Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20051877 Ver 1_Year 8 Monitoring Report_2019_20200319
ID#* 20051877 Version* 1 Select Reviewer:* Mac Haupt Initial Review Completed Date 03/19/2020 Mitigation Project Submittal - 3/19/2020 Is this a Prospectus, Technical Proposal or a New Site?* r Yes r No Type of Mitigation Project:* V Stream r Wetlands r- Buffer r- Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Matthew Reid Project Information ................................................................................... ID#:* 20051877 Existing IDY Project Type: Project Name: County: r DMS r Mitigation Bank Dye Branch II Iredell Document Information Email Address:* matthew.reid@ncdenr.gov Version: *1 Existing Version Mitigation Document Type:* Mitigation Monitoring Report File Upload: DyeBranchll_92255_MY8_2019.pdf 25.08MB Rease upload only one RDFcf the conplete file that needs to be subnitted... Signature Print Name:* Matthew Reid Signature:* Dye Branch II Stream Restoration MY8 Monitoring Report (2019) NCDMS Project Number: 92255 Submitted to North Carolina Division of Mitigation Services North Carolina Department of Environmental Quality March 2020 1652 Mail Service Center Raleigh, NC 27699 This Page Intentionally Left Blank March 5, 2020 Matthew Reid Western Project Manager NCDENR – Division of Mitigation Services 5 Ravenscroft Dr., Suite 102 Asheville, NC 28801 (828)231-7912 Mobile matthew.reid@ncdenr.gov Re: Monitoring Year 8 Draft Report for the Dye Branch II Stream Restoration Site Yadkin River Basin – CU# 03040105–Iredell County EEP Project ID No. 92255 Monitoring Contract # 004523 Dear Mr. Reid, I have outlined our responses to the comments on the Draft Monitoring Year 8 report for the Dye Branch II Stream Restoration Site in (Red). Executive Summary: •Please revise sentence regarding treatments since 2015 to read nine instead of seven toaccount for the 2019 invasive work. Updated to nine recorded treatments. •Please revise the sentence referencing June and September of 2018 (MY7) invasive treatmentand replace with the following 2019 dates: July and September of 2019 (MY8). Revised sentence. Table 2: •Please add the following invasive treatment dates to the table: June 2018, September 2018,July 2019 and September 2019. Table 2 edited. CCPV •The CCPV invasive polygon has not been updated since MY5. A contractor has spent aconsiderable amount of time on the site treating invasives to meet a threshold that will beacceptable for regulatory closure. While there may still be some invasives present, thispolygon does not represent the current site conditions based on DMS site inspections of thecontractor’s work. DMS will continue treating the site through regulatory close out. Pleaseupdate the invasive polygon to reflect current site conditions. CCPV updated to reflect MY8treatments. Appendix A •Footers in Appendix A reference MY7 Please update to MY8 and QA/QC document for other occurrences. Reviewed and edited where applicable. Appendix C •The photo description for Vegetation Monitoring Plot 7 is highlighted green in the draft hardcopy. Please correct for final. Revised photo highlight Appendix F: •Please include the attached invasive species treatment logs in Appendix F. Attached to App F 37 Haywood Street, Suite 100 Asheville NC 28801 828.253.6856 www.equinoxenvironmental.com Digital Deliverable File Review: DMS is conducting digital file audits on all projects. Below are missing or incomplete digital deliverables for the project. If you have any questions or need clarification regarding these items, please contact Greg Melia. •CVS file provided is missing observation/survey dates for certain plots, and in otherplots x y coordinates exceed the bounds of the selected plot dimensions. Pleaseresolve these errors and resubmit so DMS can enter these data into our database.Observation/survey dates added. Plot dimensions reformatted so that x,y coordinatesare within bounds. •Although it is indicated that bank height ratio (BHR) was calculated using a fixedbankfull area, it appears that the MY8 bankfull elevation was used as opposed to usingthe bankfull elevation that achieves the fixed as built bankfull cross sectional area.For example, the BHR for XS 4 using the method outlined in the Technical WorkgroupMemorandum should be equal to 0.83, with a low bank height elevation of 824.5 anda bankfull elevation of 824.997, which produces the