Loading...
HomeMy WebLinkAbout20180612 Ver 2_Stormwater Site Plans_20200317DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): WCU-Norton Athletic Fields 2. Location of Project (street address): 490 & 554 CENTRAL DRIVE City:CULLOWHEE CountyJACKSON Zip:28723 3. Directions to project (from nearest major intersection): 4. Latitude:35° 18' 52.776" N Longitude:83° 11' 12.156" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWU-102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ®Low Density ❑High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control: 9.74 ac of Disturbed Area ❑NPDES Industrial Stormwater Z404/401 Permit: Proposed Impacts IMPACTS TO WETLANDS b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? [:]No ®Yes If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/lr/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:WESTE RN CAROLINA UNIVERSITY Signing Official & Title:JOE WALKER, ASSOCIATE VC -FACILITIES MANAGEMENT b. Contact information for person listed in item 1a above: Street Address:3476 OLD CULLOWHEE ROAD City:CULLOWHEE State:NORTH CAROLINA Zip:28723 Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: Email: Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): State: Zip: City: State: Zip: Phone: ( ) Fax: Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/ Organization: CURTIS MONTEITH, PROJECT MANAGER Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: Email: 4. Local jurisdiction for building permits: NCSCO Fax: Point of Contact: Phone #: Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. STORMWATER WILL BE CAPTURED VIA STORM DRAINAGE PIPES, TREATED THROUGH A BIO- RETENTION CELL, AND DISCHARGED INTO CULLOWHEE CREEK. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the LITTLE TENESSEE River basin. 4. Total Property Area: 9.74 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: 0.5 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:9.24 acres + Total project area shall be calculated to exclude the following: the normal pool of im ounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (Nm line or Mean High Water (MHK9 line, and coastal wetlands landward from the NHW (or MHM line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHM line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 5.82 % 9. How many drainage areas does the project have? 1 (For high density, count 1 for each proposed engineered Stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ Receiving Stream Name CULLOWHEE CREEK Stream Class * C;Tr Stream Index Number * 2-79-31 Total Drainage Area (sf) 2,048,692 On -site Drainage Area (sf) 424,213 Off -site Drainage Area (sf) 1,624,479 Proposed Impervious Area** sf 23,414 % Impervious Area** total 1.14% Impervious** Surface Area Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area _ On -site Buildings/Lots (sf) - On -site Streets (so - On -site Parking (so 18,245 On -site Sidewalks (so 4,607 Other on -site (so 562 Future (sf) - Off -site (so 374,737 Existing BUA*** (sf) 1,974 Total (so: 398,151 * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wcl[ps/csu/classifications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. USING AUTOCAD Proiects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that maybe subject to more stringent stormwater requirements as per 15A NCAC 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http:/ /portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. GH 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants NIA Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 MO GH GH GH GH GH p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify GH elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 427 Page No: 399 GH 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC N/A Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/Ir/state- stormwater-forms docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Gregory Hoffman, P.E. Consulting Firm: Civil Design Concepts, PA Mailing Address:168 Patton Ave City:Asheville State:NC Phone: (828 ) 252-5388 Fax: Email: ghoffman@cdcgo.com Zip:28801 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: a Notary Public for the State of do hereby certify that Date: County of personally appeared before me this _ day of _ , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person Iisted in Contact Information, item 1a) JOE WALKER, ASSOCIATE VC -FACILITIES MANAGEMENT certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorde , and that the proposed project complies with the requirements of the applicable stormwater r er 15 CAC 2H .1000 and any other applicable state stormwater requirements. Signature:.. Date: 3 3 Qd 2� <ti a Notary Public for the State of Nor'* Cayo I LAB. . County of v TaC.kSun do hereby certify that 'TOE ei'_ personally appeared before me this 3 day of I n-dr CId c269 0 , and ac wled eteIectt on of the application for a stormwater permit. Witness my hand and official seal, III n rnrrry,�s U DER 0 OJARy s Pg\-�G U2V ''9,""90N '"")'Ail el IU�f1��� SEAL My commission expires Mardi q-% cab 9 1 Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 Page 1 of 2 Book:427 Page: 1 Seq:402 Page 2 of 2 TRACT TWO: BEGINNING at a stake on the south bank of road and running thence N 89 W 9 poles to a stake in the center of said road; thence N 46-15 W 32 poles to a stake in the center of a branch; thence up and with said branch as follows: N 65 1/2 W 2.8 poles to a stake; N 63-45 W 13.6 poles to a stake; N 79 1/2 W 4 poles to a stake; S 79 W 4.6 poles to a stake; and N 55-15 W 11 1/2 poles to an alder on the N. E. bank of said branch; at the forks of•said branch; thence up and with the right hand prong ,of said branch as follows. N 14-15 W 1.5.8 poles to a black. walnut; N 11 1/2 W 23 poles to a poplar; thence N 25-45 W 11.3 poles to a black oak (said black oak is N 60 W 1.4 poles from a spring); thence N 30 E 4.6 poles to a stake, formerly a large hickory corner in the N. boundary line; thence with said boundary line as follows: S 46--9 E 40 poles to a stake; S 84-9 E 10 poles to a black oak; and 5 66-9 E 12 poles to a stake, formerly a red oak, corner in said boundary line; thence. S 35-45 E 60 1/2 poles to the BEGINNING, containing 12.7 acres, more or less. TO HAVE AND TO HOLD the aforesaid tracts of parcels of land and all privileges and appurtenances thereunto belonging to the State of North Carolina, its successors and assigns, forever. AND the said party of: the first part covenants with the party of the second part, its successors and assigns, that she is seized of said premises in fee and has the right to convey the same in fee simple; that said premises are free from any encumbrances; and that she will forever warrant and defend title to the same against the claims of all persons whomsoever. i IN TESTIMONY WHEREOF, the said party of the first part has hereunto set her hand and seal the day and year first above,writte-n. L �j (SEAL) V r� .- Davie C . Sutton (widow) f-' PD.I073® STATE OF NORTH CAROL INA COUNTY OF :TAfaN ad I, a Notary Public in and for said County and State do hereby certify that DAVIE C. SUTTON (widow) personally came before me this day and acknowledged the due execution of the foregoing instrument for the purposes therein expressed, rr`` WITNESS my hand and Notarial Seal, this the day of M MCA , 1975. My Comm. expires: 2- NORTH CAROLINA JACKSON COUNTY Notary Public HARRIET A. R013ER 'SON NOTARY PUBLIC GUILFORD COUNTY, N. C. The foregoing certificate of i, a Notary Public is certified to be correct. This instrument was filed for registration and recorded in this office in Brook at Page 7 This the day cif ,1975 at �c M. REGTS ER" f'1F DEEDS Book:427 Page: 1 Seq:403 DEVELOPMENT DATA OWNER/DEVELOPER: CONTACT: CIVIL ENGINEER IIdelry1_ToI WESTERN CAROLINA UNIVERSITY 3476 OLD CULLOWHEE ROAD CULLOWHEE, NC 28723 CURTIS MONTEITH (828) 227-7442 CIVIL DESIGN CONCEPTS, P.A. 168 PATTON AVENUE ASHEVILLE, NC 28801 GREGORY HOFFMAN, P.E. (828) 252-5388 i2 - p Kolim ATHLETIC FIELDS JACKSON COUNTY, NORTH CAROLINA PREPARED FOR: WESTERN CAROLINA UNIVERSITY z 0 Q m cn c� z m L'I a_ m W Q 0 cn 3476 OLD CULLOWHEE ROAD 0 CULLOWHEE, NC 28723 CURTIS MONTEITH (828) 227-7442 INDEX OF SHEETS Sheet No. Title C000 COVER -- SURVEY C101 EXISTING CONDITIONS & DEMOLITION PLAN C201 SITE PLAN C401 FINE GRADING & STORM DRAINAGE PLAN C402 STORM DRAINAGE PROFILES C403 STORM DRAINAGE PROFILES C921 SITE DETAILS C941 STORM DRAINAGE DETAILS C942 BIORETENTION CELL DETAILS N SUBJECT PROPERTY wC0 NORTON RD TUCKASE GEEus 'Qi 107 M�M01114l ( o .�.6 SPVPNNPN R r o v � 0 0 ovN.�Y c-U1 OR .�.�.�.�.�.�. tOCGI`o .............. OFF VICINITY MAP (NOT TO SCALE) Know what's below. Call before you dig. W C 000 LUG 0) ul aD 0 LL0 W N N 9 H 00 a L0 a N N N N U 7� Z Z Z LL a 6 J V 00 LLJH a0 COO W J W W a w Z �> W X 00 = O LL coQa H W O LL Zaa a� 3 N U) T N U W Z W U J cq J W CO U Z u z 0 m U LJ �P o QJ. ,per 0 J' w Lo W po _ OM° GpQ- °°GRF, ') Q z 0 0 Q J W0 L z U z 0 U z 0 W U) Y J Q } a N ch W Z z O Q z J I- O � U U 0 LL p z W W O z F-- Ld 3: DRAWN BY: DNK CDC PROJECT NO.: 21943 SHEET C000 NOTES 1. ALL SITEWORK SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL REGULATORY STANDARDS AND ALL REQUIREMENTS IN THE PROJECT TECHNICAL SPECIFICATIONS. 2. CONTRACTOR TO VERIFY WITH ENGINEER THAT THE REQUIRED GRADING/LAND DISTURBANCE AND DRIVEWAY PERMITS HAVE BEEN OBTAINED PRIOR TO BEGINNING CONSTRUCTION. 3. ALL WORK MUST BE PERFORMED BY A NORTH CAROLINA LICENSED CONTRACTOR. 4. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING THE EXACT LOCATION AND ELEVATION FOR ALL UTILITIES PRIOR TO CONSTRUCTION; AND TO NOTIFY ENGINEER OF ANY CONFLICTS OR DISCREPANCIES. THE LOCATION OF SOME UTILITIES SHOWN ON THE PLANS HAVE BEEN APPROXIMATED. ALL BURIED UTILITIES HAVE NOT BEEN SHOWN ON THE PLANS AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR LOCATION PRIOR TO CONSTRUCTION. 5. CONTRACTOR SHALL PROTECT EXISTING SITE FEATURES CALLED OUT TO REMAIN DURING CONSTRUCTION. ANY DAMAGE INCURRED DURING OR RESULTING FROM CONSTRUCTION ACTIVITY IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE REPAIRED IN ACCORDANCE WITH APPLICABLE STANDARDS OF APPROPRIATE AGENCIES AT THE CONTRACTOR'S EXPENSE. 6. THE CONTRACTOR IS TO NOTIFY ALL UTILITY COMPANIES AT LEAST 72 HOURS BEFORE CONSTRUCTION ACTIVITY IS TO BEGIN. THE CONTRACTOR SHALL NOTIFY ULOCO AT 1-800-632-4949 OR 811, 72 HOURS BEFORE CONSTRUCTION BEGINS. 7. EROSION CONTROL IS FIELD PERFORMANCE BASED AND CONTRACTOR SHALL INSTALL AND MAINTAIN ANY EROSION CONTROL MEASURES NECESSARY TO ASSURE MAXIMUM PROTECTION OF THE SITE DURING DEMOLITION AND CLEARING. 8. CONTRACTOR TO COORDINATE TIMING OF DEMOLITION AND CONSTRUCTION WITH OWNER TO ENSURE EXISTING FACILITIES REMAIN ACCESSIBLE. 9. ALL DEBRIS, STRUCTURES AND UTILITIES TO BE DEMOLISHED AND REMOVED FROM THE PROJECT SITE ARE NOT SHOWN ON THIS PLAN. ANY ADDITIONAL DEBRIS, STRUCTURES AND UTILITIES ENCOUNTERED DURING CONSTRUCTION, WHICH IN THE OPINION OF THE ENGINEER SHOULD BE DEMOLISHED AND REMOVED, SHALL BE DISPOSED OF OFF -SITE AT THE CONTRACTORS EXPENSE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY REQUIRED PERMITS. 2u 4 2089.7 EXISTING SIDEWALK TO BE REMOVED (TYP) �2 mv. a► i - - EXISTING STORM LINE 4_ 1090 S97 _ NV.M1 Ik- A TO BE REMOVED (TYP) A - - - -Me Cur. EXISTING FLOODPLAIN (TYP) • •• "°°-� __ EXISTING STORM PIPE TO BE CUT FOR • III- III- � - I II CPr dull 2o•t4 PROPOSED TIE IN (SEE SHEET C401) 70R 20lLO 2i CPP -- - -- --- `J 2090.1_ m fir CPPOn. 2089,. _''_ 9.2 ' -28 - CPP: 207 W. 207LO oUR 2074A 2074.8 �/ / 2083.1 ♦ ♦ ♦ ♦ ♦ ♦ i i + r�TT7�• ♦ r ♦ ♦ ♦ r r ♦ r ♦ r ♦ r ♦ r ♦ r ♦ r ♦ i ►. � � �� ♦ • ♦ • ♦ i•. ♦ • ♦ • ♦ • ♦ • ♦ • ♦ r . PROPOSED WETLANDS IMPACT 2 • • • * ' • • * • * * * * * * * • * * * * * * • (3,238 SF) (0.07 AC) 20758 •• • • • ......t• • . • . • . • . • . • . • .. / .♦♦ .♦♦♦.••• ♦♦♦.♦.♦.♦+♦+♦+• .. + .......•.•.•...... / ♦ ♦♦♦r♦♦♦ �i+��. ♦♦♦ +♦+ ♦+`+♦+`+♦.�. (? L V \ +`r` f` + 075.9 zo76,70 - 2 5.8 1 ? 2076. PROPOSED WETLANDS IMPACT 3 (9,207 SF) (0.21 AC) 9.2 0.1 2100 2089. 1 v r •.. ♦ ♦ ♦ ♦ 4 + 4 ♦ + PROPOSED TREE REMOVAL (TYP.) 2098 2103-5 20 L76 \ � z EXISTING SEWER MANHOLE 7 �1 TO BE REPLACED I I I I � �I Ili ii 2098.E I / ///qI 77) 2098.4 I I SS l�ll/�/lI 209 .6 l I � 098.2 ��// 21 Ill/R 2079.5 ��yy it - � 2090.9" 2091.3 $ 20 4 �u✓!V V, r x X� � � � - \; 207a_7 C� r EXISTING STORM LINE TO 2098,6 / BE REMOVED TYP 2109.s 2091,4 2091.7 120t 5 \ % Q97.6 x NV. Ir CPP N: 2NU yf \ J i NV. Ir CPP CUR 1 J °' 1i � 70rt 207a0 � 2091.4 2092-2 '�1 6 I �r NK A CPP C11R 2106� 2091 2 ) 1 I - k 2089 ' 2079.6 X �x� � 2 7s. col 218 20897-----` 2089.5 r (n 2092.1 - / 9 20 C EXISTING STORM LINE �r 2 .7 TO BE REMOVED (TYP) 2092.0 .5 207 2091 1° 5 _ \ I 2082.3 - - �S 20823 � Y�r� as 2091.4 07 I 2082.9 2082.8 EXISTING POND TO BE FILLED 2091.8 � � i r 489.9 2091 4 � V 9.1 6 2092 J / I EXISTING FENCE 1 2 9.9 �� TO BE REMOVED (TYP) i 2094 20811 209.3 2092-5 L- I/ 080.6 / 2083.7 2091. 1 EXISTING FLOODWAY (TYP) 2 767rr, \ \2076-t -20�6 - R USACE ACTION ID 2015-00263 20 3 DWR WAC PROJECT #2018-0612 PERMITTED FOR IMPACT 011 \\207� 2080.7 _ 02 3 ( 2o7a_21 2 76.9 \/ T124 j - 2077.3 1 cD EXISTING SEWER LINE TO 07 7 1 BE RELOCATED (TYP) - - EXISTING SEWER MANHOLE '= EXISTING SEWER MANHOLE TO BE REMOVED 2 `�4 TO BE REPLACED - n 1_ 20 SS � SS \� SS \ 086-5 I _ .� - \/ �.� SS 4 4 4 4 ♦•♦�♦♦♦ � 2087.4 � 2086.6 2085.5 + � �� � j r ♦ t ♦ 7► 4 T \ I I 4. 2083.9 %77.9 \\, 4 + 078.2I 20 8 3 (/) � 207o208 _C i - A .4 60 IN WCU A10R7- ON RD 07 MeMQpx CF��9< ^ OQ m of, V) O x oa � Z o a oUN�� GRUB o.... . . . DEVELOPMENT DATA OWNER/DEVELOPER: CONTACT: CIVIL ENGINEER: CONTACT: SURVEYOR: CONTACT: PROJECT DATA VICINITY MAP (NOT TO SCALE) WESTERN CAROLINA UNIVERSITY 3476 OLD CULLOWHEE ROAD CULLOWHEE, NC 28723 CURTIS MONTEITH (828) 227-7442 CIVIL DESIGN CONCEPTS, P.A. 168 PATTON AVENUE ASHEVILLE, NC 28801 GREGORY HOFFMAN, P.E. (828) 252-5388 AVIOIMAGE MAPPING SERVICES 4600 LEBANON ROAD, SUITE C CHARLOTTE, NC 28227 PIN: 7559-23-1452 ADDRESS: 159 UNIVERSITY WAY, CULLOWHEE DEED BOOK/PAGE: 427/399 SITE ACREAGE: 196.50 ACRES ZONING: COMMERCIAL DISTURBED AREA: 9.74 AC IMPERVIOUS CALCULATIONS: IMPERVIOUS PERVIOUS PRE -DEVELOPMENT: 8.7 ACRES (18.5%) 38.3 ACRES (81.5%) POST -DEVELOPMENT: 9.1 ACRES (19.4%) 37.9 ACRES (80.6%) "DOES NOT EXCEED 24% BUILT UPON (IMPERVIOUS AREA)" SOILS: BkC2, Ud, UfB, W SOIL GROUP: A & C Know what's below. "1jL-11 Call before you dig. NORTH EXISTING CONDITIONS & DEMOLITION PLAN GRAPHIC SCALE 0 30 60 120 ( IN FEET ) 1 inch = 60 ft. W Oa0om CID °)CIDLO N co L W H W V Ln a N N coz V'T Z N Z ui a aH � ao ao O_1 W ONVO W J� W a w Z CO> x Q ao=OLL ccaa CO COZ W OLL ZQa 3 Itt 00 r N U W N z w U J 9 J W CIO U z o ml J Q m N CD Z z O � m w U W U� W m � w Q 0 0 N \ w � o oa oo �- ��P� ao, yy O M �oy o o� Cl) = N M " y o C) N �00000GR0\ �111111111\\\ V i 0 J W J 0 a W 0 V) z z 0 O W Z O 0 o 0 z F- x X W DRAWN BY: CDC PROJECT NO Q z J O Q O O z Z O U Z O Y U Q r Of W z D Q z J O W Q 0 z o- W Cn W DNK 21943 240 SHEET C 10 1 1. ALL SITEWORK SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL REGULATORY STANDARDS AND ALL REQUIREMENTS IN THE PROJECT TECHNICAL SPECIFICATIONS. 2. SINGLE-PHASE CONSTRUCTION. 3. ALL WORK MUST BE PERFORMED BY A NORTH CAROLINA LICENSED CONTRACTOR. 4. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING THE EXACT LOCATION AND ELEVATION FOR ALL UTILITIES PRIOR TO CONSTRUCTION; AND TO NOTIFY ENGINEER OF ANY CONFLICTS OR DISCREPANCIES. THE LOCATION OF SOME UTILITIES SHOWN ON THE PLANS HAVE BEEN APPROXIMATED. ALL BURIED UTILITIES HAVE NOT BEEN SHOWN ON THE PLANS AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR LOCATION PRIOR TO CONSTRUCTION. 5. CONTRACTOR SHALL PROTECT EXISTING SITE FEATURES (SHOWN TO REMAIN) AND NEWLY COMPLETED WORK DURING CONSTRUCTION. ANY DAMAGE INCURRED DURING OR RESULTING FROM CONSTRUCTION ACTIVITY IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE REPAIRED IN ACCORDANCE WITH APPLICABLE STANDARDS OF APPROPRIATE AGENCIES AT THE CONTRACTOR'S EXPENSE. 6. THE CONTRACTOR IS TO NOTIFY ALL UTILITY COMPANIES AT LEAST 72 HOURS BEFORE CONSTRUCTION ACTIVITY IS TO BEGIN. THE CONTRACTOR SHALL NOTIFY ULOCO AT 1-800-632-4949 OR 811, 72 HOURS BEFORE CONSTRUCTION BEGINS. 