HomeMy WebLinkAbout20161271 Ver 3_Site Meeting 2262020_20200313Strickland, Bev
From:
tcousins@palustrinegroup.com
Sent:
Friday, March 13, 2020 5:12 PM
To:
Tugwell, Todd J CIV USARMY CESAW (US)
Cc:
Kim Browning; Haupt, Mac; Davis, Erin B; Wilson, Travis W.; 'Dailey, Samantha J CIV
USARMY CESAW (USA)'; Bowers, Todd; kathryn_matthews@fws.gov; Wells, Emily N
Subject:
[External] RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift
Creek Mitigation Site - Initial Evaluation Letter
Attachments:
Swift Creek Mit Bank Site Meeting 2.26.20.docx
Follow Up Flag: Flag for follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<mailto:report.spam@nc.gov>
Todd, attached are the notes from our site visit a few weeks ago. Please let us know if y'all have any comments or
revisions. Thanks again for coming out to see the site.
Have a good weekend!
Tommy
Tommy Cousins, PWS
9 Avondale Ave
Charleston, SC 29407
Cell: (919) 522-9253
Phone: (843) 408-8733
tcousins@palustrinegroup.com
https://urldefense.com/v3/_http://www.palustrinegroup.com_;! ! HYmSToo! IinNsT21TH9WDCa6g738BoEiImIP6-
MLnyBD380jEg9wcORr6M-d_W pzGsjeLmZ7ggo$
Economic Sense. Ecological Success.
-----Original Message -----
From: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>
Sent: Wednesday, February 19, 2020 1:21 PM
To: tcousins@palustrinegroup.com
Cc: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Mac Haupt
<mac.haupt@ncdenr.gov>; Erin Davis <erin.davis@ncdenr.gov>; Travis Wilson <travis.wilson@ncwildlife.org>; Dailey,
Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>; Todd Bowers <bowers.todd@epa.gov>;
Kathryn Matthews <Kathryn_Matthews@fws.gov>; Emily Wells <Emily_Wells@fws.gov>
Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation
Letter
Tommy, yes, we still plan to take a look at the Swift Creek site on the 26th at 10:30. Would that work for you? (Also,
I've copied the IRT in case they want to join us - I think several members have already been to the site.) Thanks, Todd
-----Original Message -----
From: tcousins@palustrinegroup.com [mailto:tcousins@palustrinegroup.com]
Sent: Monday, February 17, 2020 12:32 PM
To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>
Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation
Letter
Hey Todd, just confirming the 26th is still good for the Swift Creek meeting. Let me know what time you want to meet.
Thanks!
Tommy Cousins, PWS
9 Avondale Ave
Charleston, SC 29407
Cell: (919) 522-9253
Phone: (843) 408-8733
tcousins@palustrinegroup.com
Blocked https://u rldefense.com/v3/_http://www. pa lustri negrou p.com_; ! ! HYmSToo! I i n NsT21TH9W DCa6g738BoEi I m I P
6-M LnyBD380j Eg9wcORr6M-d_W pzGsjeLmZ7ggo$
Economic Sense. Ecological Success.
-----Original Message -----
From: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>
Sent: Friday, January 24, 2020 12:53 PM
To: tcousins@palustrinegroup.com
Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation
Letter
OK thanks. BTW, is this site still going to be split as PRM and bank, or just a bank now?
Todd
-----Original Message -----
From: tcousins@palustrinegroup.com [mailto:tcousins@palustrinegroup.com]
Sent: Thursday, January 23, 2020 11:57 AM
To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>
Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation
Letter
Todd, February 26th will work for a site visit. Thanks for setting this up.
Tommy
Tommy Cousins, PWS
9 Avondale Ave
Charleston, SC 29407
Cell: (919) 522-9253
Phone: (843) 408-8733
tcousins@palustrinegroup.com
BlockedBIockedhttps://urldefense.com/v3/_http://www.paIustrinegroup.com_;! !HYmSToo! IinNsT21TH9WDCa6g738B
oEi I m I P6-M LnyBD380j Eg9wcORr6 M-d_W pzGsjeLmZ7ggo$
Economic Sense. Ecological Success.
-----Original Message -----
From: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>
Sent: Tuesday, December 17, 2019 3:46 PM
To: Tommy Cousins <tcousins@palustrinegroup.com>
Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation
Letter
Thanks Tommy, you too.
Todd
-----Original Message -----
From: Tommy Cousins [mailto:tcousins@palustrinegroup.com]
Sent: Tuesday, December 17, 2019 2:16 PM
To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Dailey, Samantha J CIV USARMY
CESAW (USA) <Samantha.J.Dailey@usace.army.mil>
Cc: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; 'Haupt, Mac'
<mac.haupt@ncdenr.gov>;'Davis, Erin B'<erin.davis@ncdenr.gov>;'Wilson, Travis W.'
<travis.wilson@ncwildlife.org>; 'Bowers, Todd' <bowers.todd@epa.gov>; twyla.cheatwood@noaa.gov
Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation
Letter
Todd, no problem on postponing the site visit. We will continue to work on the banking instrument and final plans and
look forward to showing everyone around when we reschedule. If there is any feedback or concerns in the meantime
please let me know. Hope y'all have a good Christmas.
Tommy
Tommy Cousins, PWS
Please note our new address:
P.O. Box 31411
Charleston, SC 29417
Cell: (919) 522-9253
Phone: (843) 408-8733
tcousins@palustrinegroup.com
Blocked Blocked Blockedhttps://urldefense.com/v3/_http://www.paIustrinegroup.com_;! ! HYmSToo! IinNsT21TH9WDCa
6g738BoEi I m I P6-M LnyBD380j Eg9wcORr6M-d_W pzGsjeLmZ7ggo$
Economic Sense. Ecological Success.