as built bankfull cross sectionalarea of 32.5. Please ensure that calculations are done using the bankfull elevation thatachieves the fixed as-built bankfull cross sectional area.The bankfull elevation that achieves the fixed as-built bankfull cross-sectional areawas used for all cross-sections except XS5 and XS9. The stream in the area of thesecross-sections was reconstructed during MY6. For cross-sections XS5 and XS9, thebankfull elevation that achieves the fixed Post-Repair MY6 bankfull cross-sectionalarea. •DMS does not have any spatial features for Dye Branch II. As-built features are notproperly segmented, or are continuous points and cannot be converted into lines,while prior geodatabases containing monitoring features and stream thalwegs arecompromised and no longer contain features that can be rendered in arcmap. Pleaseprovide features that characterize the creditable assets that have been reported forDye Branch II, ensuring that features are segmented and attributed as they are in theasset table and that feature lengths match the linear feet reported. Also please includethe monitoring features for this project (i.e. cross sections, crest gage locations, vegplots). Geodatabase updated to include thalweg and monitoring features. Sincerely, Danvey Walsh Environmental Scientist Monitoring Firm 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Phone: 828-253-6856 Project Contact: Danvey Walsh Email: danvey@equinoxenvironmental.com This Page Intentionally Left Blank Dye Branch II Equinox Project No. 92255 March 2020 MY8 Monitoring Report Dye Branch II Stream Restoration 2019 MY8 Monitoring Report Table of Contents 1.0 Executive Summary / Project Abstract Page 1 2.0 Methodology Page 3 3.0 References Page 3 Dye Branch II Equinox Project No. 92255 March 2020 MY8 Monitoring Report Appendices Appendix A. Project Vicinity Map and Background Tables Figure 1. Vicinity Map and Directions Table 1a. Project Components Table 1b. Component Summations Table 2. Project Activity and Reporting History Table 3. Project Contacts Table 4. Project Attributes Appendix B. Visual Assessment Data Figure 2. Integrated Current Condition Plan View Table 5. Visual Stream Morphology Stability Assessment Table 6. Vegetation Condition Assessment Photo Station Photos Appendix C. Vegetation Plot Data Table 7. Vegetation Plot Criteria Attainment Vegetation Monitoring Plot Photos Table 8. CVS Vegetation Plot Metadata Table 9. Planted and Total Stem Counts (Species by Plot with Annual Means) Appendix D. Stream Survey Data Cross-Sections with Annual Overlays and Photos Table 10a. Baseline Stream Data Summary Table 10b. Baseline Stream Data Summary (Substrate, Bed, Bank, and Hydrologic Containment Parameter Distributions) Table 11a. Monitoring Data – Dimensional Morphology Summary (Dimensional Parameters – Cross-Sections) Table 11b. Monitoring Data – Stream Reach Data Summary Appendix E. Hydrologic Data Table 12. Verification of Bankfull Events Appendix F. Invasive Species Treatment Logs Dye Branch II 1 Equinox Project No. 92255 March 2020 MY8 Monitoring Report 1.0 EXECUTIVE SUMMARY / PROJECT ABSTRACT The goals and objectives stated in the Dye Branch Stream Restoration Plan (NCEEP 2005) are as follows: •Provide a stable system of stream channels that neither aggrade nor degrade while maintaining dimension, pattern, and profile with the capacity to transport the watershed’s water and sediment load; •Improve the overall water quality and aquatic habitat by reducing sediment and waste inputs into the stream caused by bank erosion, mass-wasting, and stormwater runoff through stabilization of the stream channel and creation of a stormwater wetland; and •Improve the overall viability of the riparian vegetative communities through establishment of native species and elimination of invasive exotic species. This is the third monitoring report for the Dye Branch Stream Restoration Project since the completion of Monitoring Year 5 (MY5) in 2015. A MY6 Post-Repair Monitoring Report was completed in February 2018 that documented the repairs and plantings completed in 2017. As a part of the repairs, two small areas were repaired on Upper Dye Branch and five small areas were repaired on Lower Dye Branch. The repairs consisted of repairing failed structures, installation of brush toes, streambank grading, installation of coir matting, riffle construction, and grading of the channel to reestablish