7. SIDEWALKS SHALL BE CONSTRUCTED IN ORDER TO PROVIDE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES. A MAXIMUM OF 5% SIDEWALK/CROSSWALK LONGITUDINAL SLOPE IS PERMITTED. A MAXIMUM OF 1 /4" PER FOOT SIDEWALK/CROSSWALK CROSS SLOPE IS PERMITTED. ANY SIDEWALK/CROSSWALK INSTALLED WITH A STEEPER SLOPES SHALL BE REMOVED AND REPLACED AT CONTRACTORS EXPENSE. 8. ALL RADII LISTED ARE FROM FACE OF CURB UNLESS OTHERWISE NOTED. ALL PARKING LOT RADII ARE 3' UNLESS OTHERWISE NOTED. 9. ALL ROAD/PARKING LOT IMPROVEMENTS, STRIPING AND SIGNAGE SHALL BE IN ACCORDANCE WITH THE LATEST MANUAL ON UNIFORM TRAFFIC CONTROL DEVICE (MUTCD). CONTRACTOR MAY USE A PAINT SUITABLE FOR ASPHALT APPLICATION IN LIEU OF THERMOPLASTIC WITH PRIOR APPROVAL FROM THE ENGINEER. 10. CURB END TREATMENT TO BE APPLIED TO ALL CURB ENDS. REFER TO CURB END TREATMENT DETAIL. N SUBJECT PROPERTY WCU NORDN T RD �DKASI 1 (4/ 8 q ----- - � us 107 _ ----------- PROPOSED 9'x18' STANDARD PARKING SPACE (TYP) \ EXISTING FLOODPLAIN (TYP) op N op PROPOSED LIGHT DUTY ASPHALT �• - PAVEMENT (TYP) (SEE DETAIL D2.02) � sP�P F tp pto ovN.Y CLVB OR ..... cG!!p . . . . . . . .. VICINITY MAP (NOT TO SCALE) DEVELOPMENT DATA zCD N N N H 00 7 0 a N N N N V'T Z Z W eD aH Z z co aO J W aW J V W a w Z Q Cn> W X OD 2 Q LL coQa N W Q LL ZQa 3 L0 OWNER/DEVELOPER: WESTERN CAROLINA UNIVERSITY It 00 3476 OLD CULLOWHEE ROAD N CULLOWHEE, NC 28723 CONTACT: CURTIS MONTEITH (828) 227-7442 W CO) CIVIL ENGINEER: CIVIL DESIGN CONCEPTS, P.A. U 168 PATTON AVENUE ASHEVILLE, NC 28801 J y CONTACT: GREGORY HOFFMAN, P.E. (828) 252-5388 V Z SURVEYOR: AVIOIMAGE MAPPING SERVICES 4600 LEBANON ROAD, SUITE C CHARLOTTE, NC 28227 Y CONTACT: --- z m PROJECT DATA PIN: 7559-23-1452 ADDRESS: 159 UNIVERSITY WAY, CULLOWHEE DEED BOOK/PAGE: 427/399 SITE ACREAGE: 196.50 ACRES ZONING: COMMERCIAL DISTURBED AREA: 9.74 AC IMPERVIOUS CALCULATIONS: IMPERVIOUS PERVIOUS PRE -DEVELOPMENT: 8.7 ACRES (18.5%) 38.3 ACRES (81.5%) POST -DEVELOPMENT: 9.1 ACRES (19.4%) 37.9 ACRES (80.6%) "DOES NOT EXCEED 24% BUILT UPON (IMPERVIOUS AREA)" SOILS: SOIL GROUP: BkC2, Ud, UfB, W A & C IIII IIII IIII IIII IIII IIII IIII IIII IIII IIII IIII IIII IIII IIII iin IIII IIII IIII IIII IIII EXISTING RESIDENCE HALL �Z _�D2 -0 OS 002• 0 C p _j CF) IIII IIII IIII IIII IIII IIII IIII IIII IIII till IIII IIII IIII IIII IIII IIII IIII IIII IIII IIII — W w ` o� _ 1 1111 till 1111 1111 1111 till till till till till 1111 till 1111 1111 till 11 1 ..1. 1­ .1.1 111, PROPOSED 5' CONCRETE SIDEWALK°d ° j (SEE DETAIL D2.01) GROG / o 1 -20 30 -40 50 40- O 3 2- 0_ 1 i IIII IIII IIII IIII IIII IIII IIII IIII IIII IIII IIII-IIII-IIII IIII IIII IIII IIII IIII IIII I !;% IIII till IIII IIII till 1 IIII IIII till O IIII IIII OZ till -20 IIII IIII till IIII IIII EIS till 30 IIII IIII 1111 IIII IIII 1111 -40 IIII IIII till IIII IIII 05 till 50 IIII IIII till IIII IIII O till 40- IIII IIII - till IIII IIII O'�::- till OG IIII IIII till IIII IIII 02­ 1111 20- IIII IIII 1111 IIII IIII C 1111 1 IIII IIII L till IIII IIII ..., IIII /2 Know what's below. Call before you dig. NORTH SITE PLAN O w Z Q J a_ w U/ 0 J W LL U I— W J 017 Z O I- cr O Z O IZ Q Z J O CY Q U O z Z O U z O In Y U Q I Of w Z Q z J O Q U Z rK w (n w DRAWN BY: DNK CDC PROJECT NO.: 21943 GRAPHIC SCALE 60 0 30 60 120 240 1 SHEET ( IN FEET ) 1 inch = 60 ft. C201 NOTES 1. SEE GRADING, EROSION CONTROL, AND STORM DRAINAGE DETAIL SHEETS FOR ALL GENERAL NOTES. CONTRACTOR RESPONSIBLE FOR INCLUSION OF DETAILS SHEETS WITH ALL PLANS. 2. A PORTION OF THIS PROJECT LIES WITHIN THE 100-YR FEMA FLOODPLAIN. 3. SOIL TYPE A&C. INLET/OUTLET TABLE (INVERTS BASED ON 2D LENGTH TO INSIDE EDGES) STRUCTURE STATION STRUCTURE DETAILS DESCRIPTION Al 10+10 INV. IN 2077.0 (Al-A2) FES B1 10+10 INV. IN 2084.0 (131-132) FES Cl 10+10 INV. IN 2077.7 (Cl-C2) FES D1 10+10 INV. IN 2079.0 (D1-D2) FES E1 10+13 INV. IN 2074.7 (El-E2) FES STRUCTURE TABLE (INVERTS BASED ON 2D LENGTH TO INSIDE EDGES) STRUCTURE STATION STRUCTURE DETAILS DEPTH DESCRIPTION RIM 2084.0 A2 10+92 INV. IN 2077.8 (A2-A3) 6.3't GRATE INLET INV. OUT 2077.7 (Al-A2) RIM 2084.0 A3 12+05 INV. IN 2079.0 (A3-A4) 5.1't GRATE INLET INV. OUT 2078.9 (A2-A3) RIM 2084.2 A4 12+73 INV. IN 2079.7 (A4-A5) 4.5'f GRATE INLET INV. OUT 2079.6 (A3-A4) RIM 2084.0 A5 13+04 INV. OUT 2080.0 (A4-A5) 4.0't OUTLET CONTROL STRUCTURE RIM 2090.0 B2 10+37 INV. IN 2084.4 (B2-133) 5.7't JUNCTION BOX INV. OUT 2084.3 (61-62) RIM 2103.0 B3 11+94 INV. IN 2093.3 (B3-B4) 12.5't JUNCTION BOX INV. OUT 2090.5 (B2-B3) RIM 2106.0 B4 ??? INV. OUT 2095.0 (133-134) 11.0't CURB INLET RIM 2084.0 C2 11+04 INV. IN 2078.8 (C2-C3) 5.3't GRATE INLET INV. OUT 2078.7 (Cl-C2) RIM 2083.9 C3 12+17 INV. IN 2080.0 (C3-C4) 4.0't GRATE INLET INV. OUT 2079.9 (C2-C3) RIM 2083.8 C4 13+29 INV. OUT 2081.1 (C3-C4) 2 7't GRATE INLET RIM 2084.0 D2 10+99 INV. IN 2079.6 (D2-D3) 4.5't GRATE INLET INV. OUT 2079.5 (D1-D2) RIM 2084.0 D3 12+12 INV. IN 2080.4 (D3-D4) 3.7't GRATE INLET INV. OUT 2080.3 (D2-D3) RIM 2084.0 D4 13+24 INV. IN 2081.2 (D4-D5) 2.9't GRATE INLET INV. OUT 2081.1 (D3-D4) RIM 2091.1 D5 14+16 INV. IN 2081.8 (D5-D6) 9.4't JUNCTION BOX INV. OUT 2081.7 (D4-D5) RIM 2095.5 D6 14+77 INV. IN 2084.7 (D6-D7) 10.8't JUNCTION BOX INV. OUT 2084.6 (D5-D6) RIM 2096.0 D7 15+39 INV. OUT 2088.0 (D6-D7) 8.0't GRATE INLET RIM 2085.5 INV. IN 2075.8 (E2-E3) E2 11+21 INV. IN 2075.8 (E2-H1) 9•8't GRATE INLET INV. OUT 2075.8 (El-E2) RIM 2085.8 INV. IN 2076.7 (E3-E4) E3 12+02 INV. IN 2076.7 (E3-11) 9.2't GRATE INLET INV. OUT 2076.6 (E2-E3) RIM 2086.2 INV. IN 2078.1 (E4-E5) E4 13+33 INV. IN 2078.1 (E4-J1) 8.3't JUNCTION BOX INV. OUT 2078.0 (E3-E4) RIM 2088.1 E5 14+47 INV. IN 2082.5 (E5-E6) 5.7't CURB INLET INV. OUT 2082.4 (E4-E5) RIM 2093.0 E6 16+36 INV. OUT 2088.7 (E5-E6) 4.3't CURB INLET RIM 2084.0 INV. IN 2075.7 (F2-F3) F2 11+19 INV. IN 2075.7 (F2-G1) 8.4't GRATE INLET INV. OUT 2075.6 (F1-F2) RIM 2079.6 F3 12+53 INV. IN 2076.6 (F3-F4) 3.2't CURB INLET INV. OUT 2076.5 (F2-F3) RIM 2080.8 F4 12+60 INV. OUT 2076.6 (F3-F4) 4 2'f CURB INLET RIM 2084.0 G1 11+50 INV. OUT 2077.2 (F2-G1) 6.8't GRATE INLET RIM 2088.0 H1 10+28 INV. OUT 2083.8 (E2-H1) 4.2't CURB INLET RIM 2089.0 11 10+48 INV. OUT 2082.5 (E3-11) 6.5't CURB INLET RIM 2089.0 11 10+44 INV. OUT 2081.5 (E4-J1) 7.5't CURB INLET PROPOSED CONNECTION INTO EXISTING STORM STRUCTURE EX. TOP: 2088.2 EX. 15" INV. IN: 2082.6 PROP. 15" INV. OUT. 2082.5 � l L 074 � NOTE: ,� 2090.E /,- CONTRACTOR TO VERIFY LOCATION/INVERTS \ \ PRIOR TO ORDERING MATERIALS. PROPOSED CONNECTION INTO EXISTING STORM EXISTING FLOODPLAIN (TYP) 11 STRUCTURE EX. TOP: 2087.6 PROP 15" INV OUT 2083 8 N H1 E3 2, -- NOTE: 89. 2089.E -100- 20 CONTRACTOR TO VERIFY LOCATION/INVERTS E2 PRIOR TO ORDERING MATERIALS. 2 92 �� -2-088 888 2 - PROPOSED RIP RAP APRON El' LENGTH: 10' 0 20 PROPOSED CONNECTION INTO EXISTING STORM STRUCTURE EX. TOP: 2087.9 EX. 18" INV. IN: 2081.6 PROP. 24" INV. OUT. 2081.5 (� - ,� • NOTE: \ C CONTRACTOR TO VERIFY LOCATION/INVERTS PRIOR TO ORDERING MATERIALS. j F, J1 �� 2089.E V _(E4 E5 ��- �mqm-�mm�� -7. l==ec 2088a- ` - -- \ BC 2W. j� \ F4 C �♦ �� E6 O BC 081.3 _ - WIDTH AT FES: 7.5' F3 _ BC 2083.3 TB 2089.0 WIDTH AT END: 12.5' \ Cy 17 2075.2 BC 2081. % A zo A THICKNESS: 18" C � 2074.8 208,5 �_BC 2081.2 STONE CLASS: B � - (SEE DETAIL D4.02) 2c �� BC 2081.E / �� 2083.1 � 75 7 --BC 2086.0 _ _-BC 2084.9 / PROPOSED 1' CONTOURS (TYP) 75_I 20as;i BC 2oss.s EXISTING 1' CONTOURS 2080� F- � � � � � � � � � � \ G1 ( ).ABC 2086.E 208s.3 \/ (A ���� 2076 • 2o7s. 1 PROPOSED RIP RAP APRON F1' 00 F1 LENGTH: 26.5' s.8 2075.4 WIDTH AT FES: 6' 2085 • WIDTH AT END: 28.5'O THICKNESS: 18" 2075.3 1 STONE CLASS: 2 - 2081 s (SEE DETAIL D4.02) vo - AI 2o7s.6 PROPOSED GRATE INLET \ / - (TYP) (SEE DETAIL D4.04) 1 / \\ i PROPOSED STORM PIPE (TYP) �,076 7 2085 (SEE TABLE AND DETAIL D4.01) 2076.8 2 . B1 A5 2076.2 I el C 2085 A2 6 \\ A3 - 2085 . 2078.5 - - - A4 EXISTING FLOODWAY (TYP) Al lad 2076.8 2085 PROPOSED RIP RAP APRON 'Al' N 3 LENGTH: 10' 3 �� WIDTH AT FES: 6' - WIDTH AT END: 12' V), 1\6076.9 2078.31 THICKNESS: 18" - � 3 �� �i I I 2076.7 STONE CLASS: B o77.3 77.7 2076. C 2084.5 <� (SEE DETAIL D4.02) \\ 2085 �82-4 1 207'7.3 Aa 207.7 Cl07- C2 C3 C4 $S SS $$ $$ o SS • 1 (� 20 1 f PROPOSED RIP RAP APRON 'Cl'- _ 086.5 LENGTH: 10' (- S WIDTH AT FES: 4.5' 20 ,78s 2087.4 � 201 WIDTH AT END: 11.5' THICKNESS: 18" 0 � 77.9�7 078.2 STONE CLASS: B (SEE DETAIL D4.02) 0 C/0000 2085- ,C I, � I �IIII I� � 2079 079. 2079.E >J7 PIPE TABLE (SLOPES BASED ON 2D LENGTH TO INSIDE EDGES) PIPE NAME SIZE LENGTH SLOPE MATERIAL Al -A2 18" 80' 0.8% HDPE A2-A3 18" 111' 1.0% HDPE A3-A4 18" 67' 1.0% HDPE A4-A5 18" 27' 1.0% HDPE 131-132 18" 25' 1.0% HDPE 132-63 18" 153' 4.0% HDPE 133-64 18" 73' 2.3% HDPE Cl-C2 18" 92' 1.0% HDPE C2-C3 18" 111' 1.0% HDPE C3-C4 18" 111' 1.0% HDPE D1-D2 24" 88' 0.6% HDPE D2-D3 24" 111' 0.6% HDPE D3-D4 24" 111' 0.6% RCP D4-D5 18" 89' 0.6% RCP D5-D6 18" 57' 5.0% HDPE D6-D7 18" 59' 5.5% HDPE El-E2 24" 106' 1.0% HDPE E2-E3 24" 77' 1.0% HDPE E2-H1 15" 25' 31.4% HDPE E3-E4 24" 127' 1.0% HDPE E3-11 15" 44' 13.1 % HDPE E4-E5 24" 111' 3.9% HDPE E4-J1 24" 41' 8.4% HDPE E5-E6 24" 187' 3.3% HDPE F1-F2 24" 103' 0.6% HDPE F2-F3 24" 130' 0.6% HDPE F2-G1 24" 147' j 1.0% j HDPE F3-F4 24" 4' 0.6% 1 HDPE ?083.1 20 f 2078.7 D1 D2 D3 D4 N •' o 0 0 � �oL 0 0 0 9.7 bd 6 2o,a.- PROPOSED RIP RAP APRON 'D1' z0 .5 LENGTH: 10' WIDTH AT FES: 6' - -2085- 2079.5 WIDTH AT END: 12' THICKNESS: 18" PROPOSED CONTROL STRUCTURE (SEE DETAIL D4.09) PROPOSED BIO-RETENTION CELL (SEE DETAIL D4.07 & D4.08) \ v' PROPOSED CROSSING OF EXISTING WATER LINE \ (CONTRACTOR TO VERIFY LOCAl10N/DEPTH) \ / PROPOSED STORM STRUCTURE TO CUT INTO EXISTING CPP PIPE (SEE DETAIL D4.03) NOTE: i e CONTRACTOR TO VERIFY LOCATION/INVERTS PRIOR TO ORDERING MATERIALS. 2090.9/ B3 EXISTING 15" STORM PIPE *00 100 4001 ' 0-0 EXISTING STORM STRUCTURE (T 42) 2Qg6.3 I ITV) STONE CLASS. B (SEE DETAIL D4.02) ' 2J83 2 0'8J ' 2079.6- �I- 2 7 2078J 207- 9.7 2089.5 , 9 20 I .. - - -.. 7 ,80E C� -- 20 I.8.: ,. 07 2 J 20 .5 i� 2082.3 �(� 2082.3 s, - 0, 2oa3.s 07 2082,9 2082.8 �079..= - 2081 � I 20 9.3 080.6 1 PROPOSED CONNECTION INTO EXISTING STORM STRUCTURE EX. TOP: 2095.8 EX. 6" INV. IN: 2093.3 EX. 12" INV. IN: 2088.0 PROP. 15" INV. OUT. 2088.0 NOTE: CONTRACTOR TO VERIFY LOCATION/INVERTS PRIOR TO ORDERING MATERIALS. 60 N SUBJECT PROPERTY WCU NoRDN RDus T �CKASI 107 ��MoRiy� oR 0;0 cFti��c o� L o 0 SPA PNNNN R r v Z a 00 CHUB o. . . . �~`C.�.�.C.CCC DEVELOPMENT DATA OWNER/DEVELOPER: CONTACT: CIVIL ENGINEER: CONTACT: SURVEYOR: CONTACT: PROJECT DATA VICINITY MAP (NOT TO SCALE) WESTERN CAROLINA UNIVERSITY 3476 OLD CULLOWHEE ROAD CULLOWHEE, NC 28723 CURTIS MONTEITH (828) 227-7442 CIVIL DESIGN CONCEPTS, P.A. 168 PATTON AVENUE ASHEVILLE, NC 28801 GREGORY HOFFMAN, P.E. (828) 252-5388 AVIOIMAGE MAPPING SERVICES 4600 LEBANON ROAD, SUITE C CHARLOTTE, NC 28227 PIN: 7559-23-1452 ADDRESS: 159 UNIVERSITY WAY, CULLOWHEE DEED BOOK/PAGE: 427/399 SITE ACREAGE: 196.50 ACRES ZONING: COMMERCIAL DISTURBED AREA: 9.74 AC IMPERVIOUS CALCULATIONS: IMPERVIOUS PERVIOUS PRE -DEVELOPMENT: 8.7 ACRES (18.5%) 38.3 ACRES (81.5%) POST -DEVELOPMENT: 9.1 ACRES (19.4%) 37.9 ACRES (80.6%) "DOES NOT EXCEED 24% BUILT UPON (IMPERVIOUS AREA)" SOILS: BkC2, Ud, UfB, W SOIL GROUP: A & C STORM LEGEND EXISTING STORM PIPE ■ ■ EXISTING STORM STRUCTURE �II� PROPOSED STORM PIPE ■ ■ PROPOSED ROOF LEADER COLLECTOR -------------- PROPOSED HEADWALL L PROPOSED CURB INLET STRUCTURE PROPOSED JUNCTION BOX O 13 PROPOSED FLARED END SECTION 1 PROPOSED RIP -RAP APRON Know what's below. _""'L__LtUv_ Call before you dig. NORTH FINE GRADING & STORM DRAINAGE PLAN GRAPHIC SCALE 0 30 60 120 ( IN FEET ) 1 inch = 60 ft. Y z 0 WCD N co N H co 7 LO N N N N V'T z z Z W ao aHLU �z z co aO_1 W ONVO W J V W a w Z Q Cn> W X co 2 Q LL m N W Q LL Q a z Q a LO It 00 T N U W fN z W U J J W m U z z O d U 0 In Q ^ z U) 0 O 0 Q J W Of 0 z LL >2 U z D 0 U Z O z W y Q J Ja_Q L' c� Q Z } � Q U� Ld o w 10 z O Z V) N O Q Z �S J 0 0 I- w Z o Q O Q w z w 0 O w w z Z ~ Cl) L, 3: DRAWN BY: DNK CDC PROJECT NO.: 21943 240 SHEET C401 '070 '060 '050 2100 2100 2090 2090 20 20 20 20 0 0 + O 211 210 209 208 207 W. 205 O O 0 0 0 O 0 + + N LINE A Olt 00 + + MM LINE D 2120— 2120 2110 2110 2100— 2090 Ln Q 25 F- 8" H PE 01.0% Q O O.. 208 .-. N -H 00p M m m N m I m N m O N Z W m M Z O J O 00 0z n0000 O_Lci r000 ON O O O +� N M N +0 N 2070--m00z � mOONZ zo o _ L > 0 Q m> p Z 0f p> 0_��Z Z 2060 0 O + 0 21 PROPOSED WATER CROSSING 2100 2090— 1.3' 2090 2080— O O + ENE B 2110 XI m 70 :1 50 M m I m m m - 2080 207 U .� W W mLq Z n J M � OO) O _ O6 ON +ON U+0 O m O N Z �NZ O 0 0 H O 0_ M F- - ? 2070 2060 2060 2050 O O O + + O ___________ 111LF-1 " HDPE ©1.0% O% M U U .. N pry U I N U N W Z v 0)U Z J 00 00 +I 00 0O r 00 O O N � 0 0 N W M+ 00 N H U O N +0 U N O Z �N Z O N Z .. 0 > d(N Z Z 0_<O> NOTE: THE PIPE LENGTHS, SLOPES, AND INVERTS SHOWN IN THE ABOVE PROFILES ARE BASED ON A 2D LENGTH AND MEASURED FROM INSIDE WALL TO INSIDE WALL OF STRUCTURES. CONTRACTOR SHALL VERIFY ALL INVERTS AND LINE LENGTHS PRIOR TO CONSTRUCTION. LINE C m 2090 12080 U w Z_ J 00 2070 N 1-i -q- +00 I— U M O N 0_ 0_ H 0 Cl- U) H 2060 2050 O m O N + + M M wOW co UjCCO —U') W N� T H W-e N a N N CO U-T V Z N Z Z La CO 00 O J W V 00 00 w J W 000 a w Z Q cc > w X CO=OLL N W OLL m a a H Z a a a� 3 N 0 E O y a CL U C .� O V� Q a1 i .y .� r O O 3 UaV 3 It co T N U w co z w U J J w m U z Y � Z m J Q m (n O Z Z O 0_ 0' U W C/) W 0= � W Q O V) 0 W o Q o M 0 o z '^ (,/ J Q z J 0 0_ Q J W 0 L 0 z U z D O _ C) Z WCn p Y J mr I 0 o � a0f C0 w o 0Elf > z � a_ Q z Ow -1< O O Z Q < U � p Z fy w Know what's below. 1 z `n � Call before you dig. DRAWN BY: DNK CDC PROJECT NO.: 21943 STORM DRAINAGE PROFILES 0 20 40 80 1 inch = 40 ft. (H) SHEET 0 4 8 16 "O!!!� _ C402 - 1 inch 8 ft. (V) 211 21 20S 20E 207 20E 205 0 O + 0 187E -24" w I L w Ld -24. NDP O 127E -24' HDRE ® 1.0% 111E w LLJ � 00 >. 1.0% I b' Ln +100 0 - ^ @6L 4" EDP ®1. o W W (0 NN M M ^ M LO^ W z v J In N 00 c0 + W (00 Z) N w .M... W _ =w w �� v w vv Z W 0 �N 00� wN O OQ O_O % --. �O Z N w W W NN w w W W � z J 00 N Z O W W 00 00 00 L6 J �O � No6oDO 0- aN�Z 0 Na0r O +O N Z ZHH() - H� r00) nI-r- N N00 M pLo +0004 W MO TNZZ 0NN � trN N+00 W0 N Ld Nz F- z0 --N 0<0_ jj OfHO j WOO N �Z a O Qw O> aj�ZZ z W '�O>> > zz z n0 o nZZ Z --. �V) z - 0_ IF- O O O O O O + + + N M 2100 2100 2100 —2100 25LF-15" HDPE ® 31.4% 2090 2090 209 209C 20E 201 20E 205 O O O -- �����147LF-24" DPE ® 1.0% ^ N 0 n LI � O II W N N W N Z_ LLJ �'.� (0J +I r- -- J r, r � 0 0 0 04 00 r- r ON �00 +� H C0 �Om ±ONN FL: N0 INi �NZ Z Z 0_ 0 O 0 a* ~z Z Z Z Q_ NF- 0 0 LINE G 2080 ?070 M 2050 0 Ln LINE E 208 2080 o I N 2 v -- w 00 z J M HH 00 O 0 ONO OD N X2070---2070 = O 0 O D N � O 0 �--0 W N � Z W = W W N N Ld Lv `w-'— 00 00 00 0 206 - 2060 LID r- r O N 6 0 0 04 wto N Z Z ZO CL 0_ 0_ O zz > 0_��ZZ Z 205 2050 O cc o N O O LINE H IN 00 2100 2100 4LF-24" HDPE 0 0.6% 1090 2090 2090 '080 20E '070 20 i '060 20E —2050 205 0 0 o co 0 O O O M O " 103LF 24 " HDPE 0 0.6% N ^ ^ 04 ^ W L �— j N LMi U I W w � \.L Z Lq W LL-.� Z W CO Z (n J (C' (0 J HH (6 r- -- J O LO M cD �O O-- 0 N O O r r O ON M Ln Cn +� N + N � t W N O Z Z � o O Z Z Z 0 O Q�> I 0-- xo �0> �HOZ 0_ (n H Z �Z Z_ 0_ (n H Z —Z — — 2100 2100 2100 100 44LF-15" HDPE@13=11%]] 41LF-24" HDPE ® 8.4% 202090 2090 2090 - 111 -7— -n 208 2080 208 2 M � wuj __ I Z LO _ W M J HH 00 L W z ^^ W O O w M J 2070- w j N 2070 + 0 N 2070- W w w 2070 t o o W , w � 0 0C14 Z `• •• 0 t 0) W �`' O O O J T T 0000 00 Z N Z+Itrp� 0 HCL OZ MNOO O O -- N�r0 N O (nH- +0000N0 -- �H0� 0L60N WM0 0 (nHz M to0N TNZZ ZO W N O Q_ 0_�NZZ O D'<0- > > OQ� j 0_cn�zz z 2060-' O Z z Z 2060 206 2060 0_ (n F - - 205 2050 205 2050 O 00 O "t O 1- O 0 0 0 0 LINE I LINE J NOTE: THE PIPE LENGTHS, SLOPES, AND INVERTS SHOWN IN THE ABOVE PROFILES ARE BASED ON A 2D LENGTH AND MEASURED FROM INSIDE WALL TO INSIDE WALL OF STRUCTURES. CONTRACTOR SHALL VERIFY ALL INVERTS AND LINE LENGTHS PRIOR TO CONSTRUCTION. 0 O + LINE F 2080 LL '070 M W LL W O Z J � -H O OO ON (0 O N00 O� O OQ0 j 1060 a- N P- z 2050 Know what's below. Call before you dig. STORM DRAINAGE PROFILES 0 20 40 80 1 inch = 40 ft. (H) 0 4 8 16 "O!!!