Loading...
HomeMy WebLinkAbout20200142 Ver 1_B-4484_HYD_WISS_(Sep 2016)_20200320WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -1-1- 17+85 RT Exist. 12" CMP Removal 0.002 1 -1-1- 19+41 LT Rip Rap Outlets 0.002 0.005 1 -1-1- 20+50 RT Rip Rap Outlet 0.001 0.003 1 -1-1- 20+62 to 22+28 LT Ret Wall / Fill / Work Platform 0.072 0.185 1 -1-1- 27+85 to 32+70 LT Ret Wall / Fill / Work Platform 0.363 0.099 1 -1-1- 29+73 RT Rip Rap Outlet 0.002 2 -1-1- 39+17 LT Roadway Fill Slope 0.029 2 -1-1- 39+62 RT Roadway Cut Slope 0.004 2 -1-1- 39+71 to 40+45 RT Roadway Cut Slope 0.035 2 -L1- 39+00 to 43+32 Proposed Bridge / Work Platform 0.825 2 -1-1- 42+26 to 43+32 RT Roadway Cut Slope 0.067 2 -1-1- 43+32 to 51+32 LT Proposed Roadway/Fill Slope 0.613 0.082 2 -L1- 48+60 to 50+66 LT Channel Relocation 0.005 0.266 0.090 2 -1-1- 48+90 RT Temporary Dike for Slipline 0.028 2 -1-1- 53+00 LT Roadway Fill Slope 0.006 2 -1-1- 52+97 RT Roadway Fill Slope 0.001 TOTALS*: *Rounded totals are sum of actual impacts NOTES: Total permanent Wetland Impacts due to proposed piles = 38 sq.ft. Total permanent SW Impacts due to proposed piles = 141 sq.ft. Temp Work Platform Based on 20' or shorter spans, with pile rows 2' long and the full width of the platform (both conservative): Temporary Fill in Wetlands = 4,567 sq.ft and Temporary Surface Water Impacts = 2,905 sq.ft Revised 2016 09 09