HomeMy WebLinkAboutSW3190601_Form_(Supp.EZ)_20200311SUPPLEMENT=EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Marvin Gardens 2 Project Area ac 38,6986 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H 1003(4) 7 Width of vegetated setbacks provided feet 8 Will the vegetated setback remain vegetated? LLw50 Yes 9 Is BUA other that as listed in .1003 4 c-d out of the setback? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: FORMS LOADED InfiltrationS stem 0 Bioretention Cell 0 F14 Wet Pond 2Stormwater Wetland 0 Permeable Pavement 0 16 1Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 DESIGNER CERTIFICATION 27 Name and Title: Chris Bostic, PE -Pro ect Mana er 28 Organization: _ Kimle -Horn and Associates, Inc 29 Street address: 421 Fayetteville Street, Suite 600 30 City,State, Zip: Raleigh, NC 27601 31 Phone numbers : 919-653-2927 32 Email: chris.bostic@kimley-horn.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Signatur f Designer 3 ' 10-2GZ0 Date DRAINAGE AREAS 1 Ils this a high density project? Yes so, number of drainage areas/SCMs 2 ftIf all/part of this project subject to previous rule rsions? No FORMS LOADED DRAINAGE AREA INFOR Entire Site 1 2 4 Type of SCM Wet Pond Wet Pond 5 Total BUA in project (sq ft 665161 sf 152460 sf 422096 sf 6permitting) New BUA on subdivided lots (subject to s ft sf sf sf 7 New BUA outside of subdivided lots (subject to permitting) (sf) 665161 sf 152460 sf 422096 sf 8 Offsite - total area (sq ft) sf sf sf 9 Offsite BUA (sq ft) sf sf sf 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft 166776 sf sf 166776 sf Sidewalk (sq ft 51158 sf sf 35912 sf Roof (sq ft 67108 sf sf 67108 sf Roadway s ft 200359 sf sf 125000 sf Future (sq ft 179760 sf 152460 sf 27300 sf Other, please specify in the comment box below (sq ft) sf sf sf 11 New infiltrating permeable pavement on subdivided lots (sq ft sf sf sf 12 New infiltrating permeable pavement outside of subdivided lots (sq ft) sf sf sf 13permitting) Exisitng BUA that will remain (not subject to s ft sf sf sf 14 Existina BUA that is already permitted (sq ft sf sf sf 15 Existing BUA that will be removed (sq ft 90605 sf sf sf 16 Percent BUA 39% 61 % 77% 17 Design storm inches 1 in 1 in 1 in 18 Design volume of SCM cu ft 12473 cf 33933 cf 19 Calculation method for design volume SA/DA SA/DA ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): WET POND F-11Drainaae area number MDC FROM 02H .1050 31 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? Yes No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes IWET POND MDC FROM 02H .1053 18 Method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 641.00 639.00 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 642.00 640.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 647.00 644.00 23 Elevation of the permanent pool (fmsl) 648.00 645.00 24 Elevation of the top of the vegetated shelf (fmsl) 648.00 645.00 25 Elevation of the temporary pool (fmsl) 649.03 646.44 26 Surface area of the main permanent pool (square feet) 9999:1 18436:1 27 Volume of the main permanent pool (cubic feet) 26793 cf 60998 cf 28 Average depth of the main pool (feet) 3.72 ft 3.42 ft 29 Average depth equation used Equation 3 Equation 3 30 If using equation 3, main pool perimeter (feet) 550.0 ft 619.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 6.0 ft 6.0 ft 32 Volume of the forebay (cubic feet) 4726 cf 11152 cf 33 Is this 15-20% of the volume in the main pool? Yes Yes 34 Clean -out depth for forebay (inches) 60 in 48 in 35 Design volume of SCM (cu ft) 12473 cf 33933 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter (inches) 2.0 in 3.0 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2.05 2.17 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes 42 Are berms or baffles provided to improve the flow path? No No 43 Depth of forebay at entrance (inches) 72 in 60 in 44 Depth of forebay at exit (inches) 66 in 54 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 531 Species of turf that will be used on the dam and embankment Bermuda Bermuda b4l Has a planting plan been provided or the vegetate shelf? es es ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): For Wet Pond 1, the emergency drain elevation is set based on the downstream pipe outfall elevation. If conditions warranted, the remaining depth would be pumped out. Wet Pond 3 4:41 PM 3/10/2020