HomeMy WebLinkAbout20020350 Ver 1_COMPLETE FILE_20020307ooY r9QG
June 24, 2002
Lincoln County
DWQ Project #: 02-0350
Approval Of 401 Quality Certification with
Additional Conditions and Catawba River Buffer Rules
John W. Marrow
4701 Sierra View Drive
Denver NC 28037
Dear Mr. Marrow:
You have our approval, in accordance with the attached conditions, to impact 100 feet of shoreline
on Lake Norman for the purpose of shoreline stabilization at Sailview subdivision, Phase II, Lot # 87 as
you described in your application dated March 7, 2002. After reviewing your application, we have
decided that this fill is covered by General Water Quality Certification Number 3373, which may be
viewed on our website at http://h2o.enr.state.nc.us/ncwetlands. This certification allows you to use
General Permit Number 198200030 when the Corps of Engineers issues it. This approval is also valid
for the Catawba River buffer rules (15A NCAC 2B .0243). In addition, you should get any other
federal, state or local permits before you go ahead with your project including (but not limited to)
Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Watershed
regulations. This approval will expire when the accompanying 404 or CAMA permit expires
unless otherwise specified in the General Certification.
This approval is only valid for the purpose and design that you described in your application
except as modified below. If you change your project, you must notify us and you may be required to
send us a new application. If the property is sold, the new owner must be given a copy of this
Certification and approval letter and is thereby responsible for complying with all conditions. If total
wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be
required as described in 15A NCAC 2H.0506 (h) (6) and (7). This approval shall expire when the
corresponding Nationwide Permit expires or as otherwise provided in the General Certification. For this
approval to be valid, you must follow the conditions listed in the attached certification and any
additional conditions listed below.
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E., Director
Division of Water Quality
1. Stormwater shall be directed to flow at non-erosive velocities across the entire protected stream
buffers;
2. No trees shall be removed from Zone 1 of the Catawba Buffer unless they are directly within
the construction access corridor. If trees are removed, at least two species of native forested
vegetation shall be re-established within the construction access or other temporary impact area
occurring in the protected buffer zone within the next growing season following construction
of the project;
3. This project is for the installation of rip rap to prevent further erosion of the property due to
wave action. The use of mechanical equipment on the beach must be minimized;
t?f:UEP ;,
N. C. Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
(919) 733-1786 (phone), 919-733-6893 (fax), (hftp://h2o.enr.state.nc.us/ncwetlands
4. Equipment and materials may be offloaded to the beach at the bulkhead site, but steps must be
taken to keep all equipment out of the reservoir;
5. Any disturbance within 50 feet of the shoreline must be done in compliance with the Catawba
River buffer rules;
6. Upon completion of the project, the applicant shall complete and return the enclosed
"Certification of Completion Form" to notify DWQ that all the work included in the 401
Certification has been completed. The responsible party shall complete the attached form and
return it to the 401/Wetlands Unit of the Division of Water Quality.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send
a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the
Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and
its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act. If you have any questions, please telephone John Dorney at 919-733-1786 or Mike Parker at
our Mooresville. Regional Office at 704-663-1699.
Sincerely,
0 q,
E , D rector
Attachments
cc: Corps of Engineers Asheville Field Office
Mooresville DWQ Regional Office
File copy
Central Files
Anne Duncan, Lake Management, Post Office Box 1006, Charlotte, NC 28201-1006
DUKE POWER LAKE MANAGEMENT, EC12-Q
t ?` } P O BOX 1006
Gef
CHARLOTTE, NC 28201-1006 10,? f}
if,
704-382-1567 or TOLL FREE 1-800-443-5193
APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH ? OLINA
Please type or print and fill in all blanks. If information is not applicable, so indicate by placing NIA in blank. PLEASE
SUBMIT APPLICATION AND APPROPRIATE DUKE POWER FILING FEE, PAYABLE TO DUKE POWER,
TO ABOVE ADDRESS.
