Loading...
HomeMy WebLinkAboutNc0004774_Inspection_20200320United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 u 3 I NC0004774 I11 121 20/03/03 I17 18I � I 19 I s I 201 21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 I 72 I ni I 71 I 74 79 I I I I I I I80 701� I 711 L LJ L -1 I I Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES Dermit Number) 09:57AM 20/03/03 20/01/01 Buck Steam Station 1555 Dukeville Rd Exit Time/Date Permit Expiration Date Salisbury NC 28146 12:59PM 20/03/03 23/10/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Dale Wooten/ORC/704-630-3086/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Bristol Grohol, /Engineer 1/980-373-2693/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenar 0 Records/Reports Facility Site Review 0 Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date DocuSigned by: Roberto Scheller ESte.,.. DWR/MRO WQ/252-946-6481/ 3/16/2020 91C2A007838943E.- Signature of Management Q A Reviewer Agency/Office/Phone and Fax Nu erpps°ocuSigned by: Date � H P'*'" for WCB 3.20.2020 W. Corey Basinger DWR/Division of Water Quality/704-235-21 4/ F161F669A2D84A3... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NC0004774 I11 12I 20/03/03 117 18 i s i Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Page# Permit: NC0004774 Owner -Facility: Buck Steam Station Inspection Date: 03/03/2020 Inspection Type: Compliance Sampling Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ ❑ application? Is the facility as described in the permit? 0 ❑ ❑ ❑ # Are there any special conditions for the permit? 0 ❑ ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The current permit became effective November 1, 2018 and expires on October 31, 2023. At time of inspection is was noted that Outfall #006 is not constructed, Outfall #002A has been removed, Outfall #002 not discharging, outfall pipe moved to discharge out Outfall # 007. Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operatc on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification' Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Comment: Annual Report received by the Division dated January 21, 2020 for the year 2019. Reviewec labatory analysis, Chain of Custody, ORC log, eDMR's. Records and reports were readily available for review. Page# 3 Permit: NC0004774 Inspection Date: 03/03/2020 Owner -Facility: Buck Steam Station Inspection Type: Compliance Sampling Laboratory Are field parameters performed by certified personnel or laboratory? Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ Comment: Chronic Toxicity samples were collected at time of inspection on March 3rd and 5th, 2020. Samples were ran as Pass/Fail (@ 0.1 %. Samples collected were reported as Pass. Flow Measurement - Effluent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Comment: Operations & Maintenance Is the plant generally clean with acceptable housekeeping? Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ■ ❑ Yes No NA NE ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ Comment: At time of inspection Chronic Toxicity samples were collected from Outfall #007. At time of sampling effluent was clear with no visible suspended solids. No foam was being generated at point of discharge into Yadkin River (High Rock Lake) Chronic Toxicity analysis were reported as passed and copy of labatory analysis forward to facility. Page# 4