otherwise indicated, valves shall be equipped with handwheels and shall open counterclockwise. (c) GLOBE AND ANGLE VALVES (1) Globe and angle valves shall be provided with renewable composition discs for air or gas service and with bronze or bronze faced discs for other services. Valves shall be capable of being repacked while under pressure. Unless otherwise indicated valves shall be provided with 125 lb, bodies and with handwheels and shall open counter -clockwise. (2) Valves larger than 3 inches shall be iron body, yoke top, bolted bonnet type. (3) Valves 3 inches and smaller shall be bronze body, screwed bonnet type. (d) CHECK VALVES (1) Swing Check Valves shall be provided in all instances where check valves are indicated without further reference. Unless otherwise indicated, each swing check valve shall have a 125 lb. body and a removable cover for access to the disc. Pressure drop across valve to fully open disc shall not exceed 0,5 psi, (2) Swing check valves larger than 3 inches shall have iron bodies with bolted covers. Valves for oil or gas service shall be all iron. Valves for other services shall be bronze mounted. (3) Swing check valves 3 inches and smaller shall be bronze body, screwed cover type. Valves for oil or gas shall be composition discs, those for other services shall have bronze discs, (4) Weighted or spring loaded swing check valves shall each be as described above except that valves shall be provided with extended hinge pin and outside level and weight or with outside lever and spring all mounted integrally with the valve. Weights and springs shall be adjustable. Hinge pin shall be provided with a stuffing box and packing. Rev. 12/12 SECTION 11 Page 12 (5) Silent Check Valves shall be Williams Gauge Co., F G Valve Co., Smolensky Valve Co., or equal, spring loaded type similar or equal to Williams -Hager Figure 329 with semi -steel body and bronze trim. (6) Hydraulically Operated Check Valves shall be non -slam, diaphragm actuated globe type. Each valve shall open to permit flow when inlet pressure is higher than discharge pressure and shall close to prevent back flow when discharge pressure is higher than inlet pressure. Valve shall be hydraulically operated by the line pressure and shall seat a spring loaded, single seat type guided disc on a removable seat ring. The diaphragm disc shall be a resilient synthetic rubber disc of sufficient area to assure drip tight shut off. The diaphragm shall not be used as a seating surface and the valve shall contain no stuffing boxes or packing glands. Valves 4 inches and larger shall be furnished with an auxiliary control to adjust the rate of opening and closing. Each valve shall be provided with a high strength Iron body with bronze trim and stainless steel pilot guide. (e) PLUG VALVES (1) Plug valves shall be of the lubricated type or of the eccentric type. Body construction shall be of high tensile cast iron conforming with ASTM A126, Grade B. Unless otherwise indicated, valves shall have 125 lb. bodies and shall have lengths equal to those for 125 lb. SWP cast iron flanged wedge gate valves as listed in ASA B16.10. Lubricated plug valves shall have cylindrical or conical plugs. Eccentric plug valves shall be of a design such that the plug and seat make contact only when the valve is in a fully closed position, Each valve shall be capable of drip tight shut-off under pressure. Each valve shall have a port opening equal to the numerical size for that particular valve. Valves smaller than 8 inches shall be equipped with nuts for wrench operation or with an operating lever. Valves 8 inches and larger shall be equipped with worm gears and handwheels, unless otherwise noted. Each valve shall be provided with an "open -closed" position indicator and where applicable, a flow direction indicator and shall open counterclockwise, unless otherwise noted. Ventura type plug valves will not be permitted. Valves shall be as manufactured by A.C.F., Cie Zurik, Homstead, Nordstrom, Powell, Walworth, or equal. If a manufacturer does not make all of the types required for the Project, valves may be supplied from a second manufacturer, but in no case will more than two manufacturers' valves be permitted. (2) A minimum of two wrenches shall be furnished for each size of operating nut, and when more than 10 valves are provided one extra wrench shall be furnished for each 10 additional valves or fraction thereof. In addition, each sludge withdrawal station shall be furnished with two wrenches. Unless otherwise indicated, each lubricated plug shall be fitted with a combination button head fitting and lubricant screw, The Contractor performing the Inside Process Piping work shall furnish to the Owner one hand operated grease gun per building for each type of lubricant required and one gallon of each type of lubricant required. Rev. 12112 SECTION 11 (f) CHEMICAL VALVES (1) Valves for chlorine solution and ferric chloride solution shall be P)/C.orrubber lined diaphragm valves specifically designed for the service. Valves for other uhemicaio shall be as indicated in the Project Specifications and/or onthe Contract Drawings, (g) SAMPLING VALVES (1) Sampling valves shall be of the lever oparated, cam action solid wedge type with bolted urscrewed cap. (h) PLUG DRAIN VALVES (1) Plug drain valves shall be provided with cast iron bodies,bronze stema, disc rings and me$tdngn; and rust -proofed steel bolts and nuts. Each valve shall b*provided with aspigot oraoASAClass 125 flanged end, rising stem ornon-rising stem, 2 inch operating nut orhondvvhee|'with u/without extension stem all oadesignated on the Contract Drawings and/or in the Project Specifications. Extension stems shall be providedwith bronze bushed brackets at intervals not exceeding 10 feet. (|) SOLENOID VALVES (1) Solenoid valves for Inside Pnuoasa Piping systems shall be normally nlomed, bwo-way, paok|ems solenoid valves of the ebce indicated on the Cnntnon\ Drawings nrofthe same size oothe line in which they are installed, Un|ooe otherwise indicated each valve ohoU have o minimum working pressure of1O0 psi and shall be suitable for 116 volt6O (yo|g operation. Each valve shall be provided with a continuous duty watertight epoxy encapsulated molded coil for severe moisture orhumidity conditions suitable for operations s¢1O%above or15Y6below rated voltage, Each valve installed ongravity flow lines shall bedesigned for a zero pressure differential across the valve. Furnish and install a strainer upstream from each solenoid valve, �) CONE VALVES (1) Each cone valve aba|\ consist $fg body, o conical plug and o valve operating meohan|am. Unless otherwise indicated, uuDobooUon uheU be of/STN1 A126 Grade B e$ot inon, bronze mounted, with ASAC|aoo 125 flanged oonneoUona. Valves shall be as manufactured by APCO, Chapman Valve Manufacturing Company, Willamette Iron and Steel Company, Henry Pratt Company, orequal. (2) The valve body ohoU have a full unobstructed circular inlet and outlet equal to the Valve size. Inlet and outlet shall be provided with mone|orbronze set rings fused k/the body. (3) The plug shall have ofull circular unobstructed waterway equal to the valve sizm. Plug shall be arranged so that movement from fully open tofully closed positions inaccomplished bye00degree Rev. 12/12 SECTION 11 Page 14 rotation of the plug. Plug shall be provided with four sets of monel or bronze seat rings, two for the open position and two for the closed. Plug trunions shall be bronze bushed and shall be designed to take the maximum bearing loads for the specified operating conditions with a bearing pressure not exceeding 3000 psi. Plug shaft shall be hard bronze bushed or hard chrome overlaid where it passes through the stuffing box. (4) The operating mechanism shall operate so as to first lift the plug from its seating position by an axial movement, followed by a rotary movement of the plug to the other position - either open or closed and finally to seat the valve by a gradual axial movement. At least 64% of valve port opening shall be closed by the first 50% of mechanism closing stroke. Plug shall be locked in position when either in the fully closed or fully open position. An indicator shall be provided which will reveal the position of the plug with respect to the body. Operating mechanism shall be mounted integrally with the valve. Mechanism shall be easily accessible for inspection, repair, or replacement.. (5) Manual operators shall consist of a crank or handwheel, turning clockwise to close the valve, which operates through a gear box to the operating mechanism. Operators other than manually actuated shall be as indicated in the Project Specifications and/or on the Contract Drawings. (6) Valve bodies shall be tested hydrostatically to a pressure 50% higher than the design working pressure for a period of at least 30 minutes, Assembled valves shall be tested for leakage in the closed position with the seals under the maximum working pressure. Valves showing leakage or defects shall be rejected. (k) BALL VALVES (1) Each ball valve shall consist of a body, a plug, a torque unit and an operator. Design working pressures shall be as indicated in the Project Specifications and/or on the Contract Drawings. Valves shall be as manufactured by Henry Pratt Company, Flowserve, Willamette Iron and Steel Company or equal and shall be similar or equal to Willamette List 26_ (2) Body shall be of cast iron with ASA Class 125 flanged connections; bronze plug bearings, and rigidly attached seat of corrosion resistant metal which has been machined, ground or scraped. Body shall provide means for rigidly supporting the torque unit without additional supports. Body shall be provided with one air vent pipe connection and one drain pipe connection. Maximum seat bearing pressure shall not exceed 900 psi at 160 psi unbalance. (3) Plug shall be of cast iron design about a circular waterway equal to the size of the valve. Seat shall be of corrosion resistant metal with spherically generated surfaces which have been machined, ground or scraped. Plug trunion bearings shall be of bronze of hardness sufficiently different from body bearings to prevent seizing or galling. Shaft shall be protected from corrosion at Rev. 12112 SECTION 11 Page 15 points in contact with water and shall have a maximum torsional deflection of 116 degree per foot of unsupported length using a seat friction coefficient of 0.5, (4) Torque unit shall have a traveling crosshead to impart positive rotary movement to the plug by means of a lever and link connected to the plug shaft. Crosshead shall be confined to permit linear motion only. Cover shall be provided with a plug shaft support bearing. Torque unit shall be designed so that during the first 50% of closing the flow will be reduced between 80 and 90%; the remaining flow reduction shall take place in the final 50% of the stroke. Torque unit materials subject to rubbing shall be of different hardnesses. Torque unit shall be capable of being inspected, lubricated, removed, or repaired without removing valve from line, and shall be designed so that main shaft packing may be replaced with the valve in the line under pressure without removing the torque unit housing. (5) Manual operators shall each be provided with a 2 inch square AWWA standard wrench nut which turns clockwise to close the valve; an arrow and the word "Open" shall be cast on the nut to indicate proper opening direction. Operating stem shall be non - rising type and mechanism shall be self-locking in all positions. All bearing surfaces shall be bushed and lubricated. Operating nut shall be attached to the stem shaft by a sheer pin which will fail before any other part of the mechanism in the event of excessive torque on the nut. (6) Operators other than manually actuated shall be as indicated in the Project specifications and/or on the Contract Drawings, (7) Each valve shall be shop tested to twice the design pressure for a period of at least 30 minutes in the open position and to the design pressure for a period of at least 10 minutes on each seat in the closed position. Valves showing leaks or defects shall be rejected. (1) BUTTERFLY VALVES (1) When butterfly valves are indicated without further reference, they shall be rubber -seated butterfly valves conforming with AWWA C504. Valve classes, sizes, quantities, operator types, and required opening and closing operating time period shall be as indicated in the Project Specifications and/or on the Contract Drawings. Records of tests required by AWWA C504 shall be provided to the Owner and the Engineer. (2) When butterfly valves are indicated as being of the modified type, valves and operators shall conform with the requirements of AWWA C504, Class 25-8, with the following modifications: a. Valves in air lines having pressures of 10 psi or lower shall be suitable for air velocities not lower than 80 fps, b. Valves may be of the flangeless type for installation between flanges, providing that they comply with all structural Rev. 12112 SECTION 11 Page 16 requirements of AWWA C504 (shaft diameter, shell thickness, disc design and thickness, seats, bearings, etc.) for Class 25-8. c. Each valve operator shalt be capable of transmitting the maximum torque required to fully open and close the valve with the full differential pressure and flow conditions as listed in the Project Specifications and/or on the Contract Drawings. d. Marking of valves and laying length may be the manufacturer's standard. (m)- SLUDGE WITHDRAWAL VALVES (1) Rotating Sludge Withdrawal Valves shall be designed to provide a variable elevation outlet. Each valve shall consist of an outer pipe of cast iron in which a vertical slot is cut from top to bottom and an inner pipe of brass which contains a spiral slot from top to bottom. These two pipes shall be assembled so that when the inner pipe is rotated the intersection of the diagonal slot with the vertical slot forms an orifice which will vary in elevation. Pipes shall be finished to a reasonably tight fit and provided with a lubrication groove with alemite fitting. The units shall be installed with grease piping extensions to permit lubrication from the operating floor. The inner pipe shall be provided with a shaft extension which terminates in an operating nut and valve position indicator at the operating floor. Valves larger than 8 inches in internal diameter shall be provided with a geared operator and cast gear housing. Unless otherwise indicated, each valve shall have a vertical slot width of the maximum permissible size for. the pipe diameter. A removable tee handle operating wrench shall be provided for each valve. Valves 8 inches in diameter shall have an overall length of 4'6" and valves 14 inches in diameter shall have an overall length of 60" unless otherwise indicated. Length of valves other than 8 inches and 14 inches in diameter shall be as shown on the Contract Drawings. (n) HYDROSTATIC PRESSURE RELIEF VALVES (1) The Contractor shall install hydrostatic relief valves as shown and located on the Contract Drawings. Each valve shall be at least four (4) inches in diameter and shall be the length of the wall or slab thickness in which it is to be installed. Slab installed valves shall be utilized with 1 cubic foot of 3/4 inch gravel installed under the slab at each valve and with 2 cubic feet of sand installed around and below the gravel at each valve. Wail installed valves shall have a leaded strainer installed on the outside of the wall with 2 cubic feet minimum of 3/4 inch stone around each valve. All valves shall open at nine (9) inches of water pressure. (o) SHEAR GATES (1) Shear gates shall be of the iron frame, iron disc, bronze mounted type with bronze hinge pin and wedge block. Lifting handle shall Rev. 12112 SECTION 11 Page 17 be equipped with notches or hooks to regulate the gate opening. Each gate shall be provided with a flat, ASA Class 125 flanged, spigot or hub frame, and with or without extended handle as designated on the Contract Drawings and/or in the Project Specifications. (p) SLUICE GATES (1) Sluice gates; AWWA C601 - Both gate and frame shall be provided with bronze facings dovetailed and securely fastened into the iron castings. Stern material shall be stainless steel. Adjustable bronze bushed stem guides shall be furnished at intervals not exceeding 8 feet and where required for proper operation. A suitable stop collar or other device shall be provided for each non -rising stem gate to prevent the stem from being turned beyond normal gate closing travel. Stem shall turn clockwise to close. Other supplementary details shall be as indicated in the - Project Specifications and/or the Contract Drawings. (q) BACKWATER GATES (1) Backwater gates shall be a standard commercial product fabricated of cast iron or steel provided with bronze seat rings on the frame and flap or inserted cushioned seats of resilient material all as designated in the Project Specifications. Hinge mechanism shall be of the adjustable flexible type with bronze hinge pins in double shear. Seating face of gate frames shall be inclined with the vertical, Gates shall be designed for a working pressure of 25 psi plus any impact loads to which they may be subjected in service. Gates shall be equipped with flanges faced and drilled ASA Class 125 for attachment to wall castings. Wall castings shall be burnished with gates where shown on the Contract Drawings. Provisions shall be made to lubricate gate hinge pins and to prevent the gate form remaining in an open position. (r) FLOOR BOXES (1) Floor boxes for operating nuts of extended stem valves, where shown to be installed in concrete floors, shall be fabricated of cast iron and shall be equipped with bronze bushings or other suitable device to permanently maintain the position of the operating nut in the center of the box. Length of the floor boxes shall be equal to the thickness of the T-wrench. Each box shall be furnished with a cast iron lid with finger holes for easy removal. (s) WHEEL AND CRANK OPERATED STANDS (1) Wheel operated stands and crank operated stands shall be made of the best quality cast iron with smooth exterior surfaces. They shall be of the rising stem or non -rising stem type to suit the valves or sluice gates which they are to operate. Provisions shall be made to lubricate all working parts of the stands. (2) Each stand shall be equipped with a cold rolled steel shaft of ample size supported by bronze bushed guide brackets at Rev. 12/12 SECTION 11 Page 18 intervals not to exceed 10 feet. The threaded portion of the stems shall be of manganese bronze with machine -cut threads. The different sections of the stems shall be jointed together with manganese bronze couplings, threaded and keyed to the stems. Anchor bolts for guide brackets and stands shall be genuine wrought iron or cadmium plated steel. (3) Wheel operates stands shall be equipped with roller thrust bearings and polished handwheels. (4) Crank operates stands shall be of the single -crank type, with ball or roller thrust bearings and enclosed steel bevel gears. Cranks shall be removable and shall be equipped with smooth brass hand grips rotating freely on the handle of the crank. (t) MOTOR OPERATED STANDS (1) Motor operated stands shall be designed and built for motor operation of valves and sluice gates and shall not be hand operates stands with the equipment bolted to them. They shall be of the heavy-duty rising stem type, constructed of high-grade cast iron or cast steel, and equipped with anti -friction thrust bearings to take the upward and downward thrust of the valves or gates. They shall be capable of operating the valves and gates under their maximum operating condition. The motor operating mechanisms, reversing magnetic contactors, control stations and limit switches shall be enclosed in watertight and dust -tight cast iron housings attached to or built integrally with the stands. (2) Motors shall be suitable for operation on current characteristics as designated in the Project Specifications or shown on the Contract Drawings and shall have sufficient torque to start and operate the valves and gates in any position. Motors shall be furnished with ball bearings, with windings impregnated to withstand excessive moisture, and shall be rated to run continuously for the time required to completely open and immediately thereafter to completely close the valves or gates without exceeding safe operating temperatures. Manual operating handwheels shall be provided for emergency operation of the stands, with provisions to prevent simultaneous use of the operating mechanisms. The handwheels shall not revolve when the units are operating electrically. A suitable mechanically actuated valve or gate position indicator shall be furnished with each stand. (3) Each stand shall be equipped with a cold rolled steel shaft of ample size, supported by bronze bushed guide brackets at intervals not to exceed 10 feet. The threaded portion of the stems shall be manganese bronze with machine cut threads. The different sections of the stems shall be jointed together by manganese bronze couplings, threaded and keyed to the stems. Anchor bolts for guide brackets and stands shall be of genuine wrought iron or cadmium plated steel. (4) Reversing magnetic contactors shall be equipped with silver to silver contacts, overload relays. "Open -Stop -Close" push button station, red and green indicating lights, and control transformer Rev. 12112 SECTION 11 Page 19 with 120V secondary for all control and indicating lights shall indicate the fully open or closed positions of the valve or gate, and both lights shall be energized at intermediate positions of the valve or gate. (5) Limit switches shall be provided for limiting the valve or gate travels in either direction and shall be suitable for five adjustments and operations, particularly at the seating positions of the valve or gate. The controls shall include a mechanically actuated torque switch to protect the motor and equipment in the event the valve or gate should become jammed or excessive pressures should be applied, 11.02,3 ELECTRIC MOTORS (a) GENERAL (1) Motors shall conform to the latest applicable NEMA, AIEE, and ASA Standards. The motor ratings and types shall be as specified herein, except as modified by the Project or Equipment Specifications. All motors shall receive routine tests in accordance with AIEE test procedures. (2) Output torque and speed characteristics of each motor shall be suitable to operate the driven equipment under the full range of equipment operating load conditions without exceeding the nameplate current rating, and/or temperature rise. (3) Special equipment requiring a motor drive with unusual characteristics shall be equipped with a definite purpose motor to meet the necessary requirements. (4) Motor bearings shall be of the anti -friction type. Thrust bearings in vertical motors shall be adequate for the loading encountered, (5) Motor conduit boxes shall be oversized and shall be located so as to be readily accessible. (b) RATINGS (1) Motor ratings shall be based on continuous operation in an ambient temperature of 40 Degrees C, The maximum temperature rise for open and drip -proof type motors shall not exceed 40 Degrees C, and for totally enclosed type motors shall not exceed 55 Degrees C. (c) TYPES (1) Motors of 3/8 H,P. and larger shall be squirrel cage induction type designed for 3 phase, 60 cycle, 220/440 volt operation. Motors smaller than 3/8 H.P. shall be of the capacitor type designed for single phase, 60 cycle, 115 volt operation. Motors indicated on the Contract Drawings and/or specified in the Project Specification as 208 volt or 480 volt shall be specially wound for voltage indicated and/or specified. Rev. 12/12 SECTION 11 CD Torque and locked rotor current characteristics for three motors shall be NEIVIA Design "K The locked rotor K\/AJHP input cdfull voltage for15H.P.motors and larger shall not exceed that permitted for Code Letter "F'', except for specialized equipment requiring a motor drive with special definite ohmnadahohco. CB All motors shall be of the open "dexcept in hazardous locations and as otherwise specified under the Project Specifications and/or the Contract Drawings, (4) Explosion -proof typo motors shall be furnished for hazardous areas as defined in the National Beobic OVdg. They shall be totally enclosed and bear the Underwriters Laboratories Label indicating compliance with the requirements for the specific application. 11.03 CONSTRUCTION METHODS 11��3.1 GENERAL (a) Installation of Inside Process Piping work shall be complete in every respect, insuring systems which will operate satisfactorily and quietly. All work shall be done by skilled workmen, and work performed by unskilled help will not be acceptable, All cutting, fitting, repairing and finishing of masonry, concrete, metal and carpentry work that may be required for the contemplated work under this Specification must be done by craftsman skilled in their respective trades and at the expense of the Contractor, Unless otherwise indicating, all material and equipment shall be installed in conformance with the manufacturer's recommendations. (b) Proper and suitable tools and appliances for the safe and convenient handling and installing- of the pipe and fittings shall be used. Great care shall be taken to prevent damage to any interior coating on pipes and fittings, All pieces shall be carefully examined for defects, and no piece shall be installed which is known to be defective. If any defective piece should be discovered after having been installed, it shall be removed and replaced with a sound one in a satisfactory manner by the Contractor at his own expense. Pipe fittings shall be thoroughly cleaned before they are installed, and shall be kept clean until they are accepted in the complete (o) Ail piping connecting to equipment shall be provided with unions or companion flanges located so that piping may be readily dismantled from equipment Connections between hynnua and non-ferrous metals in piping systems shall be made with dielectric unions of the type demchbed herein. (d� All piping shallbeinstalled klsuch gmanner that it will befree hoexpand and contract without injury to itself or its supporting structure. On all piph1g, except that for high temperature service, self -equalizing type expansion joints of an approved make and quality nhnU be installed in all runs ofyUfeet nrmore unless otherwise shown unthe Contract Drawings. On piping for high temperature aemine, self -equalizing type expansion joints or pipe bends shall be installed as approved by the Engineer oraS Rev. 12112 GfI�FK}N iI shown on the Contract Drawings. Pipe bends shall be cold sprung one- half thuhed expansion in the |Ulna Guides and anchors ohuU be furnished and installed inanapproved manner. (e) All piping passing through walls and floors shall be installed in pipe sleeves or wall oastioQo accurately located before concrete is poured or placed in position during construction ofmasonry walls. Boxing out for wall castings will not be aUuwed. G|eemsa for piping smaller than 3 inches located inconcrete floors and walls and |nexterior masonry walls shall be fabricated from standard weight black obae| pipe; those located in interior partitions shall be fabricated of14gauge galvanized steel. Sleeves for pipe 3 inches and larger shall be the manufactured type honanbefona specified. Top of floor sleeves for exposed piping shall extend 1 1/2 inch above floor |avo|'' �allother sleeves �hmshallbaflush wkh surface.. Where uncovered and -all exposed pipes inches in outside diameter and smaller pass through floors, finished weUn' or finished ceilings they shall befitted with floor and ceiling plates ofthe type henainbofUreapenified. All exterior wall sleeves and any interior wall sleeves into Chlorine Rooms shall becaulked with lead wool and hemp tomake sleeves waterproof and gas tight, (f) A safety valve of the type heneinbefore specified, having a set pressure of 35 psi and e relieving capacity of at least 30 dm of free air with 10Y6 euoumu|ahon, shall be installed at each high point of each section of sludge line and between shut-off valves. (z) All piping installed below a slab resting on grade, unless otherwise specified in the Project Specification, shall be encased in concrete of the same type auused for the slab buaminimum thickness ofOinches on all sides ofthe pipe, (h) Sufficient compression sleeve orV1ctauho coupling type joints ehuU be placed at locations in addition to those specifically shown the Contract Drawings tnprovide for expansion. (i) Lines conveying' water at 100^F or higher ohoU be provided with automatic air vents at all nyab*m high points and elsewhere as indicated onthe Contract Drawings. Each air vent shall b provided with a1/4inch copper drain line to the nearest service niDk, drain orother location as dinaob*d by the Engineer; routing shall be in locations protected from traffic and/or ao directed by the Engineer, Air vents for concealed piping ahoU be made muuenoib|e by means of an approved flush type access panel. �) Chemical feed troughs shall be 10 gauge galvanized nteel unless otherwise indicated in the Project Specifications and/or on the Contract Drawings. Where stainless steel troughs are called for, they shall be 16 gauge type 316. (k) Installation of piping not hereinafter specified shall be as indicated in the Project Specifications end/or on the Contract Drawings, or as recommended bythe manufacturer ifnot otherwise indicated. (|) In general, fittings used in piping systems shall have the same uonn8ctons, matedo|, pressure rating, and finish aothe pipe towhich connected. Unless nthemNmo indicated 125 }b, cast iron threaded fittings Rov. 12M2 SECTION 11 shall beused with standard weight wrought iron and steel pipe. Drainage systems using threaded piping shall baprovided with drainage type PIPING SUPPORTS (a) Pipe hangers and roller chairs shall be large enough to accommodate pipe covering protectors, Support spacing and hanger rod sizes shall be as follows: Maximum Minimum Nominal Pipe Support Spacing Hanger Rod Size - Inches Feet Inches Diameter Steel and Wrought Iron Pipe 1/4 5 3@ 1 S 30 11/4 8 30 1&and 2 Q 30 2Y2and3 11 1/2 4and 6 12 5/8 6 14 8/4 8ho 12 15 1 14 and 16OD 15 1 1/8 18 OD 15 1 1/8 20OO 15 1 1/4 Larger than 2DOO 15 See Project Specifications Copper Tubing ,/2 G 3@ 5/8tm 1 8 3/8 1 %ho2 10 1/2 21/2to5 12 5/8 0 to 14 70 Cast Iron and Ductile Iron Pipe 1}6and 2 6 30 3and 4 8 BB 6 Q 8/4 8bo 12 0 7/8 14and 18 Q 1 18 9 1 1/8 20 Q 11/4 Larger than 2O 9 See Project Specification (b) In addition to the foregoing 8mibations, bell and spigot pipe shall be supported at each joint. |osbaK supports on each side of each valve 3 inches and |an]er, spaced no farther than 18 inches from the valve. Additional supports shall be provided where required to prevent piping loads from placing damaging stresses on valves and equipment. Where neceanary, pipe ahg|| be blocked up at each support to permit installation of pipe insulation. Rev.12M2 {%ECTl{Nif[ Page 23 (c) Rubber hose, polyvinyl chloride pipe, Saran pipe, Uscolite pipe, polyethylene pipe, and hard rubber pipe shall be supported over the entire length by means of troughs consisting of steel channels or angles which in turn are supported at intervals not exceeding 10 feet. (d) Piping materials not included in the foregoing tabulation shall be supported as indicated in the Project Specifications and/or on the Contract Drawings or in accordance with the pipe manufacturer's recommendations if not otherwise indicated. 