HomeMy WebLinkAbout20200214 Ver 1_Culvert Replacement Set_20200323Strickland, Bev From: Shumaker, Katherine <kshumaker@Dewberry.com> Sent: Monday, March 23, 2020 1:56 PM To: Munzer, Olivia; Johnson, Alan Subject: [External] McAlpine Creek Culvert Attachments: 2020.3.23 McAlpine Creek Culvert Replacement Set.pdf = External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to nc. ov Ms. Munzer and Mr. Johnson, I have attached the revised plans for the McAlpine Creek Culvert Replacement. Changes were made after consulting with both DWR and NC Wildlife. Per our last conversations, the new plans are here for your review. Please review these plans and let me know if you have comments or concerns. Thank you. I appreciate all of your help. Sincerely, Katherine Shumaker Staff Environmental Scientist Dewberry 551 Piney Forest Road Danville, Virginia 24540 434.549.8510 (Direct) 336.514.2797 (Mobile) 434.797.4341 (Fax) www.dewberry.com [dewberry.com] Visit Dewberry's website at www.dewberry.com [dewberry.com] If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you. 1 CONTACTS OWNER: Duke Energy Carolinas Randy N. Veltri 526 South Church St. Charlotte, NC 28202 PH. (704) 382-2741 FAX (704) 382-6542 randy.veltri@duke—energy.com ENGINEER: Dewberry Engineers Inc. Brian LaFranchi, P.E. 9300 Harris Corners Pkwy, Suite 220 Charlotte, INC 28269 PH. (704) 631-5206 FAX (704) 509-9937 blafronchi@dewberry.com CONTRACTOR SHALL NOTIFY "NORTH CAR(DLINA ONE CALL' SBA A) OR �A-800-632-4949) AT LEAST 48 HOURS PR10RT0 BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDED THEIR OWN LOCATOR SERVICES INDEPENDENT OR "NORTH CP.ROLINP. ONE CALL' . REPORT ANY DISCREP ANCIES TO THE ENGINEER IMMEDIATELY . REV I FILE NO. I DATE I REVISION ONSITE REPRESENTATIVE: Eric Shook PH. (336) 415-9168 eric.shook@duke—energy.com Know what's below. Call before you dig. Iq MCALPINE CREEK TRIBUTARY CULVERT REPLACEMENT 1000y(o CONSTRUCTION DOCUMENTS DRAWN I CHECKED I APPROVED PROJEC SITE VICINITY MAP SCALE: 1" = 1000' 2oQ: bFE5 ' 40016 All 1-20�zolo NORTH & SOUTH CAROLIIVA STATE MAP SHEET LIST: COVER SHEET GENERAL NOTES DEMOLITION AND EROSION CONTROL PLAN PROPOSED IMPROVEMENTS PLAN STREAM PROFILE DETAILS PROJECT NARRATIVE SHT 1 OF 6 SHT 2 OF 6 SHT 3OF6 SHT 4 OF 6 SHT 5OF6 SHT 6OF6 THE PROPOSED MCALPINE CREEK TRIBUTARY CULVERT REPLACEMENT PROJECT IS LOCATED IN MECKLENBURG COUNTY, NORTH CAROLINA. THE PROJECT INCLUDES REMOVING ONE CORRUGATED METAL PIPE CULVERT AND INSTALLING ONE REPLACEMENT REINFORCED CONCRETE PIPE CULVERT. THE DISTURBED AREA IS 0.20 ACRES. THE PROJECT WILL NOT CHANGE THE EXISTING LAND USE AND WILL REMOVE THE EXISTING CULVERT ALREADY IN PLACE. PRIOR TO CONSTRUCTION, A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS. PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION. AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES, WHENEVER POSSIBLE. EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ. THE INITIAL PROJECT DURATION IS ANTICIPATED TO START IN 03/01/2020 AND BE COMPLETED IN 04/01/2020. Dewberry . .,.,, Dewberry Engineers Inc. 9300 HARRIS CORNERS PARKWAY SUITE 220 CHARLOTTE, NC 28269 PHONE: 704.509.9918 FAX: 704.509.9937 www.dewberry.com NCBELS # F-0929 •(� DUKE ENERGY TITLE MCALPINE CREEK TRIBUTARY CULVERT REPLACEMENT SIZE DRAWING DI ESC - 1 COVER SHEET SHEET 1 OF 6 z LULU G LU U Q J p LU ry LU J U Q m Y LU LU U LU z n Q U er_r_niKit__l_ 1. LIME, SEED AND FERTILIZER SHALL BE APPLIED WITH NECESSARY EQUIPMENT TO GIVE UNIFORM DISTRIBUTION OF THESE MATERIALS. THE KINDS OF MATERIALS TO BE APPLIED PER ACRE: TEMPORARY SEEDING DATE JAN. 1 - MAY 1 MAY 1 - AUG. 15 AUG. 15 - DEC. 30 PERMANENT SEEDING DATE AUG. 20 - OCT. 25 FEB. 1 -APR. 15 TYPE PLANTING RATE FERTILIZER 10-10-10 BLEND I IrlAr C+T/lAlr RYE (GRAIN) 120 LBS./ACRE 750 LBS./ACRE 2000 LBS./ACRE KOBE LESPEDEZA * 50 LBS./ACRE GERMAN MILLET ** 40 LBS./ACRE 750 LBS./ACRE 2000 LBS./ACRE RYE (GRAIN) 120 LBS./ACRE 1000 LBS./ACRE 2000 LBS./ACRE FERTILIZER *** TYPE PLANTING RATE 10-10-10 BLEND LIMESTONE *** TALL FESCUE 200 LBS./ACRE 1000 LBS./ACRE 4000 LBS./ACRE KOBE LESPEDEZA 20 LBS./ACRE * OMIT KOBE LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. ** A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LBS/ACRE. *** QUANTITY OF FERTILIZER AND LIME SHALL BE CONFIRMED BY SOILS TEST. 2. SEEDED AREA SHALL BE CULTIPACKED TO FIRM SEEDBED AND COVER SEED. 3. GRAIN STRAW SHALL BE APPLIED OVER SEEDED AREAS AS A MULCH WITHIN 24 HOURS OF THE INITIAL SEEDING OPERATION. NO BARE GROUND SHALL BE VISIBLE WHEN RIDING BY A MULCHED AREA IF PROPER APPLICATION IS ACHIEVED. THICK CLUMPS OF STRAW ARE NOT PERMISSIBLE AS A UNIFORM COVERAGE IS EXPECTED. 4. MULCHED AREA SHALL BE TACKED WITH A POLYMER BASED TACIFIER. APPLY POLYMER PER MANUFACTURING RECOMMENDATIONS SPECIFIC TO EACH AREA OF APPLICATION (I.E. STEEP SLOPES, FLAT AREAS, ETC.). REAPPLY POLYMER AS NECESSARY TO PREVENT EROSION DURING VEGETATION ESTABLISHMENT. 