the thalweg for proper flow through the new alignment. A supplemental planting was also performed to revegetate the areas that were graded during the repairs. A temporary seed mix and 420 bare root seedlings were planted in areas affected by the repairs to help revegetate. This report incorporates data associated with MY8 monitoring and includes a qualitative vegetation and stream assessment consisting of vegetation monitoring of seven (7) annual monitoring plots, four (4) random/temporary vegetation plots, morphological monitoring of ten (10) cross-sections, and hydrologic monitoring. This report also includes a visual assessment which incorporates multiple photo points, visual assessment of the vegetation, easement, and stream channel to document any problem areas that arise. These problem areas are documented in Tables 5 and 6 and depicted in Figure 2, the Current Condition Plan View. This is the final monitoring report for the Dye Branch project with closeout activities planned in 2020. Vegetation monitoring of the Dye Branch Stream Restoration Project includes annual monitoring of seven permanent vegetation plots, four temporary vegetation plots, and visual assessment of the easement as a whole. Planted stems range from 3 to 23 per plot with 7 to 49 stems observed when volunteers are included. Based on the MY8 vegetation data, the average stem density for planted stems across all plots is approximately 364 stems per acre. This meets the year 8 success criteria of 210 planted stems per acre. When all planted and natural stems are combined, the average stem density is 977 stems per acre, which also meets the success criteria. Four random vegetation plot transects were also performed to evaluate stems throughout the easement as a whole. The stem counts for the random vegetation transects were 10, 20, 26, and 18 which extrapolate out to 500, 1000, 1300, and 900 stems per acre respectively. Dye Branch II 2 Equinox Project No. 92255 March 2020 MY8 Monitoring Report Regarding invasive-exotics, a contractor was hired to treat the invasive-exotic vegetation in November 2015. Since 2015 nine treatments have occurred at the Dye Branch site. Treatments occurred in July and September of 2019 (MY8) and have been effective. Recent treatments consisted of cut and stump sprays of a 50% glyphosate solution targeting Callery pear, (Pyrus calleryana), kudzu (Pueraria montana), privet (Ligustrum spp.), and multiflora rose (Rosa multiflora), mist blower treatments sprays of 2% clopyralid solution targeting kudzu and lespedeza (Lespedeza spp.), basal bark in a 15% solution with diesel fuel targeting kudzu, privet, and multiflora rose, and foliar backpack spray of a 3% glyphosate solution targeting kudzu and privet, multiflora rose. While treatments have been effective, populations of invasive-exotics of lesser concern, specifically Japanese honeysuckle (Lonicera japonica), still persist in areas throughout the easement. Invasive-exotics will be monitored during future site visits and invasive-exotic treatments will continue until project closeout in 2020. Visual assessment of the stream channel was performed to document signs of instability, such as eroding banks, structural instability, or excessive sedimentation. A few areas of bank erosion were noted on all reaches in 2019 (Figure 2, CCPV). All of the implemented repairs completed in late 2017 are intact and performing as designed. Photos of stream problem areas can be seen in the digital submission. MY8 morphologic monitoring of the Dye Branch Site included ten (10) cross-sections. Cross- sectional overlays are located in Appendix D and a summary of the data is located in Table 11a and 11b. Cross-sections remained relatively stable between the Post-Construction data and MY8 monitoring. Cross-section 5 continues to undergo change, as it has taken on a riffle-like geometry. Cross-sections 7 and 8, which were noted as aggrading in the MY7 report, appear to be trending back to their as-built geometry. Riffle dimensions for the three different reaches also remained relatively stable during MY8. Dimensional changes for Cemetery Branch were a decrease in the bankfull width by 0.3 foot and lowering of the width/ depth ratio by 0.3. Dye Branch Upstream exhibits little dimensional change from MY7, Dye Branch Downstream underwent an increase in bankfull width of 0.3 feet and the width/ depth ratio also increased by 0.3. A