HomeMy WebLinkAbout20020365 Ver 1_COMPLETE FILE_20020308APR ( 2002
NCDENR M/ETt_A"=DS GRtSUP
North Carolina Department of Environment and Natural Resource ou„? IT1 SSG !G"" . .
Division of Coastal Management
Michael F. Easley, Govemor Donna D. Moffitt, Director William G. Ross Jr., Secretary
April 12, 2002
Donald C. and Arline G. Hux
P. O. Box 146
Manns Harbor, North Carolina 27953
Re: DWQ #020365, Nationwide Permit Application for a fill activity off US 64/264, Manns
Harbor in Dare County
Dear Mr. & Mrs. Hux:
The North Carolina Division of Coastal Management has reviewed your application; dated March 4,
2002, for a U.S. Army Corps of Engineers Nationwide Permit, pursuant to Section 307 of the Coastal
Zone Management Act of 1972, as. amended. Based upon our review, we have determined that the
proposed activity is consistent with the North Carolina Coastal Management Program subject to the
following conditions:
1. The activity described in. your application is for the issuance of a U.S. Army Corps of Engineers
Nationwide Permit, Number 18, under 33 CFR Part 330. Any modification of your proposed
activity, or change in the Nationwide Permit Number that you are seeking, will require an
additional review for consistency by this office.
2. Since the activity that you propose involves impacts to waters and/or wetlands, a 401 Water
Quality Certification must be obtained from the North Carolina Division of Water, which our
records indicate you have already received.
Please understand that this letter does not relieve you of the responsibility to ensure that all other
applicable State authorizations and/or permit requirements are met prior to implementation of the project.
Please feel free to contact me at (252) 264 3901, if you have any questions or need further assistance.
Sincerely,
ed Sam n
District anager
TS/dc
Cc: Charles S. Jones, Assistant Director, DCM, Morehead City
Caroline Bellis, Federal Consistency Coordinator, DCM, Raleigh
Wilmington District Engineers; ATTN: CESAW-CO-E
John Dorney, Water Quality Section, DWQ/Raleigh
Tom Walker, USACOE
1367 U.S.17 South, Elizabeth City, North Carolina 27909
Phone: 252-264-39011 FAX: 252-264-37231 Internet: http://dcm2.enr.state.nc.us
An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled l 10% Post Consumer Paper
-__7F Vu n' ?R
?m QG
? f
>_ -f
4 ?
March 20, 2002
DWQ# 02-0365
Dare County
Donald C. and Arline G. Hux
P.O. Box 146
Manns Harbor, NC, 27953
APPROVAL of 401 Water Quality Certification
Dear Mr. and Mrs. Hux:
You have our approval, in accordance with the attached conditions and those listed below, to place fill in 0.10 acre of
wetlands for residential fill on your property in Dare County; as described in your application received by the Division of
Water Quality on March 8, 2002. After reviewing your application, we have determined that this fill is covered by General
Water Quality Certification Number 3362, which can be downloaded from our web site at http•//h2o.enr.state.nc.us . This
Certification allows you to use Nationwide Permit Number 18 when it is issued by the U.S. Army Corps of Engineers. This
approval is also valid for the Tar-Pamlico River Buffer Rules (15A NCAC 2B .0259). In addition, you should get any other
federal, state or local permits before you go ahead with your project including (but not limited to) Sediment and Erosion
Control, Non-Discharge and Water Supply Watershed regulations. Also this approval will expire when the accompanying
404 permit expires unless otherwise specified in the General Certification.
This approval is only valid for the purpose and design that you described in your application. If you change your
project, you must notify us in writing and you may be required to send us a new application for a new certification. If the
property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for
complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory
mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the
conditions listed in the attached certification.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act
within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to
Chapter 1508 of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh,
N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have
any questions, please telephone Tom Steffens or Deborah Sawyer in our Washington Regional Office at 252-946-6481 or
Cyndi Karoly in Raleigh at 919-733-9721.
Sincerely,
regory J. T orpe ihD.,,
Attachments
cc: Corps of Engineers Washington Regulatory Field Office
Washington DWQ Regional Office
Central Files
File Copy
020365
v"~V Governor
William G. Ross, Jr., Secretary
Department of Environment and Natural Resources
Gregory J. Thorpe, Ph.D., Acting Director
Division of Water Quality
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
n1n -1 nn -0C /..L.......\ n1n -)')'J Conn /{....\ {..u..•//L.lf...+..-_..a. __ ..../..........a1...._/
Office Use Only: Form Version October 2001
USACE Action ID No. DWQ No 7 n?
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
I. Processing FILE MAR 8 p`)op
1. Check all of the approval(s) requested for oject:
[?] Section 404 Permit
? Section 10 Permit)
401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: /9
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: ?
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP? is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: ?