11.03.3 INSTALLATION OF BELL AND SPIGOT PIPING (a) In joining bell and spigot pipe and fittings, the spigot of each pipe shall be property seated in the bell of the next adjacent piece and adjusted so as to give a uniform space for the joint, which shall be made with braided hemp or jute, fibre packing, or rubber gasket, and with lead or compound as designated in the Project Specifications. The packing shall be long enough to completely encircle the pipe, and shall be thoroughly driven into the bell so as to leave a -space of at least 2 1/2 inches in depth to be filled with lead. Each joint must be made in one pour. In making lead joints, the melting pot shall be kept near the joint to be poured, and dross shall not be allowed to accumulate in the melting pot. Lead joints shall be thoroughly caulked by competent mechanics and in such a manner as shalt- secure tight joints without overstraining the iron of the bells. Tarred jute packing shall not be used for bell and spigot wall castings or caulked wall sleeves. (b) Gast iron soil pipe joints shall be composed of oakum and lead. Joints shall be yamed, poured and caulked in the same manner as prescribed in the preceding paragraph. Each joint shall contain one pound of lead per inch of pipe diameter. (c) Gasket type bell and spigot piping shall be installed in strict conformance with the manufacturer's recommendations. 11.03.4 INSTALLATION OF FLANGED PIPING All joints in flanged piping shall be brought to exact alignment, and all gaskets and bolts or studs inserted in their proper places. Bolts or studs shall be uniformly tightened around the joints. Where stud bolts are used, the bolts shall be uniformly centered in the connections and equal pressure applied to each nut on the studs. Steel flanges bolted to 125 lb. cast iron flanges shall be furnished with flat faces. 11,03.6 INSTALLATION OF THREADED PIPING All threaded joints in steel, wrought iron, or cast iron piping systems shall have long taper threads which shall be made tight with oil and graphite paste applied to external threads only. All pipe 1-1/2 inches and smaller shall be reamed to remove burrs and stood on end and well pounded to remove scale and dirt.. Wrenches on valves and fittings shall be applied directly ovef the joint being tightened. The joints of all piping used for chlorine gas shall be made up with litharge and glycerine. Rev. 12/12 SECTION 11 Page 24 11.03.6 INSTALLATION OF WELDED PIPING All welding shall be performed in accordance with the procedures of the NCPWB, or other approved procedures, which conform with the requirements of the ASME Boiler and Pressure Vessel Code or of ASA B31.1. No welder or welding operator shall be employed on the work who has not been fully qualified under these procedures and so certified by a member of a local Chapter of the NCPWB or similar locally recognized authority. The Engineer has the right at any time to call for and witness the making of test specimens by any welder or welding operator in accordance with the foregoing and to observe the physical tests of the specimens, All labor and materials required for the tests shall- be provided at the expense of the Contractor. Filler metal for welding shall be of the same composition as the base metal, Fittings shall be of the same material and schedule number as the pipe to which attached. 11.03.7 INSTALLATION OF COPPER PIPING (a) Copper tubing with solder joint connections shall have all burrs removed from the tubing before joints are made. Both the inside of the fitting and the outside of the tubing shall be cleaned and polished and a non- corrosive flux shall be evenly distributed across the joining surfaces by applying the flux and rotating the fitting and tubing together. Joints shall be made by applying heat and solder to the end of the fitting until the solder melts and then passing the flame toward the center of the fitting until the solder is absorbed and appears uniformly around the end of the fitting. Excess solder shall be removed by brushing while the solder is still in a plastic state. A fillet shall be left around the cup of the fitting. All joints shall be allowed to cool at room temperature without chilling. (b) Copper tubing with flared joints shall be thoroughly cleaned and the ends of the tubing shall be uniformly flared to the bevels of the fittings. Wrenches shall be applied to the bodies of fittings near the joint being made but in no case to a joint previously made. 11.03,8 INSTALLATION OF MISCELLANEOUS PIPING (a) In joining cast iron pipe using joints other than bell and spigot, threaded, and flanges, the pipe shall be brought to exact alignment and all necessary rings, gaskets and _bolts inserted in their proper places. Bolts shall be- uniformly tightened around the joints to avoid any strains or distortions. Mechanical joint cast iron piping shall be installed in conformance with the notes appended to ASA A21.11. (b) Installation of types of piping other than listed herein shall be as indicated in the Project Specifications and/or on the Contract Drawings or as recommended by the manufacturer if not otherwise indicated. 11.03.9 INSTALLATION OF INSULATION (a) Thickness and type of insulation required for the various piping systems shall be as indicated in the Project Specifications and/or on the Contract Drawings. No pipe covering shall be installed until the piping system has been tested as hereinafter specified. Pipe covering protectors shall be Rev. 12/12 SECTION 11 Page 25 provided at each pipe hanger or support and shall be installed simultaneously with the insulation, Pipe covering protectors shall also be provided at locations where insulation is subject to damage from traffic. (b) Pipe insulation shall be applied over clean dry pipe with joints butted firmly together and any factory applied jacket securely pasted in place. All longitudinal and transverse joints shall be staggered when more than one layer is applied. All joints shall be sealed in accordance with the manufacturer's recommendations. Where a vapor barrier is required it shall be carried down and sealed to the pipe at intervals of not more than 50 feet. (c) Fittings, valve bodies, flanges, unions and couplings shall be insulated to the same thickness as the adjacent pipe covering either with fabricated insulation covers; or with insulating cement for pipe sizes smaller than 4 inches and with segments of insulation wired in place and finished with insulating cement for pipe sizes 4 inches and larger. Insulation requiring a vapor barrier shall be sealed with a vapor barrier tape and a sealing compound. Unions and flanges shall be insulated only on lines requiring a vapor barrier. (d) All insulation of fittings, valve bodies, flanges, unions, and couplings shall have a 6 ounce canvas jacket neatly and securely pasted on. All exposed pipe insulation shall have a 6 ounce jacket neatly and securely pasted on with all longitudinal_ seams installed toward wall or ceiling. All exposed ends of insulation at unions, flanges, equipment. etc., shall be tapered down to the pipe and sealed with insulating cement. (e) Plastic Pipe Coatings for condensation and corrosion control shall be applied to the piping systems indicated in the Project Specifications and/or on the Contract Drawings. Unless otherwise indicated, coatings shall be 1/2 inch thick and shall cover the entire system, including fittings, unions, flanges, valve bodies, and couplings. Coating shall be applied in layers not exceeding 1/8 inch in thickness over,a clean, dry surface from which all scale and rust has been removed; each layer shall be allowed to dry for a minimum period of 24 hours before the subsequent layer is applied, Temperature of surface shall be between 50F and 150F when coating is applied. Coating shall be applied by hand or brush. 11.03.10 TESTiNG OF PIPING SYSTEMS (a) Unless otherwise specified in the Project Specifications and/or shown on the Contract Drawings, all piping systems installed under the General Specification for Inside Process Piping shall be tested in the manner hereinafter specified. No piping shall be insulated, concealed, or furred - in until it has been tested to the satisfaction of the Engineer. Testing media shall be furnished and disposed of by the Contractor, and all material, labor and equipment required for the testing procedures shall be at his expense. Any leaks or defective piping disclosed by the test shall be replaced or repaired and the test repeated until all piping proves tight. No caulking of defective piping or joints will be permitted. (b) Piping which will convey water or aqueous solutions shall be tested hydrostatically. Piping which will convey gases or liquids other than water or aqueous solutions shall be tested with air. Rev. 12/12 SECTION 11 Page 26 (c) Gravity drainage systems shall be tested by filling the system with water to the highest point or overflow or by subjecting the system to an equivalent pressure; all joints and fittings shall then be checked for leaks. Other systems shall be tested by subjecting the piping to 50% in excess of the minimum pressure to which the piping will ordinarily be subjected, but in no case lower than 50 psi for systems employing cast iron pipe; however, no system shall be subjected to a pressure greater than 50% in excess of the design working pressure of the pipe and/or fittings. Regulators or other devices which could be damaged by the test shall be isolated or removed from the system during the test. 11.04 COMPLETION OF CONTRACT 11.04.1 PROTECTION OF WORK The Contractor shall protect all inside Process Piping equipment and materials from damage at all times during construction and until the final acceptance by the Owner of the completed Project. Pipe openings shall be closed with plugs or caps during installation. Equipment shall be properly covered and protected against dirt, water, chemicals, or mechanical injury at all times. Prior to final acceptance of the Project, all piping and equipment shall be thoroughly cleaned and delivered to the Owner in perfect condition. 11.04.2 IDENTIFICATION OF VALVES (a) Each shut-off or control valve installed in inside processing piping systems, except those at equipment, shall be provided with a 1-1/2 inch minimum diameter heavy brass tag. Each tag shall bear the identifying number of the valve and, when so indicated in the Project Specifications and/or on the Contract Drawings, an identifying letter symbol of the service line. - (b) The tags shall be attached to the valve by split -key rings soldered so that ring and tag cannot be removed. The numbers and letters shall be of block type, with 1/2 inch high numbers and 114 inch high letters stamped thereon and filled with black enamel. 1C04.3 IDENTIFICATION OF PIPE LINES Each inside process pipe line which is installed in an unfinished room, furred ceiling, boiler room, equipment room, or basement shall be provided with identifying letter symbols stencilled on the line. Symbols shall be provided at maximum intervals of 25 feet and shall b stencilled after the pipes have been insulated andfor painted as specified. Stencil color shall be black unless background color is dark, in which case stencil color shall be white. Identifying letters shall be at least 2 inches high for pipe OD's (including insulation) 4 inches and larger, 1 inch high for pipe OD's from 2 inches to 4 inches, and 1/2 inch high for pipe OD's smaller than 2 inches, In addition to the identifying letters, each symbol location shall be provided with a stencilled arrow indicating direction and/or directions of flow, identifying symbols shall be as indicated in the Project Specifications and/or on the Contract Drawings. 11.04.4 VALVE DIRECTORIES The Contractor shall furnish and install approved schematic pipe diagrams and valve directories for each inside process piping system. Each schematic pipe Rev. 12112 SECTION 11 Page 27 diagram shall be single line showing the relative position of valves, valve numbers and direct of flow. Each directory shall show each valve number and the location of each valve. Each diagram and directory shall be on an approved material and framed in a glazed frame with screw eyes and wires for hanging and shall be located as directed by the Engineer. 11.04.6 STERILIZATION OF POTABLE WATER SYSTEMS (a) All piping connected to and forming a part of a potable water system shall be as sterilized in a manner acceptable to the Engineer. The method described as follows; or other method acceptable to the NC Department of Environment, Health and Natural Resources, Division of Environmental Health, Public Water Supply Section or others having jurisdiction and the Engineer, shall be used. (b) After the pressure test and before sterilization, each potable piping system shall be flushed until the water runs clear, Each valved section of the newly installed piping system shall be flushed separately with potable water from the public supply. (c) Disinfect the piping system with chlorine applied by the introduction of a hypochlorite solution. Calcium hypochlorite in commercial grades contains about 65% to 70% of free chlorine. Hypochlorite powder shall first be made into a paste and then thinned to about a 1% chlorine solution. This will require about 7,50 gallons of water to each pound of powder. Solutions shall be prepared in an approved container for chlorine solutions and the solids permitted to settle out. The clear supernatant shall be applied to the main through a rubber hose by gravity, syphonage, injection or by suitable pump feeder. (d) The point of application of the chlorinating agent shall be at the beginning of the piping system or any valved sections thereof, and through a corporation cock inserted in the top of the newly installed pipe. Water from the existing distribution system shall be controlled so as to flow slowly into the newly installed pipe that the chlorine dose applied to the new pipe shall produce at least 100 ppm after 24 hours standing, Valves shall be manipulated so that the strong chlorine solution in the pipe being treated will not flow back into the line supplying the water. (e) Permit the treated water to remain in the pipe being treated for at least 24 hours, following which period of time the line shall be thoroughly flushed until all of the heavily chlorinated water is removed. The Contractor may release chlorinated water and/or flush water only in the manner, location and rate as approved by the Engineer, Such approval shall be on a site by site basis. If, for any reason, a shorter retention period must be used, the chlorine concentration shall be increased accordingly. (f) Collect bacteriological water samples from the end most outlet of the treated piping system through two successive days. If, at the end of this period the samples show safe results, the new piping system may be placed in service. If, however, the results are unsafe, the chlorine treatment shall be repeated until all samples show safe results. Bacteriological analysis samples must be picked up by the Contractor and run by a state -approved laboratory, employed and paid by the Contractor, with the cost of such tests merged in the price bid on contract items, Rev. 12/12 SECTION 11 Page 1 GENERAL SPECIFICATIONS 12.0 MISCELLANEOUS METALWORK 12.01 GENERAL 12.01 A SCOPE OF WORK (a) All labor, materials, equipment, tools, and services required for the furnishing and installation of miscellaneous metalwork required under this Contract shall be furnished and installed in compliance. with the following General Specifications, the Project Specification and the Contract Drawings. (b) This General Specification designated as Section 12.0, Miscellaneous Metalwork, covers the description of materials generally utilized in miscellaneous metalwork installations and the installation of such materials. The Project Specifications and the contract Drawings designate the specific work, the materials, and the details on the furnishing and the installation of all Miscellaneous Metalwork. The inclusion of items of material or work within this Specification does not necessarily constitute their use on this Project. 12.01.2 SHOP DRAWINGS (a) The attention of the Contractor is directed to the provisions in the General Conditions of the Contract requiring the submission to the Engineer of shop and setting drawings. On all miscellaneous metal work, such submission shall include shop drawings for all work fabricated off of the construction site and must conform to the exact description named in the General or Project Specification or in the Schedules on the Contract Drawings. (b) Shop and Setting Drawings and manufacturer's data for all material included under this section shall show the kind of material, sizes of metal, method of assembly, hardware and anchorage or connection with other work, 12.01.3 VERIFICATION OF CONTRACT DRAWINGS (a) The Contract Drawings indicate the size and arrangement for miscellaneous metal work. In the event it should become necessary to change the. location of the work due to construction details, the Contractor shall consult with the Engineer before making any such changes. (b) The Contractor shall consult with other trades in advance and shall make all the necessary provisions for the installation of their work. Rev. 3149 SECTION 12 Page 2 12.01.4 STANDARDS Where materials and methods are indicated in the following Specifications as being in conformance with- a standard specification, it shall refer in all cases to the latest edition of the specification and shall include all interim revisions. Listing of a standard specification without further reference indicates that the particular material or method shall conform with such listed specification. Where manufacturer(s) or trade -names appear, it is only to represent a level of quality expected and in no way is to be construed to preselect the Contractor's supplier or equipment. It sloes not restrict bidders to a specific -brand, make, manufacturer or specific name. They are used only to set forth and convey to bidders the general style, type-, character, and quality of product desired. Equivalent -products will be acceptable. All equipment shall conform to the latest revised applicable OSHA Standard, 12.02 CONSTRUCTION MATERIALS 12.02.1 GENERAL (a) All materials and equipment shall be furnished by an established and reputable manufacturer or supplier. All materials and equipment shall be new and shall be of first class ingredients -and construction, designed and guaranteed to perform the service required and shall conform with the following Specifications or shall be the product of the listed manufacturer's or similar and equal thereto. (b) Proper handling and storage techniques must be exercised with all material to prevent the inclusion of foreign materials or damage by water, frost or breakage. Perishable materials shall be placed on a platform raised clear of the adjoining ground and protected from damage with a weatherproof cover. (c) The Contractor shall verify conditions in the field, be responsible for proper fitting together of his material and shall check all measurements in the field, as required for work fabricated to fit job conditions. (d) Before starting work, the Contractor shall examine adjoining work on which his work is in any way dependent for perfect workmanship and fit. All corrective work shall be performed to the adjoining work as may be necessary to produce work perfect in all respects. (e) The Contractor shall make all necessary provisions for work included herein to accommodate work specified under other Sections. Rev. 3/09 SECTION 12 12.02.2 CONSTRUCTION MATERIALS ASTM Designation (a) Aluminum Castings ' Anodized finish 826AKoyG4A. b)match balance ofaluminum materials Condition ) Aluminum 8ars, Rods, Shapes 8221 ur83D8 (o) Aluminum Sheets, P|abaa Mill Finish 82U0,Alloy 11OO Anodized Finish B2Oy`Alloy 30O3 Aluminum Tubing B210 (e) Bronze Castings - Color tomatch other architectural bronze B147 Bronze Bolts, Nuts, Screws B16 (g) Bronze Rods, Bars, Shapes B124 h) Bronze Sheets, P|abaa B86 (i) Bronze Tubing B1S5 0) Bronze Pipe B48 Copper Sheets 8162.Hard Temper |) Cast Iron A48 (m) Malleable |,on,VVhitefuUyannealed A47 ) Sheet Iron , A109 (o) Stainless Steel Sheets /\1G7.Type 3O28 Exposed Sheets No. 4Finish Normally invisible sheets for protection against weather and corrosion No. 1 Finish (p) Stainless Clad Steel with A264 2096 Cladding No, 4 Finish ) Steel Pipe A120 ( Structural Steel A38 (a) Structural Steel Tubing ASTN185O1 Seamless, Hot Formed Gbae| Pipe A53 (u) Cast Steel A27 \ Genuine Wrought Iron Rods, Bars A207 Genuine Wrought Iron Plates /442 (x) Genuine Wrought Iron Sheets A102 Genuine Wrought Iron Pipe A72 (z) Zinc Coating A123 (aa)Concrete Inserts: Threaded or wedge type, galvanized ferrous uantiogo, either malleable iron ASTK8 A47 orcast steel AGTYN A27. Provide bo|(s, washers and shims as naquined, hot - dip galvanized, ASTM Al 51 (ob) MASONRY ANCHORAGE DEVICES Expansion Shields, F8FF-S-325 (an) TOGGLE BOLTS Tumble -wing type, FSFF-8-688.class and style aarequired. Rem3/09 SECTION 12 (ad) FASTENERS I. GENERAL Provide zinc -coated fasteners for exterior use or where built into exterior walls. Select fasteners for the type, grade and class required. Z BOLTS AND NUTS Regular hexagon head type, ASTM A307, Grade A 3� LAG BOLTS Square head type, FSFF'8-501 4, MACHINE SCREWS Cadmium plated nbae. F6 FF-G- 92 5, WOOD SCREWS Flat head carbon steel, FSFF-G411 G. PLAIN WASHERS Round, carbon steel, FSFF-VV-82 7, LOCKVWASHERS Helical spring type carbon steel, FSFF-VV-84 8. SELF DRILLING ANCHORS "Red Head" as manufactured by Phillips Dh|\ Company, Inc., Hi|U Fastening Systems, Ramuat.orequal. 1202.3 FABRICATION (a) GENERAL (1) Fabricated metal work shall bewell formed toshape and size, with sharp lines and angles. Shearing and punching operation shall leave dsmn. hue lines and surfaces. All permanent connections shall bewelded nrriveted. Assembling bythe use of bolts or screws shall be avoided when possible, but ifused, bolts and screws shall be screwed uptight with the threads nicked to prevent loosening, All curved work shall be evenly sprung. (2) Rev. 3/09 SECTION 12 Page 5 (3) All fastenings shall be concealed where practicable, or if impractical other methods of fastening shall be submitted to the Engineer for approval. The thickness of metal and details of assembly and supports shall give ample strength and stiffness. Joints which will be exposed to the weather when erected shall be formed to exclude water. Holes and connections for the work of other trades shall be provided. (4) Structural steel fabrication of miscellaneous metalwork items shall conform with the AISC "Specification For The Design, Fabrication and Erection of Structural Steel For Buildings (Riveted, Bolted and Arc -Welded)." All steel work which is to be galvanized shall be fabricated in accordance with AST M A143, A384 and A385.. (5) All welding shall be in accordance with the "Standard Code for Arc and Gas Welding in Building Construction" of the American Welding Society. Welding shall be continuous along entire area of contact, except where tack welding is permitted. Tack welding will not be permitted- on exposed surfaces. All exposed welds shall be ground smooth and brushed clean. (6) :Supplementary parts necessary to complete each item, though such work is not definitely shown or specified, shall be included. All miscellaneous metalwork where not shown in detail on the Contract Drawings shall be designed by the Fabricator in accordance with good accepted standard practice. (7) Use material of size and thickness shown or, if not shown, of required size and thickness to produce strength and durability in finished product. Work to dimensions shown or accepted on shop drawings, using proven details of fabrication and support. Use type of materials shown or specified for various components of work. (8) Form exposed work true to line and level with accurate angles and surfaces and straight sharp edges. Ease exposed edges to a radius of approximately 1132" unless otherwise shown. Form bent -metal corners to smallest radius possible without causing grain separation or otherwise impairing work. (9) Weld corners and seams continuously, complying with AWS recommendations. Grind exposed welds smooth and flush, to match and blend with adjoining surfaces. (10) Form exposed connections with hairline joints, flush and smooth, using concealed fasteners wherever possible. Use exposed fasteners of type shown, or if not shown, Phillips flat- head (countersunk) screws or bolts. Rev. 3109 SECTION 12 Page 6 (11) Provide for anchorage of type shown, coordinated with supporting structure. Fabricate and space anchoring devices as shown and as required to provide adequate support for intended _use. (12) Cut, reinforce, drill and tap miscellaneous metal work as required to receive finish hardware and similar items. (13) Use hot -rolled steel bars for work fabricated from bar stock unless shown or specified to be fabricated from cold -finished or cold roiled stock. (b) STAINLESS STEEL WORK (1) Only the proper type of stainless steel electrodes or welding rods -shall be used. All welded joints shall be ground and polished and made imperceptible. Welds shall be of such character as to eliminate injury to stainless steel parts in appearance, strength and resistance to corrosion. (2) All scratches, marks, pits and other blemishes on exposed surfaces incurred during fabrication of the material shall be removed by grinding and polishing until the entire surface possesses the same finish as the adjacent work. (c) ALUMINUM WORK Type and procedure for welding of aluminum shall be as established and recommended by the producer of the castings, sheets, bars, rods, shapes, etc., to be used in the finished metal work. All welded joints shall be ground and polished and made imperceptible. (d) BRONZE WORK Only the proper type of bronze electrodes or bracing rods shall be used. All welded joints shall- be ground and polished and made imperceptible, (e) COPPER WORK All copper work shall be fabricated of the weight indicated on the Contract Drawings, with concealed welds and fastenings. The assembled work shall be polished after fabrication. Rev. 3/09 SECTION-12 Page 7 (f) GALVANIZED STEEL WORK (1) Provide zinc coating for those items shown or specified to be galvanized as follows: (a) ASTM A 153 for galvanizing iron and -steel hardware. (b) ASTM A 123 for galvanizing rolled, pressed forged steel shapes, plates, bar and strip 1/8" thick and heavier. (c) ASTM A 386 for galvanizing assembled steel products. (2) GALVANIZING REPAIR PAINT High zinc dust content paint for re -galvanizing welds in galvanized steel„ complying with military Specifications MIL-P-21035 (Ships). (g) SAFETY TREAD NOSINCS Safety tread nosings shall have an abrasive surface for treads and the down side of landings and platforms of poured in place concrete stairs shall have safety tread. The nosings for concrete stairs and steps shall be 8 inches