June �4, 2019
I.��TTFIZ ��' APPI�QVAL WITH MUDIT`I�ATI()N�
Southeastern 'UlTayne Sanitary District
Attn: Mr. Phil Shlvat-, Chairman
P.O. Bax 1583
Goldsboro, NC 27533
RE: Project Name: Southeastern Wayne Sanitary District CN 147 Interconnects
Project ID: Wayne-2019-�34
County: Vllayne
Address: Multiple Streets
(US Hwy 117 Alternate at -ea)
River Basin: Neuse
Date Received by LQS: June 4, 2019
Submitted By: McDavid Associates, Inc.
Plan Type: New
Dear Sir,
Acres Approved: �.O
City: Brogden
This office has reviewed the subject erosion and sedimentation control plan, We find the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval �nL�st
be posted at the job site. This plan approval shall expire three (�} years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC
4B .� 129.
As of April l , 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent �N(�I} farm requesting a Cci-tificate of Coverage (CUC} under the
NCGO 10000 Construction Storn�water Gene�•al Permit. This form MUST be submitted prior to the
commencement of any land disturbing activity on the above named project. �I,he N(aI fortri may be
accessed at deq.nc.goy/NC;G(71.Piease direct questions about the I�I�I form to Annett
Annette.lucas�ncdenr.�ov ar Paul Clark at Paul.clark(a�ncdenr.�ov. After you s
e Lucas at
ubz�nit a complete
and correct NCI Form, a CC)C w111 be el�iailed to you within three business days. Initially, DEMLR
will not charge a fee for coverage under• the NCG�1 pe�•t�1it. I-lowever, on or after May 1, 2019, a
$100 fee will be charged annually. This fee is to be sent to the D�MLR Storinwater Centt•a1 Office
staff iri Raleigh.
Title 1 SA NCAC 4B .0118ta) and the NCG01 permit require that the :following docume��tation be
kept on file at the job site:
�I of Enriraa+�wntel Out(i!Y
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Washington Regional Office 1943 Washington Square Mall (Washington, North Carolina 21889
252.94b.6481
l . The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
etter Ives the notice uired by G.S. 113A-61.1 a) of our right of pel•lodlc inspection
Also, this 1 g re q
to ensure compliance with the approved plan.
Nal-th
Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
ratection of existing natural resources and adjoining properties. If, following the commencement
p g
A this project ' the erosion and sedimentation control plan is inadequate to meet the requirements
,
of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51
u h 66 this office may require revisions to the plan and Implementation of the revisions to
thro g ), Y q
insure compliance with the Act.
A cceptance anapprop
d yal of this ran is conditioned upon your compliance with Federal and State
Ovater qualitylaws regulations, and rules. In addition, local city or county ordinances or rules may
1 to this land activity. This approval does not supersede any other permit or
also apply g
approval.
Please note that this
Financial Responsib
if there is any chang
a royal is based in part on the accuracy of the Information provided 111 the
pp
Ilit Form, which you provided. You are requested to file an amended form
the information included on the form. In addition, it would be helpful Of
Y
e
Y
ou notify this office of the proposed starting date for this project.
have a preconstructi
on conference.
Please notify us i
f you plan to
be advised that a rule to rotect and maintain existing buffers along watercourses in the
Please p
Neuse
River Basin became effective on July 22, 1997. The Neuse River Riparian Area Protection
Maintenance Rule 15A NCAC 2B.0233) applies to the 50-foot vide zone directly adjacent to
and �
streams, perennial streams, lakes, ponds, and estuaries) In the Neuse
surface waters (intermittent
• 'n For more information about this riparian area rule, please contact the Division of
River Basin.
Water Resources wetland1401 Unit at 919-807-6300, or DWR in our regional office at 252-946-
6481.
Sincerely,
Samir Dumpor, P.E.
Regional Engineer
cc w/o enc: Steve Hamilton, Southeastern �lVayne
D.E "Trey" Gurley III, P.E., McDavid A
WaRO Division of Water Resources
Sanitary District (email)
ssociates, Inc. (email)
Y
ou notify this office of the proposed starting date for this project.
have a preconstructi
on conference.
Please notify us i
f you plan to
be advised that a rule to rotect and maintain existing buffers along watercourses in the
Please p
Neuse
River Basin became effective on July 22, 1997. The Neuse River Riparian Area Protection
Maintenance Rule 15A NCAC 2B.0233) applies to the 50-foot vide zone directly adjacent to
and �
streams, perennial streams, lakes, ponds, and estuaries) In the Neuse
surface waters (intermittent
• 'n For more information about this riparian area rule, please contact the Division of
River Basin.
Water Resources wetland1401 Unit at 919-807-6300, or DWR in our regional office at 252-946-
6481.
Sincerely,
Samir Dumpor, P.E.
Regional Engineer
cc w/o enc: Steve Hamilton, Southeastern �lVayne
D.E "Trey" Gurley III, P.E., McDavid A
WaRO Division of Water Resources
Sanitary District (email)
ssociates, Inc. (email)
l . The developer is responsible for the control of sediment on -site. If the approved erosion
and sedimentation control measures prove lnsufticlent, the developer must tale those
additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)).
Each sediment storage device inust be inspected alter each storm event (NCGS 113A-
54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity.
All sediment storage pleasures will remain on site and functional until all grading and final
landscaping of the project is complete (15A NCA.C; 04B .0113)0
developer is responsible for obtaining all pern�tts and approvals necessary foir the
development of this project prior to the commencement of this land disturbing activity.
This could include our agency's Stormwater regulations and the Division of water
Resources' enforcement requirements within Section 401 of the Clean water Act, the U.S.
Army Corps of Engineers' jurisdiction of Section 404 of the Clean 'dater Act, the Division
of Coastal Management's LAMA requirements, the Division of Solid waste
Management's landfill regulations, the Environmental Protection Agency and/or The U.S.
Army Carps of Engineers jurisdiction of the Clean Water Act, local County or
Muni clpallt*1es' ordinances, or others that may be required. This approval cannot supersede
any other permit or approval.
3. Adequate and appropriate measures must be properly installed downstream, within
the limits of disturbance, of any land disturbing activity to prevent sediment from
leaving the limits of disturbance, entering existing drainage systems, impacting an on -
site natural watercourse or adjoining property. (NCGS 113A�57)
► r r r� + � i
F ESPt�N IBi�E PAI 'rY0
rr� ►
kND/OR DISPOSAL
STAI�T�UP DATE:
{�N-S�`rE PHONE NO.:
�E�'��E PHONE Nth,;
Southeast'erri �11Tayn Sanitary District
��utheastern Wayne SanitarY District CN �.4'7 Intercanne�ts
�Navne N C3.:
•
Bayne-��3.9-�34