Loading...
HomeMy WebLinkAbout20161271 Ver 3_Site Meeting 2262020_20200313Strickland, Bev From: tcousins@palustrinegroup.com Sent: Friday, March 13, 2020 5:12 PM To: Tugwell, Todd J CIV USARMY CESAW (US) Cc: Kim Browning; Haupt, Mac; Davis, Erin B; Wilson, Travis W.; 'Dailey, Samantha J CIV USARMY CESAW (USA)'; Bowers, Todd; kathryn_matthews@fws.gov; Wells, Emily N Subject: [External] RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation Letter Attachments: Swift Creek Mit Bank Site Meeting 2.26.20.docx Follow Up Flag: Flag for follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Todd, attached are the notes from our site visit a few weeks ago. Please let us know if y'all have any comments or revisions. Thanks again for coming out to see the site. Have a good weekend! Tommy Tommy Cousins, PWS 9 Avondale Ave Charleston, SC 29407 Cell: (919) 522-9253 Phone: (843) 408-8733 tcousins@palustrinegroup.com https://urldefense.com/v3/_http://www.palustrinegroup.com_;! ! HYmSToo! IinNsT21TH9WDCa6g738BoEiImIP6- MLnyBD380jEg9wcORr6M-d_W pzGsjeLmZ7ggo$ Economic Sense. Ecological Success. -----Original Message ----- From: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil> Sent: Wednesday, February 19, 2020 1:21 PM To: tcousins@palustrinegroup.com Cc: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Mac Haupt <mac.haupt@ncdenr.gov>; Erin Davis <erin.davis@ncdenr.gov>; Travis Wilson <travis.wilson@ncwildlife.org>; Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil>; Todd Bowers <bowers.todd@epa.gov>; Kathryn Matthews <Kathryn_Matthews@fws.gov>; Emily Wells <Emily_Wells@fws.gov> Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation Letter Tommy, yes, we still plan to take a look at the Swift Creek site on the 26th at 10:30. Would that work for you? (Also, I've copied the IRT in case they want to join us - I think several members have already been to the site.) Thanks, Todd -----Original Message ----- From: tcousins@palustrinegroup.com [mailto:tcousins@palustrinegroup.com] Sent: Monday, February 17, 2020 12:32 PM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil> Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation Letter Hey Todd, just confirming the 26th is still good for the Swift Creek meeting. Let me know what time you want to meet. Thanks! Tommy Cousins, PWS 9 Avondale Ave Charleston, SC 29407 Cell: (919) 522-9253 Phone: (843) 408-8733 tcousins@palustrinegroup.com Blocked https://u rldefense.com/v3/_http://www. pa lustri negrou p.com_; ! ! HYmSToo! I i n NsT21TH9W DCa6g738BoEi I m I P 6-M LnyBD380j Eg9wcORr6M-d_W pzGsjeLmZ7ggo$ Economic Sense. Ecological Success. -----Original Message ----- From: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil> Sent: Friday, January 24, 2020 12:53 PM To: tcousins@palustrinegroup.com Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation Letter OK thanks. BTW, is this site still going to be split as PRM and bank, or just a bank now? Todd -----Original Message ----- From: tcousins@palustrinegroup.com [mailto:tcousins@palustrinegroup.com] Sent: Thursday, January 23, 2020 11:57 AM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil> Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation Letter Todd, February 26th will work for a site visit. Thanks for setting this up. Tommy Tommy Cousins, PWS 9 Avondale Ave Charleston, SC 29407 Cell: (919) 522-9253 Phone: (843) 408-8733 tcousins@palustrinegroup.com BlockedBIockedhttps://urldefense.com/v3/_http://www.paIustrinegroup.com_;! !HYmSToo! IinNsT21TH9WDCa6g738B oEi I m I P6-M LnyBD380j Eg9wcORr6 M-d_W pzGsjeLmZ7ggo$ Economic Sense. Ecological Success. -----Original Message ----- From: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil> Sent: Tuesday, December 17, 2019 3:46 PM To: Tommy Cousins <tcousins@palustrinegroup.com> Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation Letter Thanks Tommy, you too. Todd -----Original Message ----- From: Tommy Cousins [mailto:tcousins@palustrinegroup.com] Sent: Tuesday, December 17, 2019 2:16 PM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Cc: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; 'Haupt, Mac' <mac.haupt@ncdenr.gov>;'Davis, Erin B'<erin.davis@ncdenr.gov>;'Wilson, Travis W.' <travis.wilson@ncwildlife.org>; 'Bowers, Todd' <bowers.todd@epa.gov>; twyla.cheatwood@noaa.gov Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation Letter Todd, no problem on postponing the site visit. We will continue to work on the banking instrument and final plans and look forward to showing everyone around when we reschedule. If there is any feedback or concerns in the meantime please let me know. Hope y'all have a good Christmas. Tommy Tommy Cousins, PWS Please note our new address: P.O. Box 31411 Charleston, SC 29417 Cell: (919) 522-9253 Phone: (843) 408-8733 tcousins@palustrinegroup.com Blocked Blocked Blockedhttps://urldefense.com/v3/_http://www.paIustrinegroup.com_;! ! HYmSToo! IinNsT21TH9WDCa 6g738BoEi I m I P6-M LnyBD380j Eg9wcORr6M-d_W pzGsjeLmZ7ggo$ Economic Sense. Ecological Success. -----Original Message ----- From: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil> Sent: Tuesday, December 17, 2019 9:02 AM To: Tommy Cousins <tcousins@palustrinegroup.com>; Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Cc: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; 'Haupt, Mac' <mac.haupt@ncdenr.gov>;'Davis, Erin B' <erin.davis@ncdenr.gov>;'Wilson, Travis W.' <travis.wilson@ncwildlife.org>; 'Bowers, Todd' <bowers.todd@epa.gov>; twyla.cheatwood@noaa.gov Subject: RE: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation Letter Tommy, I believe we had plans to visit Swift Creek tomorrow, Dec. 18. Unfortunately, we need to reschedule that because it looks like several of us won't be able to attend. It will have to be in the new year at this point, but I don't think this should cause any delay in the bank since the visit was really an opportunity for those of us who haven't been to the site to have a chance to see it. We have some open IRT field days scheduled for the end of February, but if that is too far out, we may be able to find an earlier day. Let me know, and I apologize for the late notice. Thanks, Todd -----Original Message ----- From: Tommy Cousins [mailto:tcousins@palustrinegroup.com] Sent: Wednesday, October 23, 2019 12:42 PM To: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Cc: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly. D. Browni ng@usace.army. mil>; 'Haupt, Mac' <mac. hau pt@ ncden r.gov>; 'Davis, Erin B' <erin.davis@ncdenr.gov>; 'Wilson, Travis W.' <travis.wilson@ncwildlife.org>; 'Bowers, Todd' <bowers.todd@epa.gov>; twyla.cheatwood@noaa.gov Subject: [Non-DoD Source] RE: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation Letter Thank you to all! We will get to work on the UMBI. Tommy Tommy Cousins, PWS Please note our new address: P.O. Box 31411 Charleston, SC 29417 Cell: (919) 522-9253 Phone: (843) 408-8733 tcousins@palustrinegroup.com BlockedBlockedBlockedBlockedhttps://urldefense.com/v3/_http://www.paIustrinegroup.com_;! !HYmSToo! IinNsT21T H9W DCa6g738BoEi I m I P6-M LnyBD380j Eg9wcORr6M-d_W pzGsjeLmZ7ggo$ Economic Sense. Ecological Success. -----Original Message ----- From: Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent: Wednesday, October 23, 2019 10:54 AM To: Tommy Cousins <tcousins@palustrinegroup.com> Cc: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov>; twyla.cheatwood@noaa.gov Subject: SAW-2019-00631 PG Tar 01 UMBI and Swift Creek Mitigation Site - Initial Evaluation Letter Good morning Tommy, Attached is the Initial Evaluation Letter for: SAW-2019-00631 / Palustrine Group, LLC / PG Tar 01 UMBI, Swift Creek Mitigation Site / Edgecombe County This electronic copy is an official Department of the Army Notification. However, if you wish to receive a paper copy, one will be mailed upon request. Please let me know if you have any questions or concerns. Sincerely, Samantha Dailey Regulatory Project Manager U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 22 Samantha.j.dailey@usace.army.mil Swift Creek Mitigation Bank Site On -site IRT Meeting 26 February 2020 Attendees: Samantha Dailey — USACE Travis Wilson - NCWRC Todd Tugwell - USACE Tommy Cousins — Palustrine Group Mac Haupt — NCDEQ-DWR Allen Conger —Wood E&IS Erin Davis — NCDEQ-DWR Will Rector —Wood E&IS Maria Dunn - NCWRC Dicky Harmon —Wood E&IS - The USACE expressed concerns with the potential overlap of the PRM Site and the Bank Site. - Mac Haupt believes all ditches including "toe ditches" should be filled or plugged in the vicinity of Tributary E-2. The filling/plugging is necessary to help with hydrologic inputs for stream development. - IRT asked for wells to be installed and monitored (in wetlands to be restored) - Todd Tugwell requested that watershed size and slope be provided in the MBI. - Mac Haupt and Todd Tugwell - Mitigation Plan and Work Plan is to provide proposed solutions for beaver and invasive plant control to occur up to seven years. - IRT Team — okay to modify or adjust channel formation within the headwater restoration areas up to year 3 of the monitoring period, after year 3 natural process of stream channel or wetland development are to be allowed without manipulation. - IRT Team - Mitigation Plan/Work Plan is to include: o Details of ditch blocks and fill o Details on hydrology monitoring o Location of gauges, which should be scatted throughout the site - IRT Team — Proposed preservation mitigation ratios for preservation areas will need to be changed. The ration will be going down. - IRT Team expressed concerns whether portions of the site could sustain headwater streams within portions of the site and suggested that during MBI development further analysis be conducted. - IRT Team questioned the flow direction of Tributary E based off the soils data and available LiDAR information. Palustrine stated that all design for stream restoration reaches would be finalized during the development of the MBI.