shorter than the treads to which they are to be applied and designed so that after installation the top surface will be flush with the top surface of treads and platforms and fastened thereto with countersunk brass bolts or screws to the anchors set in concrete. (h) PIPE TRENCH COVERS AND FRAMES Pipe trench covers and frames shall consist of 3" x 2" x 114 inch steel angle frames with 1" x 1/4 inch steel anchors spaced approximately 18 inches on center on all sides for embedding in concrete. Continuous stops shall be welded to the sides of the frames. Covers shall be fabricated of 1/4" minimum steel plate set loose in sections of not over four (4) feet long with stiffener angles as required. The top of the plate and frame shall finish flush with the finished floor. (i) PIPE RAILINGS (1) GENERAL, (a) Railings shall be fabricated to the details indicated on_ the Contract Drawings, using flush type fittings with joints welded and the welds ground smooth. Handrails to be secured to walls shall be furnished with cast iron brackets to be spaced ten (10) inches from the ends, and not over five (5) feet apart. The exposed ends of these handrails shall be fitted with screw plug finials. Rev. 3/09 SECTION 12 (b) Fabricate pipe railings hodimensions and details shown, with smooth bands and welded joints ground smooth and flush. Where details are not shown, use 1'1/2" steel pipe with to of hop nsi| 42" above floor, or 32" above stair treads measured vertically otthe stair riser line. (c) Adjust railings prior to anchoring to ensure matching alignment at butting joints, Space posts not more than 8' on centers, unless otherwise shown. Plumb posts in each direction. Secure posts and rail ends tobuilding construction as follows: (1) Anchor posts in uoncnaba by means of pipe sleeves set and anchored into concrete. Provide sleeves of galvanized, standard weight, steel pipe, notless than 8" )ong, and having an inside diameter not less than 1/2" greater than uubm\da diameter of posts. A square galvanized bone plate shall be secured to bottom of sleeve and of width and length not |emu than 1" Onaotar than outside diameter ufsleeve, After posts have been inserted into sleeves, fill annular space between postand o|eewo solid with molten lead or quick -setting hydraulic cement. Cover anchorage joint with ground steel flange welded topost. (2) Anchor posts to steel with steel oval flanges, angle type on floor type aorequired by conditions, welded to posts and bolted to steel supporting members. (3)Anchm nail ends into steel with steel oval or 'round flanges welded turail ends and bolted k)structural steel members. k0Secure handrails towalls bymeans ofwall brackets, and wall return fitting edhandrail ends. Provide brackets with not less than 1 %" clear space between finish wall surface and pipe hand/oi|, and with wall plate portion of bracket drilled to receive one3/8" bn|L Locate brackets not more than 8U" o.o. Provide flush type wall return fittings with same projection as that specified for wall brackets. Secure wall bnynkeba and wall return fittings hnbuilding construction aefollows: (1) For cnncoaba and solid masonry anchorage use bolt anchor expansion shields and lag bolts. (2) For hollow masonry and stud partition eoohonage, use toggle bolts having square heads. (e) All steel pipe handrail shall bgGSUgalvanized |naccordance with AST[N A525xvhan installed on exterior areas and areas with high moisture content atmospheres. Rev. 3/09 SECTION 12 Page 9 (2) STEEL Pipe railings shall be ASTM A53 of sizes shown on Contract Drawings and shall be made -of standard weight 1-1/2" galvanized schedule 40 steel pipe, 2 rails, 42" height with 1/8" x 4" toe plates and with standards not over 5' on centers. Fittings shall be railing type or pipe may have welded joints. All welds shall be ground and polished smooth after fabrication. Wrought iron- pipe sleeves of proper size and arrangement shall be built in and the standard be provided with suitable male connection to slide and lock therein and stand rigid. Provide suitable wall stringer and floor flanges and/or floor sleeves. All welded railings shall be hot dip galvanized after fabrication. Railing expansion joints shall coincide with building or structure expansion joints. (3) ALUMINUM The work includes furnishing and installing aluminum pipe railings at the locations shown on the Contract Drawings. The railings shall be constructed using 1-1/2" I.P.S. Schedule 40 aluminum pipe weighing 0,94 pounds per foot with standards at 5' centers maximum, The railings shall be 2-rail type, 42" high, and shall be constructed using 1/8" x 4" aluminum toe plates. Floor plates, fascia plates, fascia mounts and escutcheon plates shall be used as indicated on the Contract Drawings or as required. Welds shall be completely dressed and blended to pipe. Railing expansion joints shall coincide with building or structure expansion joints. (4) ORNAMENTAL RAILINGS (a) Ornamental railings shall be fabricated from mild steel (or of other metals as designated) bars and shapes to the size and details indicated on the Contract Drawings, Uprights located in concrete shall be set in- sleeves approximately 6 inches long and caulked tight in molten lead or hot sulphur. Uprights in stone shall be set in drilled holes and caulked tight with molten lead or hot sulphur. Rail ends shall be secured into drilled 'holes in masonry and stone and caulked with lead wool. (b) The top of the rail for brass, aluminum or wood handrails shall be drilled and counter -sunk every ten (10) inches for fastening handrail with screws from the underside. Unless otherwise detailed or noted on the Contract Drawings wall brackets shall be used for handrails and shall be of stone design malleable cast iron spaced ten (10) inches from the ends, and not over five (5) feet apart, and shall be furnished with toggle or expansion bolts for fastening to wall, Rev. 3/09 SECTION 12 Page 10 0) METAL LADDERS (1) Vertical metal ladders shall be fabricated of mild steel, aluminum or of genuine wrought iron to the size and details as indicated on the Contract Drawings. Ladders and brackets to be exposed to weather or moisture shall be fabricated of genuine wrought iron. (2) Ship ladders(slopingladders) shall be of the open type, fabricated of structural steel channels or steel plate stringers, having pipe handrails and steel grading treads. Treads shall have a toe -piece at the back one-third of the height of the riser. Stairs shall be fabricated to be anchored to the floor and top with approved fastenings. (k) METAL LADDERS WITH SAFETY CAGE Metal ladders with safety cages shall be galvanized finish with not less than 1.8 oz. of zinc per square foot, according to ASTM A123. All new and existing ladders shall be fitted with safety cages to comply with OSHA Standards. Safety cages shall envelope the ladder width and 2'- 7" deep, All sections shall be welded. Parapet rails or rail extensions shall be as shown on the Contract Drawings. Rails shall be same section in size and strength as ladder rails, The top horizontal bar of the safety cage shall extend around ladder and terminate at top of deck. (I) SPIRAL METAL STAIRS Spiral stairs shall be of the diameter shown on the Contract Drawings and designed for a circular stairwell and cantilevered tread construction. Stairs shall be provided with mild steel railing, balusters and newel. One baluster shall be provided to each step and with the railings extending around the stairwell. The center pipe shall be 3 inches in diameter with cast iron terminals and base and non -slip cast iron cantilevered treads. (m) METAL STAIRS (1) Metal stairs shall be fabricated of all aluminum materials or of steel as indicated on the Contract Drawings. Railing and accessories shall be constructed of the materials indicated on the Contract Drawings. The weights of all aluminum members shall be sufficient to sustain loads without objectionable deflection. (2) All stairs and platforms shall be designed to sustain 100 pounds per square foot for a vertical projected load unless otherwise noted in the Project Specifications or detailed on the Contract Drawings, Rev. 3/09 SECTION 12 (3) Stair stringers shall be fabricated either ofchannels, flat plates or formed plates, bent orrolled to necessary size and shape, The tread and riser brackets wheU be 1-1/4x 1-1/4x 1/8 inch angle, welded or riveted to the sthngero. The headers constructed of channels shall bebolted nrwelded hzthe stringers. The sub -treads and risers shall be formed nfnot less than $ No. 14 gauge steel; intermediate platforms shall beformed ofNo. 12 minimum gauge steel and reinforced with angle or tee stiffeners. The fascia plate covers shall be fabhcatnd of 14 minimum gauge steel or as indicated onthe Contract Drawings. () Unless otherwise indicated on the Contract Drawings the sub - treads and platforms for stairs without grating treads shall be formed with abent nosing and the bottom oythe riser shall have o bent key to receive the poured in place cement or terrazzo treads and safetynoa|nga. An allowance for a two (2) inch MU on treads and three (3)inch fill onintermediate platforms shall bemade. (5) Newels and drops shall beformed tothe design indicated onthe Contract DravA(ings.fabricated of14gauge tubing with permanently secured cast iron caps and drops. Balusters shall beformed ufthe size and shape indicated nnthe Contract Drawings, fabricated of handrails thereto. Brackets for the wall handrails shall beprovided to permit installation with brackets located one (1) foot from each end and each corner and five (5)feet oncenters. (6) All anchors, bolts, angles, hangers, supports and other accessories needed for the complete assembly and installation shall be supplied. Stair members shall be either riveted or welded except that bolting may be used for field assembly where riveting or welding cannot be used. All bolting shall have concealed or flush (7) Provide brackets and bearing surfaces osdetailed and asrequired to anchor and contain the stairs on the supporting structure. (8)Handrails shall be as specified with connections welded and joints ground smooth. Provide with terminal caps and wall flanges where required. Mechanically jointed railing systems maybe used if approved by the Engineers. Install railings using sleeves, flanges, etc., as detailed and anchor with lead. (9) Install wall post flanges, wall brackets, hermina|uapa.obz. as required for complete stair installation. (10) Furnish inserts and anchoring devices which must be set in concrete or built into masonry for the installation of the stair systems work, Provide setting dnswings, hamplatea, instructions and directions for installation of anchorage devioen. Coordinate delivery with other work toavoid delay. Rem3/09 SECTION 12 Page 12 (n) STAIR FRAMING (1) Fabricate stringers of structural channels, or plates, or a combination thereof, as shown. Provide closures for exposed ends of strings. (2) Construct platforms of structural channel headers and - miscellaneous framing members, as shown. Bolt headers to stringers and newels. Bolt framing members to strings and headers. (o) GRATING (1) All gratings shall be fabricated of aluminum or as indicated on the Contract Drawings and designed for a 100- pound per square foot minimum live loading, where specific details are not supplied. All intermediate structural members required shall conform to the loading, unless noted otherwise. All intermediate structural members required shall conform to the loading requirements and must be provided by the Contractor. (2) Frames shall be constructed of aluminum angles, channels, bars or other aluminum members shown on the Contract Drawings. Gratings shall be high -strength, heavy duty, lightweight type and be designed with a minimum 1- 14" I -bar depth with loads not exceeding those permitted by Federal Specification RRG661C. Tread surface shall be extruded and continuous with the top of the 1-bar section. The side of the gratings shall be an kbar. All four outside edges of each separate section of grating shall be banded prior to installation. Any edges banded in the field shall be to the satisfaction of the Engineers. All gratings shall be aluminum 6063 Standard and as manufactured by Borden Grating, IKG Industries, Gary Grating, or equal. (3) Grating shalt be detailed to place top flush with the surrounding walking surface, areaway gratings shall be detailed to place top flush with the top of the concrete surface. Grating for floors and walkways shall be provided with an angle iron frame for anchoring to the concrete with a welded bar anchorage placed at 3 foot centers. At least 1-314" of bearing surface shall be provided on the angle iron frame. (4) Gratings in public sidewalks shall have the inner frame hinged to the outer frame with genuine wrought iron butts having brass pins and a lock requiring special tools. The outer frame shall be detailed for bolting to the concrete. (5) Steel grating shall be galvanized after fabrication. Rev. 3109 SECTION 12 Page 13 (p) HANDRAIL CHAIN When indicated on the Contract Drawings, two-line handrail chain shall be supplied to substitute for pipe handrail. Chain shall be anchored to a post at one end and connected to post ring at the other end with a snap hook. Chain and all accessories shall be fabricated of galvanized steel unless otherwise noted on the Contract Drawings with welded link construction with link metal 3/16 inch in diameter. (q) ALUMINUM MANHOLE FRAMES AND COVERS Furnish and install all aluminum manhole frames and covers shown on the Contract Drawings, Frames shall- be constructed- of aluminum angles, channels, bars or other aluminum members shown in details. All members shall be welded. Covers shall be checkered aluminum plates or bar gratings as indicated on the Contract Drawings and shall be fitted with hinges and flush handles for opening. Frames and covers shall be designed to support a uniform load of not less than 200 pounds per square foot, without excessive deflection. Covers over flumes or reservoirs shall be fitted with a minimum 6" screened vent. Aluminum manhole frames and covers shall be as manufactured by Bilco Co., Waco, Haladay or equal, (r) STEEL MANHOLE FRAMES AND COVERS Furnish and install all steel manhole frames and covers shown on the Contract Drawings. Frames shall be constructed of steel angles, channels, bars or other steel members shown in details. All members shall be welded. Covers shall be checkered steel plates, or bar gratings, as indicated on the Contract Drawings and shall be fitted with hinges and flush handles for opening,. Frames and covers shall be designed to support a uniform load of not less than 200 pounds per square foot, without excessive deflection. Covers over flumes or reservoir shall be fitted with a minimum 6" screened vent. After fabrication, steel frames and covers shall be sand blasted smooth, cleaned and be hot dip galvanized. Steel manhole frames and covers shall be as manufactured by Bilco Co., Waco Co., Haladay or equal. (s) ROOF CURBS Roof curbs shall be provided for all roof penetrations requiring curbs including architectural, process, mechanical and electrical work (except skylights) as required. Curbs shall be of 18 gauge galvanized steel construction with continuous welded corner seams, factory installed wood nailers and 3 lb, density rigid fiberglass board insulation minimum of 9" in height and shall be as manufactured by Pate Mfg. Company, Broadview, Illinois, Thybar Corp,, Addison, Dayton or approved equal. Wood nailer shall be chemically treated to resist rot and insect infestation. The type of curb required shall give the appearance of, or include a well liner, with deck closure strips furnished. It shall be the responsibility of the curb manufacturer to coordinate the curb sizes with the equipment being placed over the roof openings. Rev. 3/09 SECTION 12 Page 14 (t) JIB CRANE (i) REQUIREMENTS The Contractor shall be responsible for furnishing details which are required, but not necessarily shown on the he Contract Drawings, for the adequate and proper installation of the jib crane as required by the Engineers. Cranes and hoists shall be as manufactured by Gorbel, Bushman Equipment, Inc., Spanco, Inc., Abel Howe, or equal. (2) HOIST (a) All apparatus covered by this Specification shall be constructed in a thorough and workmanlike manner. Due regard shall be given in design for safety of operation and durability of parts. The design of all units shall embody the general characteristics as specified herein, (b) All parts requiring periodic adjustment or replacement shall be readily accessible and the maintenance shall require only standard tools. (3) FACTOR OF SAFETY All load carrying parts shall be constructed so that the static stress under full load conditions will not exceed 20% of the ultimate strength of the material used. The gears shall be designed for strength and wear in accordance with ALMA practice. (4) HOIST FRAME The hoist frame shall be made of steel members and all load supporting hoist parts subjected to tension shall be of steel. The joist frame shall be a ductile shock resistant unit and shall give adequate protection to the cable. (5) HOISTING CABLE The wire rope shall be constructed of stainless steel. The cable shall be equipped with swaged -on cable fittings for attachment to the hoist. The attachment of the cable to the hoist frame shall be accessible and shall permit convenient replacement of the cable. The wire rope shall be adequately and internally lubricated. The cable length shall be not less than 30'. (6) TROLLY & HOIST (a) REQUIREMENTS The Contractor shall furnish and install manual trolly and hoist as shown on the Contract Drawings, The Contractor shall be responsible for furnishing details which are required, but not necessarily shown on the Contract Drawings, for the adequate and proper installation of the hoist as required by the Engineers. Trolly and hoist shall be as manufactured by Rev. 3109 SECTION 12 Wright Hoist Division of American Chain and Cable Inc., Philadelphia Hoist Division Company, ACI Hoist and Crane or an equal. (b) HOIST (1) All apparatus covered by this Specifications shall be constructed in a thorough and workmanlike manner. Due regard shall be given in design for safety of operation and durability of parts. The design of all units shall embody the general characteristics as specified herein. (2) All parts requiring periodic adjustment V[replacement shall bereadily accessible and the maintenance shall require only standard tools. (c) FACTOR OF SAFETY All load carrying parts shall be constructed so that the static otnams under full load conditions will not exceed 2896 of the u\bn)ete strength of the material used. The gears shall be designed for strength and wear in accordance with AGN1A (u) WHEEL GUARDS Unless otherwise indicated the wheel guards shall becast iron. (v) PIPE TRENCH COVERS AND FRAMES Pipe trench covers and frames shall consist of3"x2"x1/4" steel angle frames with 1"x1/4"steel anchors spaced approximately center on all mkism for embedding in o0ncnete. Continuous stops shall bewelded huthe sides ofthe frame. Covers shall befabricated oy114' steel plate set loose in sections of not over feet long with stiffener angles as required, The top of the plate and frame shall finish Mush with the finished floor, (w) EXPANSION JOINT COVER PLATES Cover plates for floors, walls and ceilings shall baof cast iron or14 gauge steel. Plates for Ouom shall be made of brass and have e smooth finish on the top surface. Cover plates shall befurnished with flat -head uountepnunktep screws and expansion sleeves arranged in such omanner antupermit expansion orcontraction after installation. (x) TUBULAR METAL FRAMES Tubular metal frames for doors and windows shall be fabricated as indicated bythese Specifications oronthe Contract Drawings and shall be reinforced for all hardware. Rem3/09 SECTION 12 ! |!` 'L | Poge1G �. (0 CLEAN -OUT DOORS Clean -out doors shall befabricated ofcast iron of the size indicated on � the Contract Drawings, with a flange type frame. Each frame shall � have at least four masonry anchors and each door shall have two heavy pin hinges, alatch and hook. i / W CORNER GUARDS ' (1) Corner guards indicated oDdoor jambs and other external corners | in concrete and masonry shall be constructed ofbent steel plate, 1/4 inch th|ck, or steel angles G x O x 1/4 inches thick and extended tuaheight ofsix feet onthe jambs, The corner guards shall besecured bothe masonry with anchors welded tnthe back | and spaced 2feet apart. (am) ALUMINUM COPINGS ' Aluminum copings where indicated on the Contract Drawings shall be o|nli|sr to standard Alcoa extruded shapes of the aba required. The � copings shall be formed true to radii, with all required anchVno, nlitar8. caps and expansion devices, (ab) ALUMINUM SILLS Aluminum exterior sills for other than window openings where indicated on the Contract Drawings shall be Standard Reynolds sills with provisions for expansion. (ad ORNAMENTAL GRILLS Ornamental grills shall be of a pattern to be sw|achad by the Engineer/Owner. Unless otherwise indicated these ghUa shall be fabricated ofaluminum and shall begiven enanodized finish. (ad) ORNAMENTAL METAL LETTERS AND SIGNS Ornamental metal and porcelain on steel signs and letters shall be uunatmubsd in accordance with the best practices of the hudn Concealed stainless steel fastenings shall be furnished to attach signs and letters tomasonry. Ornamental metals shall have No. 4hninb` aluminum work shall beanodized, (ae) METAL WINDOW STOOLS Metal window stools where indicated onthe Contract Drawings shall be Nl|/oa[metal stools ofthe style shown. (af) PROTECTIVE FINISHES FOR EXPOSED ALUMINUM PIPE (1) All type 204-R1 pipe ahe|| receive a satin finish as specified herein. Rev, 3109 SECTION 12 Page 17 (2) All pipe shad be given a brushed textured finish in accordance with the Aluminum Association Designation ASTM-35. Welds shall be completely dressed and blended to pipe. (3) All aluminum shall be then anodized in accordance with the Aluminum Association Designation AA-C22-A31 (minimum coating thickness of 0.4 mil). (ag) LOOSE BEARING PLATES Provide loose bearing plates for steel items bearing on masonry or concrete construction, made flat, free from warps or twists, and of required thickness and bearing area. Drill plates to receive anchor bolts and for grouting as required. Galvanize after fabrication. (ah) LOOSE STEEL LINTELS (1) Provide loose structural steel shape lintels for openings and recesses in masonry walls and partitions as shown. Weld adjoining members together to form a single unit. Provide not less than 8" bearing at each side of openings, unless otherwise shown. (2) Install steel lintels of angle or other shapes, light steel framing not included in "Structural Steel" Section, but required to support openings 18" wide or wider in brick, concrete block, other masonry walls, partitions, radiators, ventilating ducts, registers, access doors to pipes and valves, indicated or required by mechanical trades. (3) Lintels: Minimum 16" longer than opening width, of sizes, number, setting arrangement, as required to provide proper support. (4) Provide lintels, frames, where required at duct openings in walls. Examine drawings for Heating and Ventilating for extent of framing required. (ai) MISCELLANEOUS FRAMING AND SUPPORTS (1) Provide miscellaneous steel framing and supports which are not a part of structural steel framework, as required to complete work. (2) Fabricate miscellaneous units to sizes, shapes, and profiles shown or, if not shown, of required dimensions to receive adjacent other work to be retained by framing. Except as otherwise shown, fabricate from structural steel shapes and plates and steel bars, of welded construction using mitered joints for field connection. Cut, drill and tap units to receive hardware and similar items. (3) Equip units with integrally welded anchor straps for casting into poured concrete or building into masonry wherever required. Furnish inserts if units must be installed after concrete is placed. Except as otherwise shown, space anchors 24" o.c. and provide minimum anchor units of 1-1/4" x 1t4" x 8" steel straps. Rev. 3/09 SECTION 12 Page 18 (aj) MISCELLANEOUS STEEL TRIM Provide shapes and sizes as required for profiles shown. Except as otherwise noted, fabricate units from structural steel shapes and plates and steel bars, with continuously welded joints and smooth exposed edges. Use concealed field splices wherever possible. Provide cutouts, fittings and anchorages as required for coordination of assembly and installation and other work. (ak) INSPECTION Installer must examine the areas and conditions under which miscellaneous metal items are to be installed. Notify the Contractor in writing of conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the Installer. (al) PREPARATION Furnish setting drawings, diagrams, templates, instructions, and directions for installation of anchorages, such as concrete inserts, anchor bolts and miscellaneous items having integral anchors, which are to be embedded in concrete or masonry construction. Coordinate delivery of such items to project site. 12.02.4 SHOP COATINGS (a) Ferrous Metals -- All ferrous metal work except stainless steel and that specified to be galvanized shall be properly cleaned and shop primed in accordance with Section 14.0, Painting. (b) Galvanizing -- Surfaces where indicated in the Project or General Specifications or on the Contract Drawings shall be hot -dipped galvanized after fabrication- (c) Dissimilar Metals -- At those sections where dissimilar metals come into contact, an alkali resistant bituminous paint shall be applied to the more active metal. In addition, where steel work contacts aluminum, two (2) coats of aluminum or bituminous paint shall be applied over the shop coat. (d) Anodizing -- Anodized treatment shall conform to the specifications of the Aluminum Company of America or the Reynolds Metal Company in a natural color unless otherwise indicated on the Contract Drawings. (1) Anodized treatment shall conform to the specifications of the Aluminum Company of America as follows: Exterior Ornamental Work Alumilite 204 Exterior Handrails Alumilite 215 Interior Ornamental Work Alumilite 202 Interior Handrails Alumilite 215 (2) All base metal shall have caustic etch R-1 finish. (e) Stainless Stee► Rev, 3/09 SECTION 12 i 4 Page 19 (1) After fabrication and finishing, stainless steel shall be cleaned to remove all oil, grease, finger marks or other defacements, and then passivated in a 20% nitric acid solution. Handling, cleaning and finishing shall be performed in such a manner that any defacements will be removed permanently. (2) During transportation and erection, until the adjacent work of the other trades is completed, stainless steel work shall be protected with a strippable plastic coating to prevent scratching, splashing of mortar or paint, and other defacements. (f) Copper and bronze -- Assembled copper and bronze work shall be properly cleaned and given a shop coat of high duality clear finishing lacquer. 12.03 CONSTRUCTION METHODS 12.03.1 GENERAL (a) Before starting work the Contractor shall examine adjoining work on which work is in any way dependent for perfect workmanship and fit. All corrective work shall be performed to the adjoining work as may be necessary to produce work perfect in all respects. (b) Work shall be erected square, plumb, straight and true, accurately fitted, and with tight joints and intersections. Riveted parts, where 'so indicated, shall be installed with countersunk heads or blind rivets, Work shalt be adequately reinforced and anchored in place. (c) Exposed work shall be finished smooth with even, close joints and neat connections. 12.03.2 INSTALLATION OF MATERIALS (a) The Contractor shall store, handle and install materials with every precaution to avoid damage and shall maintain protection until final acceptance of the building. (b) All components shall be installed with posts plumb and rails true -to -line, at designated location(s) and in accordance with approved shop drawings. Anchorage shall be rigid, with all mechanical fasteners drawn up tight, and all sleeve -set posts installed with nonshrink grout. (c) As late in the construction period as practical, the Contractor shall thoroughly clean all components using mild soap and water or by other methods recommended by the material manufacturer. 12.03.3 SETTING LOOSE BEARING PLATES (a) Clean concrete and masonry bearing surfaces of any bond -reducing materials, and roughen to improve bond to surfaces. Clean the bottom surface of bearing plates. (b) Set loose bearing plates on wedges, or other adjustable devices. After the joists have been positioned and plumbed, tighten the anchor bolts. Do not Rev. 3/09 SECTION 12 remove wedges or shims, but if protruding, cut-off flush with the edge of the bearing plate before packing with mortar. (c) Pack bedding mortar solidly between bearing surfaces and plates to ensure than no voids remain. 12,03.4 PROTECTION OF WORK The Contractor shall protect all completed work and construction materials at all times during construction and until acceptance by the Owner of the completed project. Prior to final acceptance of the Project, all protection to metal work shall be removed and the metal work replaced, repaired and refinished if necessary and delivered to the Owner in perfect condition. 