II. Applicant Information
1. Owner/Applicant Information
Name: 2 ®1V d )-O C, ahd AA1-1 *: Cyr, aX
Mailing,4ddress:_-P,6, BoX I,11&
/11 A. Jj
i eiepnone ivumber: ,5 a -stg1- l'7e 9- Fax Number:
E-mail Address: /i A ,i v G3 /4 G,. ,P% i.'- i. / In -
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name:
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Page 5of12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets.no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: N4-
2. T.I.P. Project Number or State Project Number (NCDOT Only): Al,/
3. Property Identification Number (Tax PIN): C ????l ?? ?3 _ ??? e?J??
4. Location
County: 2iQ/ E Nearest Town: 4//V-6 H14RJ110
Subdivision name (include phase/lot number): A1,4
Directions to site (include road numbers, landmarks, etc.):1??f/,zi?4Y la
/'S-1,1 .-P, inES /rlff IVAI RD
5. Site coordinates, if available (UTM or Lat/Long):
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
7. Property size (acres): /, (/ QCr?s
8. Nearest body of water (stream/river/sound/ocean/lake): CRO.4rA/' _5_,9LtN n
9. River Basin: W4-
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at h.ttp:,/h-o.enr.state.nc.us/admin/maps/.)
Page 6 of 12
10. Describe the purpose of the proposed work: 1 /h R&
01E g,EST'HET/CS i?ND Y.p
? C
11. List the type of equipment to be used to construct the project: _Oaln o T
daCrf' a .TAP r R
12. Describe the land use in the vicinity of this project: Y P,, OS
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
A/0IV k?
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application:
A /n
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to &termine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
Page 7 of 12
I. Wetland Impacts
Wetland Impact Area of
Site Number Type of Impact* Impact
indicate on ma acres
Located within Distance to
100-year Floodplain** Nearest Stream Type of Wetland***
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, d itching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online athtto://w,vw.fema ov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property:
y/ sue, ,C,
Total area of wetland impact proposed: /f3ee Ar'-
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact Length of Average Width Perennial or
Site Number Type of Impact* Impact Stream Name**
ndicate on ma of Stream Intermittent?
linear feet Before Impact (please specify
- / A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip -?,
g), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.usvs.env. Several internet sites also allow direct download and printing of USGS maps (e.g., p?°wlv,topo?one com
wwtiv.maequest cop etc.).
Cumulative impacts (linear distance in feet) to all streams on site
Page 8 of 12
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact Area of Name of Type of Waterbody
Site Number Type of Impact* Impact Waterbody
indicate on ma (if applicable) (lake, pond, estuary, sound,
acres bay, ocean, etc.
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredgin;
flooding, drainage, bulkheads, etc.
4. Pond Creation
N A If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): ? uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond: Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
4A, Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial-viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
VIII. Mitigation
„I DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
Page 9 of 12
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also,choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state.n.c.Lis/ncwetlaiids/stn-n.f,,ide..html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at htm:Lh2o.enr.Gtate.nc.uShvrp%index htm If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet):
Amount of buffer mitigation requested (square feet):
Amount of Riparian wetland mitigation requested (acres):
Amount of Non-riparian wetland mitigation requested (acres):,
Amount of Coastal wetland mitigation requested (acres):
Page 10 of 12
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes ? No [2r
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation
Yes ? No ?
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No ? ,
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify il10 )?
Yes ? No ? If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet
Multiplier
Required
Mitigation
1 3
2 1.5
Total
...- - -, yciyc,iu,ouiar rrom near oanK or cnannel; Gone Z extends an
additional 20 feet from the edge of Zone 1.
Page 11 of 12
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
f yousE WVV rToP - /499 Ssr. All-, vs 7 974,e. ?R Arc ?,? ?? a 1/_sxr„cf
XU. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules?
Yes ? No Q
Is this an after-the-fact permit application?
Yes ? No 0
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
VV a I
Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
i
.ry /??
rrr
N/F,/EgNiQ ,SgOLE/? R Has
t u.s.c4/zcya
N
` j CANAL
a PIT
VICINITY MAP
FENCE?I
0
? T
h
I N/F?/gCOB S. BgLL
h 0B../7,
E A5
FARM 1 p = uGHr-,4 I
f POLE I
B / A5 I (Y NOR -
FIgM 70. I
BF 70, 224 I
W/REFENCE SQ. FT. I
I' NORTH 1.61 A C. , W I i? O
j ? I 0
t z
I ? I I"_ _-
h
N/F?LfLTONC,
D.B. ?{5, PG. Sl2h!/ /OGa d o.N .`??? •w vGHr,* ETT POLE
I I ?
o rw.,roRV h
'2 DwC ?NG
X15.6'
? I I N/F,/•4hlES G. h1.4NN
,, ; DB. 786, PG. 39B
I ?- I
WIRE FENCE
I ' NOR"j ria. l
--LEGENQ _? /