water level logger was installed in December of 2010 and has since recorded a total of 14 bankfull events. An equipment malfunction led to the loss of pressure transducer between MY5 (2015) and Post-Repair Monitoring (2018). A crest gauge was installed in February 2018 to monitor for evidence of bankfull events. Wrack lines well above the bankfull elevation were observed on Dye Branch Upstream, at Station 3+00, during a site visit on May 31st, 2018. While the crest gauge did not have a reading above bankfull during this visit, consistent wrack lines throughout the project area indicate a bankfull event occurred. Cross-referenced with gauge data from NCCRONOS, the suspected date was 4/24/2018. Wrack lines observed on January 25th, 2019 indicated an additional bankfull event. This was at least the sixteenth bankfull event since the project completion. Summary information/data related to the occurrence of items such as beaver or easement encroachment and statistics related to performance of various project and monitoring elements can be found in the tables and figures in the report appendices. Narrative background and supporting information formerly found in these reports can be found in the mitigation and Dye Branch II 3 Equinox Project No. 92255 March 2020 MY8 Monitoring Report restoration plan documents available on the NCDMS website. All raw data supporting tables and figures in the appendices are available from NCDMS upon request. 2.0 Methodology The stream monitoring methodologies utilized in Post-Repair Monitoring replicate those employed during the previous monitoring years and are based on standard guidance and procedures documents (Rosgen 1996; USACE 2003). Geomorphic measurements were taken during low flow conditions using a Nikon NPR 332 Total Station. Three-dimensional coordinates associated with cross-sections were collected in the field and geo-referenced (NAD83 North Carolina State Plane feet FIPS 3200). Geomorphic data included 10 cross-sections. Vegetation monitoring follows the CVS-EEP Level 2 Protocol for Recording Vegetation, Version 4.2 (Lee et al. 2008) and includes analysis of composition and density of planted species. Data is processed using the CVS data entry tool. In the field, the four corners of each plot were permanently marked with rebar and photos of each plot taken from the origin each monitoring year. 3.0 References Harrelson, Cheryl, C. Rawlins and J. Potyondy. 1994. Stream Channel Reference Sites: An Illustrated Guide to Field Technique. Gen. Tech. Rep. RM-245. Rocky Mountain Forest and Range Experiment Station. USDA Forest Service. Fort Collins, Colorado Lee, M.T., R.K. Peet, S.D. Roberts, and T.R. Wentworth. 2008. CVS-EEP Protocol for Recording Vegetation. Version 4.2. The University of North Carolina at Chapel Hill, Department of Biology. NCEEP (North Carolina Ecosystem Enhancement Program). 2005. Dye Branch Stream Restoration Plan. Raleigh. Rosgen, D.L. 1996. Applied River Morphology. Wildland Hydrology Books. Pagosa Springs, Colorado. USACE (U.S. Army Corps of Engineers). 2003. Stream Mitigation Guidelines. U.S. Army Corps of Engineers, U.S. Environmental Protection Agency, North Carolina Wildlife Resources Commission, North Carolina Department of Environment and Natural Resources-Division of Water Quality. Wilmington District. This Page Intentionally Left Blank Appendix A Project Vicinity Map and Background Tables This Page Intentionally Left Blank Appendix A Project Vicinity Map and Background Tables Appendix A Project Vicinity Map and Background Tables Project Component or Reach ID Existing Feet/Acres Restoration Level Approach Footage or Acreage Stationing Buffer Acres BMP Elements Comment Cemetery Branch 968 lf R P3 1,014 lf 0+00 - 10+14 Stormwater wetlands Dye Branch Upstream 1,772 lf R P2 1,500 lf 0+00 - 15+00 Stormwater wetlands Dye Branch Downstream 1,232 lf R P2 1,171 lf 16+00 - 27+71 - Information unavailable =Non-Applicable Table 1a. Project Components Dye Branch II / Project No. 92255 Restoration Level Stream (lf) Non- Riparian (ac) Upland (ac) Buffer (ac)BMP Riverine Non-Riverine Restoration 3,685 0.0 0.0 Enhancement 0.0 0.0 Enhancement I 0 Enhancement II 0 Creation 0.0 0.0 Preservation 0 0.0 0.0 HQ Preservation 0 0.0 0.0 0.0 0.0 Totals 3,685 0 0 0 3 =Non-applicable 0 Table 1b. Component Summations Dye Branch II / Project No. 92255 Riparian Wetland (ac) Appendix A Project Vicinity Map and Background