5. DITCH TREATMENT SHALL BE USED IN AREAS WHERE STEEP GRADES COULD CAUSE DITCH EROSION. USE OF EXCELSIOR MATTING OR FIBERGLASS/SYNTHETIC ROVING IS ACCEPTABLE. DITCH TREATMENT SHALL BE INSTALLED BEFORE MULCHING OPERATION. 6. VEGETATION SHALL BE ESTABLISHED ON ALL DISTURBED AREA WITHIN 14 DAYS OF COMPLETION OF ANY PHASE OF GRADING ACTIVITIES OR WHERE CONSTRUCTION WILL TEMPORARILY CEASE FOR MORE 21 CALENDAR DAYS. 7. CONTRACTOR SHALL WATER SEEDED AREAS AS NECESSARY TO ESTABLISH VEGETATION. 8. CONTRACTOR SHALL WARRANT VEGETATION GROWTH FOR ONE YEAR. CONSTRUCTION NOTES: 1 2 3 4 SEEDBED PREPARATIONS 5 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL MINIMUM 4 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. 2. RIP THE ENTIRE AREA TO A DEPTH OF 6 INCHES. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER DEBRIS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURE LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND 6 MIX WITH SOIL. 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 7 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 8 7. MULCH IMMEDIATELY AFTER SEEDING. ANCHOR MULCH AGAINST WIND. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS DURING PLANTING SEASON IF POSSIBLE. IF STAND SHOULD BE OVER 60% 9 DAMAGED, RE-ESTABLISH FOLOWING ORIGINAL CLEARING AND CONSTRUCTION NOTES: THE FOLLOWING ACTIVITIES SHALL BE FOLLOWED BY DUKE ENERGY AND ITS CONTRACTORS FOR THE PROJECT. 1. ALL CONSTRUCTION ACCESS (PARTICULARLY THOSE CROSSING STREAM BRANCHES THAT ARE NOT SHOWN ON THE APPROVED PLAN AS SUBMITTED TO NCDEQ) SHALL FOLLOW THE TYPICAL DETAILS NOTED ON THESE DETAIL SHEETS. 2. ALL ROAD BEDS, SLOPES AND DISTURBED AREAS SHALL BE STABILIZED IMMEDIATELY AND SEEDED WITHIN 14 WORKING DAYS OF COMPLETION OF ANY GRADING. 3. ALL ROAD BEDS, SLOPES AND DISTURBED AREAS SHALL BE STABILIZED DAILY. 4. MINOR FIELD ADJUSTMENTS TO THE PROPOSED SEDIMENT AND EROSION CONTROL MEASURES (SUCH AS SHIFTING THE POSITION OR SLIGHTLY RE -DIRECTING A SILT FENCE) WILL BE NECESSARY TO ACCOUNT FOR REAL TERRAIN AND GRADING CONDITIONS. ALSO, ADDITIONAL SEDIMENT AND EROSION CONTROL MEASURES COULD BE NECESSARY TO HELP PREVENT OFF -SITE SEDIMENTATION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR AT ALL TIMES TO HELP PREVENT EROSIVE CONDITIONS AND OFF -SITE SEDIMENTATION FROM DEVELOPING ON THE CONSTRUCTION SITE. SHOULD QUESTIONS, CONCERNS OR PROBLEMS ARISE CONCERNING THE INSTALLATION OF THE S&EC PLAN, PLEASE CONSULT THE ENGINEER FOR ASSISTANCE. MAJOR DEVIATIONS TO THE APPROVED E&SC PLAN MUST BE REPORTED AND APPROVED BY NCDEQ. 5. SEDIMENT AND EROSION CONTROL MEASURES MUST BE MAINTAINED ON A DAILY BASIS DURING ALL LINE CONSTRUCTION OPERATIONS. 6. ACCESS ROADS ON GRADES OF 20% SLOPE OR GREATER, ON POORLY DRAINED SOILS, OR IN POTENTIAL PROBLEM AREAS SHALL BE SURFACED WITH A MAXIMUM 6" LAYER OF GRAVEL OR AGGREGATE BASE COURSE FOR STABILIZATION. 7. INSTALLATION AND REPAIR OF ACCESS ROADS SHALL USE SILT FENCE ON THE DOWN GRADIENT SIDE OF THE ROAD AND WATER BARS TO DIVERT DRAINAGE BACK TO EXISTING CONTOURS. 8. SEEDING FOR SITE STABILIZATION SHALL OCCUR IMMEDIATELY FOLLOWING THE COMPLETION OF ANY PHASE OF CONSTRUCTION IN A PROJECT. IT SHALL BE THE INTENT FOR THIS PROJECT THAT SEEDING FOR STABILIZATION (TEMPORARY OR PERMANENT) SHALL NOT LAG CLEARING OPERATIONS BY MORE THAN 1,000 FEET. 9. ANY OFF -SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS. ANY AREA ACCESSED BY VEHICLE OUTSIDE OF THE PERMITTED LOD SHALL BE COMPLETELY STABILIZED WITHIN 48 HOURS OR LESS. AREAS SHALL BE STABILIZED TO NCDEQ SPECS PER DESIGN MANUAL FOR PERMANENT STABILIZATION. AREAS SHALL BE SEEDED WITH STRAW WITHIN 48 HOURS WITH A NCDEQ PERMANENT SEED SPECIFICATIONS ON THIS SHEET. ANY AREAS WHERE RUTS WERE CREATED SHALL BE SMOOTHED AND GRADED TO PROVIDE APPROPRIATE PERMANENT STABILIZATION PER NCDEQ SPEC. ALL MUST BE COMPLETED WITHIN 48 HOURS OF DISTURBANCE. ACCESS WHERE SLOPES ARE TOO STEEP FOR SAFE VEHICLE ACCESS SHALL BE ROCKED WITH FABRIC UNDERNEATH. REMOVAL AND/OR STABILIZATION OF SUCH AREAS WILL BE AT THE DISCRETION OF NCDEQ OR THE PROPERTY OWNER. AREAS THAT NEED TO BE STABILIZED AND/OR GRADED FOR SEED PREPARATION THAT ARE CONSIDERED TOO WET WILL HAVE TEMPORARY EROSION CONTROL MEASURES INSTALLED. TEMPORARY EROSION CONTROL MEASURES SHALL BE INSTALLED TO MAINTAIN ALL SEDIMENT ON SITE UNTIL THE AREA IS DRY ENOUGH TO WORK. NO CONSTRUCTION ACCESS WILL BE ALLOWED IN AREA WAITING ON STABILIZATION DUE TO WET CONDITIONS. ALL AREAS WILL BE INSPECTED WEEKLY OR WITHIN 24HRS OF A 1-INCH OR GREATER RAIN EVENT AND DOCUMENTED ON NPDES MONITORING RECORDS FOR THE PERMIT. ALL AREAS SHALL BE SEEDED AND STABILIZED AS OFTEN AS NEEDED TO PROVIDE PERMANENT STABILIZATION PER NCDEQ REQUIREMENTS. ADDITIONAL MEASURES WILL BE INSTALLED AT ANY TIME IF DUKE ENVIRONMENTAL OVERSIGHT OR NCDEQ FEELS IT IS APPROPRIATE TO MAINTAIN COMPLIANCE AND GOOD STEWARDSHIP. ANY AREAS TOO WET FOR LIMITED DISTURBANCE ACCESS WILL BE SHUT DOWN AND NO ACCESS WILL BE ALLOWED UNTIL CONDITIONS ARE SUITABLE FOR MINIMAL DISTURBANCE. CONSTRUCTION SEQUENCE: OBTAIN AND MAINTAIN ON SITE THE LAND -DISTURBING PERMIT FROM NCDEQ. 