r November 19, 1984
Honorable Edward S. Dixon
Mayor
Town of Morehead City
P. 0. Drawer M
Morehead City, North Carolina 28557
SUBJECT: Permit No. NCO026611
Authorization to Construct
Town of Morehead City
Wastewater Treatment Facilities
Improvements
EPA Project No. C370567-01
Dear Mayor Dixon:
The final plans and specifications for the subject project have been
reviewed and found to be satisfactory. Authorization is hereby granted for
the construction of: renovations and improvements to the existing wastewater
treatment plant and influent pump station to consist of repairs to the existing
wet well, replacing the two existing pumps with two (2) new variable speed
pumps at 2,360 gpm each, replacing the existing "cyclone" type grit removal
unit, addition of a mechanical bar screen and a manual bar screen, addition
of standby power generator, and renovations -and improvements at the existing
1.7 MGD WWTP to consist of renovations to the existing primary clarifier,
trickling filter, and secondary clarifier, addition of aerated grit removal.
and grit washer unit, influent flow measurement and recording device, additional
secondary clarifier, additional chlorine contact tank, new chlorine and chemical
feed building and equipment, new pump station with three (3) new trickling
filter recirculation pumps at 1,800 gpm each, two (2) new secondary sludge
pumps at 350 gpm each, relocation of existing primary sludge pump to the
new recirculation/secondary sludge pump station building for temporary use
during construction and subsequently as a standby primary pump, conversion of
the anaerobic digester to an aerobic digester, replacing the existing primary
sludge pumps with two (2) new pumps at 152 gpm each, addition of post aeration,
addition of standby power generator, and expansion of existing laboratory
facilities.
The Grantee must contact the NCDEM Wilmington Regional Office, as soon
as possible, for the purpose of updating the project schedule noted in the
NPDES permit Special Order by Consent.
Before commencing any construction or operations involving temporary
bypassing of raw sewage to surface waters or temporary bypassing of treatment
units which results in less than secondary treatment, the Grantee must notify
the NCDEM Wilmington Regional Office for conditions and approval.
P 0.Box 27687 Raleigh,N.C.27611-7687
An Equal Opportunity Affirmative Action Employer
Honorable Edward S. Dixon
Page Two
November 19, 1984
Do not proceed with construction until the Authorization-to-Award
package, EEO, and MBE documentation/certification has been reviewed, and
you are in receipt of our approval if Federal Funding is desired for
project construction.
The Permittee shall employ an actively State certified wastewater
treatment plant operator to be in responsible charge of the wastewater
treatment facilities. Such operator must hold a valid State certificate of
the grade at least equivalent to the classification assigned to the wastewater
treatment facilities by the Certification Commission. When a new chief
operator must be obtained to be in responsible charge of the new facilities,
it is required that this be done by the time the construction of the facili-
ties is 50% completed.
This Authorization-to-Construct is issued in accordance with Part III,
Paragraph C of NPDES Permit No. P:00026611 issued August 23, 1982, and shall
be subject to revocation unless the wastewater treatment facilities are con-
structed in accordance with the approved plans, specifications, supporting
documents, and are in compliance with the conditions and limitations speci-
fied in Permit No. NC0026611.
During the construction of the proposed additions/modifications,
the Permittee shall continue to properly maintain and operate the
existing wastewater treatment facilities at all times, and in such
manner, as necessary to comply with the effluent limits specified in the
NPDES Permit.
You are reminded that it is mandatory for project to be constructed in
accordance with the North Carolina Sedimentation Pollution Control Act; and .
when applicable, the North Carolina Dam Safety Act. In addition, the
specifications must clearly state what the contractors responsibilities
shall be in complying with these acts.
The selling or free distribution of wet, dried, composted sludge or
sludge like materials from wastewater facilities without prior review and
approval by this Division is illegal.
One (1) set of final approved plans and specifications is to be
forwarded to you, one (1) set to the Environmental Protection Agency (EPA),
and two (2) sets to the Corps of Engineers.
If you have any questions or need additional information, please contact
Mr. Bill Hoffman, telephone number 919/733-6900.
Sincerely,
LH:tm Robert F. Helms
Director
cc: See Attached