Construction Sequence
1. Submit a Land Disturbing Permit Application at least 30 days prior to any land
disturbing activity occurring.
2. Buffer zones and limits of disturbance must be flagged out in the field. Tree
protection fencing should be installed at this step to protect sensitive areas.
3. Organize onsite pre -construction meeting with Drew Blake (919-548-6715), or Justin
Hasenfus (919-545- 8344) to review site plan prior to land disturbing activities.
Land -Disturbing Permit and Approved Plans will be provided at this meeting.
4. Install all initial temporary erosion control measures according to the approved plans
and information discussed during the pre -construction meeting. Minimal clearing may
occur in the immediate area of all
measures to provide for installation.
5. Contact Chatham County Watershed Protection Department staff to schedule an
inspection of all installed measures.
6. Permitted land disturbing activities may begin upon approval of the installed
measures.
7. Complete self -inspections weekly and within 24 hours of a 1" or greater rainfall
event. Email all inspection reports to Chatham County Watershed Protection
Department staff within 24 hours of
inspection.
8. Maintain all erosion and sediment control measures in good working order. Silt
fence, inlet protection and other similar measures must be cleaned out before they are
half full. Clogged silt fence outlets must be
refreshed/replaced. Silt fence cannot have holes or tears.
9. Ground cover shall be provided as follows:
a. Stabilize basins, diversion ditches, and perimeter slopes with ground cover
immediately after installation.
b. For all other areas with moderate and/or steep slopes, or areas of concentrated
flow, stabilize area with seed and matting if the slope has not been disturbed for a
period of seven (7) days.
c. Provide ground cover sufficient to restrain erosion on any portion of the site upon
which further land -disturbing activity is not being undertaken within fifteen (15) calendar
days of temporarily or permanently suspending land disturbing activity.
d. Establish permanent ground cover sufficient to restrain erosion immediately
following completion of construction or development and/or prior to final inspection.
10. Re -install adequate erosion and sediment control measures and/or increase
maintenance frequency where approved measures fail to prevent accelerated erosion,
off -site sedimentation, or repetitive non-
compliance issues.
11. Measures must be installed at the back of curb to restrict all vehicle access to the
construction entrance. All measures must be installed according to the approved plan
unless approved in the field by Chatham
County Watershed Protection Department staff (approved Field Revision).
12. Modifications to the approved and permitted plans shall be approved, by Chatham
County Watershed Protection Department staff only, prior to removal or installation.
Contact Chatham County Watershed
Protection Department staff to request an inspection and obtain a sign -off on the plans
or an approved Field Revision.
13. Once grading and construction activities are complete, permanently stabilize the
s ite.
14. If any sediment basins or other measures need converted to permanent stormwater
control measures, call Chatham County Watershed Protection Department staff for
approval before doing so. Adequate
stabilization upslope is needed before any conversions can occur.
15. Once adequate permanent stabilization has filled in with 90 % cover, call Chatham
County Watershed Protection Department staff to schedule an inspection. If the
permanent stabilization is adequate, Chatham County will instruct that all temporary
erosion control measures be removed.
16. A final inspection will be performed confirming all temporary erosion control
measures have been removed.
17. Once the final inspection is complete the permit will be closed and no additional
ground disturbing activities can occur.
Line Ditch with DS75 Excavated Material
from North American Cover with DS75 from
Green or Equal. North American Green
or Equal.
\ Excavated Material
Flow
1
Map Unit Legend
Map Unit Symbol
Map Unit Name
CmB
Cid-Lignum complex, 2 to 6
percent slopes
GeB2
Georgeville silty clay loam, 2 to
6 percent slopes, moderately
eroded
GeC2
Georgeville silty clay loam, 6 to
10 percent slopes,
moderately eroded
HrB
Herndon silt loam, 2 to 6
percent slopes
UdC
Udorthents, loamy, 2 to 10
percent slopes
LEGEND
DIVERSION
BERM
�—
SOIL TYPE
DELINEATION
STOCKPILE
OF DEBRIS
GRAVELED
AREA
DIVERSION
DITCH
�—
OWNER: Graham Scott Oldham
145 Oldham Place
Pittsboro, NC 27312
919-422-9626
SITE LOCATION:
2151 US 15 / 501 N
Pittsboro, NC 27302
PARCEL ID / PIN
0007108 / 9753 00 11 0991 (2.31 ac. )
0007110 / 9753 00 12 1383 (2.01 ac. )
ZONING: R-A2
DISTURBANCE TOTAL: 1.00 acres
/Ps
I I,
9 / I
\ Septic Area
/PS i I Ii
� t t
\ i / 12
t t t
� A
�S0 �� 100 LF `.
