Loading...
HomeMy WebLinkAboutNCC201074_NOI Application_20200319Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 3/16/2020 12:12:08 PM (NCG01 NOI Submission) Approve by Garcia, Lauren V 3/18/2020 11:56:51 AM (Review- Construction NOI 23115) • The task was assigned to Garcia, Lauren V by round robin distribution 3/16/2020 12:12 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 18, 2020 5:00 PM. The priority is: High 3/16/2020 12:12 PM Submit by McCoy, Suzanne 3/19/2020 2:44:39 PM (Payment Verification for NCC201074) * Heather Boetger • McCoy, Suzanne assigned the task to McCoy, Suzanne 3/19/2020 2:43 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 29, 2020 5:00 PM. The priority is: High 3/18/2020 11:57 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information la. Project Name * Pfizer Pharmaceuticals GTx2 Contractor Parking 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 2. County* Lee 3. Highway or Street Oak Park Road Address* Street name only is acceptable if no address nunber assigned yet 4. CityorTownship* Sanford 5. State * NC 6. Zip Code* 27330 7. Latitude* Enter the latitude in decinal degrees 35.5301 8. Longitude * Enter the longitude in decinal degrees (MJSTbe negative) -79.1826 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 03/18/2020 Estirrated Construction Project Start late 10. Date to End * 12/16/2022 Estirrated Construction Project End late 11. SIC (Primary) * Other (0000) Standard Industrial C]assification for Development 12. Acres to be 9.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 9.00 (acres)* 14. Post- 0.39 construction (Estirrated) impervious area (acres) * NCC Project NCC-LEE-2020-Pfizer Pharmaceuticals GTx2 Contractor Parking Tracking ID Assignedautorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Little Buffalo Creek Wate rbody* Wre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 17-42 Index No. * NCWaterbody Index Minter Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Wyeth Holdings LLC Name * If pernittee is an individual (i.e., organization does not apply), enter first and last nave in this field. 2. First Name* Tony If Corporation, enter Plegistered Agent First Barre 3. Last Name* Mulcahy If Corporation, enter Faegistered Agent Last Wre 3b. Title Site Leader 4. Permitee E-mail tony.muIcahy@pfizer.com Address * 5. Permittee 919-775-7100 Telephone No.* 6. Permittee Mailing Street Address Address* 4300 Oak Park Road Address Line 2 city Sanford Fostal / Zip Code 27330 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 4300 Oak Park Road Address Line 2 City Sanford Fbstal / Zip Code 27330 8. Type of Non -Government Ownership* State / Ftovince / Faegion NC Country us State / Ffovince / Fbgion NC Country us C. Site Contact Information Part C. Roject Site Contact Inforrration _............................................................................................................................................................ 1. Primary Site Charles Contact - First Name * 2. Primary Site Powell Contact - Last Name * 3. Title EHS Manager 4. Site Contact E- charles.powell@pfizer.com mail Address* 5. Site Contact 919-566-4018 Telephone No. 6. Organization Wyeth Holdings LLC Name 7. Site Contact Street Address Mailing Address* 4300 Oak Park Road Address Line 2 city Sanford Fbstal / Zip Code 27330 8. Consultant Name (Optional) N.A. First and Last narre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. State / Rovince / Region NC Country US D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 02/18/2020 Approved * 2. E&SC Plan Project LEE-2020-028 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan Letter of Approval 02182020.pdf 307.97KB Approval letter or Mist beRDFforml Grading Permit Site Map (Optional) Helpful for linear project review Mast be R7Fform3t Notes (Optional) Provide any additional information that night help the reviewer better understand how uploaded documents support the application. Include additional w aterbodies for linear projects if necessary. 6. NOI Certification Signed NOI Certification Form.pdf 404.19KB Form Mast be FDFformat This is an Express f No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature f v6l�r t//'K.I G'044 f Type Name * Tony Mulcahy Title Site Leader Organization Wyeth Holdings LLC Date * 03/16/2020 F. Tracking and COC Info NOI Tracking No. 23115 NC Reference No. NCG01-2020-1074 Uses 'count number' variable (incremrented by SP) Certificate of NCC201074 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 1074 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)