� 1 inch = 8 ft. (V) woW m °'Uj oo0LO W N� Cl) H 00 a N a N N N N U a V Z z LL! 66 Z H W CO 00 N N j 00 CM CM W J 00 �00 a W Z Q �00 LL Hw > CO m O LL co w 0 LL aH (L Zaa. 3 3 LO E 0 0 a y CL w 0 V� +^+ L C N > ^ — •v/ Y .0 Z OO 3 T N w w Z w U J J ILI W m U Z Y � Z 0 m J Q f- m D Cl) � Z Z O w 0_ U w 0_ � w � 0 W 0 V) O w Cy)o Q o M O o z Q Z Q J O Q J W 0 � O Z L U z O U Z 0 WY _J Q 0 O � U /� LL \� LL > _J w o 0 Z D o_ Q z w 0 O Q � J O � z Q Q U o z 0rK 0_ o z DRAWN BY: DNK CDC PROJECT NO.: 21943 SHEET C403 I \ SIDEWALK SURFACE X X a X a 1 2 1/8" RADJ/ / JOINT FILLER TRANSVERSE EXPANSION JOINT TRANSVERSE EXPANSION JOINT PROPOSED SIDEWALK (CONC. 4000 P.S.I. MIN.) GROOVE SURFACE VARIES -- JOINT (SEE PLAN) 1/2"/FT. 1 /4"/FT. • \-4" WASHED STONE BASE TYPICAL SECTION N.T.S. ni Al\i \nr\Al NOTES: 1. TRANSVERSE EXPANSION JOINTS TO BE A MAXIMUM OF 40 FEET. 2. ALL CONCRETE TO BE FINISHED WITH CURING COMPOUND. 3. A GROOVE JOINT 1" DEEP WITH 1/3" RADII SHALL BE REQUIRED IN THE CONCRETE SIDEWALK AT 5' INTERVALS. ONE 1/2" EXPANSION JOINT WILL BE REQUIRED AT 40' INTERVALS. A 1/2" EXPANSION JOINT WILL BE REQUIRED WHERE THE SIDEWALK JOINS ANY RIGID STRUCTURE. 4. 6"x6"/ 1.4x1.4 W.W.F. REQUIRED IN ALL SIDEWALKS. 2" LIFTS OF ASPHALT � TYPE SF 9.5C TO MAT EXISTING PAVEMENT THICKNESS STING B DRY/ UNDISTURBED EARTH NOTE: D2.01 SIDEWALK DETAIL NOT TO SCALE E'76N.7CSA_BCC >n, �r XISTING BASE COURSE COMPACTED . PROCTOR 2" MIN. 6" MIN. TACK EXISTING PAVEMENT EDGE WITH CRS—I OR CRS—II. PATCH TO MATCH EXISTING PAVEMENT ---6" LIFTS OF SUITABLE SOIL OR CABC AT OPTIMUM I���III MOISTURE COMPACTED STANDARD PROCTOR PROPOSED PIPE 1. EDGE TO BE SAWED WITH A CONCRETE SAW TO A NEAT SQUARED EDGE. BROOMED CLEAN OF DUST BEFORE TACK COAT IS APPLIED. 2. EDGES TO BE TACKED WITH EMULSIFIED ASPHALT TACK CRS—I OR CRS—II D2.03 ASPHALT DRIVE REPAIR DETAIL NOT TO SCALE N SF 9.5C ASPHALT CABC STONE COMPACTED TO 100% OF MAXIMUM LABORATORY DRY DENSITY (ASTM D 1557 OR AASHTO T 180) y\ COMPACTED \,A SUBGRADE TO MINIMUM 98% OF THE MAXIMUM DRY DENSITY USING THE MODIFIED PROCTOR TEST E TYPICAL LIGHT DUTY PAVEMENT CROSS SECTION NOT TO SCALE SEE PAVING DETAIL ASPHALT- TOOLED CONTRACTION JOINTS @ 10' O.C. r—► A 6" 1/2" RAID. A I 2" RAD. SECTION A —A FG 6" MIN. COMPACTED ABC COMPACTED SUBGRADE COMPACTED CABC UNDER PAVING A 1/8" RAD. (TYP) JOINT SEALER JOINT FILLER 1/2 EXPANSION JOINTS Q 30' O.C. AND ADJACENT TO ALL RIGID OBJECTS CONSTRUCTION NOTES: 1. CURB SHALL BE CONSTRUCTED WITH 4000 PSI CONCRETE 2. SURFACE SHALL BE GIVEN A LIGHT BROOM FINISH WITH THE BRUSH MARKS PARALLEL TO THE CURB. 3. SUB —GRADE SHALL BE COMPACTED TO 98% OF MODIFIED PROCTOR TEST 4. CABC SHALL BE COMPACTED TO 100% OF MODIFIED PROCTOR TEST D2.04 CONCRETE CURB & GUTTER (18 ") DETAIL NOT TO SCALE SITE DETAILS Y Z J Q m cn O z w o. w Q Of O V) W G 000 CLO 0) coco uj 0 ul W N T T W-e N a N co'T V Z N N Z z La a aLa 04 oD o0 OJ W V W J 000 000 a w Z Q > Z x N a0=OLL m W OLL a a Z a a a� N �a x0 o" O J 0) N �y W a o p. oo W N r7 - °°d �GO� E 0 0 vi CL U c 0 0 c P y m 3 3 It ao N U co Z w U J co W m U Z z 0 m Of 0 w 0 ofz W Q z J O Q J W — LL 0 z U z D 0 - C) Z 0 Lucn J Q mr I � r Q Ld w Z z Q z o Q Q w o z w LLJ cn z cn w DRAWN BY: DNK CDC PROJECT NO.: 21943 SHEET C921 ALL NON-FERROUS UNDERGROUND LINES OUTSIDE BUILDING FOOTPRINT SHALL BE REQUIRED TO HAVE A MAGNETIC -TYPE WARNING TAPE INSTALLED IN THE BACKFILL AT LEAST 6" BELOW GRADE. SPRINGLINE 00 w w MIN. TRENCH WIDTH (SEE TABLE) FINAL BACKFILL (SEE SPECIFICATION FOR COMPACTION REQUIREMENT) INITIAL BACKFILL (COMPACTED TO 98% OF STANDARD PROCTOR) HAUNCH (COMPACTED TO 98% OF STANDARD PROCTOR) BEDDING (COMPACTED TO 98% OF STANDARD PROCTOR) SUITABLE FOUNDATION MINIMUM TRENCH WIDTHS PIPE DIAMETER MIN. TRENCH WIDTH 12" 30" 15" 34" 18" 39" 24" 48" 30" 56" 36" 64" 42" 72" 48" 80" 54" 88" 60" 96" MAXIMUM COVER PIPE DIAMETER CLASS 1 CLASS II CLASS III 12" 43' 28' 20' 15" 43' 28' 20' 18" 43' 28' 20' 24" 34' 23' 17' 30" 34' 23' 17' 36" 34' 23' 16' 42" 34' 23' 16' 48" 31' 21' 15' 54" 31' 21' 15' 60" 31' 21' 15' io I *ASSUMED PIPE BACKFILL IS PLACED AND COMPACTED TO THE REQUIRED 98% OF THE STANDARD PROCTOR NOTES: 1. ALL PIPE SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH LATEST EDITION OF ASTM D2321, "STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER GRAVITY FLOW APPLICATIONS", AND THE PROJECT SPECIFICATIONS. 2. MEASURES SHOULD BE TAKEN TO PREVENT MIGRATION OF NATIVE FINES INTO BACKFILL MATERIAL, WHEN REQUIRED. 3. FOUNDATION: WHERE THE TRENCH IS UNSTABLE, THE CONTRACTOR SHALL EXCAVATE TO A DEPTH REQUIRED BY THE ENGINEER AND REPLACE WITH SUITABLE MATERIAL AS SPECIFIED BY THE ENGINEER. AS AN ALTERNATIVE AND AT THE DISCRETION OF THE DESIGN ENGINEER, THE TRENCH BOTTOM MAY BE STABILIZED USING A GEOTEXTILE MATERIAL. 4. BEDDING: SUITABLE MATERIAL SHALL BE CLASS I, II, OR, III. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. UNLESS OTHERWISE NOTED BY THE ENGINEER, MINIMUM BEDDING THICKNESS SHALL BE 4"(100 mm) FOR 12"-24" (100 mm - 600 mm); 6"(150 mm) FOR 30"-60" (750 mm - 900 mm). 5. HAUNCHING/INITIAL BACKFILL: SUITABLE MATERIAL SHALL BE CLASS I, II, OR III IN THE PIPE ZONE EXTENDING NOT LESS THAN 6" ABOVE CROWN OF PIPE. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. MATERIAL SHALL BE INSTALLED AS REQUIRED IN ASTM D2321, LATEST EDITION. 6. MINIMUM COVER: MINIMUM COVER, H, IN NON -TRAFFIC APPLICATIONS (GRASS OR LANDSCAPE AREAS) IS 12" FROM THE TOP OF PIPE TO GROUND SURFACE. ADDITIONAL COVER MAY BE REQUIRED TO PREVENT FLOTATION. FOR TRAFFIC APPLICATIONS, MINIMUM COVER, H, IS 12" UP TO 48" DIAMETER PIPE AND 24" OF COVER FOR 54"-60" DIAMETER PIPE, MEASURED FROM TOP OF PIPE TO BOTTOM OF FLEXIBLE PAVEMENT OR TO TOP OF RIGID PAVEMENT. HEAVY CONSTRUCTION LOADS MAY REQUIRE ADDITIONAL COVER TO PROTECT THE PIPE. CONTRACTOR TO VERIFY THAT CONSTRUCTION LOADS WILL NOT DAMAGE INSTALLED PIPES AND PROTECT INSTALLED PIPES IF REQUIRED. 7. MAXIMUM COVER: MAXIMUM COVER SHALL BE MEASURED FROM THE FINISHED SURFACE OF THE GROUND TO THE TOP OF THE PIPE, AND SHALL BE LESS THAN THE MAXIMUM VALUES SHOWN IN THE CHART WITHIN THIS DETAIL. D4.01 HDPE TRENCH INSTALLATION DETAIL NOT TO SCALE SHALLOW TYPE INTERMEDIATE TYPE (4'X4' INTERIOR) (5 FEET OR LESS IN DEPTH) (5 FEET TO 20 FEET IN DEPTH) LLT 6" MIN MIN. 6" WASHED STONE BEDDING SEE NOTE 'A' p w w 26" x w O O oz STANDARD STANDARD STEPS 16" STEPS 16" ON ON CENTER CENTER 6" MIN. MIN. 6" WASHED STONE BEDDING REINFORCED CONCRETE SLAB \,\ 48" MIN. 6" WASHED STONE BEDDING QD 6" MIN. MIN. 6" WASHED STONE BEDDING SEE NOTE 'A' O N 26" 0 48" 0 NOTE 'A' C° FOR CURB INLET: FRAME, GRATE & HOOD PER D.O.T. STD. 840.03E FOR GRATE INLET: FRAME, GRATE & HOOD PER D.O.T. STD. 840.16 FOR JUNCTION BOX: FRAME & COVER PER D.O.T. STD. 840.54 FOR CONVEX INLET: FRAME, GRATE & HOOD PER NEENAH CONVEX INLET GRATE R-2577 NOTES: 60 1. CONCRETE SHALL BE 4000 PSI MIN. FOR ALL PRECAST CONCRETE CATCH BASINS. 6 SLAB THICKNESS 2. PRECAST CONCRETE STRUCTURES MAY ONLY BE INSTALLED AND REINFORCEMENT TO DEPTHS CERTIFIED AS ACCEPTABLE BY THE o I� MANUFACTURER. C° 36> FOR SOIL AND �--. TRAFFIC LOADING BY 3. "WAFFLE" BOXES ARE ACCEPTABLE FOR SHALLOW TYPE m AN ENGINEER CATCH BASINS UP TO 10' DEEP PER D.O.T. 4. PRECAST CONCRETE CATCH BASINS SHALL CONFORM TO N SLAB DETAIL NCDOT STD. 840.02. PRECAST CONCRETE CATCH BASIN DETAILS FOR D4.04 GRATE INLETS, CURB INLETS, AND JUNCTION BOXES NOT TO SCALE N] PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL PIPE OUTLET TO WELL-DEFINED CHANNEL PLAN La La o FILTER BLANKET FILTER BLANKET SECTION AA SECTION AA NOTES: 1. La IS THE LENGTH OF THE RIP RAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (MINIMUM IS 24" DEEP IF STONE IS CLASS II) 3. IN A WELL-DEFINED CHANNEL, EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE WATT BANK, WHICHEVER IS LESS. MOR 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP AND SOIL FOUNDATION. 5. COMPACT ANY REQUIRED FILL TO DENSITY OF SURROUNDING UNDISTURBED MATERIAL. 6. RIP RAP MAY BE FIELDSTONE OR ROUGH QUARRY STONE AND SHALL BE HARD. ANGULAR AND WELL -GRADED. 7. CONSTRUCT APRON AT ZERO GRADE. TOP OF RIP RAP SHALL BE LEVEL WITH THE RECEIVING CHANNEL OR SLIGHTLY LOWER. 8. ALIGN APRON WITH RECEIVING CHANNEL OR STREAM. ASSURE APRON IS STRAIGHT THROUGHOUT ITS LENGTH. 9. END WIDTH OF APRON TO BE EQUAL TO WIDTH OF RECEIVING CHANNEL. RIP -RAP APRON D4.02 NOT TO SCALE STANDARD TYPE (UP TO 20 FEET IN DEPTH) STANDARD MANHOLE RING AND COVER STANDARD STEPS STANDAR 16" ON STEPS 1E CENTERS CENTER o TOP DESIGNED N FOR HS-20 LOADING O MAY BE FLAT OR 48" I.D. ECCENTRIC CONE MIN. 5 a PLASTIC CEMENT PUTTY OR OBUTYL RUBBER JOINTS BRICK AND MIN. 6" THICK WASHED MORTAR INVERT STONE BEDDING FLAT TOP DETAIL 58" DIA. BRICK AND MORTAR INVERT NOTE: SEE TYPICAL CATCH BASIN DETAIL FOR TYPICAL STORM STRUCTURE NOTES AAAT(H (;RATF/AAANIHnI F T() TO CREATE FLOW LINE NOTE: CONTRACTOR TO VERIFY ALL ELEVATIONS AND EXISTING PIPE SIZES AND DEPTHS PRIOR TO CONSTRUCTION. REVIEW ALL INFORMATION AND DATA WITH ENGINEER FOR APPROVAL BEFORE ORDERING OR INSTALLING PROPOSED STRUCTURES OR PIPE. INSTALLATION OF DRAINAGE D4.03 STRUCTURE OVER EXISTING PIPE NOT TO SCALE DEEP TYPE (OVER 20 FEET IN DEPTH) STANDARD MANHOLE RING AND COVER 60" I.D. MIN. 6" PRECAST CONCRETE MANHOLE D4.05 ROUND STORM STRUCTURE NOT TO SCALE TOP DESIGNED FOR HS-20 LOADING MAY BE FLAT OR ECCENTRIC CONE PLASTIC CEMENT PUTTY OR BUTYL RUBBER JOINTS MIN. 6" THICK WASHED STONE BEDDING FLAT TOP DETAIL 70" DIA. INCOMING FLARED END SECTION MATERIAL TO MATCH MATERIAL OF INCOMING PIPE GENERAL NOTES FOR STORM 1. ALL STORM INSTALLATION ON THIS SITE MUST BE AUTHORIZED BY PERMITS ISSUED BY NCDENR. ALL SITEWORK SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL REGULATORY STANDARDS AND ALL REQUIREMENTS IN THE PROJECT TECHNICAL SPECIFICATIONS. 2. CONTRACTOR TO VERIFY WITH ENGINEER THAT THE REQUIRED STORMWATER, AND ASSOCIATED NON -GRADING PERMITS HAVE BEEN OBTAINED PRIOR TO BEGINNING CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE UNDER THE INSPECTION OF THE ENGINEER, THE OWNER, AND NCDENR. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 72 HOURS PRIOR TO BEGINNING WORK. ANY WORK COVERED PRIOR TO ENGINEER'S INSPECTION IS SUBJECT TO UNCOVERING D DRAINAGE AND BACKFILLING AT THE CONTRACTOR'S EXPENSE. RE PER TIONAL STANDARDS 4. ALL WORK MUST BE PERFORMED BY A NORTH CAROLINA LICENSED CONTRACTOR. 5. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING THE EXACT LOCATION AND ELEVATION FOR ALL UTILITIES PRIOR TO CONSTRUCTION; AND TO NOTIFY ENGINEER OF ANY CONFLICTS OR DISCREPANCIES. THE LOCATION OF SOME UTILITIES SHOWN ON THE PLANS HAVE BEEN APPROXIMATED. ALL BURIED UTILITIES HAVE NOT BEEN SHOWN ON THE PLANS AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR LOCATION PRIOR TO CONSTRUCTION. 6. PROTECT EXISTING SITE FEATURES (SHOWN TO REMAIN) AND NEWLY COMPLETED WORK DURING CONSTRUCTION. ANY DAMAGE INCURRED DURING OR RESULTING FROM CONSTRUCTION ACTIVITY IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE REPAIRED IN ACCORDANCE WITH APPLICABLE STANDARDS OF APPROPRIATE AGENCIES, AS WELL AS THE PROJECT PLANS AND SPECIFICATIONS, AT THE CONTRACTOR'S EXPENSE. 7. THE CONTRACTOR IS TO NOTIFY ALL UTILITY COMPANIES AT LEAST 72 HOURS BEFORE CONSTRUCTION ACTIVITY IS TO BEGIN. THE CONTRACTOR SHALL NOTIFY NC ONE CALL AT 811, 48 HOURS BEFORE CONSTRUCTION BEGINS. NOTIFY THE ENGINEER AT LEAST 72 HOURS BEFORE STARTING CONSTRUCTION ACTIVITIES. IG PIPE 8• EROSION CONTROL IS FIELD PERFORMANCE BASED AND CONTRACTOR SHALL INSTALL AND )LAIN MAINTAIN ANY EROSION CONTROL MEASURES NECESSARY TO ASSURE MAXIMUM PROTECTION OF THE SITE. CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL MEASURES REQUIRED TO CONTROL SEDIMENT DURING INSTALLATION ALL STORM PIPES AND APPURTENANCES.. 9. CONTRACTOR IS RESPONSIBLE FOR INSTALLING, MAINTAINING, AND REMOVING ALL NECESSARY EROSION AND SEDIMENTATION CONTROL MEASURES. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ADJUSTMENT OF ALL UTILITY SURFACE ACCESSES WHETHER THE CONTRACTOR PERFORMS THE WORK OR A UTILITY COMPANY PERFORMS THE WORK. 11. ALL HIGH DENSITY POLYETHYLENE (HDPE) CORRUGATED STORM SEWER DETENTION PIPE SHALL BE TYPE "S" HANCOR SURELOK ADSN12 OR APPROVED EQUIVALENT WITH WATER TIGHT JOINTS MEETING AASHTO M252, M294 OR MP7. ALL HDPE PIPE IS TO BE INSTALLED ACCORDINGLY TO MANUFACTURERS SPECIFICATIONS AND IN ACCORDANCE WITH ASTM D2321 WITH THE EXCEPTION THAT MINIMUM COVER IN TRAFFIC LOAD AREA SHALL BE 24" FOR 4"-48" AND 18" FOR 60". PIPE MATERIAL SHALL MEET THE PRODUCT SPECIFICATIONS OF ASTM F667 AND SHALL HAVE A SMOOTH WALL INTERIOR. FOR ALL STORM SYSTEMS, WORK MUST BEGIN AT THE LOW POINT OF THE SYSTEMS. NOTIFY THE ENGINEER IMMEDIATELY OF ANY VARIANCES FROM EXPECTED CONDITIONS. 12. CURB INLET FRAME, GRATE AND HOOD SHALL CONFORM TO NCDOT 840.03E. DROP INLET FRAME AND GRATE SHALL CONFORM TO NCDOT 840.16. FIELD INLET COVER SHALL CONFORM TO NCDOT STANDARD DETAIL 840.03, OPENING FACING UPSTREAM. MANHOLE RING AND LID TO CONFORM TO NCDOT 840.54. OPEN THROAT INLETS TO CONFORM TO NCDOT 840.04 WITH A MANHOLE RING AND LID INSTALLED IN THE TOP FOR ACCESS TO THE STRUCTURE. SET ACCESS POINT ADJACENT TO A STRUCTURE WALL AS TO ALLOW ACCESS TO STEPS. 13. CONCRETE AND MASONRY SHALL MEET THE REQUIREMENTS OF APPROPRIATE SECTION OF NCDOT STANDARD SPECIFICATIONS FOR ROAD AND STRUCTURES (LATEST EDITION). CONCRETE SHALL BE CLASS A OR B, 4000 PSI MINIMUM, MEETING THE REQUIREMENTS OF SECTION 900, CONSTRUCTED IN ACCORDANCE WITH SECTION 825. MASONRY SHALL MEET THE REQUIREMENTS OF SECTION 940, CONSTRUCTED IN ACCORDANCE WITH SECTION 830 AND/OR 834. 14. TRENCH BACKFILL AND COMPACTION TESTING SHALL BE PERFORMED BY A CERTIFIED SOILS LABORATORY UNDER ALL PAVED AREAS. 15. COMPACTION REPORTS MUST BE PROVIDED TO OWNER INDICATING THAT FILL HAS BEEN COMPACTED TO NOT LESS THAN 95% MAXIMUM DENSITY (STANDARD PROCTOR). PLAN ELEVATION NOTES: 1. THE DIMENSION OF THE THE FLARED END SECTION SHALL BE PER MANUFACTURER'S SPECIFICATIONS. 2. THE SKIRT SECTION OF THE FLARED END SECTION SHOULD BE JOINED TO THE INCOMING PIPE PER MANUFACTURER'S SPECIFICATIONS. PIPE OUTLET TO WELL-DEFINED CHANNEL PLAN La La 00 71V FILTER BLANKET FILTER BLANKET SECTION AA SECTION AA NOTES: 1. La IS THE LENGTH OF THE RIP RAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (MINIMUM IS 24" DEEP IF STONE IS CLASS 11) 3. IN A WELL-DEFINED CHANNEL, EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP AND SOIL FOUNDATION. 5. COMPACT ANY REQUIRED FILL TO DENSITY OF SURROUNDING UNDISTURBED MATERIAL. 6. RIP RAP MAY BE FIELDSTONE OR ROUGH QUARRY STONE AND SHALL BE HARD. ANGULAR AND WELL -GRADED. 7. CONSTRUCT APRON AT ZERO GRADE. TOP OF RIP RAP SHALL BE LEVEL WITH THE RECEIVING CHANNEL OR SLIGHTLY LOWER. 8. ALIGN APRON WITH RECEIVING CHANNEL OR STREAM. ASSURE APRON IS STRAIGHT THROUGHOUT ITS LENGTH. 9. END WIDTH OF APRON TO BE EQUAL TO WIDTH OF RECEIVING CHANNEL. FLARED END SECTION WITH D4.06 RIP -RAP APRON NOT TO SCALE STORM DRAINAGE DETAILS Y Z p J Q m cn CD z w a_ a' w Q 0 cn W F, co CEO 0 coco ul 0 In W N� T H W-e N a N N U'T V Z N N Z z uP co ao W w co Lu W O J V Ma W cc J W w Z Q> w X N co=OLL m W OLL a a Z a a a� 3 ul It 00 N 0 W U) Z W U_ I J J W m U Z z 0 m of U w p 1� Ny ,, ,� o oo�by`'o .4 _o J � os . o� V)o�� N000" Q Z ( / 0 J O Q J_ W a 0 z U. U z D 0 0 z Wcn 0 Y J Q T i 0 o r ~ w cn o' J w > Q w ~ Z z z o Q z w U O Q J o z Q [if Q 0 o z > O w o Z DRAWN BY: DNK CDC PROJECT NO.: 21943 SHEET C941 NORTH a a PROPOSED 10' WIDE BERM ELEV: 2086.00 a CO O N PROPOSED OPEN THROAT CONTROL STRUCTURE "A5" O N 10.0' 1 1 � 1 � 0 O 1 N 1 c0 O 1 0 1 0 1 1 1 1 co 1 00 O ; 1 Q � !a zj a a a as A4 — 2088 2087 i 2086 2085 —2084 80.0' PROPOSED RIP R/ LENGTH: WIDTH AT FES: WIDTH AT END: THICKNESS: STONE CLASS: R° �o PROPOSED 2-4" PERFORATED UNDERDRAINS WITH CLEANOUTS 2084 2085 2086 a -2086 2085 — a a a D4.o� BIORETENTION CELL PLAN SCALE: 1 "=10' \ � a �O 9 C Co O N Co O N PROPOSED CLEANOUT (TYP) a a GRAPHIC SCALE 10 0 5 10 20 40 ( IN FEET ) 1 inch = 10 ft. FESCUE/BLUEGRASS MIX SOD TO BE PLACED ON SURFACE. CONTRACTOR IS RESPONSIBLE FOR OBTAINING FESCUE/ BLUEGRASS SOD AND ASSOCIATED FERTILIZATION BASED UPON SITE SPECIFIC SOIL TYPE AND SEASONAL CONDITIONS. SOD SHALL NOT BE GROWN IN CLAY SOIL. CONTRACTOR SHALL SUBMIT FESCUE/BLUEGRASS SOD DATA FOR REVIEW AND RECEIVE APPROVAL PRIOR TO ORDERING THE MATERIAL. CONTRACTOR SHALL INSTALL SOD PER MANUFACTURER'S REQUIREMENTS. 