1. ALL POTENTIALLY AFFECTED PROPERTY OWNERS WILL BE NOTIFIED PRIOR TO CONSTRUCTION. 2. NOTIFY NCDEQ AT LEAST 48 HOURS PRIOR TO BEGINNING WORK. 3. HOLD PRE -CONSTRUCTION MEETING. 4. INSTALL CONSTRUCTION ENTRANCES TO RIGHT-OF-WAY. 5. INSTALL ALL EROSION & SEDIMENT CONTROL MEASURES AS SHOWN ON PLANS, PRIOR TO ANY SITE DISTURBANCE ACTIVITIES (CLEARING, GRUBBING, GRADING, OR EXCAVATION). 6. CLEARING AND GRUBBING FOR ACCESS ONLY AS SHOWN ON PLANS. 7. INSPECT ALL EROSION CONTROL DEVICES AT WEEKLY INTERVALS AND AFTER EVERY RAINFALL EXCEEDING 1" TO VERIFY THAT THEY ARE FUNCTIONING PROPERLY. ANY ACCUMULATED SEDIMENT SHALL BE REMOVED AND PLACED IN A DESIGNATED SPOIL DISPOSAL AREA APPROVED BY THE INSPECTOR. CONDUCT PERIODIC INSPECTIONS OF ALL EROSION AND SEDIMENTATION CONTROLS AND MAKE ANY REPAIRS OR MODIFICATIONS NECESSARY TO ASSURE CONTINUED EFFECTIVE OPERATION OF EACH DEVICE. 8. REMOVE EXISTING CULVERT PIPE AND INSTALL NEW CULVERT ENDWALL, PIPE, HEADWALL AND RIP -RAP. 9. CONTRACTOR SHALL REMOVE ALL EROSION CONTROL MEASURES AFTER SITES ARE STABILIZED AND APPROVAL IS GIVEN BY THE INSPECTOR. 10.SUBMIT N.O.T. TO NCDEQ. 15A NCAC 04B .0131 SELF -INSPECTIONS WHERE INSPECTIONS ARE REQUIRED BY G.S. 11 3A-54.1 (E), THE FOLLOWING APPLY: (1) THE PERSON WHO PERFORMS THE INSPECTION SHALL MAKE A RECORD OF THE SITE INSPECTION BY DOCUMENTING THE FOLLOWING ITEMS: (a) ALL OF THE EROSION AND SEDIMENTATION CONTROL MEASURES, PRACTICES AND DEVICES, AS CALLED FOR IN A CONSTRUCTION SEQUENCE CONSISTENT WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN, INCLUDING BUT NOT LIMITED TO SEDIMENTATION CONTROL BASINS, SEDIMENTATION TRAPS, SEDIMENTATION PONDS, ROCK DAMS, TEMPORARY DIVERSIONS, TEMPORARY SLOPE DRAINS, ROCK CHECK DAMS, SEDIMENT FENCE OR BARRIERS, ALL FORMS OF INLET PROTECTION, STORM DRAINAGE FACILITIES, ENERGY DISSIPATERS, AND STABILIZATION METHODS OF OPEN CHANNELS, HAVE INITIALLY BEEN INSTALLED AND DO NOT SIGNIFICANTLY DEVIATE (AS DEFINED IN SUB -ITEM (1)(E) OF THIS RULE) FROM THE LOCATIONS, DIMENSIONS AND RELATIVE ELEVATIONS SHOWN ON THE APPROVED EROSION AND SEDIMENTATION PLAN. SUCH DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THIS DOCUMENTATION IS REQUIRED ONLY UPON THE INITIAL INSTALLATION OF THE EROSION AND SEDIMENTATION CONTROL MEASURES, PRACTICES AND DEVICES AS SET FORTH BY THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR IF THE MEASURES, PRACTICES AND DEVICES ARE MODIFIED AFTER INITIAL INSTALLATION- (b) THE COMPLETION OF ANY PHASE OF GRADING FOR ALL GRADED SLOPES AND FILLS SHOWN ON THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN, SPECIFICALLY NOTING THE LOCATION AND CONDITION OF THE GRADED SLOPES AND FILLS. SUCH DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING ACOPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, DATING AND SIGNING AN INSPECTION REPORT; (c) THE LOCATION OF TEMPORARY OR PERMANENT GROUND COVER, AND THAT THE INSTALLATION OF THE GROUND COVER DOES NOT SIGNIFICANTLY DEVIATE (AS DEFINED IN SUB -ITEM (1)(E) OF THIS RULE) FROM THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. SUCH DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, DATING AND SIGNING AN INSPECTION REPORT; (d) THAT MAINTENANCE AND REPAIR REQUIREMENTS FOR ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENTATION CONTROL MEASURES, PRACTICES AND DEVICES HAVE BEEN PERFORMED. SUCH DOCUMENTATION SHALL BE ACCOMPLISHED BY COMPLETING, DATING AND SIGNING AN INSPECTION REPORT (THE GENERAL STORM WATER PERMIT MONITORING FORM MAY BE USED TO VERIFY THE MAINTENANCE AND REPAIR REQUIREMENTS); AND (e) ANY SIGNIFICANT DEVIATIONS FROM THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN, CORRECTIVE ACTIONS REQUIRED TO CORRECT THE DEVIATION AND COMPLETION OF THE CORRECTIVE ACTIONS. SUCH DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, DATING AND SIGNING AN INSPECTION REPORT. A SIGNIFICANT DEVIATION MEANS AN OMISSION, ALTERATION OR RELOCATION OF AN EROSION OR SEDIMENTATION CONTROL MEASURE THAT PREVENTS THE MEASURE FROM PERFORMING AS INTENDED. (2) THE DOCUMENTATION, WHETHER ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR AN INSPECTION REPORT, SHALL INCLUDE THE NAME, ADDRESS, AFFILIATION, TELEPHONE NUMBER, AND SIGNATURE OF THE PERSON CONDUCTING THE INSPECTION AND THE DATE OF THE INSPECTION. ANY RELEVANT LICENSES AND CERTIFICATIONS MAY ALSO BE INCLUDED. ANY DOCUMENTATION OF INSPECTIONS THAT OCCUR ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL OCCUR ON A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE AVAILABLE ON THE SITE. ANY INSPECTION REPORTS SHALL ALSO BE MADE AVAILABLE ON THE SITE. (3) THE INSPECTION SHALL BE PERFORMED DURING OR AFTER EACH OF THE FOLLOWING PHASES OF A PLAN: (a) INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES; (b) CLEARING AND GRUBBING OF EXISTING GROUND COVER; (c) COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS THAT REQUIRES PROVISION OF TEMPORARY OR PERMANENT GROUND COVER PURSUANT TO G.S. 113A-57(2); (d) COMPLETION OF STORM DRAINAGE FACILITIES; (e) COMPLETION OF CONSTRUCTION OR DEVELOPMENT; AND (f) QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION OR UNTIL THE FINANCIALLY RESPONSIBLE PARTY HAS CONVEYED OWNERSHIP OR CONTROL OF THE TRACT OF LAND FOR WHICH THE EROSION AND SEDIMENTATION CONTROL PLAN HAS BEEN APPROVED AND THE AGENCY THAT APPROVED THE PLAN HAS BEEN NOTIFIED. IF THE FINANCIALLY RESPONSIBLE PARTY HAS CONVEYED OWNERSHIP OR CONTROL OF THE TRACT OF LAND FOR WHICH THE EROSION AND SEDIMENTATION CONTROL PLAN HAS BEEN APPROVED, THE NEW OWNER OR PERSON IN CONTROL SHALL CONDUCT AND DOCUMENT INSPECTIONS QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. ,yyyll!!!f� .%�(H• CA.Rp��.. O�•.4�5 •Q 40016 1-20,7-010 Dewberry"' ►��0. Dewberry Engineers Inc. 9300 HARRIS CORNERS PARKWAY SUITE 220 CHARLOTTE, NC 28269 PHONE: 704.509.9918 FAX: 704.509.9937 www.dewberry.com NCBELS # F-0929 STANDARD NOTES 1. EXISTING TOPOGRAPHIC DATA PROVIDED BY MECKLENBURG COUNTY GIS ACCESSED ON DECEMBER 05, 2019. 2. EXISTING BASE INFORMATION BASED ON SURVEY COMPLETED BY PROVIDENCE LAND GROUP DATED DECEMBER 02, 2019. 3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY, OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. 4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH SEED AND MULCH IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. 5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 7. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT -LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 8. ALL WATERS OF THE UNITED STATES(WOTUS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS IN ALL AREAS WHERE A 50-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOTUS. 9. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES. 10. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND -DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS. 11. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. 12. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE. 13. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.). 14. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED: • WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL; • WASTEWATER FROM WASHOUT AND CLEAN -OUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS; • FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND • SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 15. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR NC'S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED AND ALTERNATIVE BMPS MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE. \\\ ALIREZA TABARRAEI / SHOKOFEH ZIAFE \\ D.B. 31702, PG. 1 \\\ LOT 43, REAWOODS SUBDIVISION / \ PHASE 1, MAP 1 \ M.B. \\\ 2P432 2 / PID. 1165309 N.G.S. "DEBBIE" \� N:498390.28 E: 1453625.92 N.A.D. 83 2011 � T.B.M. REBAR FOUND \\ \ \ \ WOODS N:491467.62 \ p \ \ \ \ \ \ \ E:1452292.14 \\\ 3 �2 \ \ y \ N.A.D. 83/2011 \ N\ \ i'` \ ELEVATION: 541.00' \\ io h N.A. V.D. 88 \\ i' OF Nq�L1 S3)\ 11-1 606 \ "63\\ MICHELLE A. HAAS CHRISTOPHER HAAS D.B. 33086, PG. 345 LOT 42, REAWOODS SUBDIVISION PHASE 1, MAP 1 M.B. 28, PG. 432 PID. 21165308 / WOODS ti -1,�2g G� IN, CRFFkY "'D \\�, �\ BEGIN 125-FT r 'v STREAM IMPACTS \ \ \ g6� \ , / \ \ \ "S/ �, \\• \\� \ \ \ \ \ 35' POST APPROXIMATE LOCATION S / \ CONSTRUCTION EXISTING TOE OF SLOPE (TYP.) \ \\�`u9� �`S�, \ \ \ ,\2�9• / \ BUFFER 49 N.G.S. "MA 7" N: 491032.95'1.�\� \ \ , �• (T / / \ \ E:1451431.96' N,\\' �� �� EXISTING TREE - N.A.D. 83/2011 • :.`•`.`•`.`.`•`.`•`.`•`. \ TO BE REMOVED \ \\�� \ _ _ _`�.\ .`.`.`.`.`.`.`.-'•'. `':\\�- Ox \�\\ % // ZONE "AE" ��� o PROPOSED LIMITS OF . \ \� . �\ \ / GATE / _ --- - FEMA 1% ANNUAL / _ �• , 50 ��\ \� t-- CHANCE FLOOD LINE .-.�.- -.-.•� \ DISTURBANCE (TYP.) - 0.2 ACRES M�EGKL•ENBURG •C©IJNT�' IN 5N.22' -:��. PROPOSED LIMITS OF DISTURBANCE- J • \ ``,\,� AT TOP OF BANK (TYP.) J I / >� �— _ i \ `,g .�' EXISTING ��` .-��•�-••�-�- WETLANDS - l`-••`-••`-••`-••`-•-•-`•` _ �/ / / \�. \. \ \ \ \ / t �\ -•`•-•`•`-`. / _J 7�., \ \ \\ \ / ZONE ��X�� (FUTURE) � �•�-�•�•�• (TYP.-•-`-•WETLANDS IMPACTS: 62-SQFT - / EXISTING CMP CULVERT \ \ / \ \ MECK. CO. FUTURE •'!'.'.'.'.'.'.`. •'.� -'•' (0.001-ACRES) LIMITED TO // i TO BE REMOVED (TYP.) \ \ \ ,•",'��:,•,',',•,',•,•,•,•,•,•,•,•,•, \ CONDITIONS 1% ANNUAL ` ` `-`-`•`-`•`-`-`• - - PLACEMENT OF RIP -PAR (TO / / OVAL C.M.P. / `\ \ \ \ \ CHANCE FLOOD LINE BRANCH ON THIS SIDE :�:••-`•`-••`-•-`••-`-`- •-`••-`•`-••`-•-`a1110d®�-` TOP OF BANK) AND GRADING / / / 48" WIDE \ \ \ \ I / \ 7x OF THE C.M.P. IS FULL \ \ i °' . ... ..�.�...�...�...�.�...�...�. 30" TALL \ 00 \ , \\ \ \ `- \. ONLY AS REQUIRED FOR / /� \ OF SILT AND MUD. \ \ \ : ��`.-•.---.