L Applicant Information
G> r/o ca
A. Name J o 11n
_7 b J--- t i iw ?/ t ?,J i7+r
B. Mailing Address
C. Telephone. yjo `f - "I -. c Z i -
IL Location of Proposed Project
A. Lake N o o mf. n -
B. Street Address `} o l S` t riv v c ??
C. County t i n c . .? __
D. City, town, community or landmark e" V t /
E. Section Pew- X' Lot # _ Subdivision G ; V+ cw
1241, &,%v( Fa l (, L. )
F. Directions propertyyI toad ' i+ i L f
?!] D.lt?? fw! C.l''Itt(f cJr "? ? eL+°i/ .?(?? f weCr, i Ud/J frC
G. Latitude and longitude for the project site showing the
H. Please submit a reap showing the coordinates or a detailed map (USGS quad snap, city ,p> etc.) $
exact location of the project site. (NOTE: Latitude/ longitude coordinates can be found on internet site,
www.mansonus.com. Directions: Don>t register, click "Maps", enter address, draw map, select "Map
Clicking Will...", select "Lat/Long", click map)
III. Description of Project
A. Length of wall /® () 0a
B. Material _ _-
C. Distance from property line/shOmline
IV. Intended Use of Project Area
A. Private -? 01 B. Cognature Date
?J
V. Applicant ant Signature • A COPY OF THE COMPLETED APPLICATION WITH A ROAD MAP SHOWING LOCATION OF THE PROPERTY
MUST BE SUBMITTED TO: US ARMY CORPS OF ENGINEERS, 151 PATTON A VF- - ROOM 208,
ASHEVILL9, ,'VC 28801-5006
A COPY OF THE "DUKE POWER APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH
CAROLINA" AND SEVEN (7) COPIES OF THE COMPLETED "NC DIVISION OF WATER QUALITY PRE-
CONSTRUCTION NOTIFICATION APPLICATION" MUST BE SUBMITTED WITH THE DIVISION OF WATER
QUALITY APPLICATION FEE TO:
NC DIVISION OF WATER QUALITY
ATTENTION. JOHN DORNEY
PARKVIEW BLDG., 2321 CRABTREE BLVD.
RALEIGH, NC 27604
919-733-1786
12107/01 ssb
?c: o?p j r.
t, ,Z oaf
The following is an abbreviated application form for those applying for a 401 Water
Quality Certification to impact FERC (Federal Energy Regulatory Commission)
regulated lake shore or bottom under the U.S. Army Corps of Engineers Permit
GP30. This Application cannot be used for wetland or stream impacts. Please
provide seven (7) copies of this application and supporting information as well as a
non-refundable application fee to the Division of Water Quality of $200.00 for
impacts of to lake bottom of less than l acre and $475.00 for impacts to lake bottom
of greater or equal to 1 acre.
Applications should be sent to:
Division of Water Quality Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
1. Applicant Information
Owner/Applicant Information
(? -
Name:- C) rl
Mailing Address., 7 ! l" -& r'v i? L t''l Q r
Telephone Number: ?O 8CI !Z Fax Number:
E-mail Address: -
2. Agent Information (A signed and dated copy of the Agent Authorization letter
must be attachedlif the Agent)kas signatory authority for the owner/applicant.)
Company Affiliat
Mailing Address:
Telephone Number: '70 M3 S? 5 ?a `7 Fax Number: r
E-mail Address: -
11. Project Information
Attach a vicinity map clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads. Also provide a detailed site
plan showing property boundaries and development plans in relation to
surrounding properties. You may use the diagram below to make a hand sketch of
the example below for guidance. Both the vicinity map and
your project. Also, see of all buildings,
site plan must include a scale and north arrow. The footprints surfaces, or other facilities must be included.
Location Nearest Town:_ fir (J J V
county: Subdivision name or site address (include phase/lot number):
Directions to site please include road numbers, landmarks, etc. (This is not
necessary if ate adequate vicinity map is included):
2. Describe the existing land use or condition of the site at the time of this
application: i-.., S` q"A 1 4V-) rj } e 'C c- n( ti r t-' i' L'
?" 1
_ t _V___
3. Property size (acres): 4, S
-
4. Nearest body of water (stream/river/sound/ocean/lake): lrx k-N_ _ 1" ( ; , Lf
Describe
purpose of the proposed work: (V C14CC 6? R f nf:11 c7?'1 ?- An
6. List the type of equipment to be used to construct the project:???rYl C
.1 -AfN ?-t-,P. 1O 1G d_,., Y,1O,01 k"",.-.,1..•,G
7. Amount of impact (including all excavation, backfill, rip rap, retaining walls,
etc.) below the normal pool lake level in square feet or acres: J
? o Q - -_
8. a. Amount of impact (including all clearing, back fill, excavation, rip rap,
retaining walls, etc.) above the normal pool lake level and 50 feet land-ward in
square feet or acres: b?_f 34 t
b. Please describe vegetation above the normal pool lake level and 50 feet nd-
waro to be impacted (number of trees for instance): -3 4-re-c° rYtnc?
Applicant/ gent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
vL_
Please approximately sketch the fo0owing information on this plan
(please provide dimensions for each item, such as 10 ft. x 100 ft):
1) AN proposed vegetation clearing (provide dimensions).