10' WIDE BERM ELEV. 2086.0 CLEAN OUT PIPE TO BE CAPPED (TYP) 3• � ------------------- 2.5', TOP OF STONE ELEVATION: 2081.5 ...................................................................................................................... ELEVATION: 2080.83 25 YR. STORM ELEVATION: 2085.90 ------------------------------ SURFACE ELEVATION: 2084.00 %/ %/ %/ %/� // // //N\/j/ i\ 4" PERFORATED UNDERDRAIN/� 8" OF WASHED #57 STONE ASHTO M26�8 CLASS 2 NON -WOVEN UNDERDRAIN OUTLET TO CONNECT INTO STRUCTURE GEOTEXTILE FILTER FABRIC TEE W/ PIPE STUBBED TO 18' BELOW PLANTING SURFACE D4.08 BIORETENTION CELL CROSS SECTION NOT TO SCALE 30" OF FILL SOIL MEDIA MIX*: 80% MEDIUM TO COARSE SAND 10% FINES 10% ORGANIC * CONTRACTOR TO ENSURE MIX HAS A P-INDEX OF 30. * CONTRACTOR TO CONSULT WITH ENGINEER FOR ANY MEDIA ALTERNATIVES * CONTRACTOR SHALL NOT USE MECHANICAL COMPACTION EIR ELEV.=2085.5 3'• � ;�/jam/jam/jam% ---- i</j �/j✓j✓jam OPEN THROAT CONTROL 1'.,5' STRUCTURE "A5" INV.: 2082.5 INV.: 2080.83 ---------- ------ INV = 2080.0 END CAP FOR MAINTENANCE BIO-RETENTION CELL FEATURE SIDE SLOPES TOP ELEV SOD ELEV SURFACE (FT) (FT) BERM (FT) (FT) AREA (MEDIA PLANTING PLAN FOOTPRINT)(SF) 1 3:1 2086.0 2084.0 4,320 SOD PRECAST OR 8" BR W/ 1/2" 1:2 MORT, ON OUTSIDE AND II` NOTE: CORE OPENINGS TO ACCOMMODATE PROPOSED PIPES. (REFER TO PLAN SHEET FOR SIZE AND LOCATION OF PIPE) D4.09 OPEN THROAT CONTROL STRUCTURE 'A5' DETAIL NOT TO SCALE BIORETENTION CELL DETAILS Y Z 0 J Q m D c� z Ld W a_ Of W Q O V) O N rn O 0 W C 000 Ln a)ul coC N W N� Cl) H� a N a N N N Lo N Z z uj a0 a0 z'T V H CD o0 uj a w Z Q cc I.-Cn W X Co m O LL Cl)CL Cl)W O LL ZQa a� 3Cm a z O a_ O w 0 ,m o0 00 ��P� ooy\y _o / 0)'o LLI = cn Lr) � = (n M - - O�� O 1 \ � GOB\ N 000000�R� Q z U) o Q Q J W0 LL z U z 0 O Z O WY _J Q O J LL Q > W z o z J J Q Z W O O J O z � O � Q O � � Z W I—W Z W 0 Q� O z � C/') W m 3: DRAWN BY: DNK CDC PROJECT NO.: 21943 SHEET C942 NORTON ATHLETIC FIELDS STORMWATER CALCULATIONS MARCH 9th, 2020 PREPARED FOR: WESTERN CAROLINA UNIVERSITY 3476 OLD CULLOWHEE ROAD CULLOWHEE, NC 28723 CURTIS MONTEITH (828) 227-7442 pp— CtwA C�lcpts, pA JOB NO. 21943 lU PAIT0NPWN IE A91m" w K" PHONE PM FAX PM MN M6 @MAlNffffM .8UrM9 WAVNWA"NGW= Pf[ONE im ma-4tM FAX P= In 6.81 Norton Athletic Fields CDC Project No.: 21943 CDCS.-T. Concepts, PA TABLE OF CONTENTS 1. Stormwater Narrative 2. Drainage Area Maps • Bioretention Cell Drainage Area Bulletin 3. Stormwater Control Measures • HydroCAD Report 4. Pipe Network Calculations • 25 Year Event 5. Pipe Outlet Protection 6. NRCS Soil Report 7. Figures • USGS Topo Map • FEMA FIRMette Map • NOAA Precipitation Tables Mailing Address: P.O. Box 5432, Asheville, NC 28813 168 Patton Avenue Asheville, NC 28801 52 Walnut Street — Suite 9, Waynesville, NC 28786 Phone 828-252-5388 Fax 828-252-5365 Phone: 828-452-4410 Fax: 828-456-5455 MCConcepts, PA STORMWATER NARRATIVE General Norton Athletic Fields is located on a 9.74-acre part of an overall 196.50-acre parcel (PIN# 7559-23-1452) located in Cullowhee, NC, on University Way at Western Carolina University. The project area consists of an existing residence hall, parking lots, sports fields and associated grass with occasional trees. The predevelopment impervious total is approximately 18.5%. The proposed development will be constructed in 1 phase and consists of 2 football fields, 2 soccer fields, and a hammer throw field and additional parking. A sidewalk has been proposed to access this area from the parking lots. The post project impervious total is approximately 19.4%. Storm Drainage Elevations make treating the proposed parking lot difficult; therefore, it is more feasible to treat existing parking located at a higher elevation. The existing parking lot is currently untreated. The amount of existing parking lot to be treated is approximately triple the surface area of the proposed parking lot. The proposed stormwater runoff will be collected via, grate inlets, open throat structures, and conveyed through storm pipes into a bioretention pond. This pond is sized to treat the runoff volume for the 1" storm event. Permanent stormwater conveyance pipes were sized based on the 25-year storm event. Mailing Address: P.O. Box 5432, Asheville, NC 28813 168 Patton Avenue, Asheville, NC 28801 52 Walnut Street — Suite 9, Waynesville, NC 28786 Phone 828-252-5388 Fax 828-252-5365 Phone: 828-452-4410 Fax: 828-456-5455 Drainage Area Maps: PROPOSED UNTREATED IMPERVIOUS (17,090 SF/0.39 AC.) (BLUE) f 2d85 co r �o i _ Ln 00-_ c �J, 0 N - - 1 0 I , I �f Ln 0 00 o 0 c� N Ln � EXISTING FLOODWAY (TYP) cc o 1 1 N N o ^�— - I 1 n x � —1 /r !� ` — J\ `a /J — C-C77777777— �" - _I NORTON ATHLETIC FIELDS I BIORETENTION CELL "4DCDes - --'' DRAINAGE AREA BULLETIN Design Concepts, PA NCBELS #: C-2184 MARCH 2O20 Stormwater Control Measures: C__DCC ivil Design Concepts, PA WATER QUALITY CALCULATIONS BASIN INFORMATION SCM ID Bio-Pond 1 Drainage Area (A) 2.04 acres Impervious Area 1.19 acres Percent Impervious (IA) 58.3% Run-off coefficient (Rv) 0.58 WATER QUALITY VOLUME Design Storm Depth (RD) 1 inches Design Volume Required (DV) 4258 cu ft BIORETENTION CELL SCM CONFIGURATION Ponding Depth 12 inches Design Ponding Area 4258 sq ft Pond Area Provided 4320 sq ft Volume provided (V) 14,227 cu ft Media Infiltration Rate 2 in/hr Drawdown Time (T) 6 hours UNDERDRAIN SIZE Underdrain Flow Rate 0.659 cu ft/s Design Flow Rate (Q) 6.587 cu ft/s Manning's Roughness (n) 0.011 Minimum Pipe Diameter (D) 2.85 inches Pipe Diameter Selected 4.0 inch Number of Pipes Required 2 Norton Athletic Fields CDC Project No.: 21943 Rv = 0.05 + 0.90A) DV = 3630 * RD * RV * A Maximum Depth = 12" DA = DV / Pond Depth * 12 From HydroCAD Report From HydroCAD Report Estimated Rate Maximum of 2 Days Rate = V / (T * 3600) Factor of Safety = 10 Perforated PVC Pipe Minimum Slope of 0.5% Minimum Diameter = 4" See Note Below Notes: Number of pipes from NCDEQ Stormwater Design Manual section A-4 Table 1 & 2 Issued 3/6/2020 2S )� Post Development 1 - Managed Subcat Reach on Link Bioretention BMP 1 2020-03-02- BioCell Prepared by {enter your company name here} Printed 3/6/2020 HydroCAD® 10.00-12 s/n 04679 ©2014 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (sq-ft) (subcatchment-numbers) 37,230 79 50-75% Grass cover, Fair, HSG C (2S) 51,682 98 Paved parking, HSG C (2S) 88,912 90 TOTAL AREA 2020-03-02- BioCell Prepared by {enter your company name here} Printed 3/6/2020 HydroCAD® 10.00-12 s/n 04679 ©2014 HydroCAD Software Solutions LLC Page 3 Soil Listing (all nodes) Area Soil Subcatchment (sq-ft) Group Numbers 0 HSG A 0 HSG B 88,912 HSG C 2S 0 HSG D 0 Other 88,912 TOTAL AREA 2020-03-02- BioCell Prepared by {enter your company name here} Printed 3/6/2020 HydroCAD® 10.00-12 s/n 04679 ©2014 HydroCAD Software Solutions LLC Page 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Sut (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) (sq-ft) Cover Nur 0 0 37,230 0 0 37,230 50-75% Grass cover, Fair 0 0 51,682 0 0 51,682 Paved parking 0 0 88,912 0 0 88,912 TOTAL AREA 2020-03-02- BioCell Type 1124-hr 1-year Rainfall=2.78" Prepared by {enter your company name here} Printed 3/6/2020 HydroCAD® 10.00-12 s/n 04679 ©2014 HydroCAD Software Solutions LLC Page 5 Time span=0.00-36.00 hrs, dt=0.01 hrs, 3601 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2S: Post Development 1 - Runoff Area=88,912 sf 58.13% Impervious Runoff Depth=1.78" Tc=5.0 min CN=90 Runoff=6.56 cfs 13,212 cf Pond 3P: Bioretention BMP 1 Peak Elev=2,085.51' Storage=11,476 cf Inflow=6.56 cfs 13,212 cf Outflow=0.10 cfs 1,790 cf Total Runoff Area = 88,912 sf Runoff Volume = 13,212 cf Average Runoff Depth = 1.78" 41.87% Pervious = 37,230 sf 58.13% Impervious = 51,682 sf 2020-03-02- BioCell Type // 24-hr 1-yearRainfa/1=2.78" Prepared by {enter your company name here) Printed 3/6/2020 HydroCADO 10.00-12 s/n 04679 © 2014 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 2S: Post Development 1 - Managed Runoff = 6.56 cfs @ 11.96 hrs, Volume= 13,212 cf, Depth= 1.78" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type II 24-hr 1-year Rainfall=2.78" Area (sf) CN Description 51,682 98 Paved parking, HSG C 37,230 79 50-75% Grass cover, Fair, HSG C 88,912 90 Weighted Average 37,230 41.87% Pervious Area 51,682 58.13% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post Development 1 - Managed Hydrograph III LI I LI L 7 I I I I I I I I 6.56 6 I I I I I I I I I I 1 1 1 1 1 1 1 1 1 11 �y�e�r+ F�ainf�l�=2�7$'t 5 fi l fi l �I 1� IulI, �1S# L I I 4 Runoff Depth=1.78" LL IIIIIIII IIIIIII�L�� 3 ������� II IIIIIIIIIIIIIIDN��d 2 1-1 - I 1 1t-1 rl I-T I-T I rt I T I - I TIM I H 11 1 1 1 1 1 1 1 1 1 1 I H I 1 1 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Time (hours) ■ Runoff 2020-03-02- BioCell Type 1124-hr 1-year Rainfall=2.78" Prepared by {enter your company name here} Printed 3/6/2020 HydroCAD® 10.00-12 s/n 04679 ©2014 HydroCAD Software Solutions LLC Page 7 Summary for Pond 3P: Bioretention BMP 1 Inflow Area = 88,912 sf, 58.13% Impervious, Inflow Depth = 1.78" for 1-year event Inflow = 6.56 cfs @ 11.96 hrs, Volume= 13,212 cf Outflow = 0.10 cfs @ 17.79 hrs, Volume= 1,790 cf, Atten= 99%, Lag= 349.9 min Primary = 0.10 cfs @ 17.79 hrs, Volume= 1,790 cf Routing by Stor-Ind method, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Peak Elev= 2,085.51' @ 17.79 hrs Surf.Area= 5,625 sf Storage= 11,476 cf Plug -Flow detention time= 585.7 min calculated for 1,789 cf (14% of inflow) Center -of -Mass det. time= 417.2 min ( 1,225.6 - 808.5 ) Volume Invert Avail.Storage Storage Description #1 2,080.83' 14,227 cf Custom Stage Data (Irregular)Listed below Elevation Surf.Area Perim. Voids Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (%) (cubic -feet) (cubic -feet) (sq-ft) 2,080.83 4,320 268.0 0.0 0 0 4,320 2,080.84 4,320 268.0 40.0 17 17 4,323 2,081.49 4,320 268.0 40.0 1,123 1,140 4,497 2,081.50 4,320 268.0 25.0 11 1,151 4,500 2,083.99 4,320 268.0 25.0 2,689 3,840 5,167 2,084.00 4,320 268.0 100.0 43 3,884 5,170 2,085.00 5,160 292.0 100.0 4,734 8,617 6,275 2,086.00 6,072 316.0 100.0 5,610 14,227 7,475 Device Routing Invert Outlet Devices #1 Primary 2,080.00' 15.0" Round Culvert L= 145.0' Ke= 0.500 Inlet / Outlet Invert= 2,080.00' / 994.50' S= 7.4862 '/' Cc= 0.900 n= 0.011, Flow Area= 1.23 sf #2 Device 1 2,085.50' 4.0' long x 1.00' rise Sharp -Crested Rectangular Weir X 4.00 2 End Contraction(s) 1.0' Crest Height Primary OutFlow Max=0.05 cfs @ 17.79 hrs HW=2,085.51' (Free Discharge) L1=Culvert (Passes 0.05 cfs of 13.06 cfs potential flow) L2=Sharp-Crested Rectangular Weir (Weir Controls 0.05 cfs @ 0.32 fps) 2020-03-02- BioCell Type // 24-hr 1-yearRainfa/1=2.78" Prepared by {enter your company name here) Printed 3/6/2020 HydroCADO 10.00-12 s/n 04679 © 2014 HydroCAD Software Solutions LLC Page 8 7 U 4 3 0 LL 3 2 fl Pond 3P: Bioretention BMP 1 Hydrograph i T I TI T Lt i Li T IT I T I T I T e Inflow 6.56 cfs i ❑ Primary III Ii"'rea=88,91 �f I I I I I I I I I I 1 IT IT I TI TI 1I ' IIIIIIIIII IIIIIIIIII 1TTITIT I I I Oda kl b6ij:��,O86.M 11 i T T Ttor�age=l f11,7�6��f1 ITITITI I-r MITI T 1 I I T I T I I I IMIIHI IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIII TTTITTTTTITTI 0.10 cfs 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Time (hours) 2020-03-02- BioCell Type 1124-hr 10-year Rainfall=4.68" Prepared by {enter your company name here} Printed 3/6/2020 HydroCAD® 10.00-12 s/n 04679 ©2014 HydroCAD Software Solutions LLC Page 9 Time span=0.00-36.00 hrs, dt=0.01 hrs, 3601 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2S: Post Development 1 - Runoff Area=88,912 sf 58.13% Impervious Runoff Depth=3.57" Tc=5.0 min CN=90 Runoff=12.60 cfs 26,439 cf Pond 3P: Bioretention BMP 1 Peak Elev=2,085.78' Storage=12,981 cf Inflow=12.60 cfs 26,439 cf Outflow=7.83 cfs 15,017 cf Total Runoff Area = 88,912 sf Runoff Volume = 26,439 cf Average Runoff Depth = 3.57" 41.87% Pervious = 37,230 sf 58.13% Impervious = 51,682 sf 2020-03-02- BioCell Type 11 24-hr 10-year Rainfall=4.68" Prepared by {enter your company name here) Printed 3/6/2020 HydroCADO 10.00-12 s/n 04679 © 2014 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 2S: Post Development 1 - Managed Runoff = 12.60 cfs @ 11.96 hrs, Volume= 26,439 cf, Depth= 3.57" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type II 24-hr 10-year Rainfall=4.68" Area (sf) CN Description 51,682 98 Paved parking, HSG C 37,230 79 50-75% Grass cover, Fair, HSG C 88,912 90 Weighted Average 37,230 41.87% Pervious Area 51,682 58.13% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post Development 1 - Managed Hydrograph 14 t F I -r �i Runoff 13 1-1 IH I-1 - 1 cfs I LI HI HI HI H 1-1I-Jylp� + � 12 11 H Irt I rt I rt t I fi t HI HI 1 00- ela�i Fta it 60=-14 6�'t 10 1 1 1 I I I I I I I I I I I I I I I Runoff Arga:�$81,912 of 9 IH IH I 1-+ + I+- I HI H njoT'Vpliu!ne7F61,439 F U oIff-1 ept -3.57„ Iglu _o�� LL 6 1-4 IH 14 IH H 1 -H HI H H 1-4 IH IH t*I 5 4 3 IH IH 14 14 1 1 HI HI HI H IH 14 I H 14 1 2 IH IH 17 17 T 1 HI HI HI H H 17 I H 17 1 T 0 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Time (hours) 2020-03-02- BioCell Type 1124-hr 10-year Rainfall=4.68" Prepared by {enter your company name here} Printed 3/6/2020 HydroCAD® 10.00-12 s/n 04679 ©2014 HydroCAD Software Solutions LLC Page 11 Summary for Pond 3P: Bioretention BMP 1 Inflow Area = 88,912 sf, 58.13% Impervious, Inflow Depth = 3.57" for 10-year event Inflow = 12.60 cfs @ 11.96 hrs, Volume= 26,439 cf Outflow = 7.83 cfs @ 12.03 hrs, Volume= 15,017 cf, Atten= 38%, Lag= 4.2 min Primary = 7.83 cfs @ 12.03 hrs, Volume= 15,017 cf Routing by Stor-Ind method, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Peak Elev= 2,085.78' @ 12.03 hrs Surf.Area= 5,869 sf Storage= 12,981 cf Plug -Flow detention time= 205.9 min calculated for 15,017 cf (57% of inflow) Center -of -Mass det. time= 98.3 min ( 887.2 - 788.9 ) Volume Invert Avail.Storage Storage Description #1 2,080.83' 14,227 cf Custom Stage Data (Irregular)Listed below Elevation Surf.Area Perim. Voids Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (%) (cubic -feet) (cubic -feet) (sq-ft) 2,080.83 4,320 268.0 0.0 0 0 4,320 2,080.84 4,320 268.0 40.0 17 17 4,323 2,081.49 4,320 268.0 40.0 1,123 1,140 4,497 2,081.50 4,320 268.0 25.0 11 1,151 4,500 2,083.99 4,320 268.0 25.0 2,689 3,840 5,167 2,084.00 4,320 268.0 100.0 43 3,884 5,170 2,085.00 5,160 292.0 100.0 4,734 8,617 6,275 2,086.00 6,072 316.0 100.0 5,610 14,227 7,475 Device Routing Invert Outlet Devices #1 Primary 2,080.00' 15.0" Round Culvert L= 145.0' Ke= 0.500 Inlet / Outlet Invert= 2,080.00' / 994.50' S= 7.4862 '/' Cc= 0.900 n= 0.011, Flow Area= 1.23 sf #2 Device 1 2,085.50' 4.0' long x 1.00' rise Sharp -Crested Rectangular Weir X 4.00 2 End Contraction(s) 1.0' Crest Height Primary OutFlow Max=7.78 cfs @ 12.03 hrs HW=2,085.78' (Free Discharge) L1=Culvert (Passes 7.78 cfs of 13.41 cfs potential flow) L2=Sharp-Crested Rectangular Weir (Weir Controls 7.78 cfs @ 1.78 fps) 2020-03-02- BioCell Type 1124-hr 10-year Rainfall=4.68" Prepared by {enter your company name here) Printed 3/6/2020 HydroCADO 10.00-12 s/n 04679 © 2014 HydroCAD Software Solutions LLC Page 12 Pond 3P: Bioretention BMP 1 Hfydrograph 14 t T 12.60 T cfs FL Inflow ❑ Primary 13 I� 1� Infl��v�Ari�a8,�J'� 2'�s�f 12 I i i —7 17 1 10 9 IT1T1T7.83cfs T 1TITITITIT 1-1 1TITITIT 8- 7 IT ITT "141TTT�-1"141TTT 3 0 " 6 IT 17ITI T IT ITITITI TI T IT ITITIT 5 4 141414-I' kI—�1T1-t-ITI�-1"1-41T1-�-I� 3 , IT IT T 17 ITITIT1 TI T 171TITIT f 0 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Time (hours) 2020-03-02- BioCell Type 11 24-hr 25-year Rainfall=5.51 " Prepared by {enter your company name here} Printed 3/6/2020 HydroCAD® 10.00-12 s/n 04679 ©2014 HydroCAD Software Solutions LLC Page 13 Time span=0.00-36.00 hrs, dt=0.01 hrs, 3601 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2S: Post Development 1 - Runoff Area=88,912 sf 58.13% Impervious Runoff Depth=4.37" Tc=5.0 min CN=90 Runoff=15.22 cfs 32,376 cf Pond 3P: Bioretention BMP 1 Peak Elev=2,085.90' Storage=13,654 cf Inflow=15.22 cfs 32,376 cf Outflow=12.86 cfs 20,953 cf Total Runoff Area = 88,912 sf Runoff Volume = 32,376 cf Average Runoff Depth = 4.37" 41.87% Pervious = 37,230 sf 58.13% Impervious = 51,682 sf 2020-03-02- BioCell Type 11 24-hr 25-year Rainfall=5.51 " Prepared by {enter your company name here) Printed 3/6/2020 HydroCADO 10.00-12 s/n 04679 © 2014 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 2S: Post Development 1 - Managed Runoff = 15.22 cfs @ 11.96 hrs, Volume= 32,376 cf, Depth= 4.37" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type II 24-hr 25-year Rainfall=5.51" Area (sf) CN Description 51,682 98 Paved parking, HSG