`--•••� • / \ iivv.:5 3.59' •;�--•••-•••••--••-••- CULVERIMPROVEMENTS / / \ �\ \ , \\ \\ �ZONE "X" `E N .:5: _T�_ _•b� `.`.`.`.`.`.`.`. /. /J //� GRAVEL \ \ OFEPIPE: 5 9) 70P �; �`�- �/ // // /J \\ �1. �� 1 - LOT \ \ON \ _ .. I ----------------- \ / / / / \ Z / EXISTING TREE \\�• ,•i/ / TO BE REMOVED �? ••,-,•••,•,• •,•,•, / / PROPOSED (0 4.0) SEDIMENT F.E.S. \ `• � ,_._. -r �. : — • / / / / � / / SO '� � \ \ \ \ INV.: 536.73' / , BUILD-UP TO BE REMOVED �� S40 \ \ \ \ RIM: 538.92' — — — — _ / / / , / h`5 FROM EXISTING STREAM \ _\ \ \ \ INV:534.02' \\'/L---------- // / EXISTINGGRAVE� `\��'- �\��� \\ \ \ \ ` I 15" C.M.P.�` S /\ '--------- — loll _-54 \I ACCESS DRIVE- �_— — — — — — —\\ \ TO BE REPLACED WOOD F \ EXISTING SANITARY \\ SEWER EASEMENT (TYP.) LEGEND: x- SILT FENCE SEE DETAIL 2 / SHEET 6 CONSTRUCTION ENTRANCE SEE DETAIL 4 / SHEET 6 LIMITS OF DISTURBANCE WOODS LINE EDGE OF WATER REV I FILE NO ►, _ PROPOSED SILT FENCE ` ` I-� K �,\ \ IN,\ \ CANOPY AT BAYBROOK, LLC, ET A I \ (TYP.) - SEE DETAIL 1 1 D.B. 33320, PG. 695 —\ PID. 211 2121 8 PROPOSED LIMITS OF _ \ (TYP.) / END 125-FT 39� DISTURBANCE TYP. - 0.2 ACRES / �5 \ / STREAM IMPACTS \� 9 L GRATE: 542.14' OUT: 537.22' / ~\• / PvA- \o�v� PROPOSED CONSTRUCTION ENTRANCE (TYP.) - SEE DETAIL / PAVED PARKING ----- EXISTING STREAM CENTERLINE EXISTING FLOODWAY/FLOODPLAIN 0 EXISTING WETLANDS ---- EXISTING PROPERTY LINES EXISTING STREAM BANK EXISTING PROPERTY / APPROXIMATE LOCATION LINE (TYP.) \ / EXISTING TOE OF SLOPE (TYP.) \ l 35' POST \ CONSTRUCTION g • -'�� \ ZONE "AE" BUFFER FEMA 1% ANNUAL CHANCE FLOOD LINE 15' SANITARY \ \ \ \ SEWER R/W D.B. 8271, PG. 150\(FUTURE) \ ��ZONE "X»--------------------- \ \ K. CO. FUTUI�, \ \ \ CONDITIONS 1% ANNUALS \ \ \ HANCE OD LINE --'----------------------------------- EASEMENT (s SANITARY SEWER MANHOLE STORM DRAINAGE PIPE SS— SANITARY SEWER LINE EXISTING MAJOR CONTOUR ---- EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR �H• CAROB �.. HORIZONTAL GRAPHIC SCALE 2p�¢pF�5 •Q 10 0 5 10 20 40 40016 •r ( IN FEET) 1 inch = 10 ft. ,14,rk L.aFQ;����_Zoz4 DATE REVISION DRAWN CHECKED APPROVED � Rlul10 (ID 112020 'AR099 Dewrr -n Dewberry Engineers Inc. DUKE 9300 HARRIS CORNERS PARKWAY SUITE 220 E N E RGY. CHARLOTTE, NC 28269 PHONE: 704.509.9918 FAX: 704.509.9937 www.dewberry.com NCBELS # F-0929 TITLE MCALPINE CREEK TRIBUTARY CULVERT REPLACEMENT DEMOLITION AND EROSION CONTROL PLAN D ESC-3 3 OF 6 z w 2 U W Z) U m w W ry U _z 0- J Q U \\\ ALIREZA TABARRAEI \SHOKOFEH ZIAFE / \ D.B. 31702, PG. 1 \\\ LOT 43, REAWOODS SUBDIVISION / \ PHASE 1, MAP 1 \ M.B. \\\ 2P 432 2 / PID. 1165309 \ T.B.M. REBAR FOUND \\ \ \ \ \ \ \ WOODS N: 491467.62 \\ \ \ \ \ \E:1452292.14 \\ N.A.D. 83 2011 \ \ �� \ �• / N A.V.pELEVAT10$$541.00' \� CHRISTOPHER HAAS \ \\ \ i \ \ \ \ \ D.B. 33086, PG. 345 � , � �SY \ \ \ \ \ ^ LOT 42, REAWOODS SUBDIVISION N, \ �N \S3j \ \ \ \ PROPOSED REPLACEMENT PHASE 1, MAP 1 'KM.B. 28, PG. 432 \ -S3 \ \ \ OF EXISTING GRAVEL �\ \ 8 \\ PID. 21165308 \ \ \ S39� \\CCESS DRIVE - SEE DETAIL N,\ OF�giyF \ \ \ \ \ WOODS / ! / \ 'ycAp �NRIE �T \ _! �; Zz 35' POST / CONSTRUCTION � \ \ \ \? 79, I \\ BUFFER / \ \\\\\ 6\ 9F \—�\ N.G.S. "MA 7"\\s3, N: 491032.95' E:1451431.96' \ \ \\ \ �� \ IN, N.A.C. 83/2011 ' \.'.`.'.'.`.`.` \ \�-lit \ \ - �' . . ' BEGIN 125-FT STREAM IMPACTS 0 / ZONE "AE" FEMA 1% ANNUAL / CONTRACTOR SHALL PLACE APPROXIMATELY 4' OF GATE , / / CHANCE FLOOD LINE CLASS B RIP RAP TO FILL EXISTING PLUNGE POOL \ 539�� TO WITHIN 6" BELOW EXISTING WATER SURFACE �` EW01 (20.17A) C � -• ME(iKL•ENB�JRG •cOUPJT�' 1• ••:�� • • ' ` ' ` APPROXIMATE LIMITS • ��: • EXISTING • OF EXIST. PLUNGE POOL'-*-*-* •. • WETLANDS . : `.'.'.'.'.'.'.'.'.'.'...'.'• •`.`•`.`•" (TYP.) .-.1`.`•`•`•`• ZONE "X" (FUTURE) �\ \\• - - - •�•- / / \\ \\ / �\ • • • •'•'•'•'�'�' ' ' ' 'f'�'� • • PROPOSED LIMITS OF , �•�• \ X MECK. CO. FUTURE ••�• •'�'•'•••'•'•'•'•'•'•'•'•' CONDITIONS 1% ANNUAL \ •' •' •'•'• • �• DISTURBANCE (TYP.) - 0.2 ACRES / HW 02 (20.17A) \ \ \ \ \ CHANCE FLOOD LINE \\\ • •�� ••�•�•�•�•�•�•�•• wwu� • / / �- - - oRANCH ON THIS SIDE • �••••••••••••••••••••••• \ 1 OF THE C.M.P. IS FULL \ \ �. / \ OF SILT AND MUD. ••;*•• - SEE STREAM PROFILE (SHEET 5) FOR ,/ \ , \ \ \ ZONE "X" \ • ••�•• • JEFFREY B. COBB . • ADDITIONAL INFORMATION \ '•'•' . . •� .. J h"� , \ ANGELA R. COBB \ . . . `. `: �.�\ .�- 1%/ / / / / / / / \ � � \ \ � � \ � � \ D.B. 32026, PG. 244 \\ LOT 41, REAWOODS SUBDIVISIO `.`.` •- %j6 / PHASE 1, MAP 1 \ / 3� / M.B. 28, PG. 432 \ / 53a \ PID. 21165306 \f �\ •// / \ // /y39i i �� S3j \\ 9 ` \\ \s4?\ \ \ \ \AO •• / / / / / / /� , PROPOSED RIP -RAP \ \ \ \ \\�7•' ,'i/// �// // i \ / AT HEADWALL- F.E.S.