12.04 COMPENSATION 12.04.1 GENERAL Miscellaneous Metalwork furnished and installed under Section 12.0 will not be measured for separate payment. Cost of such work shall be merged in the prices bid on other contract items. Rev, 3/09 SECTION 12 Page 1 GENERAL SPECIFICATIONS 13.0 STRUCTURAL STEEL 13.01 GENERAL 13.01.1 SCOPE OF WORK (a) All labor, material, equipment, tools and services required for the furnishing and installation of structural steel and appurtenances required on this Contract shalt be furnished and installed in compliance with the following General Specification, with the Project Specifications, and with the Contract Drawings. (b) This General Specification designated as Section 13.0 Structural Steel, covers the description of materials generally utilized in structural steel construction and the installation of such materials. The Project Specifications and the Contract Drawings designate the specific work, its locations and the construction methods to be used on all Structural Steel installations under this Contract. 13.01.2 SWOP DRAWINGS (a) Attention is directed to the provisions in the General Conditions of the Contract requiring submission to the Engineer of descriptive details and of shop and setting drawings. On Structural Steel installations such submission shall include the following, even though items proposed to be furnished conform to the exact description stated in the General and Project Specifications for Section 13. 1) Shop and setting drawings of all structural members. 2) Descriptive details of rivets, bolts and other items fabricated off the site, (b) The approval of shop and setting drawings by the Engineer will cover only a check of size and arrangement of principal and auxiliary members and strength of connections. The Contractor shall be responsible for all dimensions shown on the shop and setting drawings. (c) Before the fabrication, erection or installation of any structural steel, the Contractor shall submit shop drawings as required by General Conditions, showing exact dimensions, sizes, and location of the work to be performed, for the Engineers' approval, and shall not commence work until such approval is granted. (d) Review by the Engineers shall not be construed as a waiver of construction responsibilities unless the Contractor has requested a deviation from the Contract Documents in writing and the Engineers have granted such deviation in writing. Fabrication or delivery of materials prior to review of the shop and erection drawings shall be entirely at the risk of the Contractor. 08/11 SECTION 13.0 Page 2 13.01.3 STANDARDS Where materials and methods are indicated in the following Specifications as being in conformance with a standard specification it shall refer in all cases to the latest edition of the specification and shall include all interim revisions. Listing of a standard specification without further reference indicates that the particular material or method shall conform with such listed specification. 13.02 CONSTRUCTION MATERIALS 13.02.1 GENERAL (a) All materials and fabricated items shall be furnished by an established and reputable manufacturer or supplier. All materials and fabricated items shall be new; shall be of first class ingredients and construction; shall be guaranteed to perform the service required and shall conform to the following specifications. Cited examples are used only to denote the quality standard of product desired and does not restrict bidders to a specific brand, make, manufacturer or specific name. They are used only to set forth and convey to bidders the general style, type, character, and quality of product desired. Equivalent products will be acceptable. 13,02.2 MATERIALS (a) Structural Steel (b) Rivet Steel (c) High Strength Bolts (d) Anchor Bolts (e) Anchor Bolt Washers (f) Furnish One Washer and nut with each anchor bolt or high strength bolt. 13.02.3 SHOP COATINGS ASTM-A36 ASTM-A141 ASTM-A325 or A-490 Bolts shall carry special markings to permit ready identification and shall be 314" diameter unless otherwise noted. ASTM-A307 Section IC ANSI-B27.2 Type A All structural steel shall be shop primed in accordance with Section 23.0 Finishes. Contact surfaces connections which are to be field bolted with High Strength Steel Bolts shalinot be painted. 13.02.4 TESTING 13.02.4.1 MATERIALS (a) Attention is directed to the provision in the General Conditions of the Contract requiring the certification of the inspection and testing of materials to be incorporated in the work installed under this Contract. On materials supplied for structural steel the following listed items shall be performed and submitted to the Engineer in duplicate: 08111 SECTION 13.0 (b) Structural Steel and Miscellaneous Steel and Metal Page 3 Where less than 50 tons are required, field inspection for rust, dimensions, riveting, welding, painting, etc., will be made. Where more than 50 tons of steel for fabrication are required, certified copies of mill tests conforming to the provisions of ASTM Designating A36 and shop inspection by an Independent Laboratory. (c) Certificates of conformance of shop paint primer. 1102.4.2 SOURCE CONTROL The Contractor shall include in his bid a sum of money necessary to employ a testing agency to perform testing and inspection of the structural steel in the fabricating shop. Such testing agency shall be approved by the Engineers and shall perform the following tests and inspection on all structural steel from the fabricating shop: (a) Determine the qualification of all shop welding procedures, equipment and personnel in accordance with the AWS Code. (b) Determine the qualification of all shop bolting procedures and personnel, (c) Check all structural shapes and sections for size, grade, dimension and shipping or handling damage. (d) Inspection of shop fabricated structural steel members and assemblies for conformance with the Contract Drawings and Specifications, (e) Inspection of shop assembled high strength bolted construction. (f) Visual inspection of all shop welds in accordance with Section 6 of the AWS Code. 13,02.4.3 INSPECTION OF SHOP PAINTING (a) Surface preparation prior to painting shall be visually evaluated for degree of cleaning by comparison with applicable SSPC pictorial standards for type of primer to be used. (b) Measurement of dry film thickness of the shop applied coat of paint shall be in accordance with ASTM D-1005. (c) The testing agency shall issue a report to the Engineers in triplicate prior to the delivery of structural steel to the job site, 08111 SECTION 13.0 Page 4 13,02.4.4 FIELD CONTROL Routine testing in the field, or additional testing of materials for compliance with the Contract requirements will be performed by a testing agency selected and paid by the Owner. (a) The testing agency shall perform the following. 1) Qualification of field high strength bolted construction and field welding procedures and personnel. 2) Testing of Field Assembled High Strength Bolted Construction in accordance with Section 5, "Specification for Structural Joints," 3) Visual inspection of all field welds in accordance with Section G, Article 605 of the AWS Code.. 4) Other nondestructive testing as may be ordered by the Engineers. (b) The Contractor shall notify the testing agency in ample time for scheduling of personnel when the structural bolting or welding is completed and the Contractor is ready for testing of bolt tension and inspection of welding for compliance with these Specifications. In the event bolts or welds are found to be at variance with the Specifications, any discrepancies shall be corrected and a retest or reinspection made by the testing agency. The cost of any re -tests or reinspections shall be paid for by the Contractor. (c) The Contractor shall afford the Engineers or their representative whatever casual labor, platforms, ladders or other access as may be required for proper field review of the structural steel work. Such field review shall not relieve the Contractor of his responsibility to furnish materials and workmanship in accordance with contract requirements. (d) Steel work to be encased in concrete, masonry, fireproofing or which will otherwise be concealed shall be reviewed by the Engineers prior to such concealment. (e) Metal deck, forms or centering shall not be installed on the steel frame until the frame is plumb, level and the connections completed, tested and final review of the frame has been made by the Engineers or his representative. The Contractor shall notify the Engineers in ample time for scheduling of field personnel to prevent delay in the work. (f) Any extra testing of materials occasioned by their failure to meet specification requirements shall be entirely at the Contractor's expense. 08/11 SECTION 13.0 Page 5 13,02.5 QUALIFICATIONS 13.02.5.1 STEEL FABRICATOR (a) The fabricator shall have not less than 5 years experience in fabrication of structural steel and shall have previously fabricated not less than 5 projects similar in scope to this project. (b) When directed by the Engineers, the fabricator shall submit a written description of fabrication ability including facilities, personnel -and list of similar completed projects. 13.02.5.2 STEEL ERECTOR (a) The erector shall have not less than 3 years experience in the erection of structural steel and shall have previously erected not less than 3 projects similar in scope to this project, (b) When directed by the Engineers, the erector shall submit a written description of structural steel erection ability including equipment, personnel and a list of similar completed projects. 13,02.5.3 WELDING AND WELDING OPERATORS (a) Welding shall be done and welders, tackers and welding operators shall be qualified in accordance with the AWS Code. As evidence of such qualification, the Contractor shall furnish to the Engineers a satisfactory certificate, or a copy thereof, issued within 12 months previous to the subject work by a testing agency which has been approved by the Engineers, for each welder, tacker and welding operator to be employed on the work. The Contractor shall further certify that the welder, welding operator or tacker has been doing satisfactory welding of the required type within the 3 month period previous to the subject work. (b) Certification shall be submitted prior to the commencement of welding for each welder, welding operator or tacker, stating the name of the welder, welding operator or tacker, the name and title of the person who conducted the examination, the kinds of specimens, the position of welds, the results of the tests and the date of the examination. 13.02.6 MATERIAL STORAGE (a) The loading, transporting, unloading and piling of structural steel shall be so conducted that the metal and shop coat will be kept clean and free from injury due to rough handling. All material shall be stored in such a manner as to prevent deterioration by rust, All material shall be placed on suitable skids or platforms at least 4" above the ground. (b) Other materials shall be stored in a weathertight and dry area until ready for use. (c) Packaged materials shall be stored in their original unbroken package or container. 08111 SECTION 13.0 Rage 6 13.03 CONSTRUCTION METHODS 13.03.1 (FABRICATION (a) All structural steel shall be fabricated in accordance with the AISC "Specification for Design, Fabrication and Erection of Structural Steel for Buildings." (b) All welding shall be in accordance with the "Standard Code for Are and Gas Welding in Building Construction" of the American Welding Society. (c) Any connection details not shown on the Contract Drawings shall conform to the requirements of standard AISC connections, with the series and bolt or rivet diameter as noted on the Contract Drawings. (d) Steel beams resting on masonry shall be provided with standard angle wall anchors as specified in the Steel Construction Manual of the AISC. (e) Field cutting, welding or modifying of any structural member not required by the Contract Drawings is strictly prohibited unless approved by the Engineer on each specific case. 13,03.2 CONNECTIONS (a) Framed beam connections shall conform to the latest edition of American Institute of Steel Construction, as amended to date. (b) Special connections, whether called for on Contract Drawings or not, will be used where needed. Field connections, unless otherwise noted or approved by the Engineers, shall be bolted. Botts shall conform to either ASTM A 325, for high strength bolts, or ASTM A 307, for other bolts, of the size designated by the Engineer or required by design. Matching holes in the steel framing members shall be 1/16" greater in diameter than respective bolt diameters. (c) All billet plates, bearing plates, loose lintels and beams shall be set to proper grade and level and grouted in. Columns shall be plumbed and maintained in a true vertical position. Check level of floor beams at top of each tier. In general, steel shall be plumb and level within a tolerance of 1.500. 13.03.3 SHOP CONNECTIONS (a) Shop connectons shall be bolted, unless notd otherwise. (b) Where the shop or field connections are not specifically noted on the Contract Drawings, or where reactions are not given on the Contract Drawings, the connections shall develop the strength and shear capacity of the member being supported, but in no case shall the connection develop a capacity of less than 7,500 pounds. (c) Bolted connections shall be bearing type with the bolt threads excluded from the shear planes, unless otherwise noted on the Contract Drawings. 08/11 SECTION 13.0 Page 7 13.03.4 WELDING (a) It is intended that all welds shown on the Contract Drawings shall be pre -qualified in accordance with the details, limitations and procedures prescribed by the AWS Code, In order to allow a range of joint details, procedure and process selection which will produce maximum welding economy, the Contractor is permitted to substitute other such pre -qualified joints for those shown on the Contract Drawings, subject to approval of the Engineers. Joint details may depart from those pre -qualified only if the Contract shall submit to the Engineers his proposed joint welding procedures and, at this own expense, demonstrate their adequacy in accordance with the requirements of the ASW Code, (b) Where weld lengths are noted on the Contract Drawings, they shall be the net effective lengths. (c) Where joints require backing strips, these strips shall be removed and the base metal ground smooth at joints where the steel is to be left permanently exposed to view. 13.03.5 FIELD CONNECTIONS High strength threaded fasteners shall be used for field connections except where welded connections are required by the Contract Drawings. 13.03.6 HIGH STRENGTH BOLTED CONSTRUCTION ASSEMBLY (a) Tightening shall be done in accordance with Section 5 of "Specification for Structural Joints," (b) Install one hardened washer under the nut or head, whichever is turned in tightening. (c) Column bases shall be finished in accordance with the AISC Specifications and welded to the columns. 13.03.7 BEARING PLATES AND ANCHORS (a) Bearing plates shall be provided under beams and girders supported on footings, piers and walls. (b) Bearing plates shall be welded to the beams or girders, unless otherwise indicated on the Contract Drawings. (c) Standard 3/4" diameter government anchors shall be provided for wall bearing beams less than 12" in depth, and two 5" x 3 1/2" x 3/8" angle anchors shall be provided for beams 12" or more in depth at ends to be embedded in walls, unless otherwise indicated on the Contract Drawings. 13.03.8 RE-ENTRANT CORNERS All copes, blocks, cuts and other cutting of structural steel shall have all corners shaped, notch free to a radius of at least 1/2", Overcutting shall be avoided. 08/11 SECTION 13.0 Page 8 13.03.9 HOLES, CUTTING AND FITTINGS Provide holes, cutouts and fittings for the attachment of work by other trades where indicated on the Contract Drawings. Holes shall be punched or drilled. No additional holes or cutting of steel work shall be done without approval of the Engineers. 13.03.10 ERECTION 13.03.10.1 GENERAL (a) All details of Structural Steel erection shall be in accordance with the AISC "Specifications for the Design, Fabrication and Erection of Structural Steel for Buildings," except as otherwise specified herein. (b) Base plates shall have a full even bearing on the concrete or setting plates over their entire surfaces. After base plates or settings plates are set to grade on steel shims or other approved means, bedding mortar as specified in Section 9,0 Concrete, as general purpose grout, shall be used for grouting the full bearing area. (c) All Shop and field connection shall be made with connections as noted on the Contract Drawings. (d) When high strength steel bolts are designated on the Contract Drawings or in the Project Specifications, the connections shall conform to the AISC Specifications for Structural Joints using ASTM A325 Bolts. Rivets may be used in place of high strength bolts, at the Contractor's option. 13.03.10.2 CHECKING MEASUREMENTS The Contractor, before commencing steel work, shall check all governing measurements at the building and the levels of all bearing pads, plates, foundations or other surfaces on which the work is to be supported and any discrepancies shall be corrected before steel erection is commenced. 13.03.10.3 COLUMN BASES AND BEARING PLATES Attached column bases and bearing plates for beams and similar structural members shall be aligned and leveled with steel wedges or shims, unless otherwise indicated on the Contract Drawings. 13.03.10.4 ERECTION TOLERANCES Individual pieces shall be erected so that the deviation from plumb, level and alignment shall not exceed 1:500. 13.03.10.5 FIELD ASSEMBLY (a) Structural steel frames shall be accurately assembled to the lines and elevations indicated and within the specified erection tolerances. (b) The various members forming parts of a complete frame or structure after being assembled shall be aligned and adjusted accurately before being permanently fastened. 08111 SECTION 13.0 Page 9 (c) Fastening of splices of compression members shall be done after the abutting surfaces have been brought completely into contact. (d) Bearing surfaces and surfaces which will be in permanent contact shall be cleaned before the members are assembled. (e) Splices shall be permitted only where indicated on the Contract Drawings or approved by the Engineers. 13.03.10.6 DRIFTING Light drifting necessary to draw holes together will be permitted, but drifting to match unfair holes is prohibited, 13.03,10,7 REAMING (a) Drills and reamers shall be used to enlarge slightly unfair holes as necessary to make connections. Reaming that weakens the members or makes it impossible to fill the holes properly or to adjust accurately after reaming, will not be acceptable. (b) Erection bolts used in welded construction shall be either tightened securely and left in place or removed and the holes filled with plug welds.. (c) Temporary guys and braces shall be removed by the Contractor as part of his equipment. 13,03.10.8 FLAME CUTTING Field correcting of fabrication by flame cutting shall not be permitted on any member in the structural framing without the approval of the Engineers. THE USE OF FLAME CUT HOLES FOR BOLTED CONNECTIONS WILL, UNDER NO CIRCUMSTANCES, BE ACCEPTED AND VIOLATION OF THIS CLAUSE WILL BE SUFFICIENT CAUSE OF THE REJECTION OF ANY MEMBER IN WHICH FLAME CUT HOLES EXIST. Any member rejected shall be immediately removed from the structure and replaced by a new member at no additional cost to the Owner, 13.03.10.9 FIELD CONNECTIONS (a) Field bolted connections shall be bearing type with the bolt threads excluded from the shear planes, unless otherwise noted on the Contract Drawings and shall conform to the requirements as specified in "Fabrication." Provide one hardened washer under the nut or head, whichever isturned in tightening. (b) Field welded connections shall conform to the requirements as specified in "Fabrication." The appearance and quality of welds, and the methods of correcting defective work, shall conform to the ASW Code. (c) Slag shall be cleaned from all welds and the welds wire brushed to a bright appearance. Welded joints shall not be painted until after the welding has been completed and accepted. 08/11 SECTION 13.0 13.03.10'10 TEMPORARY FLOORS All temporary flooring, planking and scaffolding requiredbylocal and national codes and laws necessary for the erection and inspection of the structural steel or the support of erection machinery shall be provided as part of this Contract, Such materials shall finally be removed by the Contractor as part of his equipment, 113.03.10.11 FIELD TOUCH-UP PAINTING After the erection of structural steeltouch-up all field welds and abrasions inthe shop paint coating with the same type paint used for the shop painting. 13.02.11 LINTELS AND SHELF ANGLES (a) Steel lintels shall be fabricated and erected to details shown on the Contract Drawings and shall have an 8 inch bearing each end unless otherwise shown. (b) When not otherwise indicated on the CnntnnoL Drawings, lintels in masonry walls shall conform to the following schedule: VVa# ' ' Clear ' Thickness Span Lintel 8" 0bz5/.01' 2 Angles3Wx3Y2/ x1/4" 8" 50.011hu EY.O" 2Ang|ao 6''x3t�x5/1G" 12` 0to5'.(Y' 3Angles 31/2'x3}B'x Y4` (c) Continuous steel shelf angles attached to concrete for support of masonry or stone facing shall basecured with 8/4 inch bolts to inserts set informs and spaced et3U inch centers. |naads shall be malleable castings similar to Peerless. Angles shall have slotted holes for horizontal adjustment, 13.04COMPLETION OFCONTRACT - Upon completion of all work performed under Section 13.0Structural Steel, all excosnnnntehals, storage hnnU0ea and temporary facilities shall be removed from the site. Areas which were occupied during construction operations and| be smoothed and left in first class condition. Pagel 13.0BMEASUREMENT FOR PAYMENT AND COMPENSATION 13.051 LUMP SUM CONTRACTS AND ITEMS On lump sum contracts and on lump sum hems on unit price contracts, Structural Steel will not bemeasured for separate payment, 13.05.2 UNIT PRICE CONTRACTS AND ITEMS Onunit price items and onunit prices for changes onlump sum items orcontracts, measurement and compensation for Structural Steel added or omitted will be computed on the basis of the theoretical weights of shapes or plates involved. No additional allowance will bemade for rivets, bolts urerection, / Page 1 GENERAL SPECIFICATIONS SECTION 14.0 THIS SECTION NOT USED Page 1 15.01 GENERAL 15.01.1 SCOPE OF WORK (a) All electric motors furnished for installation on this Contract shall comply with the following General Specifications, the Project Specifications and the Contract Drawings, (b) This General Specification designated as Section 15.0 covers the specification of electric motors generally utilized on power driven equipment. The Project Specifications and the Contract Drawings include specifications for any special motor types required and indicates the motor characteristics required on each application on this Contract. The inclusion of items of material or work within this Specification does not necessarily constitute their use on this Project. 15.01.2 SHOP DRAWINGS Equipment Shop Drawings submitted for approval shall include the following motor data: Manufacturer Nameplate Rated Horsepower, Voltage and RPM NEMA Type Code Letter Guaranteed Lock Rotor Current Guaranteed Full Load Current Guaranteed Full Load Efficiency Guaranteed Full Load Power Factor Outline Drawings and Dimensions 15.01.3 STANDARDS Where materials and methods are indicated in the following Specifications as being in conformance with a standard specification it shall refer in all cases to the latest edition of the specification and shall include all interim revisions. Listing of a standard specification without further reference indicates that the particular material or method shall conform with such listed specification. 15.02 ELECTRIC MOTORS 15.011 GENERAL (a) Motors shall conform to the latest applicable NEMA, AIEE, and ASA standards. The motor ratings and types shall be as hereinafter specified, except as modified by the Project Specifications. All motors shall receive routine tests in accordance with AIEE test procedures, Rev. 09102 SECTION 15 Page 2 (b) Output torque and speed characteristics of each motor shall be suitable to operate the driven equipment under the full range of equipment operating load conditions without exceeding the nameplate current rating, and/or temperature rise, (c) Special equipment requiring a motor drive with unusual characteristics shall be equipped with a definite purpose motor to meet the necessary requirements. (d) Motor bearings shall be of the anti -friction type. Thrust bearings in vertical motors shall be adequate for the loading encountered. (e) Explosion -proof type motors shall be furnished for hazardous areas as defined in the National Electric Code. They shall be totally enclosed and bear the Underwriters Laboratories Label indicating compliance with the requirement for the specific application, (f) Unless otherwise specified, large motors 200 hp and above shall be furnished in WP-2 enclosures with epoxy resin encapsulated windings and space heaters as herein specified. (g) Motors located out of doors, in unheated structures, in basements or as otherwise specified or indicated shall be furnished with space heaters with leads brought out to a separate weatherproof (NEMA 3R) terminal box. Terminal boxes shall be NEMA 7 in hazardous areas. All motors shown or specified wired for space heaters shall be furnished with space heaters rated at the voltage of supply for the motor, Motors requiring space heaters shall be disgned for the space heaters furnished without causing damage or warpage to the motor frame, end bell, etc. All cost of providing the same shall be included in the base bid. (h) Motors shall be supplied to operate on the voltage source as specified or indicated. In the event the voltage source is not indicated or specified or if a discrepancy exists between the Contract Drawings and Specifications concerning the electrical requirements, the Contractor shall contact the Engineers to determine the electrical requirements prior to submitting a bid. In the event the Contrator for this division does no fully understand the electrical requirements and neglects to contact the Engineers to determine the electrical requirements, submission of a bid will signify that the Contractor agrees to provide whatever is required for the project use in accordance with the Engineer's requirements. 15.02.2 RATINGS (a) Motor ratings shall be based on continuous operation in an ambient temperature of 40 degrees C. The maximum temperature rise for open and drip -proof type motors shall not exceed 40 degrees C, and for totally enclosed type motors shall not exceed 55 degrees C. (b) It should be noted that the motor sizes indicated on the Contract Drawings or as otherwise specified herein, are approximate motor sizes required for the specific equipment which is specified herein or indicated. Specific motor sizes shall be determined from the actual equipment approved, purchased and installed. Overload protection, starters, Rev. 09102 SECTION 15 | !� Page disconnect ewKches, etc, aho{| be furnished and installed for the actual motor sizes as furnished. 16.02.3 TYPES Motors of 112 lip and larger shall be squirrel cage induction type designed for 3 phase, 60 cycle, 2401480 volt operation, unless otherwise noted. Motors smaller than 1/2 lip shall be of the capacitor type designed for single phase, 60 cycle, 115 volt operation, Motors indicated on the Contract Drawings and/or specified in the Project Specification as 208 Volt shall be specially wound for the voltage indicated and/or specified. (a) (W Torque and locked rotor current characteristics for three phase motors shall -be NEMADesign "B" The looked rotor K\hA/HP input at full voltage for 10 hp motors and larger shall not exceed that permitted for Code Letter "F". with special definite characteristics. Unless otherwise noted. all three phase motors shall badesigned for a1.15service factor. (o) All mobuna located inside of heated weatherproof structures shall be of the open 'dhp-pnooy'type, unless otherwise specified orindicated. (d) Motors located out nfdoors and inhazardous locations and asotherwise specified or indicated shall be of the totally enclosed fan cooled type (TEFC)with space heaters unless indicated otherwise. (*) Explosion -proof type motors ahe|| be furnished for hazardous areas as defined in the National Electric Code. They shall be totally enclosed and bear the Underwriters Laboratories Label indicating compliance with the requirement for the specific application. (f) Unless otherwise specified, large motors 300 hp and above shall be furnished in VVP-2 enclosures with epoxy resign encapsulated windings and space heaters ooherein specified, ' (g) Motors located out of doors, in unheated struotun*o, in basements or as otherwise specified or indicated ahoU be furnished with space heaters with leads brought out to a eapanaha weatherproof (NEW1A 3F) terminal box. Terminal boxes shall be NEK0A7 in hazardous areas. All motor shown orspecified wired for space heaters shall bafurnished with space heaters rated at the voltage f supply for the motor. Motors requiring space heaters shall be designed for the space heaters furnished without causing damage or warpage to the motor frame, end bell, etc. All cost of providing the same shall beincluded inthe base bid. (h) Motors shall be supplied to operate onthe voltage source as specified or indicated. |nthe event the voltage source isnot indicated or specified or ifadiscrepancy exists between the Contract Drawings and Specifications concerning the electrical requirements, the Contractor shall contact the Engineers to determine the electrical requirements prior to submitting a bid. |nthe event the Contractor for this Division does not fully understand the electrical requirements and neglects to contact the Engineers to determine the electrical requirements, submission of a bid will signify that the Contractor agrees to provide whatever is required for the project use inaccordance with the Engineers' requirements. Rev. 09/02 SECTION 15 6 0 ELECTRICAL -16.01 GENERA. 