C 37,230 79 50-75% Grass cover, Fair, HSG C 88,912 90 Weighted Average 37,230 41.87% Pervious Area 51,682 58.13% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post Development 1 - Managed Hydrograph 17 IT IT 1 I IT 1 71 7-1 1 IT IT IT IT I IT ■ Runoff 16 15 I� I� 15.22 cfs 14 1_4 1_4 14 14 - 14-1 TI �-I �45k-�el i F 13 12 1-1 L I-i Li 11 TI TI LI ahr�fa��=�5a5�t�t LRuPPffAr-qa:�-481,tl9-0 11 IT IT T T T T1 T�r1°�IVI Iu"21°�" 10 9 Runoff-Depth-4.37" -21 o 1-1I� fi T T �I �I N 1-1I�� LL I-4 14 14 H' TI H H N 1-4 14 6 5 1-1U1-11-1 11TITLILI a1-11-1I-i1-111 4 3 IT IT 17 17 1 T 1 TI TI TI T IT IT I T 17 IT I-f 1--� I T I fit t-I t-1 N 1-1 I-f I I I t 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Time (hours) 2020-03-02- BioCell Type 11 24-hr 25-year Rainfall=5.51 " Prepared by {enter your company name here} Printed 3/6/2020 HydroCAD® 10.00-12 s/n 04679 ©2014 HydroCAD Software Solutions LLC Page 15 Summary for Pond 3P: Bioretention BMP 1 Inflow Area = 88,912 sf, 58.13% Impervious, Inflow Depth = 4.37" for 25-year event Inflow = 15.22 cfs @ 11.96 hrs, Volume= 32,376 cf Outflow = 12.86 cfs @ 12.00 hrs, Volume= 20,953 cf, Atten= 16%, Lag= 2.5 min Primary = 12.86 cfs @ 12.00 hrs, Volume= 20,953 cf Routing by Stor-Ind method, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Peak Elev= 2,085.90' @ 12.00 hrs Surf.Area= 5,979 sf Storage= 13,654 cf Plug -Flow detention time= 180.0 min calculated for 20,953 cf (65% of inflow) Center -of -Mass det. time= 79.0 min ( 862.3 - 783.3 ) Volume Invert Avail.Storage Storage Description #1 2,080.83' 14,227 cf Custom Stage Data (Irregular)Listed below Elevation Surf.Area Perim. Voids Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (%) (cubic -feet) (cubic -feet) (sq-ft) 2,080.83 4,320 268.0 0.0 0 0 4,320 2,080.84 4,320 268.0 40.0 17 17 4,323 2,081.49 4,320 268.0 40.0 1,123 1,140 4,497 2,081.50 4,320 268.0 25.0 11 1,151 4,500 2,083.99 4,320 268.0 25.0 2,689 3,840 5,167 2,084.00 4,320 268.0 100.0 43 3,884 5,170 2,085.00 5,160 292.0 100.0 4,734 8,617 6,275 2,086.00 6,072 316.0 100.0 5,610 14,227 7,475 Device Routing Invert Outlet Devices #1 Primary 2,080.00' 15.0" Round Culvert L= 145.0' Ke= 0.500 Inlet / Outlet Invert= 2,080.00' / 994.50' S= 7.4862 '/' Cc= 0.900 n= 0.011, Flow Area= 1.23 sf #2 Device 1 2,085.50' 4.0' long x 1.00' rise Sharp -Crested Rectangular Weir X 4.00 2 End Contraction(s) 1.0' Crest Height Primary OutFlow Max=13.47 cfs @ 12.00 hrs HW=2,085.90' (Free Discharge) L1=Culvert (Passes 13.47 cfs of 13.57 cfs potential flow) L2=Sharp-Crested Rectangular Weir (Weir Controls 13.47 cfs @ 2.16 fps) 2020-03-02- BioCell Type 11 24-hr 25-year Rainfall=5.51 " Prepared by {enter your company name here) Printed 3/6/2020 HydroCADO 10.00-12 s/n 04679 © 2014 HydroCAD Software Solutions LLC Page 16 Pond 3P: Bioretention BMP 1 Hydrograph 17 I—F I T I T I FI 1-1 I7 T T F 15.22 cfs L Inflow El Primary 1615 14 F 12.86 cfs H H I -+ I13 I4 14 1+ 1 H I4 14 1+ 12 10 0 9 -1 1i 1 I1 Ii 1-i 1 I I LI L1 Ll L I-L III L 0 8 LL 7 fj 7I—FI7 I7171TIT17-1 F-1 17ITITIT- 6 5 Irt1rtI-rI� —tIrtIfi1fi1t—I"MIrtlrtlfi 3 I� I� ICI rt I H H 1--+ 1+1+1 +- 1 0 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Time (hours) 2020-03-02- BioCell Type/1 24-hr 50-year Rainfall=6.18" Prepared by {enter your company name here} Printed 3/6/2020 HydroCAD® 10.00-12 s/n 04679 ©2014 HydroCAD Software Solutions LLC Page 17 Time span=0.00-36.00 hrs, dt=0.01 hrs, 3601 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2S: Post Development 1 - Runoff Area=88,912 sf 58.13% Impervious Runoff Depth=5.02" Tc=5.0 min CN=90 Runoff=17.33 cfs 37,205 cf Pond 3P: Bioretention BMP 1 Peak Elev=2,087.46' Storage=14,227 cf Inflow=17.33 cfs 37,205 cf Outflow=15.46 cfs 25,782 cf Total Runoff Area = 88,912 sf Runoff Volume = 37,205 cf Average Runoff Depth = 5.02" 41.87% Pervious = 37,230 sf 58.13% Impervious = 51,682 sf 2020-03-02- BioCell Type 11 24-hr 50-year Rainfall=6.18" Prepared by {enter your company name here) Printed 3/6/2020 HydroCADO 10.00-12 s/n 04679 © 2014 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 2S: Post Development 1 - Managed Runoff = 17.33 cfs @ 11.96 hrs, Volume= 37,205 cf, Depth= 5.02" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Type II 24-hr 50-year Rainfall=6.18" Area (sf) CN Description 51,682 98 Paved parking, HSG C 37,230 79 50-75% Grass cover, Fair, HSG C 88,912 90 Weighted Average 37,230 41.87% Pervious Area 51,682 58.13% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 1E 1E 17 1E 1E 14 12 12 a 11 1C o E LL f Subcatchment 2S: Post Development 1 - Managed Hydrograph I-1 Irt I -T- I -r I -rI 1-I r-I r-1 I-1 Irt I rt I-, I rt l IHIH 17.33 IHI cfs IHIHIHIHIHIHI H IH I I I H I HI HI HI 1t0t-�e6 Ftgik04a'r$'t IH IH I 1 I H I H I HI HI i RulppffAr"-oa81,14-1?-pf IH IH 1 1 H IH IH 1 1 H H H 1 1H IH IH I H I 'IIIIHIHI 5 6 7 8 9 10 11 12 1 H I H�1 �1° V lu leT Ru noff-Dep�#h=5.102•• � I - HI HI HI C7�� HI HI HI HI H IH IH IH 1N�o H1HHHHHHHHIIHI H 1 H HI HI HI H IH IH IH IH H Ir�H I HI HI HI H IH 1H H H H 6 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Time (hours) ■ Runoff 2020-03-02- BioCell Type 11 24-hr 50-year Rainfall=6.18" Prepared by {enter your company name here} Printed 3/6/2020 HydroCAD® 10.00-12 s/n 04679 ©2014 HydroCAD Software Solutions LLC Page 19 Summary for Pond 3P: Bioretention BMP 1 [93] Warning: Storage range exceeded by 1.46' [95] Warning: Outlet Device #2 rise exceeded Inflow Area = 88,912 sf, 58.13% Impervious, Inflow Depth = 5.02" for 50-year event Inflow = 17.33 cfs @ 11.96 hrs, Volume= 37,205 cf Outflow = 15.46 cfs @ 11.99 hrs, Volume= 25,782 cf, Atten= 11 %, Lag= 2.1 min Primary = 15.46 cfs @ 11.99 hrs, Volume= 25,782 cf Routing by Stor-Ind method, Time Span= 0.00-36.00 hrs, dt= 0.01 hrs Peak Elev= 2,087.46' @ 11.99 hrs Surf.Area= 6,072 sf Storage= 14,227 cf Plug -Flow detention time= 166.6 min calculated for 25,775 cf (69% of inflow) Center -of -Mass det. time= 70.6 min ( 850.1 - 779.5 ) Volume Invert Avail.Storage Storage Description #1 2,080.83' 14,227 cf Custom Stage Data (Irregular)Listed below Elevation Surf.Area Perim. Voids Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (%) (cubic -feet) (cubic -feet) (sq-ft) 2,080.83 4,320 268.0 0.0 0 0 4,320 2,080.84 4,320 268.0 40.0 17 17 4,323 2,081.49 4,320 268.0 40.0 1,123 1,140 4,497 2,081.50 4,320 268.0 25.0 11 1,151 4,500 2,083.99 4,320 268.0 25.0 2,689 3,840 5,167 2,084.00 4,320 268.0 100.0 43 3,884 5,170 2,085.00 5,160 292.0 100.0 4,734 8,617 6,275 2,086.00 6,072 316.0 100.0 5,610 14,227 7,475 Device Routing Invert Outlet Devices #1 Primary 2,080.00' 15.0" Round Culvert L= 145.0' Ke= 0.500 Inlet / Outlet Invert= 2,080.00' / 994.50' S= 7.4862 '/' Cc= 0.900 n= 0.011, Flow Area= 1.23 sf #2 Device 1 2,085.50' 4.0' long x 1.00' rise Sharp -Crested Rectangular Weir X 4.00 2 End Contraction(s) 1.0' Crest Height Primary OutFlow Max=15.28 cfs @ 11.99 hrs HW=2,087.31' (Free Discharge) L1=Culvert (Inlet Controls 15.28 cfs @ 12.45 fps) L2=Sharp-Crested Rectangular Weir (Passes 15.28 cfs of 103.66 cfs potential flow) 2020-03-02- BioCell Type // 24-hr 50-year Rainfall=6.18" Prepared by {enter your company name here) Printed 3/6/2020 HydroCADO 10.00-12 s/n 04679 © 2014 HydroCAD Software Solutions LLC Page 20 1£ 1E 17 1E 1E 14 12 12 11 1C LL i Pond 3P: Bioretention BMP 1 Hydrograph IHI HI H H HIHH H 1—t H HI+ t I -t 1 17.33 cfs H 15.46 cfs -T TI H - I H HI A H HIHH H H H HIHH H IHITITIHI H IH HIT IIIH H IH IHIHI 4-1 HI H IH I-�IHI 4- 0 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 Time (hours) L Inflow ❑ Primary Pipe Network Calculations: STORM DRAIN CALCULATIONS Civil Design Concepts, PA (25 YEAR EVENT) Norton Athletic Fields CDC Project No.: 21943 PIPE STRUCTURE DRAINAGE LU C G W a a Q LU iY z C Q W H iY W � zo W h a Z JZ a W 0- O H N LU Z Z ? o W LY Z d Z O O J 7 W Q ~ Z W = V 0 Li- = �O = ~ Z Z I O J O Q H H O w > J LL H Qa U (FT) (FT) (IN) (FT) (%) "N" (FT) (FT) (AC) (MIN) "C" (IN/HR) (CFS) (CFS) (FT/SEC) (CFS) B1-B2 2084.25 2084.00 18 25.276 0.99 0.012 B2 2090.00 2.42 0.01 5.0 0.01 7.62 0.00 0.00 10.41 7.23 11.31 22.75 132-133 2090.47 2084.35 18 153.031 4.00 0.012 B3 2103.00 2.42 0.01 5.0 0.01 7.62 10.41 5.89 133-64 2095.00 2093.34 18 76.114 2.18 0.013 EX1 2106.00 2.42 2.04 5.0 0.67 7.62 10.41 10.41 9.41 15.51 D1-D2 2079.53 2079.00 24 88.062 0.60 0.012 D2 2084.00 1.98 0.51 5.0 0.30 7.62 1.16 11.83 4.68 18.99 D2-D3 2080.29 2079.63 24 110.500 0.60 0.012 D3 2084.00 1.85 0.49 5.0 0.30 7.62 1.12 10.67 3.48 18.98 D3-D4 2081.05 2080.39 24 110.500 0.60 0.012 D4 2084.00 1.72 0.84 5.0 0.31 7.62 1.99 9.55 3.27 18.98 D4-D5 2081.68 2081.15 18 89.039 0.60 0.012 D5 2091.08 1.48 0.01 5.0 0.01 7.62 0.00 7.56 4.28 8.78 D5-D6 2084.61 2081.78 18 56.521 5.01 0.012 D6 2095.45 1.82 0.01 5.0 0.01 7.62 0.00 7.56 4.44 25.46 D6-D7 2088.00 2084.71 18 59.377 5.54 0.012 D7 2096.00 1.82 1.65 5.0 0.60 7.62 7.56 7.56 4.28 26.78 El-E2 2075.75 2074.70 30 105.264 1.00 0.012 E2 2085.52 3.43 0.16 5.0 0.30 7.62 0.37 31.51 7.48 44.42 E2-E3 2076.62 2075.85 30 77.237 1.00 0.012 E3 2085.85 3.29 0.23 5.0 0.30 7.62 0.53 27.20 5.54 44.42 E3-E4 2077.99 2076.72 24 127.160 1.00 0.012 E4 2086.25 3.06 0.01 5.0 0.01 7.62 0.00 22.44 7.15 24.49 E4-E5 2082.40 2078.09 24 112.172 3.84 0.012 E5 2088.14 2.10 0.49 5.0 0.82 7.62 3.07 12.85 4.09 48.03 E5-E6 2088.70 2082.50 24 188.756 3.28 0.012 E6 2093.00 1.75 2.52 5.0 0.51 7.62 9.78 9.78 3.11 44.41 Al-A2 2077.67 2077.00 24 81.037 0.83 0.012 A2 2084.00 2.65 0.43 5.0 0.30 7.62 0.97 17.30 7.80 22.28 A2-A3 2078.87 2077.77 24 110.500 1.00 0.012 A3 2084.00 2.09 0.50 5.0 0.31 7.62 1.19 16.32 5.20 24.51 A3-A4 2079.64 2078.97 24 66.763 1.00 0.012 A4 2084.19 2.38 0.71 5.0 0.34 7.62 1.85 15.14 4.82 24.51 A4-A5 2080.00 2079.74 24 29.354 0.89 0.012 A5 2084.00 2.38 0.01 5.0 0.01 7.62 13.29 13.29 4.23 23.06 Cl-C2 2078.65 2077.72 18 93.134 1.00 0.012 C2 2083.98 1.25 0.34 5.0 0.30 7.62 0.78 4.44 6.04 11.39 C2-C3 2079.86 2078.75 18 110.500 1.00 0.012 C3 2083.88 1.11 0.51 5.0 0.30 7.62 1.17 3.67 2.51 11.38 C3-C4 2081.06 2079.95 18 110.500 1.00 0.012 C4 2083.77 0.88 1.06 5.0 0.31 7.62 2.50 2.50 1.97 11.38 E4-J 1 2081.50 2078.09 24 40.535 8.41 0.012 J 1 2088.99 1.72 3.15 5.0 0.40 7.62 9.59 9.59 3.05 71.07 1`142 2075.59 2074.97 24 103.431 0.60 0.012 F2 2084.00 12.55 0.53 5.0 0.30 7.62 1.22 53.08 16.90 19.00 F2-F3 2076.47 2075.69 24 130.444 0.60 0.012 F3 2079.64 23.21 16.83 5.0 0.37 7.62 47.44 50.44 16.06 18.98 F3-F4 2076.60 2076.57 24 4.355 0.59 0.012 F4 2080.82 23.10 0.56 5.0 0.70 7.62 2.99 2.99 0.95 18.89 E3-11 2082.50 2076.72 15 44.056 13.12 0.01211 2089.00 1.38 1.09 5.0 0.51 7.62 4.22 4.22 3.44 25.34 F2-G1 2077.16 2075.69 24 147.000 1.00 0.012 G1 2084.00 10.99 0.60 5.0 0.31 7.62 1.42 1.42 0.45 24.50 E2-H1 12083.80 2075.85 15 24.979 131.83 0.012 H1 2088.00 1.31 10.75 5.0 0.69 7.62 3.94 3.94 3.21 39.47 Issued 3/9/2020 Pipe Outlet Protection Calculations: Appendices 30 ��]` Outlet W = Do + La pipe I diameter (Do) La —mod T ilwater < 0.5D0 APRON DEPTH IS 1.5 TIMES THE STONE~ pt0 DIAMETER (18" MINIMUM DEPTH) P 10 FT (MIN. LENGTH) 3 5 60 50 100 Discharge (0/sec) 4) 2 N CL (13 Q 1 -a 0.50 FT ..(—(MIN.d50) Ulu 0 1000 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). STRUCTURE: Al LENGTH: 10 ft DISCHARGE: 17.30 cfs WIDTH: 12 ft PIPE DIA. (D) 24 in d50: 0.50 ft DEPTH: 1.5 ft Rev. 12/93 8.06.3 Appendices 30 ��]` Outlet W = Do + La pipe I diameter (Do) La —mod T ilwater < 0.5D0 APRON DEPTH IS 1.5 TIMES THE STONE~ pt0 DIAMETER (18" MINIMUM DEPTH) P 10 FT (MIN. LENGTH) 3 5 60 50 100 Discharge (0/sec) 4) 2 N CL (13 Q 1 -a 0.50 FT (MIN.d50) Ulu 0 1000 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). STRUCTURE: B1 LENGTH: 10 ft DISCHARGE: 10.41 cfs WIDTH: 11.5 ft PIPE DIA. (D) 18 in d50: 0.50 ft DEPTH: 1.5 ft Rev. 12/93 8.06.3 Appendices 30 ��]` Outlet W = Do + La pipe I diameter (Do) La —mod T ilwater < 0.5D0 APRON DEPTH IS 1.5 TIMES THE STONE~ pt0 DIAMETER (18" MINIMUM DEPTH) P 10 FT (MIN. LENGTH) 3 1 5 60 50 100 Discharge (0/sec) 4) 2 N CL (13 Q 1 -a 0.50 FT (MIN. d50) Ulu 0 1000 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). STRUCTURE: C1 LENGTH: 10 ft DISCHARGE: 4.44 cfs WIDTH: 11.5 ft PIPE DIA. (D) 18 in d50: 0.50 ft DEPTH: 1.5 ft Rev. 12/93 8.06.3 Appendices 30 ��]` Outlet W = Do + La pipe I diameter (Do) La — W T ilwater < 0.5Do APRON DEPTH IS 1.5 TIMES THE STONE~ t� DIAMETER (18" MINIMUM DEPTH) ok P'p 60 �roR`Jfi 54+ 20 10 FT (MIN. LENGTH) ' 0111111111111101 80 4 111111111P1111111 II IIII:IIIIIIV:i11' ralr' nnr II! 1110111,1111 ' I�ICIIIU ;qq mIpIlIi. lPll Nod IIIIII!1 :�l it .vl nni rinF rv-nrai! Cif j li I i I:dII •IIIII , " 1111 �� fIIIII:IIIILIIIiI !IIIV;11111511!IIC1Pi !1P • n111111 II=I!111I!ill 111111:111115::;:Halal.: III:d1%fir":i�lll 11111111111 IIIII ilrr"; i0:111!:111�1! 111111111I1111111111 � l!illll!i1D:dPil1i1111111111I1111111111 � Ii1i,�,111f1f111111111I111111111111111111111111111 �_ IIIIIII 1I1111111111111��11111I111111111111 • 1��1�IIIIII 1 1IIIII111111111 11 111 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). STRUCTURE: D1 LENGTH: 10 ft DISCHARGE: 11.83 cfs WIDTH: 12 ft PIPE DIA. (D) 24 in d50: 0.50 ft DEPTH: 1.5 ft Rev. 12/93 8.06.3 Appendices 30 ��]` Outlet W = Do + La pipe I diameter (Do) La —mod T ilwater < 0.5D0 APRON DEPTH IS 1.5 TIMES THE STONE~ pt0 DIAMETER (18" MINIMUM DEPTH) P 10 FTT> (MIN. LENGTH) 3 5 60 1 50 100 Discharge (0/sec) 0) 2 N CL (13 Q 1 -a 0.50 FT (MIN.d50) U1 u 0 1000 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). STRUCTURE: E1 LENGTH: 10 ft DISCHARGE: 31.51 cfs WIDTH: 12.5 ft PIPE DIA. (D) 30 in d50: 0.55 ft DEPTH: 1.5 ft Rev. 12/93 8.06.3 Appendices 30 ��]` Outlet W = Do + La pipe I diameter (Do) La —mod T ilwater < 0.5D0 APRON DEPTH IS 1.5 TIMES THE STONE~ pt0 DIAMETER (18" MINIMUM DEPTH) P 10 FTT> (MIN. LENGTH) 3 5 60 501 100 Discharge (0/sec) 0) 2 N CL (13 Q 1 -a 0.50 FT (MIN.d50) U1 u 0 1000 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). STRUCTURE: F1 LENGTH: 26.5 ft DISCHARGE: 53.08 cfs WIDTH: 28.5 ft PIPE DIA. (D) 24 in d50: 1.25 ft DEPTH: 1.88ft Rev. 12/93 8.06.3 NRCS Soil Report: USDA United States Department of Agriculture N RCS Natural Resources Conservation Service A 0 _A A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Jackson County, North Carolina r hf f 4.0cr •� # 4y t Ilk February 27, 2020 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nres.usda.gov/wps/ portal/nres/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nres) or your NRCS State Soil Scientist (http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nres142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface.................................................................................................................... 2 How Soil Surveys Are Made..................................................................................5 SoilMap.................................................................................................................. 8 SoilMap................................................................................................................9 Legend................................................................................................................10 MapUnit Legend................................................................................................ 11 MapUnit Descriptions.........................................................................................11 Jackson County, North Carolina..................................................................... 13 BkC2—Braddock clay loam, 8 to 15 percent slopes, eroded......................13 BkD2—Braddock clay loam, 15 to 30 percent slopes, eroded....................14 CrD—Cowee-Evard-Urban land complex, 15 to 30 percent slopes ............ 15 EvD—Evard-Cowee complex, 15 to 30 percent slopes .............................. 17 EvF—Evard-Cowee complex, 50 to 95 percent slopes, stony .................... 19 TrE—Trimont gravelly loam, 30 to 50 percent slopes, stony.......................22 Ud—Udorthents, loamy...............................................................................23 UfB—Udorthents-Urban land complex, 0 to 5 percent slopes, rarely flooded.................................................................................................. 24 W—Water.................................................................................................... 