\:;,,—INV.: 536.73 \ , T r• _ — / / / / , / , PER. DETAIL 20.23 \ \ \ RIM: 538.92' — INV:534.02' \\ram---------- 1-41 1 15" C.M.P. — — / , \ \ \ \ IS, S / ------------ /�I /�� NNq \\\� \ \\ \\ \\ Sg\ ------------------ // \\ \ // WOODS \\ \\ j _ — — j / \ \ \\ _ / PROPOSED (0' - 4.0') SEDIMENT \ \ BUILD-UP TO BE REMOVED \ \ \ \ \ CANOPY AT BAYBROOK, LLC, ETA , �\ \ \ FROM EXISTING STREAM ` , �538� \ \\\\ \ IN, \ \ \ \ ` 1 D.B. 33320, PG. 695 �\ \ ` \ \ \\ � z I \ PID. 21121218 , \ — ` \ / w \ / END 125-FT \ \53g� _ — '- \ // LLB — 1 \— \ U STREAM IMPACTS \ � \ ��\ AL, GRATE: 542.14' —� / OUT: 537.22' J �` — — — — — — — — — — — — c� le GJ� LEGEND: x- SILT FENCE SEE DETAIL 2 / SHEET 6 CONSTRUCTION ENTRANCE SEE DETAIL 4 / SHEET 6 LIMITS OF DISTURBANCE WOODS LINE EDGE OF WATER REV I FILE NO. I DATE � REVISION ® N.G.S. "DEBBIE" j N:498390.28 E:1453625.92 N.A.D. 83/2011 1___� (1-IF n h Ca ----- EXISTING STREAM CENTERLINE EXISTING FLOODWAY/FLOODPLAIN 0 EXISTING WETLANDS ---- EXISTING PROPERTY LINES EXISTING STREAM BANK f/ \ \ i 35' POST \ CONSTRUCTION 8 \ \ \ ZONE "AE" BUFFER FEMA 1 % ANNUAL \ \ \ nHANCF FI nnn I INF EASEMENT (s SANITARY SEWER MANHOLE STORM DRAINAGE PIPE SS— SANITARY SEWER LINE -- EXISTING MAJOR CONTOUR ---- EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR �H• CAROB �.. HORIZONTAL GRAPHIC SCALE 2p�¢pF�5 •Q 10 0 5 10 20 40 40016 •r ( IN FEET) 1 inch = 10 ft. ,�lll yi l L of 0% ��_ZOz4 DRAWN CHECKED APPROVED � Rlul10 (ID 112020 'AR099 Dewrr -n Dewberry Engineers Inc. DUKE 9300 HARRIS CORNERS PARKWAY SUITE 220 E N E RGY. CHARLOTTE, INC 28269 PHONE: 704.509.9918 FAX: 704.509.9937 www.dewberry.com NCBELS # F-0929 Y w LU ry U Lu _z J Q U TITLE MCALPINE CREEK TRIBUTARY CULVERT REPLACEMENT PROPOSED IMPROVEMENTS PLAN D ESC-4 4 OF 6 CULVERT REPLACEMENT 545 545 PROPOSED GRADE (TYP.) EW01 HW02 w Z U) o o � co CR 0 Co N N M N Lo Lo W O O Z N 41- Q =� Q � w� 540 �z �z 540 PROPOSED (0' - 4.0') SEDIMENT BUILD-UP END 125-FT TO BE REMOVED FROM EXISTING STREAM STREAM IMPACTS RIP -RAP LEADIN INTO CULVERT INLET TO HAVE A DEPRESSION 535 TO FACILITATE "BASE FLOW" 535 BEGIN 125-FT STREAMIMPACTS PROPOSED _ II GRADE (V DEPTH INSIDE 60" RCP) - - - - �� �1TI-m-1 I -III TTEEP71 1=' 11 El I El I IEEI11= I' Ti 1 — PROPOSED CLASS B RIP -RAP TO B EMBEDDED 24 m_ APPROXIMATE EXISTING=I INTO CHANNEL BOTTOM AND BANK STREAM BED (TYP.) 1.00% - MIN. DEPTH = 16", MIN. D50 RIP -RA SIZE = 8" ELEV.: 532.60 530 530 PLACE APPROXIMATELY 4' OF CLASS B RIP RAP TO FILL EXISTING PLUNGE POOL TO WITHIN 6" BELOW EXISTING WATER SURFACE 525 525 0+00 LEGEND: x x SILT FENCE SEE DETAIL 2 / SHEET 6 CONSTRUCTION ENTRANCE SEE DETAIL 4 / SHEET 6 LIMITS OF DISTURBANCE WOODS LINE EDGE OF WATER REV I FILE NO. I DATE � REVISION ----- EXISTING STREAM CENTERLINE EXISTING FLOODWAY/FLOODPLAIN 0 EXISTING WETLANDS ---- EXISTING PROPERTY LINES EXISTING STREAM BANK 1+00 EASEMENT (D SANITARY SEWER MANHOLE STORM DRAINAGE PIPE SS— SANITARY SEWER LINE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR HORIZONTAL GRAPHIC SCALE 20Q`¢p41� .Q 10 0 5 10 20 40 40016 •r ( IN FEET)Pt'V:� 1 inch = 10 ft. ,�lllyilLaF�����_ZOz4 DRAWN CHECKED APPROVED 2+00 ENERGY DISSIPATION -"*'— FLOW IMPERVIOUS DIKE DEWATERING DEVICE NOTE: ANCHOR ALL PUMPS AND PIPES SECURELY • CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS CIIARUYPIIE. INCLUDES CHARLOTTE ETJ `202V O 11 D w rr 1•.•1 Dewberry Engineers Inc. 9300 HARRIS CORNERS PARKWAY SUITE 220 CHARLOTTE, NC 28269 PHONE: 704.509.9918 FAX: 704.509.9937 www.dewberry.com NCBELS # F-0929 DISCHARGE HOSE WORK AREA BYPASS PUMPING SUCTION HOSE TOP OF BANK NOT TO SCALE 30.22A11 TITLE MCALPINE CREEK TRIBUTARY DUKE CULVERT REPLACEMENT STREAM PROFILE E N E RGY.RAWING SIZE D DESC - 5 SHEET 5 OF 6 z Lu 2 Lu U Q J p Lu ry ry Lu J U ry Q 00 ry Y Lu Lu ry U Lu z_ J Q U NOTES: 1. 6" COMPACTED ABC STONE AND GEOTEXTILE FABRIC TO BE USED AS SHOWN ON PLANS. TYPICAL INSTALLATION OF STONE IS ON SLOPES OF 20% OR GREATER MACHINE CLEARING ONLY AREA 20' - 0" DISTURBED AREA FOR ACCESS ROAD CLEARING AND GRUBBING AREA 12' - 011 TEMPORARY ACCESS ROAD 6'-0" r211 EXISTING GRADE 1/4 INCH PER FOOT (2%) SIDE SLOPE (TYPICAL) COMPACTED SOIL MACHINE CLEARING ONLY AREA MIN. 500 LB TENSILE STRENGTH MIRAFI 500 OR EQUAL GEOTEXTILE FABRIC TO STABILIZE FOUNDATION WHEN STONE IS APPLIED (ESPECIALLY IMPORTANT WHERE SOFT SOIL IS ANTICIPATED) MAINTENANCE: • CUT AND FILL SLOPES SHALL BE STABILIZED IMMEDIATELY UPON COMPLETION OF ROADWAY GRADING. THESE AREAS SHALL BE BLANKETED WHEREVER THEY ARE LOCATED WITHIN 50 FEET OF A SURFACE WATER OR WHERE A SUITABLE VEGETATIVE FILTER STRIP DOES NOT EXIST. • A TOP DRESSING COMPOSED OF HARD, DURABLE STONE SHALL BE PROVIDED FOR SOILS HAVING LOW STRENGTH. • ROADSIDE DITCHES SHALL BE PROVIDED WITH ADEQUATE PROTECTIVE LINING WHEREVER RUNOFF CANNOT SHEET FLOW AWAY FROM THE ROADWAY. • ADEQUATELY SIZED CULVERTS OR OTHER SUITABLE CROSS DRAINS SHALL BE PROVIDED AT ALL SEEPS, SPRINGS, AND DRAINAGE COURSES. RIPRAP OUTLET PROTECTION TO BE SIZED ACCORDING TO ANTICIPATED DISCHARGE VELOCITY. • ROADWAY SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED ROADWAYS, DITCHES, OR CROSS DRAINS SHALL BE REPAIRED IMMEDIATELY. 