16.01.1 SCOPE OF WORK Page 1 (a) All labor, materials, equipment, tools and services required for the furnishing, installation, testing and adjusting of all Electrical Work required on the Contract shall be furnished and installed in compliance with the following General Specifications, the Project Specifications and the Contract Drawings. (b) This General Specification designated as Section 16.0, Electrical, covers the description of materials generally utilized in electrical work and the specifications for the installation of -materials. The Project Specifications and the Contract Drawings designate the specific electrical work to be installed under this Contract. (c) it is the intention of the General and Project Specifications and of the Contract Drawings for the. electrical work, that each part will be complete as related to other parts, and that there will be no omission from any portion of the system or systems, including the connections to the Electric Utility serving the Project, even though each and every minor item may not be specifically mentioned in the Specifications or shown on the Contract Drawings. (d) Motor Control System - The Contractor, where required, shall furnish and - install all labor, equipment, materials, components, services and operations required to furnish and install a complete, tested and operating motor control system in strict accordance with these Specifications, the Contract Drawings and the requirements within. All instruments, push buttons, indicating lights, switches, etc., shall be furnished and installed complete. (e) Area Lighting - The Contractor, where required, shall furnish and install a I area lighting fixtures, poles, bases and all else required for a complete and operating lighting system in accordance with these Specifications, the Contract Drawings and the requirements within. (f) instrumentation Wiring System - The Contractor, where required, shall furnish and install all labor, equipment, materials, components, services and operations required to furnish and install a complete, tested and operating instrumentation wiring system in strict accordance with these General Specifications, the Project Specifications, the Contract Drawings and the requirements within. (g) Alarm and Display Wiring System - The Contractor shall, where required, furnish and install all labor, equipment, materials, components, services and operations required to furnish and install a complete, tested and operating Alarm and Display Wiring System instruct accordance with these Specifications, the Contract Drawings and the requirements within. Rev 5109 SECTION 16 Page 2 16.01.2 REQUIREMENTS (a) Certain items of work, materials and/or equipment may be furnished under other Contracts of this Project. These items may affect work under this Contract. Therefore, the Contractor shall be responsible for and required to read and become familiar with the Contract Drawings and the General and Project Specifications for all other aspects of work for this Project and shall be responsible for coordinating his phase of this work. (b) Existing facilities must be kept in operation to the fullest extend possible. The Contractor shall so organize and schedule his work as to cause the least inconvenience to the operation of any existing facilities. Should it become necessary to put any part of the existing facilities out of operation, the Contractor shall do- so at the convenience of the Owner, or shall make such temporary connections, alterations, etc., as may be required to keep the existing facilities in operation. (c) Attention is directed- to the requirement of examining the complete Contract Documents to become familiar with the type of construction, actual location of walls, columns, beams, equipment and other details that will affect the installation, -obstacles which may be encountered and all other relevant matters concerning the work to be performed. The submission of a Proposal shall be deemed as acknowledgment that the above conditions are fully understood and that the Contractor shall not be allowed any additional compensation due to the failure of the bidder to properly inform himself prior to submitting his bid. The bidder shall also consult the Engineers if there are any questions concerning the manner in which the work is to be done or the conditions governing it. (d) The Contractor is also advised that certain items of electrical equipment are being furnished and installed internally wired. The Contractor is required to read the other sections of this Contract Document and coordinate his work with the work of all the other Contractors to the end that external wiring, power connections and controls are fully understood and the electrical equipment will be properly and safely wired. (e) The Contractor is cautioned not to install any electrical work that will connect to any item of equipment, including those items not specified under electrical work, until shop drawings of such equipment approved by the Engineer are available. Any such work installed by the Contractor prior to the availability of approved shop setting drawings wilt be the Contractor's responsibility and any modification of electrical work necessary to meet the equipment requirements shall be made without additional compensation. (f) The Contractor shall make arrangements, obtain, and pay for all temporary permits, licenses, and inspections; pay all necessary fees in conjunction with all electrical work. The cost of such permits and fees shall be included in the lump -sum price Bid under this Contract Division. All costs, both temporary and permanent, to connect all utilities shall be included in the Bid. Rev 5/09 SECTION 16 Page 3 (g) The Contractor shall perform all work in strict accordance with all rules, regulations, codes, ordinances, or laws of local, state and federal governments or of other authorities having lawful jurisdiction. Such rules, regulations, codes, ordinances, or laws shall include but are not necessarily limited to the following: 1) State Building, fire and electrical codes. 2) City Building, fire and electrical codes, 3) National Electrical Code (NEC). 4) National Electrical Safety Code (NESC). 5) National Fire Protection Association (NFPA). 6) Occupational Safety and Health Act (OSHA), 16.01.3 CONTRACTOR'S RESPONSIBILITY Existing building, structures and work of other contractors, both above and below ground shall be protected, In the event that any public or private property is damaged by reason of or consequent from the Work contracted herein, the Contractor shall, at his own expense, make all such repairs as may be necessary as a result of such damage and indemnify and save harmless the Owner from and against all suits, actions, claims, demands and liabilities, Failure on the part of the Contractor to make all such necessary and proper repairs, or to satisfy any legal demand or liability, shall confer upon the Owner the right to make, or have made such repairs and -discharge any such liability and demand, The cost and expense shall be deducted from any Moneys due, or to become due, the Contractor under the terms of the Contract and Specifications, The Owner may at this option require the Contractor's Bondsman to satisfy any such claims for damages. 16.01.4 SERVICE AND METERING (a) The Contractor shall furnish and install all equipment, wiring and connections required for a complete and ready to operate electrical power service installation in full compliance with the requirements of the electric utility serving the Project. (b) The Contractor shall furnish and install all equipment, wiring, connections and grounding as required by the current National Electric Code, for a complete installation, at no additional cost to the Owner, even though each and every item is not described in these Specifications or designated on the Contract Drawings. (c) The Contractor shall pay all costs for, and keep the Owner free from any "service charge" that may be made by the electric utility for serving the Project unless otherwise specified in the Project Specifications, or otherwise submitted to the Engineers in writing prior to bid. (d) The Contractor shall confirm all details pertaining to electric service and metering with the electric utility before installation. Rev 5109 SECTION 16 Page 4 16.01.5 QUALITY ASSURANCE (a) An item equal to that named or described in the General or Project Specifications of the Contract may be furnished by the Contractor. The naming of any commercial name, trademark, or other identification shall not be construed to exclude any item or manufacturer not mentioned by name or as limiting competition, but shall establish a standard of equality only. An item may be considered equal to the item so named or described if (1) it is at least equal in quality, durability, appearance, strength and design, (2) it will perform at least equally the specific function imposed by the general design for the work being contracted for or the material being purchased and (3) it conforms substantially to the detailed requirements for the item in the Specifications. The name- and identification of all materials other than the ones specifically named shall be submitted to the Engineers in writing for approval 14 days prior to bid. Subject to the provisions of any applicable laws, approval shall be at the sole discretion of the Engineers, shall be in writing to be effective and the decision of the Engineers shall be final. The Engineers may require the tests of all materials so submitted to establish quality standards at the Bidder's expense. All directions, specifications and recommendation by manufacturers for installing, handling, storing, adjustment and operation of their equipment shall be complied with; responsibility for proper performance shall continue to rest with the Bidder. (b) Except as otherwise provided for by the provision of any applicable laws, the Contractor shall not have any right of appeal from the decision of the Engineers condemning any materials submitted if the Contractor fails to obtain the approval for substitution under this clause. Any additional cost incurred by an approved substitution shall be at the Contractor's expense. (c) Where manufacturer's catalog and/or figure numbers are given, it is the intent of the Specifications to have the Contractor supply the equipment represented by these numbers, or their equal by another manufacturer. In some cases, the manufacturer has revised his catalog and/or figure numbers since publication of the specification, but still produces the item specified. In these incidences, the Contractor shall furnish equipment and/or fixtures identical to that originally represented by the catalog and/or figure numbers given herein. If a manufacturer has redesigned any of the products specified herein by catalog and/or figure number, the Contractor shall furnish the improved model regardless of whether or not the item retains its original catalog and/or figure number. Where items denoted by catalog and/or figure numbers have been discontinued by the manufacturer, the Contractor shall request one or more equivalent selections from the Engineer. (d) The Contractor shall provide all materials bearing UL Labels for approval when the Underwriters Laboratories has established a standard for the particular type of the material to be installed. Rev 5/09 SECTION 16 Page 5 (e) Any reference in the Specifications or on the Drawings to any article, device, product, material, fixture, or the item or equipment by name, make or catalog number shall be interpreted as establishing the type, function, and standard of quality and shall not be construed as limiting competition; and the Contractor, in such cases, may at his option use any article, device, product, material, fixture, or item or equipment with in the judgment of the Engineer expressed in writing is equal to that specified. 16.01.6 PRODUCT REQUIREMENTS Unless otherwise indicated, the materials to be provided under this specification shall be the products of manufacturers regularly engaged in the production of all such items and shall- be the manufacturers latest design. The products shall conform to the applicable standards of UL and N.EMA, unless specified otherwise. All items of the same type or ratings shall be identical. This shall be further understood to include products with the accessories indicated. All equipment and materials shall be new, unless indicated or specified otherwise. The Contractor shall submit proof if requested by the Engineer that the materials, equipment, or devices that he provides under this Contract meet the requirement of the Underwriters Laboratories, Inc., in regard to fire and casualty hazards. The label of or listing by the Underwriters Laboratories, Inc., will be accepted as conforming with this requirement. 16,01,7 EQUIPMENT LOCATION The Drawings show the general location of feeders, equipment, outlets, conduits, and circuit arrangements. Because of the small scale of the Drawings, it is not possible to indicate all of the details involved. The Contractor shall carefully investigate the structural and finish conditions affecting all his work and shall arrange such work accordingly, furnishing such fittings, junction boxes, and accessories as may be required to meet such conditions, The Contractor shall refer to the entire drawing set to verify openings, special surfaces and locations of other equipment, or other special equipment prior to roughing -in for panels, switches and other devices. The Contractor shall verify all equipment dimensions to insure that proposed equipment will fit properly in spaces indicated. Conduit should be buried in the slab where possible M-Mr-�ImamFl" (a) The Contractor shall be responsible for checking the Project Specifications and the Contract Drawings for electrical work and any electrical work prepared by him against the general work, the mechanical work, all other work involved in the project, and all equipment drawings prior to the installation of any electrical work to be sure that the location of switches, outlets, etc., will not interfere with or be covered by doors, casework, heating equipment or the like, and that conduit stubs for motors and equipment are placed in their proper location. Rev 5/09 SECTION 16 Page 6 (b) The Contractor is cautioned not to install any electrical work that will connect to any item of equipment, including those items not specified under electrical work, until shop drawings of such equipment approved by the Engineer are available. Any such work installed by the Contractor prior to the availability of approved shop and setting drawings will be the Contractor's responsibility and any modification of electrical work necessary to meet the equipment requirements shall be made without additional compensation. 16.01.9 SHOP DRAWINGS (a) Shop drawings shall be submitted to the Engineers for approval in accordance with the General Conditions of these Specifications. It is the intention and purpose of shop drawing submittals to convey to the Engineer that the equipment chosen for the particular item is capable of satisfying the design parameters as scheduled, specified and/or required. It is therefore imperative that the submittals be as complete, readable and organized as possible to insure prompt reply by the Engineer and to eliminate questions concerning items submitted. Shop drawings shall include the following information. (b) Dimension drawings and mounting details showing installation, attachment and wiring of all field and pipeline mounted equipment which is supplied under this Contract. (c)- System schematic drawings illustrating all components being supplied, complete with electrical interconnections of equipment being supplied under this Contract. Provide complete loop drawings. (d) Layout and construction drawings of all control panels, cabinets and all other electrical equipment which is supplied under this Contract. Include internal wiring diagrams. (e) Equipment specification sheets and specification index sheets. Show loop and tag numbers for all components and location, description and service of all components. (f) Details of electric motors submitted for approval shall include the following: 1) Manufacturer. 2) Nameplate rated horsepower, voltage and rpm. 3) NEMA type. 4) Code letter. 5) Locked rotor current_ 6) Full load current. 7) Full load efficiency. 8) Full load power factor. 9) Outline drawings and dimensions. Rev 5/09 SECTION 16 Page 7 16.01.10 UNIFORMITY OF MANUFACTURERS AND SUPPLIERS All identical equipment included under each equipment item shall be as manufactured and/or supplied by the same manufacturers or suppliers to reduce maintenance expense. 16.02 CONSTRUCTION MATERIALS: 16.02.1 GENERAL (a) All materials, equipment, sizes and capacities of electrical equipment incorporated in the project shall conform to the latest requirements of the current National Electric Code, the- National Electrical Manufacturers Association, the State and local electrical codes and to applicable rules and regulations of the local electrical utility serving the project. (b) All material and equipment must be the product of an established and reputable manufacturer; must be new and of first class construction; must be designed and guaranteed to perform the service required; and must bear the label of approval of Underwriter's Laboratories, Inc., where such approval is available for the type of material_or equipment. All material and equipment shall be the product of the listed manufacturer or similar and equal thereto as approved by the Engineer. (c) When a specified or indicated item has been superseded or is no longer available, the manufacturer's latest equivalent type or model of material or equipment as approved by the Engineers shall be furnished and installed at no additional cost to the Owner. (d) Where the Electrical Contractor's selection of equipment of specified manufacturers or additionally approved manufacturers required changes or additions to the system designs, the Contractor shall be responsible in all respects for the modification to all system designs, subject to approval of the Engineers. The Contractors bid shall include all costs for all work of the Contract for all specialties of work wherein additional costs are made necessary by such changes, additions or modification resulting from any approve substitution. (e) The Electrical Contractor shall furnish and instalf motor controls for each piece of equipment requiring the controls under this Contract. The motor controls shall be the size and type recommended by the manufacturer for the application and as otherwise specified by the Project Specifications or indicated by the Contract Drawings. (f) The Electrical Contractor shall furnish and install all stands, racks, brackets, supports, etc., required to properly serve the motors and motor controls which are furnished under this Contract or motors and motor controls otherwise specified by the Project Specifications or indicated on the Contract Drawings, Rev 5/09 SECTION 16 Page 8 (g) The Electrical Contractor shall install all motor controls and other special electrical equipment when such equipment is furnished by him or by the Contractor of other contracts in accordance with the General and Project Specification, When other divisions of work are included in this Contract, the Electrical Contractor shall read the Contract Documents of the other Contracts to the end- that all electrical equipment shall be coordinated and properly installed in accordance with the requirements of the manufacturer, the Owner and the Engineers. (h) The Electrical Contractor shall read the complete Contract Document set so as to be thoroughly familiar with this responsibility. It is hereby brought to his attention that insofar as the electrical work is concerned, that when the Electrical Work is bid as a separate division, equipment which is to be furnished under this Contract may have been indicated as having been furnished and/or installed by this Electrical Contractor at various location throughout the Contract Drawing set. To this end, he shall review the Contract Drawing set without regard to the Work to determine his requirements under this Contract. (i) It is the intention of these General -and Project Specifications and the Contract Drawings covering the electrical work that each part shall be complete as related to other parts and there shall be no omissions from any of the system or systems, even though each and every minor item may not be specifically mentioned in these Specifications or shown on the Contract Drawings. The Electrical Contractor shall include in his- bid the cost of all items required to make a system or system complete for which this Contractor is responsible for furnishing and/or installing in accordance with these Specifications and/or Contract Drawings. It shall be this Contractor's responsibility to include the cost of furnishing and installing items for an electrically complete system or systems- Should a system which this Contractor is furnishing require special items or accessories for operation, which are not being furnished and installed by others, then these items or accessories shall be the responsibility of the Electrical Contractor furnishing the system. Items shall include, but not be limited to, control wire, instrumentation cable, control transformers, control stations, indicating lights, enclosure, solenoid valves, pressure, flow, vibration, or special switches, alarms, interlocks, conduits, and -disconnects. In addition, it is the intent of these Specifications that this Contractor shall make its supplier responsible to include with his package all additional items required for an electrically complete system for which he is furnishing to this Project. (j) In the event the voltage source is not indicated or specified or if a discrepancy exists, the Contractor shall contact the Engineers to determine the electrical requirements prior to submitting a bid. In the event the Contractor does not fully understand the electrical requirement prior to submitting a bid. In the event the Contractor does not fully understand the electrical requirements but neglects to contact the Engineers to determine the electrical requirements, submission of a bid will signify that the Contractor agrees to meet the requirements of this Project in accordance with the Engineers' requirements. (k) The Contractor shall be responsible for furnishing details which are required, but not necessarily shown on the Contract Drawings, for the adequate and proper construction of the electrical systems as required by the Engineers. Rev 5/09 SECTION 16 Page 9 16.02.2 PERFORMANCE REQUIREMENTS (a) MATERIAL. HANDLING Material arriving on the job site shall be stored in such a manner as to keep material free of rush and- dirt, and properly aligned and true to shape. Rusty, dirty, or misaligned materials sale be rejected. Electrical conduit shall be stored to provide protection from the weather and accidental damage. Plastic conduit shall be stored on even supports and in locations not subject to direct sun rays or excessive heat. Cables shall be sealed, stored, and handled carefully to avoid damage to the outer covering or insulation and damage from moisture and weather. Adequate protection shall .be required at all times for electrical equipment and accessories until installed and accepted. Materials damaged during shipment, storage, installation, or testing shall be replaced or repaired in a manner meeting with the approval of the Engineer. (b) SLEEVES, CUTTING, AND PATCHING Avoid cutting insofar as possible by setting sleeves, frames, etc., and by requesting openings in advance. Assist other trades in securing the- correct location and placement of rough -frames, sleeves, opening, etc. When necessary due to omission, use only approved cutting and drilling methods. Lay out hoes in advance, locating so as not to affect structural sections. Perform cutting in a manner which will not weaken walls, partitions, or floors. Neatly cut all holes, including locations where sleeves have been omitted. Cut holes as small as possible to admit work. Drill holes in floors without breaking out around the holes. Cut holes through reinforced concrete using rotary type drills. Do not use pneumatic hammer type drills, impact type electrical drills, and hand or manual hammer type drills, unless specifically approved by Engineer where working space is limited. Do not penetrate the metal building without approval of the engineer. Prepare accurate drawings locating .all inserts, sleeves, etc., installed in or passing through reinforced concrete. Select locations to permit near installation of work. Arrange locations to avoid interferences and -misalignment. Prepare drawings for own use at earliest practicable date. Where alterations are necessary, cut and remove, patch, repair, and restore all cut surfaces which are disturbed to permit installation of new work. Leave work is as good a condition as existed before the start of work. Sleeves through floors and walls if necessary shall be of proper size to accommodate the raceway, shall be flush with walls or finished floors, and shall be black iron pipe or styrene plastic conduit. Caulk sleeves through exterior walls with approved compound above grade and with oakum and lead wool below grade. Caulk underslab conduits penetrating slab through sleeves. in general, all conduit shall be installed concealed in the concrete walls, slab, underground, or exposed on the building structural steel. Rev 5109 SECTION 16 Page 10 (c) FOUNDATIONS AND ELECTRICAL EQUIPMENT PADS The Contractor shall provide concrete foundation for electrical apparatus and equipment and shall furnish exact location and dimensions for these foundations. He shall also furnish for installation all necessary anchor bolts, channel iron sills, etc. This information and material shall be provided well in advance of the scheduled placing of these slabs and other concrete work in the area of the foundation pad and/or curb. Equipment foundations shall be 4 inches high (unless otherwise called for on the Drawings) with top edges chamfered 3/4 inch and all exposed surfaces rubbed smooth with a carborundum block after stripping forms. Pad shall be reinforced (unless otherwise called for in the Drawings with steel wire mesh and shall have dowel rods inserted into the floor for anchorage. Carefully level, shim, and align the equipment on the foundations. (d) EXCAVATION AND DACKFILLING This Contractor shall perform all excavation and backfill required for the installation of all electrical work in and under the slab. Particular care shall be taken not to disturb or damage work of other Contractors or existing buried piping or other equipment. In backfilling trenches, approved fill shall first be compacted firmly and evenly in 6 inch layers to a depth of 12 inches over the top of the pipe or duct bank. Remainder of trench shall be backfilled to establish vibratory tamper. Where compaction requirements are not established for an area, compact fill to 95% maximum density at optimum moisture content. Excess earth shall be distributed on premises as directed. Where ditches occur outside of building, the surface shall be finished to match existing surfaces, Any existing work or work of other trades which is damaged or disturbed shall be repaired or replaced and left in good order. (e) CONCRETE Concrete shall conform in every respect to the requirements of General Conditions. (f) PAINTING Panels, safety switches, motor starter equipment, and wireways, shall be painted standard colorsof the manufacturer finishing the equipment, This contracto. r shall. touch up all scratches and abrasions after installation with the manufacturer's finish paint. The Contractor shall paint all ungalvanized metal used in construction of supports for electrical equipment and materials. Painting shall be with epoxy paint with color to be selected. Where galvanized channels are cut, touch up