-----Original Message -----
From: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>
Sent: Tuesday, December 17, 2019 9:02 AM
To: Tommy Cousins <tcousins@palustrinegroup.com>; Dailey, Samantha J CIV USARMY CESAW (USA)
<Samantha.J.Dailey@usace.army.mil>
Cc: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; 'Haupt, Mac'
<mac.haupt@ncdenr.gov>;'Davis, Erin B' <erin.davis@ncdenr.gov>;'Wilson, Travis W.'
<travis.wilson@ncwildlife.org>; 'Bowers, Todd' <bowers.todd@epa.gov>; twyla.cheatwood@noaa.gov
Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation
Letter
Tommy,
I believe we had plans to visit Swift Creek tomorrow, Dec. 18.
Unfortunately, we need to reschedule that because it looks like several of us won't be able to attend. It will have to be
in the new year at this point, but I don't think this should cause any delay in the bank since the visit was really an
opportunity for those of us who haven't been to the site to have a chance to see it. We have some open IRT field days
scheduled for the end of February, but if that is too far out, we may be able to find an earlier day. Let me know, and I
apologize for the late notice.
Thanks,
Todd
-----Original Message -----
From: Tommy Cousins [mailto:tcousins@palustrinegroup.com]
Sent: Wednesday, October 23, 2019 12:42 PM
To: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>
Cc: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Browning, Kimberly D CIV USARMY
CESAW (USA) <Kimberly. D. Browni ng@usace.army. mil>; 'Haupt, Mac' <mac. hau pt@ ncden r.gov>; 'Davis, Erin B'
<erin.davis@ncdenr.gov>; 'Wilson, Travis W.'
<travis.wilson@ncwildlife.org>; 'Bowers, Todd' <bowers.todd@epa.gov>; twyla.cheatwood@noaa.gov
Subject: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation
Letter
Thank you to all! We will get to work on the UMBI.
Tommy
Tommy Cousins, PWS
Please note our new address:
P.O. Box 31411
Charleston, SC 29417
Cell: (919) 522-9253
Phone: (843) 408-8733
tcousins@palustrinegroup.com
BlockedBlockedBlockedBlockedhttps://urldefense.com/v3/_http://www.paIustrinegroup.com_;! !HYmSToo! IinNsT21T
H9W DCa6g738BoEi I m I P6-M LnyBD380j Eg9wcORr6M-d_W pzGsjeLmZ7ggo$
Economic Sense. Ecological Success.
-----Original Message -----
From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>
Sent: Wednesday, October 23, 2019 10:54 AM
To: Tommy Cousins <tcousins@palustrinegroup.com>
Cc: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Browning, Kimberly D CIV USARMY
CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov>; Davis, Erin B
<erin.davis@ncdenr.gov>; Wilson, Travis W.
<travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov>; twyla.cheatwood@noaa.gov
Subject: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation Letter
Good morning Tommy,
Attached is the Initial Evaluation Letter for:
SAW-2019-00631 / Palustrine Group, LLC / PG Tar 01 UMBI, Swift Creek Mitigation Site / Edgecombe County
This electronic copy is an official Department of the Army Notification.
However, if you wish to receive a paper copy, one will be mailed upon request.
Please let me know if you have any questions or concerns.
Sincerely,
Samantha Dailey
Regulatory Project Manager
U.S. Army Corps of Engineers
Regulatory Division
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
(919) 554-4884, Ext. 22
Samantha.j.dailey@usace.army.mil
Swift Creek Mitigation Bank Site
On -site IRT Meeting
26 February 2020
Attendees:
Samantha Dailey — USACE Travis Wilson - NCWRC
Todd Tugwell - USACE Tommy Cousins — Palustrine Group
Mac Haupt — NCDEQ-DWR Allen Conger —Wood E&IS
Erin Davis — NCDEQ-DWR Will Rector —Wood E&IS
Maria Dunn - NCWRC Dicky Harmon —Wood E&IS
- The USACE expressed concerns with the potential overlap of the PRM Site and the
Bank Site.
- Mac Haupt believes all ditches including "toe ditches" should be filled or plugged in the
vicinity of Tributary E-2. The filling/plugging is necessary to help with hydrologic inputs
for stream development.
- IRT asked for wells to be installed and monitored (in wetlands to be restored)
- Todd Tugwell requested that watershed size and slope be provided in the MBI.
- Mac Haupt and Todd Tugwell - Mitigation Plan and Work Plan is to provide proposed
solutions for beaver and invasive plant control to occur up to seven years.
- IRT Team — okay to modify or adjust channel formation within the headwater restoration
areas up to year 3 of the monitoring period, after year 3 natural process of stream
channel or wetland development are to be allowed without manipulation.
- IRT Team - Mitigation Plan/Work Plan is to include:
o Details of ditch blocks and fill
o Details on hydrology monitoring
o Location of gauges, which should be scatted throughout the site
- IRT Team — Proposed preservation mitigation ratios for preservation areas will need to
be changed. The ration will be going down.
- IRT Team expressed concerns whether portions of the site could sustain headwater
streams within portions of the site and suggested that during MBI development further
analysis be conducted.
- IRT Team questioned the flow direction of Tributary E based off the soils data and
available LiDAR information. Palustrine stated that all design for stream restoration
reaches would be finalized during the development of the MBI.