Loading...
HomeMy WebLinkAboutNCG070149_Inspection Report_20200310Compliance Inspection Report Permit: NCG070149 Effective: 06/01/18 Expiration: 05/31/23 Owner : Imerys Perlite USA Inc SOC: Effective: Expiration: Facility: Imerys - Youngsville Plant County: Franklin 100 Robert Blunt Dr Region: Raleigh Youngsville NC 27596 Contact Person: Joshua Martin Title: Phone: 919-562-0031 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 03/10/2020 Entry Time 10:OOAM Primary Inspector: Thaddeus W Valentine Secondary Inspector(s): Certification: Phone: Exit Time: 11:15AM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG070149 Owner - Facility:lmerys Perlite USA Inc Inspection Date: 03/10/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The stormwater inspection program should include the oil drum containment area, maintenance shop, and all equipment and trucks on the facility. Please update the USGS and site map, as well as the BMP summary to better characterize site -specific BMPs. Provide a list of significant spills whether they occur or not for each year. Be sure that employees trained yearly for stormwater sign -off and date that they have accomplished their training. Page 2 of 3 Permit: NCG070149 Owner - Facility:lmerys Perlite USA Inc Inspection Date: 03/10/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Although plan was complete, updates are needed and should be implemented. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: OK Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: OK Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ 0 ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Work on documenting illicit discharge inspections. Page 3 of 3