the ends with zinc paint. The electrical contractor shall be responsible for this painting, but may arrange with the General Contractor to include this work where appropriate. Rev 5/09 SECTION 16 Non-metallic enclosure, boxes, conduit, etc.,shall basued inthe chemical room and shall not be painted. (g) SUBMITTALS The Contractor shall submit to the Engineer shop drawings of all electrical mateha|a, oppanatua, appUonces, equipment and miscellaneous devices shown or shallShop Drawings be sufficiently complete in detail to enable the Engineer to determine compliance with Contract requirements, Details and information shown shall include but are not necessarily limited to the following: 1 Performance characteristics, 2 sizes, 3 Material specifications and construction details, 4) Compliance with rules, regulations, and codes, 5 /\ooesaohee, 6 Complete wiring diagrams, 7\ Voltage, current, KVA.phase ratings. Shop Drawings will be approved only to the extendofthe information- oh Approval of an item of equipment shall not be construed to mean approval for components of that item for which Contractor has provided no information, MISCELLANEOUS (h) The Contractor for the electrical work shall his work in conformity with the construction called for under other Contracts and shall afford other Contractors reasonable opportunity for the execution of their amd(, and he shall popoe/h connect and coordinate his work with the work of other Contractors at such a time and in such a manner as not to delay or interfere with the work of other Contractors. The Contractor for the a|auLdc$| work shall examine the complete Drawings and Specifications set for the facility and the Drawings and specifications for piping, and drainage work and for the work ofother similar trades involved in this project and shall coordinate his work accordingly. The Contractor shall promptly report to the General Contractor any delay or difficulties encountered in the installation of his mm,k or which might make it unsuitable to connect with or receive the work of others. His failure to so report shall constitute an acceptance of the work ofother Contractors as being 5t and proper for the reception cdthis work. The Electrical- Contractor shall locate controls, owUrhen, receptacles, pull boxes' etz, for each a000so for operations, mgintennnca, and repair and wheU provide access doors where such items are concealed. At the end of each work day, theContractor shall remove form the work area all rubbish and debris resulting from the electrical work, At the completion of the work and before final acceptance, the Contractor shal| clean all spaces occupied byelectrical equipment, clean all a|eddoa| oquApment, apparatus, equiprnent, and devices; and leave all such items in perfect working order ready iouse. Rev 5/09 SECTION 16 Page 12 (i) TESTS Upon completion of the installation, the Contractor shall perform tests for operation, panel load balance, short circuits and ground, Tests shall be made with and to the satisfaction of the Owner and Engineer. The Contractor shall perform all field tests and shall provide all labor, equipment, and incidentals required for testing and shall pay for electric power required for the tests. All defective material and workmanship disclosed shall be corrected by the Contractor at no cost to the Owner.. The Contractor shall show by demonstration in service that all circuits and devices are in good operating condition. Tests shall be such that each item of control equipment will function not less than five (5) times, The grounding system shall be tested to assure continuity and compliance with the requirement that ground resistances not exceed 5 ohms, Ground resistance measurements of the system shall be taken and certified by the Contractor if requested, Ground resistance shall be measured from each piece of equipment to the ground electrode, 0) OPERATING AND MAINTENANCE INSTRUCTIONS The Contractor shall compile and find four (4) sets of all manufacturer's instructions and descriptive literature on all items of equipment furnished under this work. These instruction shall be delivered to the Engineer for approval before construction is 90% complete. Instruction shall include operating and testing procedures and parts list of all equipment. The Contractor shall instruct the Owner's personnel in the proper operation of all systems and equipment. The front of the binder shall be titled "Electrical Operating and Maintenance Instruction", with the name of the job and the firm name of the Electrical Contractor under the title, The operating and maintenance instructions shall contain complete elementary wiring diagrams for all equipment and installations provided by this Contractor. These elementary diagrams shall have all connections identified with the same numbers that are required to be on wire markers on the ends of all wires at terminations. 16.02.3 EQUIPMENT (a) GENERAL All electrical equipment shall conform to the applicable NEMA specifications. All electrical equipment shall be properly labeled. Labels- shall be engraved high pressure plastic laminate, black labels with white lettering for 120/240 volt equipment, and red labels with white lettering for 480 volt equipment. The labels shall be attached to the equipment cabinets with 2 machine screws with double hex nuts and washers or with pop rivets for labels up to 2 nuts andwashers or 4 pop rivets shall be used, one (1) in each corner of the label. All panelboards, starters, control panels, cabinet enclosures, and equipment switches shall be labeled in the manner described or in an equally approved manner. All materials equipment, sizes and capacities of electrical equipment incorporated in the project shall conform to the latest requirement of the current NEC, the NEMA, Rev 5/09 SECTION 16 Page 13 the State and local electrical codes to applicable rules and regulations of the local electrical utility serving the project. All material and equipment must be the product of an established and reputable manufacturer; must be new and of first class construction; must be designed and guaranteed to perform the service required; and must bear the label of approval of the Underwriter's Laboratories, Inc,, where such approval is available for the product of the listed manufacturer as approved by the Engineer. When a specified or indicated item has been superseded or is no longer available, the manufacturer's -latest equivalent type or model of material or equipment as approved by the Engineer shall be furnished and installed at no additional cost to the Owner. Where the Contractor's selection of equipment of specified manufacturers or additionally approved manufacturers required changes or additions to the system design, the Contractor shall be responsible- in all respects for the modifications to all system designs, subject to approval of the Engineer. The Contractor's bid shall include all costs for all work of the Contract for all trades made necessary by such changes, additions or modification or resulting from any approved substitution. Furnish and install controls for each piece of equipment requiring the controls under this contract. The controls shall be the size and type recommended by the manufacturer for the application and as otherwise specified or indicated on the Drawings. Furnish and install all stands, racks, brackets, supports, etc., required to properly serve the equipment which is furnished under this Contract, or equipment otherwise specified or indicated on the Drawings. In the event the Contractor does not fully understand the electrical requirements, submission of a bid will signify that the Contractor agrees to meet the requirements of the project in accordance with the Engineers requirements, (b) CIRCUIT BREAKER PANEL,BOARDS Circuit Breaker Panelboards shall be of the dead front safety type suitable for operation on the voltage and phase shown on the Drawings. The panels shall have main lugs or main breaker and branch circuits as scheduled. Branch circuits and mains shall be protected by thermal magnetic ambient compensated quick make, quick break automatic, trip free molded case circuit breakers. Bus withstand rating and circuit breaker interrupting rating shall be 14,000 symmetrical RMS amperes minimum or greater where indicated in the Drawings. Circuit breaker handles shall have three (3) positions, "OFF" "ON", and "TRIPPED" position and shall thus clearly indicate the abnormal condition of the circuit. Panelboards shall conform to UL 67 and UL 50, as applicable. As insulated neutral bus for panels indicated in the schedules for connection of both feeder and branch circuit neutral wires shall be provided. A separate ground bus, bonded to the steel cabinet, shall be provided for each panel connection of all ground wires and shall be marked with a green stripe along the front of the bus. Bus bars shall be copper and shall be securely fastened to bases and shall not depend upon breakers for support. All main buses and back pans shall be so Rev 5109 SECTION 16 Page 14 designed that branch circuits may be changed without additional machining, drilling, or tapping. All breakers shall be designed to accept copper, copperclad, and aluminum conductors. Multipole circuit breakers shall be of the common -trip type having a single operating handle. All multipole breakers shall be so designed that an overload in one (1) pole automatically causes all poles to open. Any three (3) adjacent breaker poles shall be connected to Phases A, B, and C, respectively and that same relationship of phase sequence shall be maintained. Circuit breaker units shall be operable in any position and removable from the front of the panelboard without disturbing adjacent units. The panelboard shall be of such design that a combination of one (1), or two (2), and three (3) pole circuit breakers can be readily assembled in the same panel. Tandem or half-size circuit breakers will not be accepted. Bus bars shall be constructed of rectangular solid copper bars of the size required by latest NEMA and UL standards, securely mounted and braced to give adequate short circuit protection or to withstand short circuit current as shown on the Drawings. All connections to bus bars shall be made through high conductive metal and shall be securely bolted. Bolt -on circuit breaker shall be provided. Ground fault circuit interrupting breakers shall be sized as indicated, shall conform to NEC, and shall be UL listed, and shall have a "Push- To -Test" button and visible indication of a tripped condition, and shall detect a current imbalance of approximately 5 milliamperes, GFI type breakers shall be used for all outdoor circuits and circuits to damp locations where required by code. Panelboards shall be mounted in enclosed cabinets consisting of a code gauge, sheet steel box with trim and door. Boxes shall be manufactured from commercial galvanized sheet steel, or shall be housed in an integrated equipment enclosure designed for the purpose. Trim shall be manufactured from one (1) piece of full -finish sheet steel, not galvanized, painted with two (2) coats of paint, the first being a prime coat and the second a finish coat of neutral grad lacquer. Cabinets shall be 5 3/4 inches deep minimum unless otherwise indicated and of sufficient size to allow gutter space of at least 4 inches on all sides around lighting panelboards and greater for power panels, Trim shall be fastened to the cabinet by means of approved adjustable clamps. Trim shall have doors equipped with chrome -plated combination lock and catch, two (2) milled keys being -supplied with each lock. Locks shall be keyed alike, and a directory frame shall be provided on the inside of the door. The Contractor shall identify all circuit locations in each respective panel as indicated and shown on the Drawings. Panels are identified on the Drawings by alphabetical letters and with numerals. Branch circuit breaker sizes and type are indicated in the panel schedules, in the one -line -diagram, or the electrical equipment schedules on the plans. The Contractor shall prepare a type circuit director correctly identifying the destination and the item served by the breaker. For individual branch circuits, the item name as it appears on the electrical drawings shall be listed. The completed directory shall be mounted behind a protective Rev 5/09 SECTION 16 plastic cover on the inside ofthe panelboard door, Any circuit mislabe|edshall be corrected by the Contractor before final acceptance. Engraved non-metallic nameplates ofphenolic materials shall be providedfor each panelboard,enQraved with the pane|boarddesignation asindicated. Where conduit terminate in the top orsides of weatherproof enclosures, such terminations ohoU be made with Myers type hube. Milbank, 3N universal interchangeable hubs or equa|, and shall be installed to prevent the entry of water into the enclosure. Suitable grounding continuity shall be maintained as required herein. Panelboard shall be Westinghouse WEB, General Electric NHE\ Square D NEHB, or equal. k� MOTOR STARTERS Each starter unit shall be a combination circuit breaker and starter or fused switch and starter asindicated. High current hxbanupdnQcapacity fuses orcircuit breakers shall be furnished where for on the Drawings. Switch and circuit breaker handles shall be operable from the outside front of the access door and shall be interlocked so that the door cannot be opened unless the breaker or switch in in the "OFF" position. Each starter shall have o green pilot light in the front door toindicate when the motor imrunning. Circuit breakers shall be manually -operated, ambient -compensated, trip- free from the handle and provided with the inverse -time, thermal- element over -load protection and instantaneous magnetic short-circuit protection on all poles. The circuit breakers of any combination starter shall have an interrupting rating of not less than 14,000 RMS amperes symmetrical, and higher where shown on the Drawings. The operating handle shall clearly indicate whether the breaker is "ON", "OFF", or "TRIPPED". Hasps shall be provided to lock each circuit breaker handle in the "OFF" position with the cover closed by means of a padlock. Fusible switches shall have visible blades and quick -make quick -break operating mechanism, Fuse clips to be positive -pressure type, The operating handle shall clearly indicate whether the breaker is "ON", "OFF", or "TRIPPED", Hasps shall be provided to lock each circuit breaker handle in the "OFF" position with the cover closed bymeans ofapadlock. Fusible switches shall have visible blades and quick -make quick -break operating mechanism. Fuse clips to be ponUYe'preaeunatype The operating handle shall clearly indicate whether the switch is "on" or "off^. Means shall be providedhzlock each switch in the "off' position with cover closed by means of a padlock. Unless otherwise indicated or specified, all motor starters smaller than size 4shall provide full voltage ucrooa-the-||nestarting. All starters iDthe chemical room shall be housed incorrosive resistant nonmetallic enclosures. All fittings, devices, etc. shall benonmetallic, Starters shall bathree CB polehavithree manually resettable overload relays providing complete single phasing and overload protection with a reset pushbutton in the front door. Provide door mounted control components and indicating lights as specified, and as shown on the drawings, or as required for the equipment to be Rev5/OA SECTION16 Page 16 controlled. All starters shall be equipped with a minimum of two (2) auxiliary contacts. Circuit breaker combination starter units shall be Cutler Hamer, Westinghouse, General Electric, Square D, or equal. Provide ambient compensated overload relays. Properly sized instantaneous trip only circuit breakers may be substituted for the instantaneous/thermal type circuit breakers in motor starter units if indicated on the Drawings. All control wiring and components shall be for 120 volt, 60 hertz. Provide a 10 ampere, Class K-5 fuse in a pull-out block for protection and disconnection of all control wiring associated with that unit. Where the motor control is energized at 480 volts, 3 phase, 3 wire, provide a control transformer mounted in the starter unit, unless indicated otherwise. Where a control transformer is used, primary wiring shall be tapped to two (2) poles on the load side of the circuit breaker of fusible switch. Fuse both primary wires with 10 amperes, Class K-5 fuses. Fuse the ungrounded secondary side with a fuse capable of handling_ 100% to 125% at the rated control transformer secondary current. Provide control transformers with volt ampere ratings equal to a minimum of 125% of the volt ampere load connected to the control transformer. It shall be the Contractor's responsibility to provide approved sized overload relay heaters in all starters. Each unit shall have a suitable phenolic nameplate to designate the purpose of the circuit. Mount the nameplate on the unit door. (d) INDIVIDUAL CIRCUIT BREAKERS Circuit breakers shall be the molded case type of the frame and trip rating noted on the Drawings mounted in the panel enclosures unless noted otherwise. Circuit breakers shall be of the same manufacturer as the panel to be installed in. All circuit breakers shall be ambient compensated. (e) CONDUCTORS, 600 VOLTS Conductor sizes are expressed in American Wire Gauge (AWG) or in circular mils. Minimum conductor size shall be No. 12 AWG except control wires and cables shall be minimum No. 14 AWG. Wires No. 8 and larger shall be stranded. All secondary service, feeder, and branch circuit wire and cable shall be single conductor, soft drawn copper wire with 600 volt insulation, type THW or TWHN. Wire and cable shall be a manufactured by Anaconda, General Cable, US Rubber, Okonite, Phelph-Dodge, or equal. All secondary service, feeder, branch and control circuit conductors shall be color -coded. Conductor identification shall be provided within each enclosure where a tap, splice, or termination is made. Conductor identification shall be color -coded insulated conductors, plastic coated self -sticking printed markers, colored nylon cable ties and plates, or heat -shrink type sleeves. Control circuit termination shall be peripheral identified and numbered. Colors to be used in coding shall be: Rev 5t09 SECTION 16 Page 17 208 Volt, 3-Phase System Neutral - White Phase A - Black Phase B - Red Phase C - Blue Grounding Conductor - Green 120/240 Volt, 3-Phase System Neutral - White Phase A - Black Phase B - Grange (High Leg) Phase C - Blue Grounding Conductor - Green 480 Volt, 3-Phase System Neutral - Gray Phase A - Brown Phase B - Orange Phase C - Yellow Grounding Conductor - Green 120/240 Volt, 1-Phase System Neutral - White Phase A, Black Phase B - Red Grounding Conductor - Green Control circuit conductors shall be AWG #14 unless otherwise indicated, stranded, copper, red THWN or THHN insulation. Conductors for grounding, bonding, and other uses requiring bare copper wire shall be solid bare copper wire conforming to ASTM B1 for sizes No. 8 AWG and small and shall be stranded bare copper wire conforming to ASTM B8, Class B for sizes No, 6 AWG and larger. Flexible cable for connection to movable equipment shall be heavy- duty type SO cord- The cable shall have a green equipment ground conductor, in addition to the current carrying conductors, All branch circuit conductors run through fluorescent fixtures shall be type RHH or THNN rated 90 degrees C, Rev 5109 SECTION 16 Page 18 Splices and terminations shall conform to UL 486. Tapes for splices and termination shall conform to UL 510. Connections in wires No. 10 AWG and smaller shall be made with insulated pressure type connectors or wirenut type connectors. Splices for wires No. 8 AWG and larger shall be made with a solderless connector. Splices and terminations shall be made in outlet or junction boxes and shall be mechanically and electrically secure, using proper thickness of tape. Mechanical connectors of every kind shall be taped. Splices and terminations shall be covered with an insulation material equivalent to the conductor insulation. Flashover or insulation valve of joints shall be at least 100% in excess of wire insulation. Termination strips shall be used for interconnecting or splicing control cables, communication cables and other conductors where called for on the Drawings. These terminal strips shall be of the proper voltage, properly labeled and mounted in the cabinet. Solderless connectors and lugs shall be screw type connectors and taped with rubber compound and friction tapes, Splices and taps made with crimp -type or indenter -type connectors will not be permitted, Wire connections to terminals or disconnecting switches, starters, motors, panelboards and similar connections shall be made with mechanical connections. Tape of proper color may be used to identify the phase conductors of the larger feeders (larger than No. 6 AWG). Painting or taping will not be acceptable on conductors No. 6 AWG or smaller. All feeders, subfeeds to panel, motors, etc., shall be completely phased out as to sequence and rotation. Phase sequence shall be A-B-C from rear to front, top to bottom, or left to right when facing equipment. Suitable equipment shall be used to pull conductors through conduit exercising due care to avoid damage to insulation. Wires shall not be pulled through conduits before the conduit system is complete and has been carefully freed from obstruction of any kind. Soapstone or an approved compound may be employed to facilitate pulling wires. Cable pulling lubrications compound shall not contain petroleum or other products which will have a deteriorating effect on cable insulation. (f) CONDUIT Rigid steel conduit (RS) shall be standard weight, mild steel pipe, hot -dipped galvanized, or zinc -coated conforming to the requirement of ANSI a 80.1, latest edition. Rigid steel conduit shall be installed where routed .in poured in. place - concrete, in exterior masonry walls, or in wet locations where subject to severe physical damage. Exposed conduit shall be rigid steel unless otherwise indicated. Electrical metallic tubing (EMT) shall be cold -rolled steel tubing with a zinc coating on the outside and protected on the inside by a zinc, enamel, or equivalent corrosion -resistant coating and conforming to the requirement of ANSI C80.3, latest edition. Largest trade size shall be 2 inches. Electrical metallic tubing shall not be used in floor slabs, outside walls, below grade, or exposed, except that it may be used for serving exposed light switch boxes mounted at least 4 feet 6 inches above floor and fed from above. Flexible conduit (FC) shall be galvanized steel, single strip, with a copper strip interwoven and shall conform to UL-1. FC shall be used to connect all indoor vibrating equipment. Rev 5/09 SECTION 16 Page 19 Liquid -tight flexible conduit (LFC) shall be galvanized steel, single strip, with a copper strip interwoven and shall conform to UL-1. LFC shall have an extruded moisture and oil proof PVC jacket. Watertight connectors shall be used with liquid - fight flexible conduit on both ends. LFG shall be used to connect all vibrating equipment installed in wet areas. Plastic conduit_ (PC) shall be polyvinyl chloride (PVC) and shall conform to NEMA TC-8. PVC conduit for direct burial in earth shall be type DB, Schedule 40. PVC conduit for concrete encasement shall be type EB. Plastic conduit shall be in accordance with UL-651 "heavy -wall" for direct burial and "thin- wall" for concrete encasement, All plastic conduit runs shall contain a green TW insulated copper grounding conductor sized in accordance with the NEC. PVC as specified shall be for optional use in low abuse underground -areas and in concrete ductbanks. Fittings, elbows, etc., shall be manufactured in accordance with NEMA TC-9. Each length of conduit shall be stamped with the name and trademark of the manufacturer and shall bear the Underwriter's Label. Conduit shall be installed concealed unless otherwise indicated or specified. Conduit may be run exposed on walls only where concealing is not practical. Where exposed, maintain a minimum distance of 6 inches from parallel runs of flues or water pipes. For floor mounted equipment, conduit may be run overhead and dropped down, where underfloor installation is not practical. Groups of conduits shall be uniformly spaced, where straight and at turns. Conduit shall be cut with a hacksaw or an approved conduit -cutting machine and reamed after threading to remove all burrs. Securely fasten conduit to outlets, junction and pull boxes to effect firm electrical contact. Join conduit with approved couplings. Expansion fittings shall be installed in a conduit where it passes through structural expansion joints. Conduits shall be freed of all obstructions. Empty conduit systems shall be provided as indicated and shall have pull wires installed. The pull wire shall be No. 14 AWG zinc -coated steel, or of plastic having not less than 200 pound tensile strength. Not less than 12 inches of slack shall be left at each end of the pull wire. All bends shall be made with standard conduit elbows or conduit bent to not less than the same radius than a standard conduit elbow. Bends with kinks shall not be acceptable. Exposed conduit shalt be supported every 8 feet and shall be installed parallel with or perpendicular to walls, structural members, or intersections of vertical planes and - ceilings with right angle turns consisting of fittings in symmetrical bends. Conduits shall be supported within 1 foot of all changes in direction. Supports shall be approved pipe straps, wall brackets, hangers or ceiling trapeze. Perforated strap hangers will not be accepted. in no case shall conduit be supported or fastened to another pipe or installed to prevent the removal of other pipes for repairs. Fastening shall be by expansion bolts on concrete; by machine screws, welded threaded studs, or spring -tension clamps on steel work. Explosive -drive equipment may be used to make connections where the use of this equipment complies with safety regulations. Wooden plugs Inserted in masonry and the use of nails as fastening media area prohibited. Threaded C-clamps may be used on rigid steel conduit only. Conduits or pipe straps shall not be welded to steel. The load applied to fasteners shall not exceed 1/4 of the proof test load. Fasteners attached to concrete shall be vibration and shock resistant. Holes cut to depth of Rev 5109 SECTION 16 Page 20 more than 1 V2 inches in reinforced concrete beams or to a depth of more than 314 inch in concrete joints shall not cut the main reinforcing bars. Holes not used shall be filled, Spring steel fasteners may only be used to support lighting branch circuit conduits to structural steel members. Conduits shall be fastened to all sheet -metal boxes and cabinets with two (2) locknuts where required by the NEC to insure adequate bonding for grounding. Where insulated bushing are used, or where bushings cannot be secured firmly to the box or enclosure, a bonding jumper shall be installed to maintain suitable grounding continuity. Locknuts shall be the type with sharp edges for digging into the wall of metal enclosures. Bushings shall be installed on the ends of all conduits and shall be of the insulating type where required by the NEC. Conduit installed in concrete slabs or walls shall be located so as not to affect the designed structural strength of the slabs, Conduit shall be installed within the middle one-third of the concrete slab except where necessary to not disturb the reinforcement. The outside diameter of conduit shall not exceed one-third of the slab thickness, and conduits shall be spaced no closer than three (3) diameters except at cabinet locations. Curbed portions of bends shall not be visible above the finish slab, Where embedded conduits cross expansion joints, suitable watertight expansion fittings and bonding jumpers shall- be provided. Conduit larger than one (1) inch trade size shall be parallel with or at right angles to the reinforcement, the conduit shall be close to one of the supports of the slab. Conduits shall not be stacked more than 2 diameters high in floor slabs, Where plastic conduit is installed in or below floor slabs, or the concrete walls, bridges, or other structures a transformation from plastic conduit to steel conduit shall be provided for each conduit using approved couplings. This transformation shall be embedded in the concrete and all stub -ups out of the concrete shall be rigid galvanized steel conduit. Steel conduits installed in the earth shall be field coated with 2 coats of coal tar base asphaltum, 30 mils thick, over the entire surface of conduit and all fittings. Field made joints, fittings, abrasions, and imperfections shall be coated with material equivalent to the above. All conduits buried in the earth outside of the structure shall have minimum of 24 inches of cover above the conduit. PVC shall be changed to metal conduit at the point where it leaves the ground. No more than three (3) 90 degree bends will be allowed in any one conduit run. Where bends are necessary, a conduit or pull box shall be installed. All bends in 112 inch and 3t4 inch conduit shall be made with a conduit