Loading...
HomeMy WebLinkAbout20190210 Ver 1_Compliance Evaluation Inspection_20200324Wetland Inspection Report Inspection Type: Reason for Inspection Inspection Date: Site Owner Name Latitude: County: Project Name: Project Num: Location: SW Plan Location 20190210 NCDOT - NC 69 Widening (A-0011C) Clay NCDOT - NC 69 Widening (A-0011C) NC DOT Division 14 - Sylva 3/10/2020 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Road/Highway Widening Region:Asheville Longitude:-83° 49' 32''+35° 00' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Inspection Summary: Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on March 10, 2020. Reid Whitehead, Patrick Breedlove, and Greg Wallace were present during the inspection. Project is in the early phases of clearing and grubbing. E&SC measures are being installed. Cleared areas have temporary mulch. Site appears to be compliant the 401 WQC. page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190210 3/10/2020 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? SIte is in the initial phases of clearing and grubbing. Erosion control measures are being installed on the project. Comment: page:2