o I Y ` `
tiQ \` �10 �s i � SV'% \ I I' // ` ® ` � t Fence \\ \
oQ 5 S Sl \
60,
�Dis�ipator will have $ftw,,W— `
i"q Clas� A stone, 6' long �V
�p��sf `\ I \ and 18" deep, 6' wide i
\ %/
--_—_ o �� y� I ` ♦ — Silt Fence utle /
\ d /PS Receive
-----_ �. \ I \ /' 1 1 V PERMANENT acre ,
__-- `-- X.
\ ♦ .� 0
(9 GRASSING--
♦ rs . to
N\
O
Septic Easement \ % /' I ♦ ; I ��
x f
C
O
47 /
400qI ;
p 11
to--- ----
0-• / /__ B
I I --� TemporaryClean Water
D istu abed Area e
' C / Diversion Ditch/Bern
1.00 /-1 % ,\e-�cee��re
nporary Clean Vat r /' /' ; 0�\(�
DiversiQrl Ditch erm
/PS mom
7 I mono
2.010 Acres
I , ,
Dissipator will he
Class A stone 6
I
I
t
t
t
t
t
I
I
I
I
I
1
/
/
/1 /00
/PS
10
I
I
I "
I
I
1
1
I
I
I
I �
� I
PFR�
and 18" deep, 6',4vide cb i CONCRETE WASHOUT
PERMANENT h' . h� $
' 11-------------------- /' GRASSING �o O /
v�
'- c--♦-�--�ttt t;_____
100
LF
Sit FenceOi Silt Fence
Outlet
Receives
100 LF 100 LF 0.25 acres.
Silt Fence l i
/i
I /
i♦Existin
Edge of\PVavementJ/;Pavement Fenco'
'' 280.02' ----------- -
oc e S 87013'1811W
I
100 LF
Silt Fence
12 inch Berm
' g--g— 12 inch
—�—�— Silt Fence Outlet
� / Berm Ik '
Receives 0.13 /
o Silt Fence acres ; ,, ��� Silt Fence Outlet
Disslpat will have (O Outlet Receives 71_2'inc=h`B`erm
/ � � ♦; Receives 0.20
Class ton 6' long 0 1 Acres ; /P acres
`t and /18"tdee ide 4 i fi
i
Existin a ��
I Drop Inlet
� Inlet Protection as Per
2
Chatham County Detal -001
Shown on Sheet EC4
-t---/
t
Existing 11
t
I Metal Building 1 I
1
Disturbed Area
=xistin Ground
i
I
i
i
i
i
i
i
i
i
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II
ECM
3
I
I
I
I
curb
Existing
Edqe of Pavement
J' rho
ECM
2
�(b
Co
Temporary Bench
Top of Concrete Mond
Elevation = 44,5.E
/PS
1
mate/T bbline
#3
Ly
CONTOUR NOTE
\\1 11111111111/l�
J
Y
=V',w L0
.,�0 o
,�
Xn -- --�.:
U
o
>~
ct
�U C�
4
C) .
r/]
r
Revision: 16 OCT 2019 WHK
Q
Z
J
�
0
�
Lo
N
�
O
�U
Z
2
O
2i
D
-0
=
o
Q
N
�
�
M
EC1
Layout
2 \IX
Varies with Cross -slope
TYPICAL DETAIL
Temporary Clean Water
Diversion Ditch/Berm
20 10 0 20 40 60
SCALE: 1" = 20'
FIELD TOPO CONTOURS
BY VAN FINCH LAND SURVEYS
WITHIN DISTURBED AREA
ALL OTHER CONTOURS TAKEN
FROM CHATHAM COUNTY GIs