bender, and all larger sizes shall have -machine bends. Joints in threaded conduit shall be made up watertight with white lead or compound applied to male threads only; and all field joints shall be cut square, reamed smooth, and properly threaded to receive couplings, No running threads will be permitted. All conduit ends at switch and outlet boxes shall be fitted with an approved lockout and bushing forming an approved tight bond with box when screwed up tightly in place. Conduits stubbed up through concrete floors for connections to free standing equipment and future equipment shall be provided with an adjustable top or coupling threaded inside for plugs, set flush with the finished floor. Wiring shall be extended in rigid threaded conduit to equipment, except that where required, flexible conduit may be used 6 inches above the floor. Screwdriver operated threaded flush plugs shall be installed in conduits from which no equipment connections are made. Where outlets are shown near identified equipment furnished by this or other Contractors, it is the intent of the specification and drawings that the outlet be located at the equipment to be served. This contractor shall coordinate the location . Rev 5109 SECTION 16 Page 21 of these outlets to be near the final location of the equipment served whether placed correctly on incorrectly on the Drawings. Changes in outlet locations required to serve the equipment furnished by other Contractors on the Project shall be brought to the attention of the Engineer. Home runs may be combined with one (1) conduit, provided all connections are in accordance with NEC requirements and the maximum unbalanced current in the neutral does not exceed the capacity of the conductor; and the conductors are not required to be de -rated to below circuit capacity or are re -sized to meet de -rated circuit requirements. (g) CONDUIT FITTINGS For rigid metal conduit, nonmetallic conduit, flexible metal conduit shall conform to UL 467 and UL 514, as applicable. Fittings for electrical metallic tubing shall be raintight and concrete tight and shall conform to UL 467 and UL 514, as applicable and shall be plated steel hexagonal threaded compression type. Set screw or indenter type connectors shall not be used. Fittings for conduit installed in wet locations and underground shall provide a watertight joints, Fittings for rigid conduit and intermediate metal conduit shall be threaded. Fittings or bushings shall be installed in easily accessible locations. Where conduits pass through expansion joints, approved waterproof telescopic type expansions fittings shall be used. Fittings hall be OZ/GEDNEY type AX watertight and permit a movement up to 4 inches and shall be equipped with approved bonding jumpers around or through each fitting. Bonding jumpers -shall be an Appleton, Crouse -Hinds, Gedney or equal. Conduit fitting "condulets" shall be used on exposed conduit work for lighting and power outlets, convenience outlets, changes in direction of conduit runs and breaking around beams, "Condulets" shall be cast ferrous alloy, galvanized or cadmium plated, as manufactured by Crouse -Hinds, Plyle-National, Killark, Appleton Company or equal. Epoxy coated fittings and boxes shall be used with coated conduit in all chemically aggressive areas or where called for on the drawings. Covers shall be of a design suitable for the purpose intended. In damp areas, the outside condulets shall be made watertight. Install all condulets with the covers accessible. Use proper tools to assemble conduit system to prevent injury to the plastic covering, No -damage to the covering shall be permitted. Outlet boxes, switch boxes, and small junctions and pull boxes shall conform to UL 514. Boxes shall be provided in the wiring or raceway system wherever required for pulling of wires, making connections, and mounting of devices or fixtures. Boxes for metallic raceways shall be of the cast metal hub type when located in normally wet locations, when surface mounted on outside of exterior surfaces, and when installed exposed up to 7 feet above interior floors and walkways. Boxes in other locations shall be sheet steel. Boxes shall be sized and installed according to the NEC. Boxes for use with raceway system shall not be less than 1 1/2 inches deep except where shallower boxes, required by structural conditions are approved. Boxes for other than lighting fixture outlets shall not be less than 4 inches square except that 4" x 2" boxes may be used where only one (1) raceway enters the outlet. Boxes less than 4 inches for mounting lighting fixtures may be installed as required by fixture configuration when approved. Rev 5/09 SECTION 16 All other lighting outlet boxes shall be hot dipped galvanized four (4) inch octagon boxes as manufactured by Appleton Electric Company, Steel City, Raco or equal. Switch boxes for concealed wiring shall be hot dipped galvanized standard steel switch boxes as manufactured by Appleton Electric Company, Steel City, Raco or equal. Where fixtures are to be mounted on the box they shall have suitable studs and supports for carrying the weight of the fixture. Boxes in finished walls shall be flush mounted and have flush cover plates, If in concrete, boxes shall be 4 inch concrete type. Where outlets occur in exposed masonry construction, they shall te adjusted where practical tuoccur inthe nearest joint hothe height specified orindicated. and junction dimensioned, for concealed wiring, shall behot dipped galvanized four (4) inch square boxes- as manufactured by Appleton Electric Company, Steel City, Raco or equal, Boxes for outlets, switches receptacles, andfor junctionboxes used |othe, following kJoadona shall be cadmium -plated oao1 malleable iron type with threaded hobo and Vellumoid cover gasket, Crouse -Hinds, Appleton, Raco or equal. 1) Any exterior location, _' .---— --__` 3) In all surface mounted, exposed, conduit 4) Where exposed to moisture laden atmosphere, and 5) Where shown on the Drawings. Boxes with unused punched -out openings shall have the openings filled with proper Where sizes of boxes are not shown on the Drawing, the Contractor shall provide box sizes in accordance with the NEC. Where junction or pull box size exceeds the standard box sizes or where shown on the Drow/ngo, boxes shall be provided as specified for large junction and pull boxes. Provide pull boxes or junction boxes in conduit runs where indicated or where required to facilitate the pulling of wires orthe making ofconnections. All pull boxes and junction boxes except where cast iron boxes are specified orindicatedehaDbe code size galvanized steel and shall be providedwith plain black removable covers held in place with screws unless otherwise shown; and covers of all boxes shall be accessible. Boxes shall beconstructed Vf12gauge minimum hot rolled sheet steel and shall behot dipped galvanized inside and outside. In damp and wet locations and where indicated on the Drawings, cast iron junction boxes shall be provided. Cast iron junction boxes shall have a galvanized finish and be Russell & Stoll, Crouse -Hinds, Raco or equal. Gaskets shall be used where required and in all wet or damp locations, Where large junction and pull boxes are recessed, the box covers shall beinstalled flush with the surface, Rigid steel wiring troughs mha be constructed of steel, totally enclosed with hinged cover Vrcover fastened with screws, and sized anindicated or as required by NFPA ?(l Thavjnaway shall be provided complete with all necessary accessories and fittings, Rev 5109 SECTION 16 Where wiring troughs are indicated indamp mwell locations, provide NEMA 3R (h) DEVICES Lighting switches shall be Leviton, Hubbell, Pass and Seymour or equal, and shall conform to UL 20 and shall be "Specification Grade" quiet -operating flush toggle type for back and side wiring, 20 amperes, 120 volts, AC only. Switches for use in wet locations shall be installed in type "FS"boxes, fitted with weatherproof cover with gasket and with external operating- handle integral with the cover, Switches or devices in chemical areas shall be in nonmetallic boxes. VVhona indicated or required by NFPA70for individual branch cjrcuits, provide convenience outlets identical to above except rated 20 amperes, NEk8A nonfiguration5-20R. Convenience outlets installed in wet locations shall be 15A, 125V duplex 3-wire grounding complete with cast metal double lift cover late for |ype^FSr cast metal boxes, including gasket. In chemical area, boxes shall be nonmetallic with double lift nonmetallic covers, Grounding fault circuit interrupter receptacles shall conform to UL 943 as applicable and nhwU be duplex receptacle feed -through type for mounting in a standard outlet box. The device shall be capable of detecting a current leak of Where portable equipment is shown on the Drawings with a cord and plug indicated, the Contractor shall provide a plug -cap to match the receptacle and the necessary heavy duty rubber covered 3, 4 or 5 wire cord of the required size and shall install the plug caps thereon and attach to the equipment. The plug and receptacle shall be completely weatherproof and manufactured by Leviton, Hubbell, Raco or equal. All wiring devices in boxes shall be equipped with a plate of the required Device plates for surface -type boxes shall be galvanized sheet steel designed for the application in non -chemical areas. Outlets must be centered with regard to openings, trim, etc. Outlets shall be symmetrically arranged. Any outlet which is improperly located must be corrected at Contractors expense. Outlets must be set plumb or horizontal and shall extend to the finished surface of the wall, ceiling or floor where recessed without projecting beyond same, Receptacles, switches, etc. shall be installed symmetrically on such trim or fixture and, where necessary, shall be set with the long dimension of the plate vertical or shall be ganged in tandem. Mounting heights above finished floor cf finished grade tocenter, shall beaafollows unless otherwise shown nrindicated inthese specifications o[ontheDrawiMDn. Rev 6/09 SECTION 16 Page 24 Single -pole light switches, 541I unless otherwise noted, Duplex receptacles in dry areas, 16" Duplex receptacles in wet areas, 54" Pushbutton motor control stations, 54" Panelboards to top 78" Motor starters to center 54" Devices shall be NEMA rated and manufactured by Leviton, Hubbell, Raco or equal. (i) GROUNDING AND BONDING Grounding and bonding equipment shall be in accordance with UL 467. The maximum resistance to ground shall not exceed 5 ohms under normally dry conditions. Except where specifically indicated otherwise, all exposed non -current carrying metallic parts of electrical equipment, metallic raceway systems, grounding conductor in nonmetallic raceways and neutral conductor or wiring systems shall be grounded. The ground connection shall be made at the main services equipment. Where ground fault protection is employed, care shall be taken so that the connection of the ground and neutral does not interfere with the correct operation of the fault protection. Where indicated, a green -colored equipment grounding conductor, which shall be separate from the electrical system neutral conductor shall be provided. Provide green equipment grounding conductor in all nonmetallic conduits. Equipment grounds shall be solid and continuous from a connection at earth to all distribution panelboards. Ground connections at panelboards, outlets, equipment, and apparatus shall be made in an approved and permanent manner. 0) LIGHTING Each fixture shall be the Underwriter's Label. Fixtures shall be located symmetrically with building lines. All lighting fixtures shall be furnished complete with lamps of the size and type as indicated on the drawings and all fittings and hardware necessary for a complete installation. Lighting fixtures shall have all parts and fittings necessary to completely and properly install the fixtures. Fixture leads shall be required by NEC and shall be grounded by the conduit connection to the fixture. Ballasts for fluorescent fixtures shall be rapid -start, high power factor, with certification by ETL, CMM and Underwriter's Laboratories. All ballasts shalt be equipped with internal, non -resetting thermal protectors and shall be guaranteed against service failure for a period of two (2) years, Ballasts shall be rated "Class P" to agree with requirements of NEC and to conform to the time schedule for this requirement, and shall be Class A sound rating and series lead -lag type. Rev 5149 SECTION 16 Lamps shall baofthe following types: 1 Fluorescent'. White, HO 2)H|[l 12OVolt, HP8 3)|uoondesoent 130Volt. Lenses for all fluorescent light fixtures shall be 00% virgin acrylic clear prismatic. The contractor shall provide submittals or samples showing the lenses he proposes to use. Painting of fluorescent fixtures shall be after hsbhooUnn. Fixtures made from pre -painted stock will not beaccepted. Surface and pendant mounted fluorescent fixtures shall be individually supported from the facility structural system, Continuous row fixtures shall be jointed by the use of chase nipples or fittings approved for the use. All lighting fixtures shall set true to line and spacing. Ud EQUIPMENT FIELD CONSTRUCTED RACKS The Contractor shall furnish and fabricate all equipment racks for all electrical equipment. Racks shall befabricated for electrical equipment furnished under the Contract as well oaequipment hu ed by others where specified, Equipment racks shall bespecified herein unless otherwise noted. All nuts and bolts shall becase hardened to assure proper seating into theintumed edge 0fthe channel framework and shall bo galvanized. The Contractor shall furnish and install all equipment, channels,accessories,gbc., necessary to makethe racks complete, stable and professional- Components s;.hall be factory purchased and completely assembled for equipment nsoka in the field. Components shall be by Dniatnut. Husky/Burndy` Kondort or equal. 0 SAFETY AND CONTROL SWITCHES Disconnect switches shall be heavy duty type and/or as designated in the Specifications. Switches oknU be located as shown on the Drawings and as required bythe NEC, Handles shall belockable. Switches shall berated for service entry where required. Switches shall be NEMA Type HD, single-thmw, externally operated, fused or non4unedae required. Switches ofthe poles, voltage and ampere ratings shown 1n NEMA-1A or NEMA-3 enclosures as required. All switches tobemounted 5'0" above the floor matthe equipment height where Switches shall be quick -make, quick -break and with an interlocked cover which cannot be opened when switch in|nthe "ON"position and capable of being locked in the "OPEN" position. , Rev 5/09 SECTION16 (| ` �. | ! _ Paga28 � � Pushbutton stations and selector switches shall be the heavy duty, nU tight type � and, unless otherwise designed shall be of the same manufacturer as similar units furnished bvthe control center manufacturer. P|msUo or bakoiba engraved nameplates oho|| besecurely fastened to the front of each safety switch and each pushbutton mtmUon, selector switch and motor starter | � remotely located from the motor control center. ifadequate space is not available, ' nameplate oheU be mounted bo|m* the pushbutton stations. Nameplates oh$U | ( designate the item ofequipment controlled. . ` Identify all switches osto the equipmentwhich they control. Provide engraved � laminated 1/18" thick pliable plastic fastened to the switches with self -tapping � stainless steel ocn*wn and drawn down to conform to the contour of the avNtoh ` ! Safety and control switches shall be enclosed in nonmetallic enclosures in the chemical room, (n) FUSES,G00 VOLTS Provide two complete sets of fuses for all switches requiring fuses- Install one sat and deliver second set to the Owner with proper identification. All fuses uhoU be dual e|ement. time delay type unless otherwise noted on drawings. (Fuoetnonfuaea shall be used.) Fuses shall conform toNEMAFU4and UL198,a complete set Vffuses for all switches shall be provided. Time -current characteristic curves offuses serving motors orconnected in series with circuit breakers shall be coordinated for proper operation. Fuses shall have voltage rating not less than the circuit voltage. The Contractor shall furnish and install fuses nfvarious types as required with the continuous ampere ratings as shown on the Drawings. One complete set of spare fuses shall be furnished and delivered to the Owner at the time of final inspection. Fuses shall be manufactured by Federal Pacific Electric, Buaamun' Chase Shawmut, or equal, (n) EXHAUST FANS Exhaust fans shall bedirect mbelt driven, centrifugal or propeller type and shall provide the exhaust air volume as ebm".- in -thm exhaust fan schedule on the drawings. Fan ehe|| becoordinated with all louvers and dampers such that the CFM'a listed are maintained regardless of the system static pressure. Any system which required an increase in the static pressure nhn|| naou\t in the fen being re -sized to Meet the DFK8 requirements ||ated. The fan shall bear the ULlabel where listing is available and bear the AMCAaeal. Ratings shall be in accordance with AMCA Standard 210 and comply with the requirements of the AMCA Certified Rating Program. Fan shall bealuminum finished with corrosive resistant paintwhere shown, and include e wire guard and gravity shutters similarly finished. All dimensions and openings shall be coordinated with the building openings and dimensions shall be submitted to the engineer prior to any construction which effects the location and size ofany opening. Rev 5/0 SECTION 16 Page 27 All fans 1/2 hp and less shall be designed for operation at 120 volts. Fans greater than 1/2 hp shall operate on 3-phase power. The gravity shutter shall be coordinated or matched with the fan supplied so that pre -drilled holes for mounting line up, and the shutter fits flush to the outside wall. Exhaust fan shall be as specified on drawings. Starters and electrical controls shall be furnished. Fans and all fan hardware shall be delivered to the building contractor for installation with the building. The contractor shall thoroughly coordinate- the installation of the fans and openings required to ensure proper fit. (o) DAMPERS All wall mounted exhaust openings shall include a gravity damper. Dampers shall be coordinated to operate and interface with the fan when in operation. Dampers on the fans shall be mounted flush on the outside wall unless shown recessed in the opening. All dampers shall be low leakage type. Dampers shall have aluminum blades with sealing edges and couplings at both ends with tie rods. Frames shall be welded steel and painted with a corrosive resistant primer and a finished coat of natural aluminum. Dampers shall be pre -drilled to match the fan or louver. Dampers shall be natural aluminum unless indicated on the drawings. Dampers shall be sized to fit the openings, and where necessary multiple dampers shall be used for large intake openings, All dimensions shall be coordinated with the building contractor and dimensions shall be submitted to the owner prior to any construction which affects the location and size of openings. The contractor shall furnish the dampers to the building contractor for installation. The dampers shall be delivered to the job site with all installation hardware well in advance of the work schedule for this item. (p) UNIT HEATERS The cabinets shall be of 18 gauge die formed furniture grade steel. Individual adjustable louvers shall be furnished to provide desired control to discharge air. All metal surfaces of the casing shall be phosphate coated to resist corrosion and finished in neutral gray baked enamel. The heating coil shall consist of three (3) metal sheathed fintube electric heating elements each wired to a built-in line voltage, automatic reset thermal overload protective device for instantaneous operation of the power contractor holding coil in the event of an overload. Motors shall be of the totally enclosed continuous fan duty sleeve bearing type equipped with built-in thermal overload protections. Each unit shall be equipped with combination fan guard/motor support resiliently mounted at four (4) points to absorb any motor vibrations. The fan motor shall be wired within the unit heater to the electric heating coil power supply, thus, eliminating the need for external motor starters or a separate fan motor circuit to the unit Fans shall be broad bladed Rev 5/09 SECTION 16 � i i Page28 ' aluminum directly connected to the fan motor, dynamically balanced and designed � for the unit heater application. ! On/Off type operation shall be provided by interrupting the heater power supply with a contractor of size as required by the equipment indicated on the Drawings. The contactor folding coil shall in turn be operated by a pilot duty type thermostat. The unit heater shall be supplied complete with a thermostat switch VOlemo othenVioe indicated, designed h»maintain temperature between 35deQrees Fand 55 degrees F unless otherwise indicabad. The control circuit shall operate on 120 vac, single phase, G0hertz from econtrol transformer with the unit. All heaters shall beULlisted and meet the requirement of the National Electrical Code. Unit heaters shall bens manufactured by Emerson-Chrornzlox, Emerson Electrical Co,, Singer Co., or equal, and shall have a grounding conductor. (q) THERMOSTATS Mounted): Thermostats for exhaust fans andunit heaters shall beGPST duty,heavy to close the circuit as required by e control point and open the circuit aarequired bvacontrol point. Unless otherwise specified or indicated the range ofadjustment shall ba70-1UO degrees Ffor exhaust fans and 4U-G0degrees Ffor unit heaters. Enclosures for thermostats location on corrosive otnnnaphenea or facilities shall be waterproof polyester type Polyester enclosures sbo|| he as manufactured by Cnouoe-Hiodo.Ada|eLCarton, orequal. Electrical nequirem*nt, unless otherwise specified or indicated, ehe|| be 120vao' single phase, 6Ohertz. Thermostats toiemanufactured byEmermn'Chmmekm,Emerson Electrical Co.. Honeywell, orequal. 16'02.4 ELECTRICAL -ALARMS & CONTROLS (a) GENERAL The Electrical Contractor shall provide all external power and control wiring to control panels of pre -wired packaged equipment, unless indicated otherwise, Control wiring requirements are indicated in electrical schematics and descriptions on the drawings, in control function descriptions in the specifications, and in equipment manufacturer's equipment data. Furnish, and install control wiring in accordance with the drawings and specifications. This Contractor shall provide all control circuits and wiring for a particular item of equipment in accordance with requirements as set forth by the manufacturer of the particular item of equipment. Where pumps furnished with solenoid valves or other devices for control, the Electrical Contractor shall wire those valves ordevices to operate when the pump command is"DN"cvindicated bythe Control Drawings. Unless otherwise indicated or specified, magnetic starter contactors ahnU be wired to drop out and remain dropped out on loss of power to the line side of the starter, Rev5/Dg SECTION16 Page 29 Operator action shall be required to restart the motor unless the motor is under automatic control that is operational after power is restored. Motor control components and control wiring shall conform to NEMA specifications ISC-1970 (Revised, 1975), Industrial Controls and Systems. Where devices are installed in NEMA 4 or 3R enclosures, provide covers to maintain the NEMA 4 or 313 rating of the enclosure. The exhaust fans shall be controlled by a thermostat. Thermostats shall- be 120 vac in a nonmetallic waterproof enclosure at +60" AFF. Unit heaters shall have integral contactors and control transformer for operation at 120 vac control voltage, Unit heaters shall be interlocked with the existing load shedding system through the 120 vac control circuit and a new relay panel. All electrical equipment shall be mounted in NEMA 3R enclosures when installed outdoors or in basement areas and in NEMA 12 enclosures when installed outdoors above ground, 16.03 CONSTRUCTION METHODS 16.03.1 GENERAL (a) Installation of Electric Work shall be complete in every respect, insuring systems which will operate satisfactorily and safely. All work shall be done by skilled workmen, and work performed by unskilled help will not be acceptable. All cutting, fitting, repairing and finishing of masonry, concrete, metal and carpentry work that may be required for the contemplated work under this Specification must be done by craftsmen skilled in their respective trades and at the expense of the Contractor. Unless otherwise indicated, all materials and equipment shall be installed in accordance with the manufacturer's recommendations. (b) Concrete used in Electrical Work for equipment bases, conduit encasement, hndholes, manholes, and otherwise shall conform to Class C as specified under Section 9.0 of the General Specifications. (c) Excavation and 6ackfill work required for Electrical Work shall be done by the Electrical Contractor under the requirements of Section 8.0 of these General Specifications. Work within structures shall include that required below excavation for general construction. Outside of structures, it shall include all work necessary to properly perform the Electrical Work. Excavation of rock larger than 1/2 cubic yard in size will be performed under other Sections of these specifications; however, the Electrical Contractor shall backfill rock excavation with sand or gravel acceptable to the Engineer as required to support items of Electrical Work. The Electrical Contractor shall- provide all equipment and do all work necessary to keep his excavations free of water until conduit has been laid or until concrete or masonry has been allowed to set for at least 48 hours. He shall furnish and install all temporary sheeting, shoring, timbering and bracing required to maintain the excavation in a condition to permit proper installation of the work; such bracing shall be left in place at no added compensation should the site conditions so require. He shall furnish and install all items necessary to protect adjacent structures, existing pipelines, grass plots, trees, when so indicated, and pedestrian and Rev 5109 SECTION 16 Page 30 vehicular traffic from damage as the result of excavation work. The Electrical Contractor will be held liable for any damage resulting from his operations. All buried items shall be inspected and approved by the Engineer before backfilling. Backfill material shall be free of debris, frozen material, cinders, and other corrosive material. No rock or hard material shall be placed in contact with buried conduit, handholes or manholes. Backfill shall be placed by hand in layers not exceeding 66 inches in depth and thoroughly tamped to a point at least 12 inches above the top of conduit and duct runs; the remainder may be placed mechanically and shall be placed to a height slightly above the original ground elevation. Baokfill under paved areas or ornamental grounds and around all structures shall be compacted by jetting or puddling with water if backfill material is of sand or gravel, or by methods designed to control moisture and secure maximum material shall be disposed off the site or as directed by the Engineer. Existing pavement, curbs, sidewalks, shrubbery, sod or other appurtenances removed or damaged by excavation shall be restored to their original condition unless otherwise directed. When work is done in a public street or highway, the Electrical Contractor shall make all necessary arrangements with the municipal or highway authority for permits, inspections, and repairs without additional cost to the Owner. (d) All materials and equipment shall be installed in strict compliance with manufacturer's recommendations unless directed otherwise. All exposed conduit shall be installed parallel or perpendicular to walls and partitions and shall be vertically plumb. All piping shall be run concealed in finished areas. Installation of work shall be complete in every respect, insuring system will operate satisfactorily, All equipment shall be adequately protected prior to installation, The Contractor shall provide and connect power in accordance with the NEC and the manufacturer's recommendations to all motor and equipment space heaters which have been furnished with same prior to connection to the project electrical system. In the event the Contractor fails or neglects to connect power to an equipment space heater as specified, the Contractor shall perform tests to determine if the equipment insulation system has been affected and shall disassemble and brake out the insulation or suitably repair same in an approved manner directed by the Engineer. The Contractor shall bear the expense of all tests and repairs as directed by the Engineer. (e) The Electrical Contractor shall be responsible for: (1) Arranging order of work so as not to cause interference of delays with other trades. (2) Obtaining all required tests and approvals of work before such work is closed in or covered up. (3) Proceeding with roughing -in all portions of work before such work is closed in or covered