Pre -Construction Notification (PCN) Form
September 29, 2018 Ver 3
Initial Review
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
Is this project a public transportation project?*
G Yes r No
Change only if needed.
BIMS # Assigned
20140923
Is a payment required for this project?*
r No payment required
r Fee received
r Fee needed - send electronic notification
Select Project Reviewer*
Kevin Mitchell:eads\rkmitchell
Information for Initial Review
1a. Name of project:
Davidson River Connector - Roundabout
1a. Who is the Primary Contact?*
Kevin Barnett
1b. Primary Contact Email:*
khbarnett@ncdot.gov
Date Submitted
3/24/2020
Nearest Body of Water
Davidson River
Basin
French Broad
Water Classification
WS-V,B,Tr
Site Coordinates
Latitude:
35.268931
A. Processing Information
County (or Counties) where the project is located:
Transylvania
Is this project a public transportation project?*
IT Yes r No
Is this a NCDOT Project?*
r Yes r No
(NCDOT only) T.I.P. or state project number:
R-5605
WBS#M
43587.1.1
1a. Type (a) of approval sought from the Corps:
Longitude:
-82.710302
Version#*
2
Reviewing Office*
Asheville Regional Office - (828) 296-4500
1c. Primary Contact Phone:*
(828)586-2141
L.1
W Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What type(s) of permit(s) do you wish to seek authorization?
W Nationwide Permit (NWP)
r Regional General Permit (RGP)
r Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
Nationwide Permit (NWP) Number: 14 - Linear transportation
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - Regular
r Non-404 Jurisdictional General Permit
r Individual Permit
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR401 Certification:
For the record only for Corps Permit:
r 401 Water Quality Certification - Express
r Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?*
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
Acceptance Letter Attachment
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r No
1j. Is the project located in a designated trout watershed?
r Yes r No
B. Applicant Information
1d. Who is applying for the permit?
V Owner r Applicant (other than owner)
le. Is there an Agent/Consultant for this project?*
r Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
NC Department of Transportation
2b. Deed book and page no.:
2c. Responsible party:
2d.Address
Street Address
253 Webster Road
Address Line 2
City
Sylva
Rstal / Zip Code
28779
2e. Telephone Number:
(828)586-2141
2g. Email Address:*
State / Rovince / Rion
NC
Country
us
2f. Fax Number
r Yes r No
r Yes r No
khbarnett@ncdot.gov
C. Project Information and Prior Project History U
1. Project Information
1b. Subdivision name:
frf appropriate)
1c. Nearest municipality/ town:
Brevard
Project Identification
2a. Property Identification Number:
2c. Project Address
Street Address
Intersection of Davidson River Connector and NC276/US64
Address tine 2
City
Brevard
Postal / Zip Code
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Davidson River
3b. Water Resources Classification of nearest receiving water:*
WS-V,B;Tr
3c. What river basin(s) is your project located in?*
French Broad
3d. Please provide the 12-digit HUC in which the project is located.
060101050202
4. Project Description and History
2b. Property size:
State / Province / Region
NC
Country
4a. Describe the existing conditions on the site and the general land use in the vicinityof the project at the time of this application:*
This project is to provide a connector road between US64 and US64/FMy276 through the mixed use Davidson River Village redevelopment. This specific modification request is to
provide the connection of Davidson River Village to US64/Mroy276 by way of a two lane roundabout.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
r Yes r No r Unknown
4c. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000).
USACOE: 2014-01120
DWR: 20140923
Project History Upload
Transylvania R-5605 C203752_permits.pdf
2.28MB
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
R-5605.USGS Topo.pdf
1.19MB
4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
R-5605.Soil Survey.pdf 1.92MB
4f. List the total estimated acreage of all existing wetlands on the property:
-4.2 acres
4g. List the total estimated linear feet of all existing streams on the property:
-27,159 linear feet
4h. Explain the purpose of the proposed project:*
The project has been modified to replace the designed signaled intersection at US 276/64 with a two-lane round -about. The construction of the round -about vdll impact two streams vnth
no impact to wetlands. The attached plan sheet accurately depicts streams in the project footprint. Work will involve clearing and grading a forested and field area totaling less than 0.5
acre. The project area is in the Davidson River Watershed, Mich is classified as B, and a tributary to the French Broad River, which supports Appalachian elktoe mussels, so erosion
controls will be very important with this project.
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
This modification request is to authorize stream impacts in association with the construction of a roundabout (in place of the previously designed signaled intersection) and the
construction of a sidewalk along eAsting roadway. Typical land grading and paving equipment Will be utilized.
4j. Please upload project drawings for the proposed project.