26 References............................................................................................................ 27 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil -vegetation -landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 Custom Soil Resource Report scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil -landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil -landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field -observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and 0 Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. 7 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 0 3 301050 35° 19' 0" N 0 M Custom Soil Resource Report Soil Map 301120 301190 301260 301330 301400 3 301470 35' 19' 0" N iw � 93 4 — � Y' 1 - * o g AN, it t35°18'41"N \ 301050 301120 301190 301260 301330 3 m Map Scale: 1:2,910 W printed on A portrait (8.5" x 11") sheet. Meters m YN 0 40 80 160 240 n Feet 0 100 200 400 600 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 17N WGS84 9 301400 itI 35' 18' 41" N 301470 3 MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils 0 Soil Map Unit Polygons im 0 Soil Map Unit Lines ■ Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit .4 Gravelly Spot 0 Landfill Lava Flow Marsh or swamp + Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip oa Sodic Spot Custom Soil Resource Report MAP INFORMATION A Spoil Area The soil surveys that comprise your AOI were mapped at 1:12,000. Stony Spot Very Stony Spot Warning: Soil Map may not be valid at this scale. Wet Spot Enlargement of maps beyond the scale of mapping can cause Other misunderstanding of the detail of mapping and accuracy of soil .- Special Line Features line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed Water Features scale. - Streams and Canals Transportation Please rely on the bar scale on each map sheet for map �}} Rails measurements. Interstate Highways Source of Map: Natural Resources Conservation Service US Routes Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Major Roads Local Roads Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts Background distance and area. A projection that preserves area, such as the Aerial Photography Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Jackson County, North Carolina Survey Area Data: Version 15, Sep 16, 2019 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 6, 2016—Oct 26, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. 10 Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BkC2 Braddock clay loam, 8 to 15 6.2 13.5% percent slopes, eroded Braddock clay loam, 15 to 30 BkD2 0.4 0.9% percent slopes, eroded CrD Cowee-Evard-Urban land 1.5 3.3% complex, 15 to 30 percent slopes EvD Evard-Cowee complex, 15 to 30 6.6 14.4% percent slopes EvF Evard-Cowee complex, 50 to 95 0.2 0.5% percent slopes, stony TrE Trimont gravelly loam, 30 to 50 0.1 0.3% percent slopes, stony Ud Udorthents, loamy 5.0 10.8% UfB Udorthents-Urban land 25.5 55.3% complex, 0 to 5 percent slopes, rarely flooded W Water 0.4 0.9% Totals for Area of Interest 46.1 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They 11 Custom Soil Resource Report generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or Iandform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha -Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha -Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 12 Custom Soil Resource Report Jackson County, North Carolina BkC2—Braddock clay loam, 8 to 15 percent slopes, eroded Map Unit Setting National map unit symbol: lc70 Elevation: 1,750 to 2,200 feet Mean annual precipitation: 50 to 58 inches Mean annual air temperature: 46 to 57 degrees F Frost -free period: 116 to 170 days Farmland classification: Farmland of statewide importance Map Unit Composition Braddock, moderately eroded, and similar soils: 80 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Braddock, Moderately Eroded Setting Landform: Stream terraces Landform position (three-dimensional): Mountainbase, tread Down -slope shape: Linear Across -slope shape: Linear Parent material: Old alluvium Typical profile Ap - 0 to 11 inches: clay loam Bt - 11 to 57 inches: clay BC - 57 to 80 inches: loam Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: High (about 9.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Hydric soil rating: No Minor Components Urban land Percent of map unit: 8 percent Hydric soil rating: No 13 Custom Soil Resource Report Udorthents Percent of map unit: 6 percent Landform: Stream terraces Landform position (three-dimensional): Mountainbase, tread Down -slope shape: Linear, convex Across -slope shape: Linear, convex Hydric soil rating: No Thurmont Percent of map unit: 4 percent Landform: Drainageways on stream terraces Landform position (three-dimensional): Mountainbase, base slope Down -slope shape: Concave, linear Across -slope shape: Linear Hydric soil rating: No Dillard Percent of map unit: 2 percent Landform: Drainageways on stream terraces Landform position (three-dimensional): Mountainbase, base slope Down -slope shape: Linear, concave Across -slope shape: Linear Hydric soil rating: No BkD2—Braddock clay loam, 15 to 30 percent slopes, eroded Map Unit Setting National map unit symbol: Ic71 Elevation: 1,710 to 2,240 feet Mean annual precipitation: 50 to 58 inches Mean annual air temperature: 46 to 57 degrees F Frost -free period: 116 to 170 days Farmland classification: Farmland of local importance Map Unit Composition Braddock, moderately eroded, and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Braddock, Moderately Eroded Setting Landform: Stream terraces Landform position (three-dimensional): Mountainbase, tread Down -slope shape: Linear Across -slope shape: Linear Parent material: Old alluvium Typical profile Ap - 0 to 11 inches: clay loam 14 Custom Soil Resource Report Bt - 11 to 57 inches: clay BC - 57 to 80 inches: loam Properties and qualities Slope: 15 to 30 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat) high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: High (about 9.0 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: B Hydric soil rating: No Minor Components Udorthents Percent of map unit: 5 percent Landform: Stream terraces Landform position (three-dimensional): Down -slope shape: Linear, convex Across -slope shape: Linear, convex Hydric soil rating: No Urban land Percent of map unit: 5 percent Hydric soil rating: No Thurmont Percent of map unit: 5 percent Landform: Stream terraces Landform position (three-dimensional): Down -slope shape: Linear Across -slope shape: Linear Hydric soil rating: No Moderately high to Mountainbase, tread Mountainbase, base slope CrD—Cowee-Evard-Urban land complex, 15 to 30 percent slopes Map Unit Setting National map unit symbol: Ic7t Elevation: 1,400 to 4,000 feet Mean annual precipitation: 40 to 80 inches Mean annual air temperature: 46 to 57 degrees F Frost -free period: 130 to 180 days 15 Custom Soil Resource Report Farmland classification: Not prime farmland Map Unit Composition Cowee and similar soils: 40 percent Evard and similar soils: 25 percent Urban land: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Cowee Setting Landform: Mountain slopes, ridges Landform position (two-dimensional): Summit, backslope Landform position (three-dimensional): Upper third of mountainflank, side slope Down -slope shape: Convex Across -slope shape: Linear Parent material: Residuum weathered from igneous and metamorphic rock Typical profile A - 0 to 10 inches: sandy loam Bt - 10 to 38 inches: clay loam Cr - 38 to 80 inches: weathered bedrock Properties and qualities Slope: 15 to 30 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock Natural drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 5.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: C Hydric soil rating: No Description of Evard Setting Landform: Mountain slopes, ridges Landform position (two-dimensional): Summit, backslope Landform position (three-dimensional): Upper third of mountainflank, side slope Down -slope shape: Convex Across -slope shape: Linear Parent material: Residuum weathered from igneous and metamorphic rock Typical profile Ap - 0 to 5 inches: clay loam Bt - 5 to 29 inches: sandy clay loam BC - 29 to 37 inches: sandy loam C - 37 to 80 inches: sandy loam 16 Custom Soil Resource Report Properties and qualities Slope: 15 to 30 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat) high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Moderately high to Available water storage in profile: Moderate (about 8.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: B Hydric soil rating: No Description of Urban Land Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8 Hydric soil rating: No EvD—Evard-Cowee complex, 15 to 30 percent slopes Map Unit Setting National map unit symbol: 2vOyd Elevation: 1,670 to 4,770 feet Mean annual precipitation: 38 to 82 inches Mean annual air temperature: 46 to 57 degrees F Frost -free period: 137 to 159 days Farmland classification: Farmland of local importance Map Unit Composition Evard and similar soils: 50 percent Cowee and similar soils: 30 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Evard Setting Landform: Mountain slopes, ridges Landform position (two-dimensional): Landform position (three-dimensional). crest Down -slope shape: Convex, linear Backslope, summit Mountainflank, mountaintop, side slope, 17 Custom Soil Resource Report Across -slope shape: Linear, convex Parent material: Residuum weathered from biotite gneiss and/or amphibolite that is affected by soil creep in the upper solum Typical profile A - 0 to 5 inches: gravelly loam Bt - 5 to 32 inches: clay loam BC - 32 to 45 inches: loam C - 45 to 80 inches: sandy loam Properties and qualities Slope: 15 to 30 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: High (about 9.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4e Hydrologic Soil Group: B Hydric soil rating: No Description of Cowee Moderately high to Setting Landform: Ridges, mountain slopes Landform position (two-dimensional): Summit, backslope Landform position (three-dimensional): Mountaintop, mountainflank, crest, side slope Down -slope shape: Convex Across -slope shape: Linear Parent material: Residuum weathered from biotite gneiss and/or amphibolite that is affected by soil creep in the upper solum Typical profile A - 0 to 5 inches: gravelly sandy loam Bt - 5 to 27 inches: sandy clay loam Cr - 27 to 80 inches: bedrock Properties and qualities Slope: 15 to 30 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low (about 4.2 inches) 18 Custom Soil Resource Report Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: C Hydric soil rating: No Minor Components Saunook Percent of map unit: 12 percent Landform: Toes on drainageways Landform position (two-dimensional): Footslope Landform position (three-dimensional): Mountainbase, upper third of mountainflank, base slope, head slope Down -slope shape: Linear, concave Across -slope shape: Concave Hydric soil rating: No Hayesville Percent of map unit: 8 percent Landform: Ridges on hillslopes Landform position (two-dimensional): Shoulder, summit Landform position (three-dimensional): Mountaintop, side slope, crest Down -slope shape: Convex, linear Across -slope shape: Linear, convex Hydric soil rating: No EvF—Evard-Cowee complex, 50 to 95 percent slopes, stony Map Unit Setting National map unit symbol: 2rdwy Elevation: 5,690 to 15,510 feet Mean annual precipitation: 40 to 86 inches Mean annual air temperature: 46 to 57 degrees F Frost -free period: 100 to 176 days Farmland classification: Not prime farmland Map Unit Composition Evard and similar soils: 50 percent Cowee and similar soils: 30 percent Minor components: 20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Evard Setting Landform: Mountain slopes, hillslopes Landform position (two-dimensional): Landform position (three-dimensional). Backslope Mountainflank, side slope 19 Custom Soil Resource Report Down -slope shape: Convex Across -slope shape: Linear Parent material: Residuum weathered from hornblende gneiss and/or amphibolite that is affected by soil creep in the upper solum Typical profile A - 0 to 5 inches: loam Bt - 5 to 29 inches: clay loam BC - 29 to 37 inches: loam C - 37 to 80 inches: sandy loam Properties and qualities Slope: 50 to 95 percent Percent of area covered with surface fragments: 0.1 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Moderate (about 8.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7e Hydrologic Soil Group: B Hydric soil rating: No Description of Cowee Setting Landform: Mountain slopes, hillslopes Landform position (two-dimensional): Backslope Landform position (three-dimensional): Mountainflank, side slope Down -slope shape: Convex Across -slope shape: Linear Parent material: Residuum weathered from hornblende gneiss and/or amphibolite that is affected by soil creep in the upper solum Typical profile A - 0 to 5 inches: gravelly loam Bt - 5 to 27 inches: clay loam Cr - 27 to 80 inches: bedrock Properties and qualities Slope: 50 to 95 percent Percent of area covered with surface fragments: 0.1 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Very low to high (0.00 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None 20 Custom Soil Resource Report Available water storage in profile: Low (about 4.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7s Hydrologic Soil Group: C Hydric soil rating: No Minor Components Edneyville, stony Percent of map unit: 6 percent Landform: Mountain slopes, hillslopes Landform position (two-dimensional): Backslope Landform position (three-dimensional): Mountainflank, side slope Down -slope shape: Convex Across -slope shape: Linear Hydric soil rating: No Chestnut, stony Percent of map unit: 6 percent Landform: Hillslopes, mountain slopes Landform position (two-dimensional): Backslope Landform position (three-dimensional): Mountainflank, side slope Down -slope shape: Convex Across -slope shape: Linear Hydric soil rating: No Cullasaja, very stony Percent of map unit: 3 percent Landform: Drainageways Landform position (three-dimensional): Mountainflank, base slope Down -slope shape: Linear Across -slope shape: Concave Hydric soil rating: No Trimont, stony Percent of map unit: 3 percent Landform: Mountain slopes, hillslopes Landform position (two-dimensional): Landform position (three-dimensional). Down -slope shape: Linear, concave Across -slope shape: Linear Hydric soil rating: No Fannin Percent of map unit: 2 percent Landform: Mountain slopes, hillslopes Landform position (two-dimensional): Landform position (three-dimensional). Down -slope shape: Convex Across -slope shape: Linear Hydric soil rating: No Rock outcrop Percent of map unit: 0 percent Hydric soil rating: No Backslope Mountainflank, side slope, head slope Backslope Mountainflank, side slope 21 Custom Soil Resource Report TrE—Trimont gravelly loam, 30 to 50 percent slopes, stony Map Unit Setting National map unit symbol: Ic9t Elevation: 1,900 to 3,610 feet Mean annual precipitation: 54 to 64 inches Mean annual air temperature: 46 to 57 degrees F Frost -free period: 100 to 176 days Farmland classification: Not prime farmland Map Unit Composition Trimont, stony, and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Trimont, Stony Setting Landform: Mountain slopes, hillslopes Landform position (two-dimensional): Backslope Landform position (three-dimensional): Mountainflank, side slope, head slope Down -slope shape: Linear, concave Across -slope shape: Linear Parent material: Residuum weathered from hornblende gneiss and/or amphibolite that is affected by soil creep in the upper solum Typical profile A - 0 to 9 inches: gravelly loam Bt - 9 to 45 inches: sandy clay loam BC - 45 to 80 inches: fine sandy loam Properties and qualities Slope: 30 to 50 percent Percent of area covered with surface fragments: 0.1 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Moderate (about 8.