1 TEMPORARY ACCESS ROAD DETAIL NTS EROSION CONTROL MATTING DETAIL FOR STEEP SLOPES INSTALLATION: BLANKET IS DESIGNED TO PROTECT SEED ON SLOPES AND REDUCE OR PREVENT EROSION. PROPERLY PREPARE, FERTILIZE AND SEED AREA TO BE COVERED BEFORE BLANKET IS APPLIED. OVERCUT CHANNELS 2" TO ALLOW BULKING DURING SEEDBED PREPARATION. WHEN THE BLANKET IS UNROLLED, NETTING SHOULD BE ON TOP AND FIBERS IN CONTACT WITH TEH SOIL OVER THE ENTIRE AREA. IN DITCHES, APPLY BLANKETS IN THE DIRECTION THE WATER FLOWS, BUTTING THEM AT THE ENDS AND SIDES AND THEN STAPLING. ON SLOPES, APPLY BLANKETS HORIZONTAL TO SLOPE, OVERLAP ENDS AND SIDES 6" AND THEN STAPLE. VERTICAL INSTALLATION MAY USED UPON ENGINEERS APPROVAL. INSTALL 6" LONGITUDINAL ANCHOR TRENCHES AT TOP OF SLOPE, AND ANCHOR. LONGITUDINAL ANCHOR TRENCHES SHOULD BE LOCATED ABOVE THE DESIGN DEPTH OF DITCHES. STAPLING INSTRUCTIONS: USE WIRE STAPLES, .091" DIAMETER OR GREATER, "U" SHAPED WITH LEGS 6" LONG OR LONGER AND 1" CROWN. SIZE AND GAUGE OF STAPLES USED WILL VARY WITH SOIL CONDITIONS. DRIVE STAPLES VERTICALLY INTO THE GROUND. USE FOUR STAPLES ACROSS AT THE START OF EACH ROLL. FOR SLOPE INSTALLATION, CONTINUE TO STAPLE ALONG THE LENGTH OF THE ROLL AT 3' TO 5' INTERVALS. FOR DITCH LINER, STAPLE ALONG THE LENGTH OF THE ROLL AT 3' FT. INTERVALS. ANOTHER ROW OF STAPLES IN THE CENTER OF EACH BLANKET SHOULD BE ALTERNATELY SPACED BETWEEN EACH SIDE FOR EITHER SLOPE FOR DITCH. USE A COMMON ROW OF STAPLES ON ADJOINING BLANKETS. TYPICAL STAPLING PATTERN FOR HIGH -VELOCITY DITCHES AND \ \ SLOPES. \ \ \ \ USE 4 STAPLES ACROSS AT THE \ \ \ \ \ \ START OF EACH ROLL AND \ \ \ \ \ \ \ CONTINUE TO STAPLE THROUGHOUT \ \ \ \ \ THE LENGTH OF THE ROLL AT 1.5 FT. INTERVALS. \ \ F�. MATTING MATERIALS: NORTH AMERICAN GREEN SLOPES 2:1 OR GREATER, OR ON SENSITIVE AREAS- TYPE S75 OR APPROVED EQUAL SWALES OR HIGH VELOCITY AREAS- TYPE S150 OR APPROVED EQUAL 3 MATTING STEEP SLOPES CONCRETE PIPE DIMENSIONS WALL THK. OUT DIA. IN DIA. H A B C E F G W K M 2 1/4 19 1/2 15" 271/1 20" 24" B" 7 1 2" 4" 4" 8" 17 10" 2 1 2 23" 18" 31" 20" 24" 8" 9" 4" 4" 8" 17 12" 3" 30" 24" 38" 20" 30" 8" 12" 4" 4" 8" 21 15" 3 1 2 37" 30" 45" 20" 44" 12 15" 6" 8" 8" 31 18" 4" 44" 36" 52" 32" 44" 12 18" 6" 8" 8" 31 22" 4 1 2 51" 42" 59" 32" 48' 12 21" 6 8 8 34 26" 5 58 48 66 32 48 7T 24 6" 8 8 34 29 5 1 2 65" 54" 73" 32" 54" 12 27' 6 8" 8" 38 33" 6" 72" 60" BO 36 66 12 30 8 12 12 46 36 6 1 2" 79 66 67 36 72 12 33 8" 12 12 51 40 7" 86" 72" 94" 36" 78" 12 36" 8" 12 12 56 43" STEEL POST (1.33 LB/LIN FT STEEL- 5FT MIN LENGTH) STEEL POST - EXTRA STRENGTH FILTER FABRIC NEEDED WITH WIRE MESH FABRIC (MIN. 14 GAUGE W/ MAX. 6" MESH SPACING)ro 0 T� 6' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE NOTES: 1. A DOUBLE ROW OF SILT FENCE (MINIMUM 5' APART) MUST BE INSTALLED IN AREAS WHERE A 50' UNDISTURBED BUFFER CANNOT BE MAINTAINED BETWEEN THE DISTURBED AREA AND THE WATERS OF THE STATE. 2. A MINIMUM 10' MAINTENANCE BUFFER SHALL BE PROVIDED BETWEEN LAST ROW OF SILT FENCE AND THE WATERS OF THE STATE. 3. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN DEPOSITS REACH 30% OF FENCE HEIGHT. 4. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFF -SITE AND CAN BE PERMANENTLY STABILIZED. 5. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. 6. DRAINAGE AREA OF 1/4 ACRE OR LESS PER 100 LF. 7. USE FILTRATION GEOTEXTILE A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE POSTS AND WIRE AS DIRECTED. 8. USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 9. PROVIDE 5'-0" STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. 10. FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTEXTILE SHALL BE A MAXIMUM OF 18" ABOVE GROUND SURFACE. PONDING HEIGHT 9" MAX. RUNOFF (RECOMMENDED) STORAGE HEIGHT - 8" DOWN-4" FORWARD TRENCH WITH COMPACTED BACKFILL STANDARD DETAIL TRENCH WITH NATIVE BACKFILL MAINTENANCE: • SILT FENCE SHOULD BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. • NEEDED REPAIRS SHOULD BE INITIATED IMMEDIATELY AFTER THE INSPECTION. • SEDIMENT SHALL BE REMOVED WHERE ACCUMULATIONS REACH HALF THE ABOVEGROUND HEIGHT OF THE FENCE. • ANY SECTION OF SILT FENCE WHICH HAS BEEN UNDERMINED OR TOPPED SHALL BE IMMEDIATELY REPLACED WITH A ROCK FILTER OUTLET (STANDARD CONSTRUCTION DETAIL #4). 2 SILT FENCE DETAIL DESIGN CRITERIA: 1. AGGREGATE SIZE: 2-3" DIAMETER WASHED STONE 2. PAD THICKNESS: 6" MINIMUM 3. PAD WIDTH: 12' MINIMUM 4. PAD LENGTH: 50' MINIMUM 5. PAD LOCATION: LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC ROADS. 6. WASHING: IF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT ARE NOT REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL AREA. A WASH RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND EFFECTIVE. NTS WATTLES J 15"-16" DISTURBED AREA ISOMETRIC VIEW -UVVVIVJLVY t J I /• r\r- TOP VIEW 2' WOODEN STAKE MAINTENANCE: • WATTLES SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. • SEDIMENT DEPOSITS SHALL BE CLEANED FROM THE WATTLES WHEN IT REACHES HALF THE HEIGHT OF THE LOG. • DAMAGED WATTLES SHALL BE REPLACED WITHIN 24 HOURS OF INSPECTION. A SUPPLY OF WATTLES SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE. NOTES: USE MINIMUM 18 IN. NOMINAL DIAMETER COIR FIBER (COCONUT) WATTLE AND LENGTH OF 10 FT. EXCAVATED A 2 TO 3 INCH TRENCH FOR WATTLE TO BE PLACED. DO NOT PLACE WATTLES ON TOE OF SLOPE. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. INSTALLED A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. FOR BREAKS ALONG LARGE SLOPES, USE MAXIMUM SPACING OF 25 FT. WATTLES WILL BE FILLED WITH BIODEGRADABLE, DENSE, COIR FIBERS. DISTURBED AREA - Spl FRONT VIEW SEE INSET A o MiN�M G SOP/ e o o 0 0 Q too e 00 e 00 ' o ,­'-o GEOTEXTILE FABRIC TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE WETNESS IS ANTICIPATED) 2-3" DIAMETER WASHED STONE, 6" // PERSPECTIVE VIEW MAINTENANCE: DEEP • ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE. • ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS SHALL BE REMOVED AND RETURNED TO THE CONSTRUCTION SITE IMMEDIATELY. • IF EXCESSIVE AMOUNTS OF SEDIMENT ARE BEING DEPOSITED ON ROADWAY, EXTEND LENGTH OF ROCK CONSTRUCTION ENTRANCE BY 50 FOOT INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL WASH RACK. • WASHING THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWERS, CULVERTS, OR OTHER DRAINAGE COURSES IS NOT ACCEPTABLE. NTS 4 CONSTRUCTION ENTRANCE 12' MIN. NTS J I V YY!'1 I 1 LL DOUBLE ROW WATTLE SPACING WATTLES NTS NOTES: W2 1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON END OF FLARED SECTION TO BE DESIGNED BY THE ENGINEER. 2. REFER TO THE CHARLOTTE MECKLENBURG STORM WATER DESIGN MANUAL FOR RIPRAP APRON DESIGN STANDARDS. 3. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END GENERAL NOTES: OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 4. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED 1. ALL CORNERS TO BE CHAMFERED 1" IF CONCRETE. SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE THE .. SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL.. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM ENDCOD I. F 2. THE CONTRACTOR WILL BE REQUIRED TO PLACE 2-#6 BARS "Y" IN THE TOP 5. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM 9 B B T �� WIDTH OF THE RECEIVING CHANNEL MAXIMUM TAPER TO RECEIVING CHANNEL 5:1 I OF ALL ENDWALL FOR PIPE CULVERTS 42" AND OVER WITH A MINIMUM 3" 6. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. FRONT VIEW COVER AND A LENGTH OF 6" LESS THAN ENDWALL. 7. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING I W, CHANNEL SHALL NOT BE ALLOWED. END OF APRON REINFORCING I G I 3. FORMS ARE TO BE USED FOR THE CONSTRUCTION OF THE BOTTOM SLAB. 8. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON "C" BAR "D" BAR WILL BE PERMITTED. PLAN C (IF NEEDED) ELEVATION NATURAL GRADE Yys;J�r:. RIP RAP �I r• ;t. r� : yy C BARS AT 12 ON CENTER H I hi ■ T (THICKNESS)-10" MIN. • d50 (see fig 8.06 aft "NC SEDIMENT AND EROSION CONTROL MANUAL" dmax = 1.5 x d50 1.5 T SIDE VIEW = 1.5 X dmax. NOTE: LAYER OF RLTER FABRIC MINIMUM H-V3 PIPE DIAMETER T(10" SECTION B-B NOT TO SCALE NOT TO SCALE • CITY OF CHARLOTTE • CITY OF CHARLOTTE CONCRETE W I N G WA L L • CITY OF CHARLOTTE RIPRAP APRON AT PIPE O U T FA L LS LAND DEVELOPMENT STANDARDS CONCRETE W I N G WA L L WITH SPLASH PAD LAND DEVELOPMENT STANDARDS WITH SPLASH PADS LAND DEVELOPMENT STANDARDS OTHER THAN AT SWIM � STD. N0. REV. � � STD. N0. REV. CEIAPMOTj'E- INCLUDES CHARLOTTE ETd 20.17A 8 "RUMTE, INCLUDES CHARLOTTE ETd 20.17E QIARLOTTE. INCLUDES CHARLOTTE ETd 20.23 7 IA. NO.1 LGT. I NO. LGT. 15" 4 2'-0" 4 1'-11" 18" 4 2'-3" 4 2'-2" 24" 4 2'-9" 4 2'-B" 30" 4 3'-3" 4 3'-2" 36" 4 3'-9" 4 3'-8" 42" 4 4'-3" 4 4'-2" 48" 4 4'-9" 4 4'-8" 54"t46'-3" 4 5'-2" 60" 4 5'-8" 66" 4 6'-2" E 9. FILTER FABRIC SHALL BE INSTALLED ON COMPACTED SUBGRADE PRIOR TO 4. WALL THICKNESS (T) SHOWN IS NOT TO BE INTERPRETED TO PLACEMENT OF RIP RAP. 10. ANY DISTURBED AREA FROM END OF APRON TO RECIEVING CHANNEL O 1G SLOPE MEAN THE THICKNESS ACCEPTABLE, BUT IS USED ONLYMUST BE STABILIZED. IN COMPUTING ENDWALL QUANTITIES.,' MIN. USE USDA NOMOGRAPH FROM NC SEDIMENT AND EROSION CONTROL MANUAL ORCHARLOTTE MECKLENBURG STORM WATER DESIGN MANUAL FOR DESIGN DATA. V_B" VMIN. FILTER FABRIC LAP 5. IF CONTRACTOR ELECTS TO USE CONSTRUCTION JOINT AT BOTTOM OF PIPE,AND POURS BASE SEPARATELY, THE TOP OF BASE SHALL BE LEFT ROUGH. '9 C, 72" 4 6'-8" ' G 6. ALL CONCRETE TO BE 3600 P.S.I COMPRESSIVE STRENGTH. Z a. G •° N TOP VIEW #4 BAR 12" O.C. "D" BARS AT 12" ON CENTER REV I FILE NO. DATE REVISION DRAWN CHECKED J APPROVED `�� �H• CA. Rp��.. 2C) bFE5 ' 4 40016 Mi ; ;of 0% -70_ ZozU Geoff MY- ew rr e ►�•••�� 1�•�1 Dewberry Engineers Inc. 9300 HARRIS CORNERS PARKWAY SUITE 220 CHARLOTTE, NC 28269 PHONE: 704.509.9918 FAX: 704.509.9937 www.dewberry.com NCBELS # F-0929 -('DUKE �. ENERGY. TITLE MCALPINE CREEK TRIBUTARY CULVERT REPLACEMENT D ESC-6 DETAILS 6 OF 6