Loading...
HomeMy WebLinkAbout540032_30-Day POA updated_20200317PLAN OF ACTION FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD State University A&T State University NCCOOPERATIVE I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE EXTENSION Empowering People • Providing Solutions 1. Structure Name/Identifier (ID): 54-32 Date: 3/17/2020 2. Current liquid volume in 25 yr/24 hr. storm stroage & structural freeboard a. Current liquid level according to marker 20 inches b. Designed 25 yr/24 hr. storm & structural freeboard 25.5 inches c. Line b - line a (inches in red zone) F 5.5 inches d. Top of dike surface area according to design 79200 ft2 (area at below structural freeboard elevation) e. (Line c/12) x (line d) x (7.48 gallons/ft) 271524.0 gallons 3. Projected volume of waste liquid produced during draw down period f. Temporary storage period according to structural design 180 days g. Volume of waste produced according to design 388800 ft3 h. Actual waste produced current herd #/certified herd # x line g 389772 ft3 current herd: 3609 certified herdr 3600 i. Volume of wash water according to structural design 0 1 ft3 j. Excess rainfall over evaporation according to design 46200 ft3 k. (line h + line i +line j) x 7.48 x (30 days/line f) = 543511.76 gallons 4. Total PAN to be land applied during draw down period I. Current waste analysis dated 2.43 Ib/1000 gal MM/DD/YYYY 3/12/2020 m. (lines e + k)/1000 x (line 1) = 9980.5369 lb PAN REPEA T SECTION I FOR EA CH WASTE STR UCT URE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. TMNN0$-VWTAQ19 FACILITY THIRTY (30) DAY DRAW DOWN PERIOD 1. structure ID: line m= I 1980.5369 Ib PAN 2. structure ID: line m= ilb PAN 3. structure ID: line m= ilb PAN 4. structure ID: line m= ilb PAN 5. structure ID: line m= ilb PAN 6. structure ID: line m= ilb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 1980.5369 total lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. PAN balance t. total PAN u. application (lb/acre) column r x s window 2589 1 through 36 bermuda 1 1 1 7,200 1 oct-mar loct-mar 2589 2589 oct-mar 2589 oct-mar more fields are available- plenty of PAN State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. V. TOTAL PAN AVAILABLE FOR ALL FIELDS (SUM OF COLUMN T.) IV. FACILITY'S POA OVERALL PAN BALANCE W. TOTAL PAN TO BE LAND APPLIED (LINE n from section II) X. CROP'S REMAINING PAN BALANCE (LINE V FROM SECTION III) Y. OVERALL PAN BALANCE (W-X) 7200 1980.5369 7200 F--5219.4631 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PERSON COMPLETING THIS DOCUMENT: EVE H. HONEYCUTT NC COOPERATIVE EXTENSION LENOIR AND GREENE COUNTIES Date Completed: 3/17/2020