Tables Activity or Report Data Collection Complete Actual Completion or Delivery Restoration Plan -Oct 2005 Final Design - Construction Plans -April 2006 Final Design - Repair Plans -July 2010 Construction Repairs -Dec 2010 Temporary S&E mix applied -Summer 2010 Permanent seed mix applied -Summer 2010 Planting -Feb 2011 Mitigation Plan / As-built (Year 0 Monitoring - Baseline)Mar 2011 Aug 2011 Year 1 Monitoring Nov 2011 Jan 2012 Year 2 Monitoring Dec 2012 Jan 2013 Year 3 Monitoring Nov 2013 Dec 2013 Year 4 Monitoring Dec 2014 Dec 2014 Year 5 Monitoring Nov 2015 Nov 2015 Invasive-Exotic Vegetation Treatment -Nov 2015 Invasive-Exotic Vegetation Treatment -Mar 2017 Invasive-Exotic Vegetation Treatment -Apr 2017 Invasive-Exotic Vegetation Treatment -July 2017 Invasive-Exotic Vegetation Treatment -Aug 2017 2017 Repair - Stream -Nov 2017 2017 Repair - Planting -Feb 2018 Year 6 Monitoring - Post Repair Feb 2018 Feb 2018 Invasive-Exotic Vegetation Treatment -June 2018 Invasive-Exotic Vegetation Treatment -Sep 2018 Year 7 Monitoring Oct 2018 Nov 2018 Year 8 Monitoring Jul 2019 Nov 2019 Invasive-Exotic Vegetation Treatment -Jul 2019 Invasive-Exotic Vegetation Treatment -Sep 2019 - Information unavailable. N/A - Item does not apply. Table 2. Project Activity & Reporting History Dye Branch II / Project No. 92255 Appendix A Project Vicinity Map and Background Tables Designer Mulkey Engineers & Consultants 6750 Tryon Road Cary NC, 27518 Primary Project Design POC Emmett Perdue (919) 858-1874 Construction Contractor Fluvial Solutions P.O. Box 28749 Raleigh, NC 27611 Construction Contractor POC Peter Jelenevsky (919) 605-6134 Repair Construction/ Planting Contractor Baker Grading 2018 970 Bat Cave Rd Old Fort, NC 28762 Repair Construction Contractor POC Charles Baker (828) 668-7659 Planting Contractor Fluvial Solutions P.O. Box 28749 Raleigh, NC 27611 Planting Contractor POC Peter Jelenevsky (919) 605-6134 Seeding Contractor Fluvial Solutions P.O. Box 28749 Raleigh, NC 27611 Seeding Contractor POC Peter Jelenevsky (919) 605-6134 Seed Mix Sources Hanes Geo Components Winston-Salem, NC 27101 Nursery Stock Suppliers North Carolina Forest Service Goldsboro, NC 27530 Monitoring Performers (MY0-MY8) Equinox Environmental 2010 - 2015, 2017 - 2019 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream Monitoring POC Danvey Walsh (828) 253-6856 Vegetation Monitoring POC Danvey Walsh (828) 253-6856 Post-Repair Monitoring Performers (MY6)Equinox Environmental 2017 37 Haywood Street, Suite 100 Asheville, North Carolina 28801 Stream Monitoring POC Danvey Walsh (828) 253-6856 Vegetation Monitoring POC Danvey Walsh (828) 253-6856 Table 3. Project Contacts Dye Branch II / Project No. 92255 Appendix A Project Vicinity Map and Background Tables - Information unavailable. N/A - Item does not apply. -- -- 13-17-2 C Yes Poor Bioclassification Yes No C No -- Urban -- 0.0097 / 0.0125 0.0217 - Depth 0.06 First / Second First 2,671 1,014 N/A E4 / G4c E4 C - None -- -- N/A Chewacla / Cecil / Colfax 12.0 8.9 12.0 85% 15% Warm 100% No Restoration Component Attributes Cemetery BranchDye Branch Piedmont Southern Outer Piedmont Yadkin - Pee Dee 03040105010010 03-07-11 Upper Rocky River Local Watershed Plan Clay% K T Valley Toe Slope Range Cowardin Classification Trout Waters Designation Species of Concern, Endangered, Etc. Series Dominant Soil Series and Characteristics - Total Planted Acreage as Part of Restoration Rosgen Classification of Pre-Existing Rosgen Classification of As-Built Valley Type Valley Slope Valley Side Slope Range NCDWQ AU/Index Number NCDWQ Classification 303d Listed Upstream of 303d Listed Segment Reasons for 303d Listing or Stressor Total Acreage of Easement Watershed Impervious Cover Drainage Area (sq.mi.) Stream Order Restored Length (feet) Perennial or Intermittent Watershed Type Watershed LULC Distribution Perennial Perennial 0.60 Within Extent of EEP Watershed Plan Project County Physiographic Region Ecoregion Other River Basin Total Vegetated Acreage within Easement WRC Class % of Project Easement Fenced or Demarcated Urban Table 4. Project Attributes Dye Branch II / Project No. 92255 Iredell Beaver Activity Observed During Design Phase USGS HUC NCDWQ Sub-Basin This Page Intentionally Left Blank Appendix B Visual Assessment Data This Page Intentionally Left Blank ^_^_ ^_^_^_ ^_ ^_ ^_ ^_ +U GF GF GFGF 3 2 4 5 1 8 6 7 4 3 2 1 PP1 PP2 PP3 PP4 PP5PP6PP7 PP8PP9 Figure 