R-5605_Permit Drawings_ modified 3_16_2020.pdf 3.29MB
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes r No r Unknown
Comments:
Delineation performed by Clearwater Environmental and approved 200801792
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r' Preliminary r Approved r Not Verified f^ Unknown r N/A
Corps AID Number:
200801792
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known):
Agency/Consultant Company: Clearwater Environmental
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
08-08-2014
5d1. Jurisdictional determination upload
6. Future Project Plans
6a. Is this a phased project?*
r Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory U
1. Impacts Summary
la. Where are the impacts associated with your project? (check all that apply):
r Wetlands W Streams -tributaries r Buffers
r- Open Waters r Pond Construction
3. Stream Impacts
3a. Reason for impact (?)
3b.lmpact type *
3c. Type of impact*
3d. S. name *
3e. Stream Type*
Type of
3gSwidth *
3h. ImpactM
❑
�[3f.
urisdiction*
length*
S1
Roadway
Y
Permanent
Culvert
F�adson River
Perennial
Both
3
246
Average (feet)
(linearfeet)
S2
Bridge Abutment
Permanent
Fill
F�aydson River
Perennial
BothgAver�e(feet)
(linearfeet)
S3
bank protection
Permanent
Bank Stabilization J
Davidson River
Perennial
Both
50
145
Average (feet)
(lir�rfeet)
�
bank P rotection
Permanent
Bank Stabilization
Davidson River Side Channel
Perennial
Both
30
135
Average (feet)
(lir�rfeet)
SS
culvert wdension
Permanent
Culvert
UT Davidson River
Perennial
Both
2
14
Average (feet)
(lirearfeet)
S6
dewater
Temporary
Dewatering
UT Davidson River
Perennial
Both
60
Average (feet)
(linearfeet)
S7
culvert wdension
Permanent
Culvert
UT Davidson River
Perennial
Both
3
18
Average (feet)
(linearfeet)
S8
dewater
Tem orar
P Y
Dewaterin 9
UT Davidson River
Perennial
Both
2
50
Average (feet)
(linearfeet)
S9
bank P rotection
Permanent
Bank Stabilization
UT Davidson River
Perennial
Both
3
26
Average (feet)
(lir�rfcet)
S10
culvert e)dension
Permanent
Culvert
UT Davidson River
Perennial
Both
3
14
Average (feet)
(lir�rfcet)
S11 dewater Temporary Dewatering LIT Davidson River Perennial Both 3 41
Average(feet) i (linearfeet)
31. Total jurisdictional ditch impact in square feet:
3i. Total permanent stream impacts: 3i. Total temporary stream impacts:
634 151
3i. Total stream and ditch impacts:
785
3j. Comments:
Based on e-mail correspondence, The modifications grouped as single and complete total 292 liner=ar feet of impact. Please see cover letter.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
These are the minimum impacts necessary to construct the sidewalk and 2 lane roundabout.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
The use of headwalls allowed pipe lengths to be kept to a minimum.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes
r No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
The original project permitted to Davidson River Partners, LLC did not require compensatory mitigation. We believe that the proposed Nationwide 14 for the round -about work also
should not require compensatory mitigation as the combined permanent impacts associated with channel loss or degradation for the new impacts are only 46 feet.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r Yes
If no, explain why:
r No
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r No
Comments:
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes
r No
u
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
r Yes
r No
Comments:
Previously approved project included the environmental documentation.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
r Yes
r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
r Yes f• No
3b. If you answered "no," provide a short narrative description.
This project is only to provide access to and from the Davidson River Village. The development of the Davidson River Village will be performed under
its own permitting.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
r Yes r No r WA
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
r Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
r Yes r No
5c. If yes, indicate the USFWS Field Office you have contacted.
Asheville
5d. Is another Federal agency involved?*
r Yes r No
5e. Is this a DOT project located within Division's 1-8?
r Yes r No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
r Yes r No
5g. Does this project involve bridge maintenance or removal?
r Yes r No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
r Yes r No
r Unknown
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWS online mapping of species along with in person surveys for species.
Consultation Documentation Upload
R-5605_Consultation.docxpdf 296.75KB
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
South Atlantic Habitat and Ecosystem IMS
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
r Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
SHPO consultation
7c. Historic or Prehistoric Information Upload
19-11-0013NoSurveyReq.pdf 3.34MB
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
r Yes r No
8c. What source(s) did you use to make the floodplain determination?*
County GIS FEMA mapping
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
R-5605. CorpsNa rrative. PermitMod. pdf
503.74KB
R-5605.Arch itectu ral. pdf
512KB
R-5605_Vicinity Map. pdf
3.14MB
Hydro Report.pdf
47.24KB
NCWRC.Commentletter.pdf
86.36KB
No Archaeological Survey Required PA 19-11-0013.pdf
2.961VIB
R-5606.existingconditions.pdf
2.06MB
Signature
® By checking the box and signing below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act');
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act');
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Kevin Barnett
Signature
Date
3/24/2020