Loading...
HomeMy WebLinkAboutNCC201113_ESC Approval Submitted_20200319ROY COOPER MICHAEL S- RCGAN Srr m.p BRIAN WUNIN 'Ic o rry Uh 12e wr Colonial Pipeline Company Attn: Dan Jacobsen, Project Manager 1185 Sanctuary Parkway, Suite 100 Alpharetta, Georgia 30009 ,� star �•~�a i W)PTH CAR01 I`A Environmental Quality February 4, 2020 LETTER OF APPROVAL RE; Project Name: Complete 1-450 Area 2 West Lake Road Acres Approved: 6.0 Project ID: WAKE-2020-044 County: WAKE, City: Apex, Address: West Lake Road River Basin: Neuse, Stream Classification: Other Submitted By: Kleinfelder Date Received by LQS: February 3, 2020 Plan Type: Revised Dear Mr. Jacobsen: The subject erosion and sedimentation control plan has been approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 1 SA NCAC 4B .0129. As of April I, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) forth requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stomtwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at dec1.nr.gov/NCC01. Please direct questions about the NOI form to Annette Lucas at Annetle.Lucns a ncdenr.gov or Paul Clark at After you submit a complete and correct NO[ Ponn, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stonnwater Central Office staff in Raleigh. Title 15A NCAC 413.0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: 1. , The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. D_ EPlot!L!-.r,alnoD;p:.!•nlcnl�!FC-rr.aor�nirn!�IQiril,i�:3P.ii`.:aullCntrtl}',1ire:.imu1L:¢�;fcsrur,�•. � � R�Iouhlicqun_ilirlli:,r; 1618!.L: SIX, Ct&IIt! ;800O1.,rriflPra' R„!r:glrNnrll!!-:iud'r1:r ih0« Letter of Approval Colonial Pipeline Company February 4, 2020 Page 2 of 2 Also, this letter gives the notice required by G.S. 1 13A-61.1(a) of our right ol'periodic inspection to insure compliance with the approved plan. Title 15A NCAC 4B .01 1 S(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 1 13A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water duality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other pen -nit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to rile an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this pennit and would require a revised plan and additional application fee. In addition, it would be helpful ifyou notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, S Sally Castle, E1 Regional Engineering Associate Land Quality Section Enclosures: Certificate of Approval NPDES NCGOI Fact Sheet cc: Elizabeth A. Bissonnette, PE (eh issonnettc(i kIcinieldcr.c m - Electronic Copy Jake liuber (JAI lubcr: kjeinfelder-c ni) - Electronic Copy Regional Office file