2. Integrated Current Condition Plan View Prepared byPrepared for Project NumberMarch 2020 ®0 500250 Feet NCDMS # 92255 Dye Branch Stream RestorationMonitoring Year 8 - Integrated Current Condition Plan ViewIredell County, North Carolina Sheet 1 of 1 Project:Notes:1) Base Map Data Provided by Mulkey Engineers & Consultants2) NC OneMap 2010 Aerial Photo3)Areas of Lonicera japonica also on site Legend Cross Sections Easement Boundary Roads As-Built Centerline McLelland AvenueCa rb a r ru s Av enu e Ch u r c h S t r e e t Cemetery BranchDye Branch UpstreamDye Branch Downstream Catawba Avenue XS-1 XS-3 XS-2 XS-4 XS-5 XS-6 XS-7 XS-8 XS-9XS-10 0+ 0 0 1+ 0 0 2+ 0 0 3+ 0 0 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 8+ 0 0 9+ 0 0 10+000+001+002+003+004+005+006+007+008+009+0010+ 0 011+0012 + 0 0 13 + 0 0 1 4+ 0 0 1 5+ 0 0 16+001 7+ 0 0 18+ 0 019+0020+0021+0022+002 3 + 0 0 2 4 + 0 025+0026+0027+00As-Built Top of Bank 1+ 0 0 0+ 0 0 Post-Repair Conditions In-Stream Structure Condition Failed Failed Log Sill Stressed Stressed Rock SillBank / Bed Condition Bed AggradationBank Scoured / Eroding Mass Wasting Bed Degradation Vegetation Plots Criteria Met Criteria Not Met Impacted - No Data Collected +U Crest Gauge Control Points#0 Photo Points^_ Root Wad Log Sill Cross Vane Rock Vane Rock Sill GF Temporary Vegetation Plot Origin Vegetation Problem Areas Invasives - Present Appendix B Visual Assessment Data This Page Intentionally Left Blank Appendix B Visual Assessment Data 0 0 100% 0 0 100% 2. Riffle Condition 14 14 100% 15 15 100% 15 15 100% 15 15 100% 14 14 100% 1. Scoured / Eroding 1 12 99%0 0 0% 2. Undercut 0 0 100%0 0 0% 3. Mass Wasting 0 0 100%0 0 0% Totals 1 12 99%0 0 0% 1. Overall Integrity 32 32 100% 2. Grade Control 28 28 100% 2a. Piping 28 28 100% 3. Bank Protection 4 4 100% 4. Habitat 13 13 100% 2. Bank Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion. Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. Bank slumping, calving, or collapse. 3. Engineered Structures Structures physically intact with no dislodged boulders or logs. Grade control structures exhibiting maintenance of grade across the sill. Structures lacking any substantial flow underneath sills or arms. Bank erosion within the structures extent of influence does NOT exceed 15%. Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth Ratio ≥ 1.6. Rootwads/logs providing some cover at base-flow. 2. Degradation - Evidence of downcutting. 1. Texture/Substrate - Riffle maintains coarser substrate. 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth ≥ 1.6). 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstream riffle). 4. Thalweg Position 1. Thalweg centering at upstream of meander bend (Run). 2. Thalweg centering at downstream of meander bend (Glide). % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted % for Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability (Riffle and Run Units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars). Table 5. Visual Stream Morphology Stability Assessment Dye Branch II / Project No. 92255 - Cemetery Branch Assessed Length 1,014 feet Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Amount of Unstable Footage Appendix B Visual Assessment Data 0 0 100% 0 0 100% 2. Riffle Condition 17 17 100% 20 20 100% 16 20 80% 17 17 100% 16 16 100% 1. S coured / Eroding 6 152 95% 0 0 95% 2.Undercut 0 0 100%N/A N/A N/A 3. Mass Wasting 0 0 100% 0 0 100% Totals 6 152 95% 0 0 95% 1. O verall Integrity 29 30 97% 2. Grade Control 8 8 100% 2a. Piping 8 8 100% 3. Bank Protection 21 23 91% 4. Habitat 5 5 100% Table 5 cont'd. Visual Stream Morphology Stability Assessment Dye Branch II / Project No. 92255 - Dye Branch - Upstream Assessed Length 1,500 feet Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Amount of Unstable Footage % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted % for Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability (Riffle and Run Units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars). Bank erosion within the structures extent of influence does NOT exceed 15%. Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth Ratio ≥ 1.6. Rootwads/logs providing some cover at base-flow. 2. Degradation - Evidence of downcutting. 1.Texture/Substrate - Riffle maintains coarser substrate. 3. Meander Pool Condition 1.Depth Sufficient (Max Pool Depth : Mean Bankfull Depth ≥ 1.6). 2.Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstream riffle). 4. Thalweg Position 1. Thalweg centering at upstream of meander bend (Run). 2. Thalweg centering at downstream of meander bend (Glide). 2. Bank Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion. Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. Bank slumping, calving, or collapse. 3. Engineered Structures Structures physically intact with no dislodged boulders or logs. Grade control structures exhibiting maintenance of grade across the sill. Structures lacking any substantial flow underneath sills or arms. Appendix B Visual Assessment Data 1 34 97% 0 0 100% 2. Riffle Condition 11 11 100% 10 10 100% 10 10 100% 10 10 100% 10 10 100% 1. S coured / Eroding 2 62 97% 0 0 0% 2.Undercut 0 0 100% 0 0 0% 3. Mass Wasting 0 0 100% 0 0 0% Totals 2 62 97% 0 0 97% 1. O verall Integrity 21 22 95% 2. Grade Control 7 8 88% 2a. Piping 8 8 100% 3. Bank Protection 14 14 100% 4. Habitat 5 5 100% 2. Bank Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion. Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. Bank slumping, calving, or collapse. 3. Engineered Structures Structures physically intact with no dislodged boulders or logs. Grade control structures exhibiting maintenance of grade across the sill. Structures lacking any substantial flow underneath sills or arms. Bank erosion within the structures extent of influence does NOT exceed 15%. Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth Ratio ≥ 1.6. Rootwads/logs providing some cover at base-flow. 2. Degradation - Evidence of downcutting. 1.Texture/Substrate - Riffle maintains coarser substrate. 3. Meander Pool Condition 1.Depth Sufficient (Max Pool Depth : Mean Bankfull Depth ≥ 1.6). 2.Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstream riffle). 4. Thalweg Position 1. Thalweg centering at upstream of meander bend (Run). 2. Thalweg centering at downstream of meander bend (Glide). % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted % for Stabilizing Woody Vegetation 1. Bed 1. Vertical Stability (Riffle and Run Units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars). Table 5 cont'd. Visual Stream Morphology Stability Assessment Dye Branch II / Project No. 92255 - Dye Branch - Downstream Assessed Length 1,171 feet Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Amount of Unstable Footage Appendix B Visual Assessment Data Vegetation Category CCPV Depiction Number of Polygons Combined Acreage % of Planted Acreage 1. Bare Areas Stipple Black Dots White Background 0 0.00 0% 2. Low Stem Density Areas N/A 0 0.00 0% Totals 0 0.00 0% 3. Areas of Poor Growth Rates or Vigor N/A 0 0.00 0% Cumulative Totals 0 0.00 0% Easement Acreage 12.01 Vegetation Category CCPV Depiction Number of Polygons Combined Acreage % of Easement Acreage 4. Invasive Areas of Concern Cross Hatch (Red - Dense/Yellow - Present)2 0.22 2% 5. Easement Encroachment Areas Stipple Orange Dots White Background 0 0.00 0.0%Areas or points (if too small to render as polygons at map scale). Definitions Areas or points (if too small to render as polygons at map scale). Very limited cover of both woody and herbaceous material. Woody stem densities clearly below target levels based on MY7 stem count criteria. Areas with woody stems of a size class that are obviously small given the monitoring year. Definitions Table 6. Vegetation Condition Assessment Dye Branch II / Project No. 92255 Planted Acreage 9.0 Appendix B Visual Assessment Data Cemetery Branch – Permanent Photo Station 1 Downstream Cemetery Branch – Permanent Photo Station 2 Upstream Appendix B Visual Assessment Data Cemetery Branch – Permanent Photo Station 2 Downstream Dye Branch – Permanent Photo Station 3 Downstream Appendix B Visual Assessment Data Dye Branch – Permanent Photo Station 4 Upstream Dye Branch – Permanent Photo Station 5 Upstream Appendix B Visual Assessment Data Dye Branch – Permanent Photo Station 6 Upstream Dye Branch – Permanent Photo Station 7 Downstream Appendix B Visual Assessment Data Dye Branch – Permanent Photo Station 8 Upstream Dye Branch – Permanent Photo Station 9 Upstream Appendix B Visual Assessment Data Dye Branch – Permanent Photo Station 10 Upstream Repair Area 6 STA 10+50 (Photo form 2018) Dye Branch – Permanent Photo Station 11 Downstream Repair Area STA 19+00 (Photo from 2018) Appendix C Vegetation Plot Data This Page Intentionally Left Blank Appendix C Vegetation Plot Data Table 7. Vegetation