up. (4) Keeping the premises free from all debris and waste materials resulting from the work under this section, All such debris and rubbish shall be removed from the site. Rev 6/09 SECTION 16 Page 31 16.03.2 INSTALLATION OF MATERIALS CONDUIT (1) All conduit installation shall be in full compliance with the NEC. (2) Conduits shall be either underground, concealed in walls, concealed in slabs, unless indicated otherwise by the Drawings or directed by the Engineer. (3) All exposed conduit in the plant shall be supported with rustproof malleable iron one hole scraps and Appleton "clamp backs" securely anchored with rustproof screws at a maximum spacing of 8'. For two or more exposed conduit runs, a trapeze hanger or other approved method of installation shall be used, Perforated strap hangers will not be acceptable. All exposed conduits shall run parallel or perpendicular with adjacent wall or partitions. (4) Conduits shall be thoroughly cleaned of dirt and free of moisture before installing any conductors. (5) Expansion couplings shall be installed at all points where conduits cross structural joints. Bonding jumpers shall be provided. (6) Conduit insulating bushings with ground lugs shall be provided on all conduits terminating in or under equipment, and ground to the equipment and to the system ground. Insulating bushings shall be provided at locations which the NEC requires. Conduit stubs under equipment shall be of uniform height and neatly arranged with a minimum of 1" space between conduits. (7) Conduit connection to motors and other equipment subject to vibrations shall be made by means of a short length of flexible conduit between the motor or equipment outlet box and the feeder conduit in compliance with the NEC. (8) The minimum conduit size shall be 3/4" unless otherwise specified or indicated on the Drawings. (9) Conduits shall be plugged and capped until ready for pulling conductors and making connections. (10) Rigid conduit shall be used in non -chemical areas and when placed where subject to mechanical injury. Conduit in contract with earth and in chemical area shall be Schedule 40 PVC. (11) No electrical metallic tubing (EMT) may be used. (12) Flexible steel conduit may be used in runs from adjacent junction boxes or motors and in certain locations where, for structural or other reasons, it is impractical to use rigid tube and where specific permission to do so has been granted by the jurisdictional authorities. For motor connection in moist or damp locations use flexible conduit; American Brass "Sealtite Flexible" Type "UK, Columbia, "Flex -Seal" Type "XL", Allied, or approved equal, with flexible fittings, Aluminum flexible conduit shall not be used for power circuits. (13) PVC Schedule 40 conduit shall be used in and under slabs and underground where approved by local codes, A green ground wire shall be installed in all Rev 5/09 SECTION 16 Page 32 PVC conduits of the required size and conduit size shall be adjusted for the additional wire. The joints shall be made liquid tight. (14) Conduit installed underground, in concrete, or in any moist or periodically damp location shall have joints made liquid and gas -tight and made up with an approved joint compound. (15) Provide and install PVC sleeves where conduits pass through masonry walls, etc. Caulk all sleeves after installation of conduits with silicon. (16) Conduit shall not be run closer than 6" to any water pipe. No conduit shall be installed in concrete slabs laid on the ground. (17) Ends of conduit shall be cut square and carefully reamed. (a) Conduit riser shall be fully protected from physical damage by a metal skirt or in some other approved manner fully enclosed. (b) Nylon pullers shall be used (when pulling conductor wire). (18) No running threads permitted. Special union fittings shall be used in lieu thereof. Open ends of all conduit shall be kept closed with approved conduit seals during the construction of the building. (19) Underground conductors entering a raceway in a gutter, pull box, junction box, or auxiliary gutter, shall be protect by a substantial bushing or liner. (20) Conduits 1" and smaller require 1 or 2 hole pipe straps spaced at not greater than 10' intervals and within 24" of an outlet, junction or pull box or terminal closet. (21) Exposed conduit larger than 1" require 2 hole pipe straps. Where conduit runs are grouped, use conduit trapezes supported on 3/8" diameter rods. (22) Provide a threaded flush floor coupling where conduits enter or leave floor slabs. (23) Where non-metallic conduit is used the Contractor shall install ground wire. (24) It is the Contractor's responsibility to install: the conduits with a minimum number of bends in such a manner as to conform to the structure, avoid obstructions, preserve headroom, keep openings and passage ways clear, and meet all structural code requirements. The routing of conduits may be changed, providing the length of any conduit is not increased or decreased more than 10% of the length shown or indicated on the drawings. (25) In conduit runs where an excessive number of bends are required, install additional pull boxes, offsets, condultes, etc., to comply with the applicable codes. 16.03.3 CONDUCTORS (1) All conductors shall be installed in compliance with the NEC and in a careful manner to avoid damage to conductors or insulation. Rev 5109 SECTION 16 Page 33 (2) Copper conductors, joints, splices, taps, and connections for 600 volt conductors, joints, splices, taps, and connections for 600 volt conductors shall be made with solderless connectors approved by the Engineer. The following connectors are approved: (a) For wire #10 AWG and smaller use "Scotchlock" Buchanan connectors, MAR connectors, orwirenuts. (b) For wire #8 AWG and larger use S&S "Lock-Tite" connectors; O/Z solderless connectors; or Trumbull solderless connectors, (3) Terminal lugs shall be used on all conductors of No. 0 AWG size or larger where conductors are attached to terminal blocks or screws. The lugs shall have a conductivity not less than that of the wore or cable to which they are attached. The lugs shall be securely connected to the conductors and all contact surfaces securely connected to the conductors and all contact surfaces shall be carefully finished and fitted to provide a low resistance connection. (4) Minimum size conductor for power, single conductor control wire, shall be No. 12 AWG unless otherwise specified or indicated on the Drawings. (5) Minimum size conductor for field multi -conductor control cable wiring shall be No. 14 AWG unless otherwise specified or indicated on the Drawings. 16.03.4 GROUNDING (1) Provide fully bonded system of grounding in accordance with NEC requirements including all services, systems and equipment requiring grounding in accordance with the NEC and other prevailing code requirements. (2) The complete installation, including the neutral conductor, metallic conduits and raceways, boxes, cabinets, structure, and equipment shall be permanently and effectually grounded in accordance with all code requirements, whether or not such connections are specifically shown, The following methods may be utilized to achieve an effective ground, Local inspection authorities shall be consulted as to approved methods. (a) The identified neutral wire of "WHITE" wire of the interior wiring system shall be permanently bonded to the main grounding electrode. All conduit leaving equipment shall be bonded to the ground bar in the equipment. (b) Ground connections to grounding electrodes shall be made to non -current carrying metal parts of panels, secondary neutral points, motor frames, etc. (c) Enclosures and housings shall be bonded to ground with a green copper conductor and extended to the grounding electrode and securely attached with proper fittings. Grounding jumpers shall be installed from the building structural steel to the grounding electrodes. Rev 5/09 SECTION 16 Page 34 (3) Provide a green grounding conductor in all non-metallic, and flexible metal conduit systems and wherever shown in the drawings. (4) Ground conductor shall by type "TW" or "THW" wire. (5) The electrical system and building structure shall be grounded by bonding to the grounding electrodes in accordance with NEC article 250. 16,03.5 GUARANTEE (1) In addition to the specific warranties called for under the specifications, guarantee this work as follows: (a) All parts of the electrical systems shall be guaranteed to perform the required functions in accordance with the performance requirements which are indicated- or specified, or where such particular requirements are not stated, shall perform in accordance with the prevailing recognized trade standards of performance requirements, During the period of one year following completion, the Contractor shall make all repairs of replacements necessary to accomplish the required performance, (b) For factory assembled equipment and devices on which the manufacturers' furnished standard published guarantees as regular trade practice, the Contractor shall obtain such guarantee and will be held to replace any such equipment which proves defective during the life of the guarantee. (c) All work for which materials are furnished, fabricated or erected by the Contractor; all factory assembled equipment for which no specific manufacturer's guarantee is furnished; and all work in connection with installing manufacturer's guaranteed equipment shall be guaranteed by Contractor for a period of one year from completion of the work, against defects in materials and defective workmanship of any kind. (2) in the event of failure of any work, equipment or device during the life of the guarantee, the Contractor shall repair or replace the defective work and shall remove, replace or restore at no cost to the Owner, any parts of the structure or building which may be damaged as the direct result of the Contractor's defective work, or in the course of the Contractor's making replacement of his defective work or material. 16.04 COMPLETION OF CONTRACT: 16.04.1 GENERAL (a) The Electrical Contractor shall examine the rating of the motor starter overload protective devices, the motor nameplate full load running current, and determine whether or not the overload devices are suitable to provide adequate motor protection. Replace any protective devices that will not provide adequate motor overload protection before energizing any motor. (b) The Contractor shall examine the rating of the motor starter overload protective devices, the motor nameplate full load running current, and determine whether or not the overload devices are suitable to provide Rev 5/09 SECTION 16 � adequate motor protection. Replace any protective devices that will not provide motor overload protectionbefore energizing any motor, (o) Upon completion ofthe work the Contractor shall measure line voltage ofeach � phase atthe load terminals ofthe main breaker orswitch. ' h8 Upon the wm�Ue�n�o� shaUme�u���ou�n�� \ ` ' each phase � of each piece ofequipment under load. ! (e) Upon completion of the work the Contractor shall energizeand put into ! operation each item of equipment requiring electrical connection. (f)i All necessary repairs, alterations, replacements and adjustments required fora complete and satisfactory operatingelentrical system karequired. (g) All fixtures shall Le lamped and iOoperating condition when the work is accepted by the Owner, (h) Out and patch all hnles, openings, or damage to the building caused by the installation of the electrical equipment. 16.04.3 DATA TO BE FILED WITH OWNER (a) The Electrical Contractor shall furnish in triplicate the following data upon completion of the tests and before final acceptance of the Work. The original and one (1) copy shall be filed with the Owner and one (1) copy With the (1) Complete nameplate data of each motor, identification, together with a record of the measured line currents (under load) for each motor onherein before specified under testing. (2) List ofmanufacturer's nmmumndtypeorundenumberandknampere rating Vfall motor starter overload heaters for each motor starter. (3) Measured voltage atload terminals ofmain breaker. (4) Certificate ofinspection from the local Electrical Inspector. 16.034 WALL EXHAUST FANS Wall exhaust fans shall be direct driven type and shall provide the exhaust air volume as shown in the exhaust fan schedule on the drawings. Fans shall be coordinated with all louvers and dampers such that the CFM's listed are maintained regardless of the system static pressure, Any system which requires an increase in the static pressure shall result in the fan being resized to meet the CFk8 requirement listed. The fans shall bear the UL label where listing isavailable and bear the AMCAsea. Ratings ohsU| be in accordance with AMCA Standard 21 and comply with the Rev 5109 SECTION 16 Page 36 Fans shall be finished with a corrosive resistant paint or natural aluminum and include a wire guard where indicated on the drawings and gravity shutters similarly finished. All dimensions and openings shall be coordinated with the building openings and certified dimensions shall be submitted to the engineer prior to any construction which effects the location and size of any opening. The units shall be securely mounted and include an integral disconnect switch. 16,03.5 LOUVERS Louvers shall be anodized medium bronze extruded aluminum stationary drainable blade type and shall provide maximum weather protection with minimum pressure drop. Louvers shall be 4 to 6 inches deep depending on the size and shall have drainable blades with built-in gutters which divert moisture down full depth jamb channels and out over sill blades to reduce cascading across the louver face. Blade design shall provide superior free area for intake with no more than 0.005 ozs, per square foot of water penetration at an air velocity of 900 feet per minute. Construction shall be .081 anodized extruded aluminum blades and frames. The louver shall include aluminum mesh insect screen. The louver shall bear the AMCA seal with ratings in accordance with AMCA standard 500 which applies to air performance ratings and water penetration ratings. The louvers shall fit flush to the outside wall except where shown in the drawings. All dimensions shall be accurately coordinated with the general contractor and certified dimensions submitted to the engineer prior to any construction which effects the location and size of the openings, The contractor shall furnish the louvers to the general contractor for installation. The louvers shall be delivered to the job site with all installation hardware well in advance of the work schedule for this item. 16.03.6 GRAVITY DAMPER All wall mounted axial exhaust fans and intake louvers shall include a gravity damper. Dampers shall be coordinated to operate and interface with the fan being furnished. in addition, all intake louvers shall include intake dampers designed to operate when the exhaust fan is on. Dampers on the fan shall be mounted to operate with a flush louver. Dampers on the intake louvers shall be mounted on the inside walls. All dampers shall be low leakage type. Dampers shall have aluminum blades with sealing edges and couplings at both ends with tie rods. Frames shall be welded steel painted with a corrosive resistant primer and a finished coat of medium bronze epoxy. Dampers shall be pre -drilled to match the fan and louver. Dampers shall be sized to fit the openings, and where necessary, multiple dampers shall be used for large intake openings. Rev 5/09 SECTION 16 All dimensions shall be coordinated with the general contractor and certified dimensions shall be submitted to the engineer prior to any construction which effects the location and size ofthe openings, Dampers sbmU begravity operated where listed static pressures are met, Should it be necessary for any supplier to lower the nyatem'o static pressure to meet those Usted, the contractor shall use motor opansbad dampers interlocked to the fan control as part of the bid price which results in no additional cost to the owner. The contractor shall furnish the dampers to the general contractor for |nnhs||aUon. The dampers shall be delivered to the job site with all installation hardware well in advance nfthe work schedule for this item. Rev5K)A {EIT]{}N-YG Page 1 Y�tTi �+ei � r• 1 � 7y1: 17.01.1 SCOPE OF WORK (a) All labor, materials, equipment, tools and services to fulfill the requirements of this General Specification, the Project Specifications and the Contract Drawings shall be furnished by the Contractor as part of his Base Bid. (b) All concrete sidewalk, asphalt and concrete driveways, asphalt and concrete pavements, ditches, curb and gutter, fences, poles, mail boxes, landscaped areas, building components, equipment, and all other disturbed areas shall be replaced or restored to equal or better than their condition prior to work beginning. Upon completion of the work in this Contract, all surplus material, earth, rubbish, etc., shall be removed from the site of the work. That portion of the surface of each yard or street disturbed by construction under this Contract shall be left in as good condition as it was before the commencement of the work, and it shall be promptly and regularly maintained in such condition during a period of one year after the acceptance of the work. This work of maintenance shall apply only to items of materials and workmanship improperly installed under this Contract, and maintenance measures made necessary by the ordinary wear and tear shall not be at the expense of the Contractor. However, any repairs required because of unsatisfactory trench backfilling shall be at the expense of the Contractor. The inclusion of items of material or work within this Specification does not necessarily constitute their use on this Project. 17.02 PAVEMENTS, CURBS AND CURBS AND GUTTERS (a) in all streets or parts of streets or other areas that are paved or macadamized, all backfilling shall be well compacted by jetting. After the trench or excavation has been backfilled and jetted to the required height, the subgrade for the new paving, curb and/or curb and gutter shall be replaced. (b) All pavements, curbs and curbs and gutters shall be replaced to the section and of the same materials as that removed in accordance with the Owner's established standards or in their absence to the Standards of the State Highway Department. 17.03 DRIVEWAYS AND SIDEWALKS (a) The backfill and subgrade for all driveway and sidewalk replacement shall be jetted and compacted in the same manner as that specified for pavements. All edges broken from driveways and sidewalks shall be sawed or cut off at right angles to the driveway or sidewalk and after approval of Engineer replaced. Rev. 09/00 SECTION 17 Page 2 (b) All driveways and sidewalks shall be replaced to the section and of the same materials as that removed in accordance with the Owners established standards for similar work, 17.04 MISCELLANEOUS All ditches disturbed during this construction shall be regraded to their original line and grade unless otherwise noted. All regrading of ditch lines shall be followed by reseeding and adequate protection from erosion until seed can be established. Any part of any lawn disturbed whether part of road right-of-way or not shall be regraded to its original grade, shall have a minimum of four (4) inches of topsoil placed and shall be reseeded with seed similar to the original sod. All damaged trees and shrubs in yards shall be replaced with similar items unless otherwise noted. This replacement of damaged trees and shrubs does not apply to those planted within established road rights -of -way unless specifically stated otherwise in the Project Specification. Rev, 09/00 SECTION 17 SPECIAL EQUIPMENT ITEM NO. 1 DIGESTER SUBMERSIBLE PUMPS PART 1 - GENERAL 1.01 DESCRIPTION A. The General Contractor shall furnish, install, test and place in satisfactory operation, as shown on the- Plans and specified, two (2) wet -pit submersible pump(s) complete with all appurtenances, accessories and spare parts as will be required to produce a complete and workable installation. To maintain system unit responsibility, the pump control system shall be furnished by the pump manufacturer as described herein. PART 2 - MATERIALS 2.01 MANUFACTURERS A. Manufacturer: Sewage pumps shall be manufactured by Wilo-USA, Flygt, Pentair Fairbanks Nijhuis, Sulzer, or pre -approved equal. B. Pump Performance: Each pump shall be capable of the following performance: Duty Point Flow, gallons per minute 55 Duty Point Total Dynamic Head, feet 20 Minimum Hydraulic Efficiency at Duty Point, % 45 Frequency, hz 60 Maximum Nominal Motor Power, Horsepower 5 Maximum Motor Speed, Revolutions Per Minute 1,800- 2.02 PUMP CONSTRUCTION A. GENERAL The sewage pumping units shall be vertical, non -clogging, centrifugal grinder sewage pumps with bottom inlet and side discharge. The pumps shall be direct driven by integral squirrel cage, electric induction motors. Each pump shall include -quick removal system, anchor bolts and all accessories specified herein. 1 B. VOLUTE The volute shall be constructed of ASTM A48 minimum Class 35B or higher cast iron (GG25) capable of prolonged resistance to raw sewage. 2. Suction and discharge flanges shall be 125# and meet ANSI standard B16.1. 3. All nuts, bolts, washers, and other fastening devices supplied with the pumps shall be stainless steel. 4. All mating surfaces requiring a watertight seal shall be machined and fitted with FPM (Viton) O-rings. Paper gaskets are not acceptable. C. IMPELLER Pump impellers shall be of the solids handling non -clog type. The impeller vane shall be smooth, finished throughout, and shall be free from sharp edges. 2. Pump impellers shall be manufactured from ASTM A48 Class 35B or higher cast iron (GG25). 3. Impellers shall be key driven and securely held to the shaft by a streamlined impeller washer and bolt assembly specifically designed to reduce friction in the suction eye of the impeller. The arrangement shall be such that the impeller cannot unscrew or be loosened by torque from either forward or reverse rotation. Designs based on threaded connection between pump shaft and impeller will not be considered. 4. The impeller shall be capable of passing a 3.1 inch solid non-deformable sphere through the bottom inlet and out between the two shrouds. Designs which cannot pass a sphere through the impeller or rely on deforming, cutting or chopping solid materials shall not be acceptable. D. WEAR RINGS The impeller shall be provided with an AISI 329 (1.4462) duplex stainless steel wear ring which is drive fitted to the suction eye of the impeller. 2. The casing shall be provided with an AISI 304 (1.4308) stainless steel wear ring which is drive fitted to the bottom suction inlet. 2.03 MOTORS A. SUBMERSIBLE MOTORS Each pump shall be furnished with a squirrel cage, induction motor enclosed in a watertight housing suitable for use and compatible with all variable frequency drive systems. 2 2. The motors shall be air -filled and constructed with moisture resistant NEMA Class H insulation and Class H slot liners and constructed to NEMA B design standards. The copper wound stator shall be dipped in epoxy enamel and hardened to withstand a temperature of 180 degrees Centigrade as defined in NEMA Standard MG-1. Each winding phase or layer shall be laced with Class H glass lined paper. The use of cable ties to restrain windings shall not be allowed. The rotor shall be statically and dynamically balanced after fabrication. The rotor shall utilize aluminum amortisseur bars and short circuit rings. The constructed motor shall be certified for continuous duty with a service factor of 1.10 and shall be non - overloading over the entire range of the impeller. 3. Motors shall be capable of sustaining 15 starts per hour (unlimited starts with VFD) at a minimum ambient temperature of40°C. 4. Motors shall be capable of uninterrupted operation with a voltage drop of 10%. 5. Thermal switches shall be furnished to monitor stator temperatures. The stator shall be equipped with three (3) thermal switches. Thermal switches shall automatically de -energize the motor when its temperature exceeds a preset limit as recommended by the manufacturer. . 6. The motor shall bear the FM (Factory Mutual) explosion -proof label certifying its use in a Class 1, Division 1, Groups C & D hazardous location. 7. The pump manufacturer's nameplates shall be engraved, laser etched or stamped on stainless steel and fastened to the motor casing. B. SHAFTS All shafts shall be dynamically balanced and shall be constructed of AISI 420 (1.4021) stainless steel. Carbon steel shafts or shafts with sleeves of any type are not acceptable. The shaft shall be one piece construction without joints or stubs attached. , 2. Multiple row lower bearings for axial thrust and a single row upper bearing for radial thrust shall support the motor/pump shafts. Thrust bearings shall be restrained from thrust in both directions. Designs that do not protect the pump/motor from thrust in reverse directions shall not be acceptable. 4. Bearings shall be sealed and grease lubricated. 5. Minimum shaft diameter shall be 2-1/8 inches at the lowest bearing. 6. Shaft overhang ratio L3/D4 shall not exceed 10. C. MECHANICAL SEALS 3 Each pump shall be provided with an enclosed block mechanical seal with the seal housing and spring system constructed of AISI 316 stainless steel. The block seal housing shall be constructed such that it can be dismantled allowing the seal faces and springs to be renewed and the seal system to be put back into service. Cartridge seals constructed such that they cannot be repaired or renewed shall not be acceptable. Both upper and lower seal faces shall be silicon carbide versus silicon carbide. 2. The seal shall be mounted in a separate and isolated seal chamber. The seal chamber shall be filled with non-conductive lubricating oil as recommended by the manufacturer. 3. A moisture sensor shall be furnished to sense seal failure for each pump. This sensor shall be wired to the Pump Control Panel (specified in Division 16) and shall activate an alarm light upon seal failure. The sensor probe shall be mounted in the seal chamber and shall be of the conductive type, sensing moisture intrusion above the lower seal, but below the upper seal. Designs which sense seal failure above the upper seal through the use of a float switch are not acceptable. D. Power and Control Cables: Power and control cables shall be furnished in lengths to run un-spliced from the pump to the pump control panel as shown on the Contract Drawings and as specified herein. Cables shall terminate with conductor sleeves that bundle the entire group of strands of each phase to improve termination at the pump control panel. The sleeves shall be provided to confirm that all strands of each conductor is terminated properly. Termination shall be coordinated with the connection to the Pump Control Panel. 2. Cables shall be of the "NSSHOU" type and shall be approved by the MSHA for use in hazardous locations and shall conform to industry standards for loads, resistance under submersion against sewage, and be of stranded construction. The cables shall enter the pump through a heavy duty galvanized cast iron entry assembly which shall be provided with an external clamp assembly to protect against tension once secured providing a strain relief function as part of standard construction. 3. The cables for each pump shall pass through the galvanized cast iron strain relief component and then through a series of stainless steel disks and Buna-n grommet that is sandwiched between the disks to control compression of the grommet. The cable entry design shall be of the type recommended in the Factory Mutual Research Corporation specifications for Explosion Proof Certification. The entry shall be comprised of the cast iron fitting that will include the Buna-N strain refief grommet coupled with a poured conductor section. In the poured section, only Factory Mutual approved sealant shall be used to wick into each conductor strand that has the insulation removed in this area to provide a positively leak proof seal for the power and sensor cords. CI 2.04 SHOP PAINTING A. Primer and Finish Paint - Shop apply to all exterior ferrous surfaces of the pump and motor. 1. Solids by volume: 75 +/- 2% 2. Type: Two part, cross -linked epoxy with VOC content of 1.78 lbs./gal 3. Total Dry Film Thickness: 1 coat at 6-8 mils. 4. Resistance: Level 1 (continuous duty) for sewage with pH of 6-10, Level 2 (occasional duty) for saltwater, Level 3 (not recommended) for 10% hydrochloric acid. B. Surface Preparation - Prepare all surfaces to receive coating system. 1. Method: Blasting per ISO 12944-4 2. Standard Cleanliness Grade: 2.5 3. Minimum Peak to Valley Height: 70 microns (2.75 mils) PART 3 - EXECUTION 3.01 WARRANTY A. The pumps and motors will be covered by a five (5) year warranty that shall comprise the following terms: The initial year from start-up of the equipment shall be covered 100% for parts and labor. The following years 2 through 5 shall be covered 50% for parts. This warranty shall not be limited by hours of running time or operation from variable speed drives. + +END OF SECTION + + 5