A Location of rip rep or rdl to be placed above the Full Pond elevation
3) Location of rip rap or fill to be placed below the Fu0 Pond elevation
4) The location of any proposed sbuctures such as buildings, retaining
walls, docks, etc.
3) The location of any excavation or dredging below the Full Pond
elevation.
B) Location of construction access corridors.
\O?pF W AT?9QG Michael F. Easley, Governor
William G. Ross Jr., Secretary
y North Carolina Department of Environment and Natural Resources
Q Y Gregory J. Thorpe, Ph.D.
Acting Director
Division of Water Quality
April 1, 2002
DWQ # 02-0350
Lincoln County
CERTIFIED MAIL - RETURN RECEIPT REQUESTED
John W. Marrow
4701 Sierra View drive
Denver, NC 28037
Dear Mr. Marrow:
On March 7, 2002the Division of Water Quality (DWQ) was notified by receipt of you applications regarding you
plans to impact 100 feet of shoreline on Lake Norman on Sierra View Drive for the purpose of stabilizing the shoreline of
your lot in Lincoln County. Approval from DWQ is required to impact these waters. Please provide seven copies of the
following information and refer to the DWQ number listed above in your reply.
1. The location of the proposed shoreline stabilization measures must be shown on map.
2. Also the Catawba River buffer rules become effective on June 30, 2001 and allow shoreline stabilization
measures within the protected buffers along Lake Norman. We are concerned that construction of these shoreline
stabilization measures will result in excessive impact to the protected buffers. Please provide details on how you
plan to install these shoreline stabilization measures, what measures you will take to minimize impact to the
buffers and then how and when you plan to replant the unavoidably impacted portions of these buffers.
3. Please provide a copy of written authorization from you to your agent (Mr. Case) which authorizes him to seek
this approval on your behalf.
Please telephone Bob Zarzecki (919) 733-9726 or me at 919-733-9646 if you have any questions or would require copies
of our rules or procedural materials. This project will remain on hold as incomplete in accordance with 15A NCAC 2H
.0505(c). The processing time for this application will begin when this information is received. If we do not hear from you
by writing within three (3) weeks eve will assume you no longer want to pursue the project and will consider it withdrawn.
Sincerely,
raterQuality if tion Program
cc: Mooresville DWQ Regional Office
Asheville Corps of Engineers
Ann Duncan, Lake Management
Central Files v
File Copy
Asp
NCt7E" l
North Carolina Division of Water Quality, Wetlands/401 Certification Unit
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
Ph: (919) 733-1786, Fax: (919) 733-6893, http://h2o.enr.state.nc.us/ncwetlands/
0 0O-#6a-a?50
FILE Ip,
4?? aK? ?- r?? L 2do?-
T..ftic ??r ? i?
t;
?
...., a.,?m.e ............... ....................................... ............................ ........... ......... ............................ ............. ............... ................... ................................
J 7
June 15, 2002 i5 ?_.
it!
SUN ; f
t 92%L'r
Fir a?oll?
Mr. Dorney : !TY SECtlOA!
We at Green Tree have been commissioned to install at rip rap seawall for one Mr. John Marrow.
The wall will be on an existing home sight, located at 4701 Sierra View Denver, NC 28037.
The wall will be 100ft by about 5ft give or take a few inches. The project will require us to use a skid steer
, however due to the property already being clear during construction of the home we will not need to
impact the land in such a way as of cutting down trees. The area we will be working in is what we call a
natural area , meaning the home owner has used mulch instead of grass here. the impact of our
construction to this area will probably be at least 10 ft wide by the length of the wall (100ft). The area has
2 bare root trees and the owner has asked us to bring fill dirt to put on the roots to try and save the trees.
We will be planting an Oak tree. The wall will require 15 tons of rip rap that we will place along the bank
with the skid steer and by hand also. Once the wall is finished we will then level up and dirt we might
have disturbed and remulch the natural area.
We hope to have all the work finished no -later than Dec 31, 02.
Sincerely,
Clyde W. Case
4701 Sierra View Dr.
Denver, NC 28037
4/8/02
To: Walter Case
Greentree Landscaping
Effective immediately, you are authorized to act on my behalf in seeking approval from
the North Carolina Department of Environment and Natural Resources for shoreline stabilization
of my lot on Lake Norman.
Sincerely,
)John Marrow
i
V'
C>>
\ t,
C?
o
X
^br
S?
r
V
Co
C-p
et? 5-
0
D
g
O-t,? t--r
or (U-0
0
'AT T? C-a? 6?-c-e 61V, .
??