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6e Hydrologic Soil Group: B Hydric soil rating: No 22 Custom Soil Resource Report Minor Components Evard, stony Percent of map unit: 9 percent Landform: Mountain slopes, hillslopes Landform position (two-dimensional): Backslope Landform position (three-dimensional): Mountainflank, side slope Down -slope shape: Convex Across -slope shape: Linear Hydric soil rating: No Cowee, stony Percent of map unit: 6 percent Landform: Hillslopes, mountain slopeE Landform position (two-dimensional): Landform position (three-dimensional). Down -slope shape: Convex Across -slope shape: Linear Hydric soil rating: No Ud—Udorthents, loamy Backslope Mountainflank, interPluve, nose slope Map Unit Setting National map unit symbol: Ic9x Mean annual precipitation: 48 to 60 inches Mean annual air temperature: 46 to 57 degrees F Frost -free period: 116 to 170 days Farmland classification: Not prime farmland Map Unit Composition Udorthents, loamy, and similar soils: 90 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Udorthents, Loamy Setting Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down -slope shape: Linear, convex Across -slope shape: Convex Parent material: Loamy and stony mine spoil or earthy fill derived from metamorphic rock Typical profile C - 0 to 80 inches: sandy clay loam Properties and qualities Slope: 2 to 50 percent Percent of area covered with surface fragments: 0.1 percent 23 Custom Soil Resource Report Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to very high (0.06 to 19.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Moderate (about 7.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7e Hydrologic Soil Group: C Hydric soil rating: No Minor Components Urban land Percent of map unit: 9 percent Hydric soil rating: No Rubble land Percent of map unit: 1 percent Hydric soil rating: No UfB—Udorthents-Urban land complex, 0 to 5 percent slopes, rarely flooded Map Unit Setting National map unit symbol: Ic9y Elevation: 1,300 to 2,950 feet Mean annual precipitation: 50 to 64 inches Mean annual air temperature: 46 to 57 degrees F Frost -free period: 116 to 170 days Farmland classification: Not prime farmland Map Unit Composition Udorthents, rarely flooded, and similar soils: 60 percent Urban land, rarely flooded: 30 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Udorthents, Rarely Flooded Setting Landform: Flood plains Landform position (three-dimensional): Mountainbase Down -slope shape: Linear, convex Across -slope shape: Linear, convex 24 Custom Soil Resource Report Parent material: Loamy and clayey mine spoil or earthy fill derived from metasedimentary rock Typical profile C - 0 to 80 inches: channery loam Properties and qualities Slope: 0 to 5 percent Percent of area covered with surface fragments: 0.1 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Very low Capacity of the most limiting layer to transmit water (Ksat): High (1.98 to 5.95 in/hr) Depth to water table: More than 80 inches Frequency of flooding: Rare Frequency of ponding: None Available water storage in profile: Moderate (about 7.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 7e Hydrologic Soil Group: A Hydric soil rating: No Description of Urban Land, Rarely Flooded Setting Parent material: Streets, parking lots, buildings, and other structures Properties and qualities Runoff class: Very high Frequency of flooding: Rare Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8s Hydric soil rating: No Minor Components Dillard, rarely flooded Percent of map unit: 2 percent Landform: Stream terraces Landform position (three-dimensional): Mountainbase, base slope Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: No Reddies, occasionally flooded Percent of map unit: 2 percent Landform: Flood plains Landform position (three-dimensional): Mountainbase Down -slope shape: Linear Across -slope shape: Linear Hydric soil rating: No Thurmont Percent of map unit: 2 percent 25 Custom Soil Resource Report Landform: Stream terraces Landform position (three-dimensional): Mountainbase, base slope Down -slope shape: Concave Across -slope shape: Linear Hydric soil rating: No Cullowhee, occasionally flooded Percent of map unit: 2 percent Landform: Swales on flood plains Landform position (three-dimensional): Mountainbase Down -slope shape: Linear Across -slope shape: Concave, linear Hydric soil rating: No Dellwood, occasionally flooded Percent of map unit: 2 percent Landform: Flood plains Landform position (three-dimensional): Mountainbase Down -slope shape: Linear Across -slope shape: Linear Hydric soil rating: No W—Water Map Unit Composition Water: 100 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Water Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8w Hydric soil rating: No 26 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep -water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/ nres/detail/national/soils/?cid=nres 142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www. nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nres.usda.gov/wps/portal/nres/detail/soils/ home/?cid=nres142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 27 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/ nres/detail/soils/scientists/?cid=nres142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/? cid=nres142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/lnternet/FSE—DOCUMENTS/nrcsl 42p2_052290.pdf 28 Figures: STATE OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM tK HAYWOO D SWAIN �°� ��� �`l,� ��� ��� ��� A� ` �� i 1 � � fit R°b N ram) r °, Cb °' ° °' ' °' °' °' PI°' Doi 1 ' pJ _� _ • NZh #.Irbti (P co A" 4' P," ' 3 3 3 ° 3 MACO N ��'� ^''� �``���� �``�� �``��' �``�e' q,``� 2 T RAN SY LVAN IA o'. ��°� ���^ �� (b IbD ------------------------------ DATUM INFORMATION The projection used in the preparation of this map was the North Carolina State Plane (FIPSZONE 3200). The horizontal datum was the North American Datum of 1983, GRS80 ellipsoid. Differences in datum, ellipsoid, projection, or Universal Transverse Mercator zones used in the production of FIRMs for adjacent jurisdictions may result in slight positional differences in map features across jurisdictional boundaries. These differences do not affect the accuracy of this FIRM. All coordinates on this map are in U.S. Survey Feet, where 1 U.S. Survey Foot = 1200/3937 Meters. Flood elevations on this map are referenced to the North American Vertical Datum of 1988 (NAVD 88). These flood elevations must be compared to structure and ground elevations referenced to the same vertical datum. An average offset between NAVD 88 and the National Geodetic Vertical Datum of 1929 (NGVD 29) has been computed for each North Carolina county. This offset was then applied to the NGVD 29 flood elevations that were not revised during the creation of this statewide format FIRM. The offsets for each county shown on this FIRM panel are shown in the vertical datum offset table below. Where a county boundary and a flooding source with unrevised NGVD 29 flood elevations are coincident, an individual offset has been calculated and applied during the creation of this statewide format FIRM. See Section 6.1 of the accompanying Flood Insurance Study report to obtain further information on the conversion of elevations between NAVD 88 and NGVD 29. To obtain current elevation, description, and/or location information for bench marks shown on this map, please contact the North Carolina Geodetic Survey at the address shown below. You may also contact the Information Services Branch of the National Geodetic Survey at (301) 713-3242, or visit its website at http://www.ngs.noaa.gov. North Carolina Geodetic Survey 121 West Jones Street County Average Vertical Datum Offset Table Raleigh, NC 27601 County Vertical Datum Offset (ft) (919) 733-3836 JACKSON 0.04 http://www.ncqs.state.nc.us Example: NAVD 88 = NGVD 29 + (0.04) All streams listed in the Flood Hazard Data Table below were studied by detailed methods using field survey. Other flood hazard data shown on this map may have been derived using either a coastal analysis or limited detailed riverine analysis. More information on the flooding sources studied by these analyses is contained in the Flood Insurance Study report. FLOOD HAZARD DATA TABLE Floodway W idth (feet) Left/Right Distance From The Center of Stream to 1% Annual Chance Cross Stream Flood Discharge (100-year) Encroachment Boundary Section Station' (cfs) Water -Surface Elevation (Looking Downstream) or (feet NAVD 88) Total Floodway Width COX BRANCH 002 216 730 2,115.5 46 / 29 004 392 730 2,115.5 38 / 42 005 472 730 2,115.5 22 / 64 011 1,091 730 2,129.7 53 / 10 CULLOWHEE CREEK 001 53 NA 015 1,531 NA 032 3,168 NA 047 4,699 NA 058 5,755 NA 061 6,125 NA 072 7,154 4,980 076 7,625 4,980 082 8,231 4,980 089 8,932 4,980 092 9,249 4,940 095 9,478 4,790 096 9,599 4,790 105 10,546 4,790 270 120 80 1403 90 70 46 / 125 37 / 93 133 / 37 79 / 34 36/51 53 / 72 57 / 55 39 / 82 LONG BRANCH 002 211 NA 2,093.0 60 012 1,162 NA 2,112.5 80 TUCKASEGEE RIVER 2012 201,168 NA 2130 212,995 NA 2166 216,586 NA 2172 217,166 NA 2194 219,437 NA 2213 221,338 NA 2235 223,502 NA 2255 225,456 NA 2288 228,782 NA 2,070.12 2,070.12 2,074.9 2,081.5 2,088.4 2,091.6 2,095.8 2,096.4 2,098.2 2,100.7 2,103.7 2,104.6 2,106.6 2,113.0 200 160 220 310 160 150 160 160 210 Feet above mouth z Elevation includes backwater effects from Tuckasegee River s Value is inaccurate, as the floodway has been adjusted in this area to match topographic -based floodplain redelineation 2,048.6 2,065.2 2,072.6 2,073.5 2,076.4 2,081.6 2,084.1 2,085.5 2,092.1 11 .05. Cr� p�PART�F p„ i ti a�xm0l' FEMA'S COOPERATING TECHNICAL PARTNER G� `1ND S� This digital Flood Insurance Rate Map (FIRM) was produced through a unique cooperative partnership between the State of North Carolina and the Federal Emergency Agency (FEMA). The State of North Carolina has implemented a long term approach of floodplain management to decrease the costs associated with flooding. This is demonstrated b the States commitment to Y map floodplain areas at the local level. As a part of this effort, the State of North Carolina has joined in a Cooperating Technical State agreement with FEMA to produce and maintain this digital FIRM. www.ncfloodmaps.com 750 000 FEET 600 000 FEE 35°19'3C 3911 000 35°19'( 3910 00c C u r 35° 18'30 592 500 FEE 3909 000 35°18'0 590 000 FEE 750 ininic+ MAKIM -7rrcn 83'11'30" 301 UUM 302"""'°' uvll�v 1 �1��� i vvv r 2012 E RIVERBEND RD -� • (SR 1493) • • 1 �O`)^u� • W RIVERBEND RD W UNIVERSITY • (SR 1493) HEIGHTS RD (SR 1512) W BUCKDEN 2063 PARK DR ZONE X 2049 ZONE X • OQ- E OLD CULLOWHEE RD E LUCKS LN J� • � (SR 1002) • �� HMO ��Q- TUCKASEGEE RIVER • ZONE X 20 ��- R Nr o , ' , ' ZONE X 6GgA Li E SEARCY ZONE X ' ' • MOUNTAIN RD • • 26b� a ' . 2064 ZONE AE CC° o �� w e- • M � � s°BFrrFR ���� ZONE AE • �0�� 0 R 133 j) RD ���0 • TUCKASEGEE RIVER <� R��O W PRESTIGE RD • • • • ' 065 2 ZONE X ' 2p74 2075 201 6 ZONE X M cc J �TO� PP C E BLACKHAWK RD PP 4 W COTTAGE HILL RD Jackson County ZONE X E PEMBROKE DR ZONE AE QQ� Unincorporated Areas E TROPHY LN ' 370282 2130 • <11� O E STERLING DR 11 'Ao ' • CULL W MONTEITH GAP---- • ' ' • 2Q66 FB2523 W PAINTER RD (SR 1338) RD (SR 1336) \, _ - 1 � E LEDBETTER RD � / ' O O� (SR 1337) ' N - N C) ZONE X N /' ) o . ' ZONE AE ' • / W -4 / W OLD CULLOWHEE RD .. � (SR 1002) • • • • • • • • • • • • • . .� o co 032 Cullowhee Creek -� ZONE X • •' •' BAR 4 ZONE X cb DG4369 [j 015 \ • N ZONE X W TRACER LN /�� 757 500 FEET 83' 10'0" E STEPHENS RD (SR 1729) Jackson County Unincorporated Areas 370282 ZONE X }• �0 O E WAYEHUTTA RD O 0/'L kkZO 001 20 \- (SR 1732) ►� � �G,��9 � • 01 a '� _ - - - �/ Z0TUCKASEGEE RIVER 014 oR • • 0 E BUZZARDS ROOST RD 20 • 9 LIMIT OF STUDY 2019 2080 2081 20820 00 0 0 0 0oa7 I I, 2083 ZONE X (SR 1333) 2073 E MONTEITH GAP RD (SR 1336) W OLD CULLOWHEE RD 2166 _ <11 (SR 1002) _� ZONE AE Dam - • oN A2172 ZONE X • cP O O E CASEY RD N� (SR 1733) cl CIRCLE DR o� y�F - .^ if , o Cullowhee Creek ® , 2084 o M BREESE ZONE X z� FB2522 208 W BLACKHAWK RD 058 N\PLDR (SR 1552) �GENS��3251 6v\� oN ZONE X 2089 E CENTENNIAL DR �'Q9 2089 (SR 1325) �O,Q Li E BRIAR PATCH RD 002 E- E CATAMOUNT RD rd',Q 061 (SR 1325) J >>69 2094 4 ACCESS RD TO WCU 2 o J W GOTHIC CT 0 2092 072 W CAMP LAB RDLu W COMET CT Ir O 0 S �R� GAD • / • • • L.L 149 o , .p • 2094 • rV U12 • ti. 0 Jackson County Z Unincorporated Areas • } N 0 • 370282 . N O cc \ . c� o 2093 ' ' - O w ' ZONE ZONE X 2095 og6 • • • . . rn AE • E ZUNI DR ZONE X • • • W CATAMOUNT RD (SR 1550) E LITTLE SAVANNAH RD 1�1 O Long Branch (SR 1367) 076 & 26g� • W BELK N m r JI gv\�D\NG o °�ti / FOOTBRIDGE E FACULTY DR '14 2098 u, 082 M • • • • • • 2099 E CATAMOUNT RD ZONE X ZONE AE _ • FOOTBRIDGE��Q)� ACCESS RD TO WCU PARKING LOT ZONE X kd JOHNNIE 2100 2101 COCKRELL 089 AB6841 095) FOREST HILLS RD 2102 �J 096 092 2104 ' • 210 ZONE X 002 ' • E W DELTA CHI DR (SR 1549) ZONE AE 6' S, ULPHUR S COUNTRY CLUB DR / ' SPRINGS Town of Forest Hills ' • Cullowhee creek ' • ; �1og W VALHALLA RD g 30248 7 2116 SR 1330 210 2116 ZONE AE ( ) ... 111 ZONE X �`'o� 211� 106 Cox Branch / ,�Q N 107 • • 005 - 1 - 113 o LINMAR LP �� O� CA 004 e-1 4,0 • • 2 Nm m W COUNTRY CLUB DR (SR 1330) �_7u?o c5` W COUNTRY 2116 ZONE o • CLUB DR / \ o m 27140 011 W FREEDOM DR • ' 2114 a T 000 FEET 301000M 83°11'0" 302000M This map is for use in administering the National Flood Insurance Program. It does not necessarily identify all areas subject to flooding, particularly from local drainage sources of small size. The community map repository should be consulted for possible updated or additional flood hazard information. To obtain more detailed information in areas where Base Flood Elevations (BFEs) and/or floodways have been determined, users are encouraged to consult the Flood Profiles, Floodway Data, Limited Detailed Flood Hazard Data and/or Summaryof Stillwater Elevations tables contained within the Flood Insurance Stud FIS Y ( ) report that accompanies this FIRM. Users should be aware that BFEs shown on the FIRM represent rounded whole -foot elevations. These BFEs are intended for flood insurance rating purposes only and should not be used as the sole source of flood elevation information. Accordingly, flood elevation data presented in the FIS report should be utilized in conjunction with the FIRM for purposes of construction and/or floodplain management. Boundaries of regulatory floodways shown on the FIRM for flooding sources studied by detailed methods were computed at cross sections and interpolated between cross sections. The floodways were based on hydraulic considerations with regard to requirements of the National Flood Insurance Program. Floodway widths and other pertinent floodway data for flooding sources studied by detailed methods as well as non - encroachment widths for floodingsources studied b limited detailed methods are provided in the FIS report Y p p for this jurisdiction. The FIS report also provides instructions for determining a floodway using non - encroachment widths for flooding sources studied by limited detailed methods. Certain areas not in Special Flood Hazard Areas may be protected by flood control structures. Refer to Section 4.4 "Flood Protection Measures" of the Flood Insurance Study report for information on the flood control structures in this jurisdiction. F F. �.. ZONE X MEROle C, m 0 z O 3 O Z 0 CO Wayehutta Creek wegccy0s % / E WAYEHUTTA RD (SR 1731) 0�lb E REMDIRGTON ,P(99 2 (' \ �' C) 1 E WELL ' �O`� 20�p SPRING DR Wayehutta Creek 2084 2082 • ZONE X oos 2081 _\ 1. ZONE AE �- - - - 2Q�6 E WAYEHUTTA RD p� (SR 1731) .. 2019 �- E EDGEWATER RD r (SR 1797) 2194 • • 002/ � \. ��� ZONE X / RD . � \ \R ' . o • .�„_ _ - / O \ s • • • /co • • \ 2C ICJR 1 • ' 2213 • \ E WAYEHUTTA RD (SR 1731) E GUDGER HILL RD �� • (SR 1734) F� ZONE X �20 ZONE AE OF , A� .... • 2084 �O \0 oti� J\; N) o 0 J� 11�G F- W DIXS GAP CIR Fc qNrFR et,RyR 0 Jackson County Unincorporated Areas 370282 TUCKASEGEE RIVER ' a • • JI 2255 • • • ZONE X W WAYEHUTTA RD / (SR 1731) �0 r'o ' ZONE AE `9 `yam ' ZONE X . 2Q \ j N co 0 1 . . . • / � W CHIQUITA • LN � . 2Q94 0�� _ N w cL CD co o • ZONE AEco 10 o TUCKASEGEE RIVER o °� ZONE X w E 2095 ZONE X W EDGEWATER RD ZONE X 9 (SR 1797) E HAZE DR 83°1w3n" inIKIC oAKICA -7cco 303000M 1b2 boo FEE V\J119V 1 , 11's- 1.,.,,, 83° 10'0" 3 ■W C u r u e < 0 u 0 TABBY LN -,.� 3 5 760 000 I FEET DO 000 FEET 5° 19'30" 3911 000 M 97 500 FEET 5° 19'0" 3910 000 M 5° 18'30" 3909 000 M 5° 18'0" a0 000 FEET EET NOTES TO USERS FEMA recommends that a Flood Insurance Policy be purchased for structures in areas where levees are shown This map reflects more detailed and up-to-date stream channel configurations than those shown on the MAP REPOSITORY as providing protection from the 1% annual chance flood. Flooding is not covered by standard previous FIRM for this jurisdiction. The floodplains and floodways that were transferred from the previous FIRM property/fire/dwelling insurance policies nor is it covered by Homeowners Insurance, Renters Insurance, may have been adjusted to conform to these new stream channel configurations. As a result, the Flood Profiles Refer to listing of Map Repositories on Map Index or visit http://www.ncfloodmaps.com. Condominium Owners Insurance, or Commercial Property Insurance. Contact your insurance agent and local and Floodway Data tables in the Flood Insurance Study report (which contains authoritative hydraulic data) may floodplain administrator for further information. Visit http://w\Aw.fema.gov/pdf/fhm/frm gsah.pdf for information reflect stream channel distances that differ from what is shown on this map. on levees and the risk of flooding in areas shown as being protected by levees. EFFECTIVE DATE OF FLOOD INSURANCE RATE MAP PANEL Please refer to the separately printed Ma Index for an overview ma of the count showing the layout of ma p Yp p p Y 9 Y p Base map information and geospatial data used to develop this FIRM were obtained from various panels, community map repository addresses, and a Listing of Communities table containing National Flood organizations, including the participating local community(ies), state and federal agencies, and/or other sources. Insurance Program dates for each community as well as a listing of the panels on which each community is APRIL 19, 2010 The primary base for this FIRM is aerial imagery acquired by Jackson County. The time period of collection for located. the Jackson imagery is 2005. Information and geospatial data supplied by the local community(ies) that met EFFECTIVE DATE(S) OF REVISION(S) TO THIS PANEL FEMA base map specifications were considered the preferred source for development of the base map. See If you have questions about this map, or questions concerning the National Flood Insurance Program in geospatial metadata for the associated digital FIRM for additional information about base map preparation. general, please call 1-877-FEMA MAP (1-877-336-2627) or visit the FEMA website at http://vmw.fema.gov. Base map features shown on this map, such as corporate limits, are based on the most up -to- date data An accompanying Flood Insurance Study report, Letter of Map Revision (LOMR) or Letter of Map Amendment available at the time of publication. Changes in the corporate limits may have occurred since this map (LOMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North For community map revision history prior statewide mapping, refer to the Community Map History table located in was published. Map users should consult the appropriate community official or website to verify current Carolina Floodplain Mapping Program website at http://www.ncfloodmaps.com, or contact the FEMA Map the Flood Insurance Stud report for this jurisdiction. Y p J ri conditions of jurisdictional boundaries and base ma features. This ma may contain roads that were not J p p Y - - - Service Center at 1 800 358 9616 for information on all related products associated with this FIRM. The p considered in the hydraulic analysis of streams where no new hydraulic model was created during the Y Y Y 9 - - - FEMA Map Service Center may also be reached by Fax at 1 800 358 9620 and its website at To determine if flood insurance is available in this community, contact your insurance agent, the North Carolina production of this statewide format FIRM. http://w\Aw.msc.fema.gov. Division of Emergency Management or the National Flood Insurance Program at the following phone numbers or websites: INC Division of Emergency Management National Flood Insurance Program (919) 715-8000 http://www.nccrimecontrol.org/nfip 1-800-638-6620 http://www.fema.gov/business/nfip LEGEND SPECIAL FLOOD HAZARD AREAS (SFHAs) SUBJECT TO INUNDATION BY THE 10ANNUAL CHANCE FLOOD The 1% annual chance flood (100-year flood), also known as the base flood, is the flood that has a 1% chance of being equaled or exceeded in any given year. The Special Flood Hazard Area is the area subject to flooding by the 1% annual chance flood. Areas of Special Flood Hazard include Zones A, AE, AH, AO, AR, A99, V, and VE. The Base Flood Elevation is the water -surface elevation of the 1 % annual chance flood. ZONE A No Base Flood Elevations determined. ZONE AE Base Flood Elevations determined. ZONE AH Flood depths of 1 to 3 feet (usually areas of ponding); Base Flood Elevations determined. ZONE AO Flood depths of 1 to 3 feet (usually sheet flow on sloping terrain); average depths determined. For areas of alluvial fan flooding, velocities also determined. ZONE AR Special Flood Hazard Area formerly protected from the 1% annual chance flood by a flood control system that was subsequently decertified. Zone AR indicates that the former flood control system is being restored to provide protection from the 1% annual chance or greater flood. ZONE A99 Area to be protected from 1 % annual chance flood by a Federal flood protection system under construction; no Base Flood Elevations determined. ZONE VE Coastal flood zone with velocity hazard (wave action); Base Flood Elevations determined. FLOODWAY AREAS IN ZONE AE The floodway is the channel of a stream plus any adjacent floodplain areas that must be kept free of encroachment so that the 1% annual chance flood can be carried without substantial increases in flood heights. OTHER FLOOD AREAS ZONE X Areas of 0.2% annual chance flood; areas of 1 % annual chance flood with average depths of less than 1 foot or with drainage areas less than 1 square mile; and areas protected by levees from 1% annual chance flood. OTHER AREAS ZONE X Areas determined to be outside the 0.2% annual chance floodplain. ZONE D Areas in which flood hazards are undetermined, but possible. COASTAL BARRIER RESOURCES SYSTEM (CBRS) AREAS OTHERWISE PROTECTED AREAS (OPAs) CBRS areas and OPAs are normally located within or adjacent to Special Flood Hazard Areas. 1% annual chance floodplain boundary 0.2% annual chance floodplain boundary Floodway boundary ................�. Zone D boundary CBRS and OPA boundary Boundary dividing Special Flood Hazard Zones and boundary dividing Special Flood Hazard Areas of different Base Flood Elevations, flood depths or flood velocities. ^^� 513 - Base Flood Elevation line and value; elevation in feet* (EL 987) Base Flood Elevation value where uniform within zone; elevation in feet* *Referenced to the North American Vertical Datum of 1988 012 Cross section line 23 - - - - - 23 Transect line 97°07'30", 32°22'30" Geographic coordinates referenced to the North American Datum of 1983 (NAD 83) 4276 000 M 1000-meter Universal Transverse Mercator grid ticks, zone 17 1 477 500 FEET 2500-foot grid values: North Carolina State Plane coordinate system (FIPSZONE 3200, State Plane NAD 83 feet) BM5510 North Carolina Geodetic Survey bench mark (for more information X Visit http://www.ncgs.state.nc.us) BM5510 National Geodetic Survey bench mark (for more information visit ® http://www.ngs.noaa.gov) BM5510 NGS-58 GPS 2-5 cm Vertical Control Marks or Contractor -Established NCFMP Bench Marks (for more information visit http://www.ncqs.state.nc.us) • M1.5 River Mile GRID NORTH MAP SCALE 1" = 500' (1 6,000) 250 0 500 1000 FEET METERS 150 0 150 300 PANEL 7559J FIRM FLOOD INSURANCE RATE MAP NORTH CAROLINA PANEL 7559 (SEE LOCATOR DIAGRAM OR MAP INDEX FOR FIRM PANEL LAYOUT) CONTAINS: COMMUNITY CID No. PANEL SUFFIX FOREST HILLS, TOWN OF 370248 7559 J JACKSON COUNTY 370282 7559 J Notice to User: The Map Number shown below should be used when placing map orders; the Community Number shown above should be used on insurance applications for the subject community. EFFECTIVE DATE MAP NUMBER APRIL 19, 2010 3700755900J d` M,, 4" O�rA���Ar 0 x �r O ti ' V �t41VD S�G� State of North Carolina Federal Emergency Management Agency Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?st=nc&sta=31... NOAA Atlas 14, Volume 2, Version 3 CULLOWHEE Station ID: 31-2200 Location name: Sylva, North Carolina, USA* Latitude: 35.3256*, Longitude:-83.1911- Elevation: iMW Elevation (station metadata): 2192 ft**, , source: ESRI Maps * source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 0.352 0.410 0.482 0.554 0.635 0.704 0.770 0.835 0.915 0.989 5-min (0.317-0.391) (0.370-0.455) (0.434-0.535) (0.498-0.615) (0.567-0.704) (0.625-0.781) (0.679-0.857) (0.729-0.934) 1.32 (0.790-1.03) 1.45 (0.842-1.12) 1.56 0.562 0.656 0.772 0.886 1.01 1.12 1.22 10-min (0.506-0.624) (0.591-0.728) (0.695-0.858) (0.796-0.983) (0.903-1.12) (0.995-1.24)1 (1.08-1.36) 11 (1.16-1.48) (1.25-1.63) (1.33-1.77) 0.702 0.825 0.977 1.12 1.28 1.42 1.55 1.67 1.82 1.96 15-min (0.633-0.780) (0.743-0.916) (0.879-1.09) 1 (1.01-1.24) 1 (1.14-1.42) 1 (1.26-1.58) 1 (1.36-1.72) 1 (1.46-1.87) (1.57-2.05) (1.67-2.22) 0.962 1.14 1.39 1.62 1.90 2.14 2.37 2.60 F 2.90 3.17 30-min (0.868-1.07) 1 (1.03-1.26) 1 (1.25-1.54) 1 (1.46-1.80) 1 (1.70-2.11) 1 (2.09-2.64) 11 (2.27-2.91) (2.50-3.27) 1.20 1.43 1.78 2.12 2.53 2.90 3.26 3.65 4.16 4.6 2 60-min (1 .08-1.33) 1 (1.29-1.59) 1 (1.60-1.98) 1 (1.90-2.35) 1 (2.26-2.80) 1 (2.57-3.21) 1 (2.88-3.63) 1 (3.19-4.08) (3.59-4.68) (3.94-5.25) 1.42 1.68 2.09 2.47 2.96 3.40 3.83 4.29 4.90 5.45 2-hr (1.29-1.57) 1 (1.53-1.87) 1 (1.88-2.31) 1 (2.23-2.74) 1 (2.65-3.28) 1 (3.02-3.76) 1 (3.38-4.26) 1 (3.75-4.79) (4.22-5.51) (4.63-6.19) 1.53 1.80 2.22 2.63 3.16 3.65 4.14 4.67 5.40 6.06 3-hr (1.39-1.69) 1 (1.64-2.00) 1 (2.01-2.45) 1 (2.38-2.90) 1 (2.84-3.49) 1 (3.25-4.03) 1 (3.66-4.59) 1 (4.08-5.20) (4.64-6.06) (5.12-6.87) 1.93 2.25 2.72 3.20 3.83 4.42 5.01 5.66 6.57 7.37 6-hr (1.77-2.12) 1 (2.06-2.48) 1 (2.49-2.99) 1 (2.91-3.51) 1 (3.47-4.20) (3.964.84) 1 (4.46-5.52) 1 (4.97-6.26) (5.66-7.31) (6.25-8.30) 2.47 2.89 3.46 4.03 4.74 5.37 5.99 6.62 7.44 8.14 12-hr (2.28-2.70) 1 (2.66-3.15) 1 (3.18-3.77) 1 (3.70-4.38) 1 (4.34-5.15) 1 (5.40-6.53) (5.93-7.24) (6.59-8.20) (7.14-9.06) 2.78 3.33 4.08 4.68 5.51 6.18 6.87 7.57 8.51 9.24 24-hr (2.63-2.96) (3.14-3.54) (3.85-4.34) (4.41-4.98) (5.17-5.86) (5.78-6.56) (6.39-7.29) (7.00-8.03) (7.81-9.05) (8.42-9.85) 3.34 3.97 4.83 5.51 6.44 7.19 7.94 8.72 9.75 10.5 2-day (3.14-3.56) (3.74-4.24) (4.54-5.15) (5.18-5.88) (6.04-6.87) (6.71-7.65) (7.39-8.47) (8.08-9.30) (8.97-10.4) (9.64-11.3) 3.60 4.28 5.16 5.85 6.80 7.54 8.28 9.04 10.0 10.8 3-day (3.40-3.83) (4.04-4.56) (4.87-5.49) (5.52-6.23) (6.39-7.23) 1 (7.75-8.81) (8.42-9.62) (9.28-10.7) (9.93-11.5) 3.87 4.59 5.49 6.20 7.15 7.89 8.63 9.36 10.3 11.0 4-day (3.664.11) (4.34-4.88) (5.20-5.83) (5.87-6.58) (6.75-7.58) (7.44-8.36) 1 (8.10-9.15) 1 (8.76-9.94) (9.59-11.0) (10.2-11.7) 4.67 5.54 6.61 7.47 8.64 9.57 10.5 11.4 12.7 13.6 7-day (4.41-4 96) (5.22-5.88) (6.24-7.03) (7.04-7.94) (8.12-9.17) (8.96-10.2) (9.80-11.1) (10.6-12.2) ( 11.7-13.5) ( 12.5-14.5) 10-day 5.38 6.36 7.52 8.45 9.72 10.7 11.7 12.7 14.0 15.0 (5.09-5.72) 1 (6.01-6.75) 1 (7.11-7.98) 1 (7.98-8.96) 1 (9.14-10.3) 1 (10.0-11.4) 1 (10.9-12.4) 1 (11.8-13.5) (13.0-14.9) (13.8-16.0) 7.41 8.71 10.1 11.2 2 1.6 13.6 4 1.6 15.6 16.9 17.8 20-day (7 .08-7.80) 1 (8.31-9.16) 1 (9.64-10.6) 1 (10.7-11.7) 1 (12.0-13.2) (13.0-14.3) 1 (13.9-15.4) 1 (14.8-16.5) (15.9-17.8) (16.6-18.8) 9.09 10.6 12.2 13.3 14.8 15.8 16.8 17.7 18.9 19.7 30-day (8.71-9.50) 1 (10.2-11.1) 1 (11.6-12.7) 1 (12.7-13.9) 1 (14.1-15.4) (15.1-16.5) 1 (16.0-17.6) 1 (16.9-18.6) (17.9-19.8) (18.6-20.7) 11.6 13.6 15.3 16.5 18.0 19.0 20.0 20.8 21.8 22.4 45-day (11.2-12.1) 1 (13.1-14.1) 1 (14.7-15.9) 1 (15.9-17.2) 1 (17.3-18.7) 1 (18.3-19.8) 1 (19.2-20.8) 1 (19.9-21.7) (20.8-22.8) (21.4-23.4) 14.0 16.3 18.2 19.6 21.2 22.3 23.3 24.2 25.2 25.8 60-day (13.5-14.6) (15.7-17.0) (17.6-19.0) (18.9-20.4) (20.4-22.1) (21.5-23.2) (22.4-24.3) (23.2-25.2) (24.1-26.3) (24.7-27.0) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical 1 of 4 9/27/2018, 1:45 PM Precipitation Frequency Data Server https: //hdsc.nws.noaa. gov/hdsc/pfds/pfds_printpage.html?lat=3 5.3256&... NOAA Atlas 14, Volume 2, Version 3 ' Location name: Sylva, North Carolina, USA* Latitude: 35.3256°, Longitude:-83.1911 * Elevation: 2045.5 ft** source: ESRI Maps "source: USGS'' POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 4.22 4.92 5.78 6.65 7.62 8.45 9.24 10.0 11.0 11.9 5-min (3.80-4.69) (4.44-5.46) (5.21-6.42) (5.98-7.38) (6.80-8.45) (7.50-9.37) (8.15-10.3) (8.75-11.2) (9.48-12.4) ( 10.1-13.5) 3.37 3.94 4.63 5.32 6.07 6.73 7.34 7.94 8.68 9.34 10-min (3.04-3.74) 1 (3.55-4.37) 1 (4.17-5.15) 1 (4.78-5.90) 1 (5.42-6.73) 1 (5.97-7.46) 1 (6.47-8.17) 1 (6.94-8.88) 1 (7.49-9.78) 1 (7.96-10.6) 2.81 3.30 3.91 4.48 5.13 5.68 6.18 6.68 7.29 7.82 15-min (2 .53-3.12) 1 (2.97-3.66) 1 (3.52-4.34) 1 (4.03-4.98) 1 (4.58-5.68) 1 (5.04-6.30) 1 (5.45-6.88) 1 (5.84-7.47) 1 (6.29-8.21) 1 (6.66-8.88) 1.92 2.28 2.78 3.25 3.80 4.27 4.73 5.20 5.80 6.33 30-min (1.74-2.14) 1 (2.05-2.53) 1 (2.50-3.08) 1 (2.92-3.60) 1 (3.39-4.21) 1 (4.17-5.27) 11 (4.54-5.81) 1 (5.00-6.53) (5.39-7.19) 1.20 1.43 1.78 2.12 2.53 2.90 3.26 3.65 4.16 4.62 60-min (1.08-1.33) 1 (1.29-1.59) 1 (1.60-1.98) 1 (1.90-2.35) 1 (2.26-2.80) 1 (2.57-3.21) 1 (2.88-3.63) 1 (3.19-4.08) (3.59-4.68) 1 (3.94-5.25) 0.708 0.842 1.04 1.24 1.48 1.70 1.92 2.15 2.45 2.73 2-hr (0.642-0.786) (0.762-0.934) (0.942-1.15) 1 (1.11-1.37) 1 (1.33-1.64) 1 (1.51-1.88) 1 (1.69-2.13) 1 (1.87-2.39) (2.11-2.76) (2.31-3.10) 0.509 0.601 0.738 0.875 1.05 1.22 1.38 1.56 1.80 2.02 3-hr (0.464-0.564) (0.546-0.665) (0.671-0.817) (0.793-0.965) (0.947-1.16) 1 (1.22-1.53) (1.36-1.73) 1 (1.55-2.02) (1.71-2.29) 0.322 0.376 0.453 0.534 0.640 0.737 0.838 0.946 1.10 1.23 6-hr (0.295-0.355) (0.345-0.414) (0.415-0.499) (0.487-0.586) (0.580-0.702) (0.662-0.808) (0.744-0.921) (0.830-1.05) (0.945-1.22) 1 (1.04-1.39) 0.205 0.240 0.287 0.334 0.394 0.446 0.497 0.550 0.618 0.676 12-hr (0.189-0.224) (0.221-0.262) (0.264-0.313) (0.307-0.364) (0.360-0.428) (0.405-0.485) (0.448-0.542) (0.492-0.601) (0.547-0.681) (0.592-0.752) 0.116 0.139 0.170 0.195 0.230 0.258 0.286 0.315 0.355 0.385 24-hr (0.110-0.123) (0.131-0.148) (0.160-0.181) (0.184-0.207) (0.216-0.244) (0.241-0.273) (0.266-0.304) (0.292-0.335) (0.325-0.377) (0.351-0.410) 0.070 0.083 0.101 0.115 0.134 0.150 0.165 0.182 0.203 0.220 2-day (0.065-0.074) (0.078-0.088) (0.095-0.107) (0.108-0.122) (0.126-0.143) (0.140-0.159) (0.154-0.176) (0.168-0.194) (0.187-0.217) (0.201-0.235) 0.050 0.059 0.072 0.081 0.094 0.105 0.115 0.126 0.139 0.150 3-day (0.047-0.053) (0.056-0.063) (0.068-0.076) (0.077-0.086) (0.089-0.100) (0.098-0.111) (0.108-0.122) (0.117-0.134) (0.129-0.148) (0.138-0.160) 0.040 0.048 0.057 0.065 0.074 0.082 0.090 0.098 0.107 0.115 4-day (0.038-0.043) (0.045-0.051) (0.054-0.061) (0.061-0.069) (0.070-0.079) (0.078-0.087) (0.084-0.095) (0.091-0.104) (0.100-0.114) (0.106-0.122) 0.028 0.033 0.039 0.044 0.051 0.057 0.062 0.068 0.075 0.081 7-day (0.026-0.030) (0.031-0.035) (0.037-0.042) (0.042-0.047) (0.048-0.055) (0.053-0.060) (0.058-0.066) (0.063-0.072) (0.070-0.080) (0.075-0.087) 0.022 0.026 0.031 0.035 0.040 0.045 0.049 0.053 0.058 0.062 10-day (0.021-0.024) (0.025-0.028) (0.030-0.033) (0.033-0.037) (0.038-0.043) (0.042-0.047) (0.046-0.052) (0.049-0.056) (0.054-0.062) (0.058-0.067) 0.015 0.018 0.021 0.023 0.026 0.028 0.037 0.033 0.035 0.037 20-day (0.015-0.016) (0.017-0.019) (0.020-0.022) (0.022-0.024) (0.025-0.028) (0.027-0.030) (0.029-0.032) (0.031-0.034) (0.033-0.037) (0.035-0.039) 0.013 0.015 0.017 0.018 0.020 0.022 0.023 0.025 0.026 0.027 30-day (0.012-0.013) (0.014-0.015) (0.016-0.018) (0.018-0.019) (0.020-0.021) (0.021-0.023) (0.022-0.024) (0.023-0.026) (0.025-0.028) (0.026-0.029) 0.011 0.013 0.014 0.015 0.017 0.018 0.018 0.019 0.020 0.021 45-day (0.010-0.011) (0.012-0.013) (0.014-0.015) (0.015-0.016) (0.016-0.017) (0.017-0.018) (0.018-0.019) (0.018-0.020) (0.019-0.021) (0.020-0.022) 0.010 0.011 0.013 0.014 0.015 0.016 0.016 0.017 0.017 0.018 60-day (0.009-0.010) (0.011-0.012) (0.012-0.013) (0.013-0.014) (0.014-0.015) (0.015-0.016) (0.016-0.017) (0.016-0.018) (0.017-0.018) (0.017-0.019) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical 1 of 4 9/27/2018, 1:44 PM