Plot Criteria Attainment Dye Branch II / Project No. 92255 Vegetation Plot ID Vegetation Survival Threshold Met? Tract Mean 1 No 57% 2 Yes 3 Yes 4 No 5 No 6 Yes 7 Yes Appendix C Vegetation Plot Data Vegetation Monitoring Plot 1 MY8 Monitoring – July 30th, 2019 Vegetation Monitoring Plot 2 MY8 Monitoring – July 30th, 2019 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 3 MY8 Monitoring – July 30th, 2019 Vegetation Monitoring Plot 4 MY8 Monitoring – July 30th, 2019 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 5 MY8 Monitoring – July 30th, 2019 Vegetation Monitoring Plot 6 MY8 Monitoring – July 30th, 2019 Appendix C Vegetation Plot Data Vegetation Monitoring Plot 7 MY8 Monitoring – July 30th, 2019 Appendix C Vegetation Plot Data Report Prepared By Danvey Walsh Date Prepared 10/22/2019 15:22:15 PM Database name Equinox-2018-A-DyeBranch_MY6_2018.mdb Database location Z:\ES\NRI&M\EEP Monitoring\Dye Branch\DB-MY8-2019\Data\Veg Computer name FIELD-PC3 File size 46333952 Metadata Description of database file, the report worksheets, and a summary of project(s) and project data. Proj, planted Each project is listed with its PLANTED stems per acre, for each year. This excludes live stakes. Proj, total stems Each project is listed with its TOTAL stems per acre, for each year. This includes live stakes, all planted stems, and all natural/volunteer stems. Plots List of plots surveyed with location and summary data (live stems, dead stems, missing, etc.). Vigor Frequency distribution of vigor classes for stems for all plots. Vigor by Spp Frequency distribution of vigor classes listed by species. Damage List of most frequent damage classes with number of occurrences and percent of total stems impacted by each. Damage by Spp Damage values tallied by type for each species. Damage by Plot Damage values tallied by type for each plot. Planted Stems by Plot and Spp A matrix of the count of PLANTED living stems of each species for each plot; dead and missing stems are excluded. ALL Stems by Plot and spp A matrix of the count of total living stems of each species (planted and natural volunteers combined) for each plot; dead and missing stems are excluded. Project Code 92255 project Name Dye Branch Description River Basin Yadkin-Pee Dee Length(ft) Stream-to-Edge Width (ft) Area (sq m) Required Plots (calculated) Sampled Plots 7 Table 8. CVS Vegetation Plot Metadata Dye Branch II / Project No. 92255 DESCRIPTION OF WORKSHEETS IN THIS DOCUMENT PROJECT SUMMARY Appendix C Vegetation Assessment Data 1PnoLS: No livestakes included in tally; P-all: All planted stems included in tally; T: Total stems including recruitment. PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T Acer rubrum Red Maple Tree 6 1 1 1 1 1 1 Betula nigra River Birch Tree 1 1 1 1 8 8 8 Carpinus caroliniana American Hornbeam Tree 1 1 1 2 2 2 1 1 1 Cercis canadensis Eastern Redbud Tree 1 1 1 2 2 2 Cornus amomum Silky Dogwood Shrub 2 2 2 Diospyros virginiana Common Persimmon Tree 2 1 1 4 1 1 1 4 13 Fraxinus pennsylvanica Green Ash Tree 3 3 3 1 1 1 3 1 4 4 4 9 9 11 Juglans nigra Black Walnut Tree 1 1 1 Juniperus virginiana var. virginiana Eastern Redcedar Tree 1 1 1 2 2 2 Liriodendron tulipifera Tuliptree Tree 5 6 18 7 Liriodendron tulipifera var. tulipifera Tulip-tree, Yellow Poplar, Whitewood Tree 1 1 1 Nyssa sylvatica Blackgum Tree 4 13 Pinus virginiana Virginia Pine Tree 2 2 2 1 1 1 Platanus occidentalis American Sycamore Tree 1 2 1 1 1 Platanus occidentalis var. occidentalis Sycamore, Plane-tree Tree 1 1 1 Quercus Oak Tree 2 2 2 Quercus nigra Water Oak Tree 1 1 3 1 Quercus phellos Willow Oak Tree 1 1 1 7 7 11 2 2 3 4 Quercus velutina Black Oak Tree 1 1 1 1 1 1 4 4 7 7 7 8 10 10 26 3 3 18 4 4 13 12 12 48 23 23 49 3 3 5 5 5 6 4 4 7 3 3 7 3 3 7 6 6 9 6 6 9 162 162 283 283 283 324 405 405 1052 121 121 728 162 162 526 486 486 1942 931 931 1983 1 size (ACRES)0.02 0.02 0.02 0.02 0.02 0.02 0.02 1 1 1 Species count Stems per ACRE Stem count size (ares)1 1 1 Table 9. Planted Stem and Total Stem Counts (Species by Plot) Dye Branch Current Plot Data (MY8 2019) Scientific Name Common Name Species Type VP1 VP2 VP3 VP4 VP5 VP6 VP7 Appendix C Vegetation Assessment Data PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T Acer negundo boxelder Tree 3 13 1 Acer negundo var. negundo boxelder Tree 7 7 Acer rubrum red maple Tree 2 2 8 11 11 16 13 13 16 4 2 Acer rubrum var. rubrum red maple Tree 5 5 Albizia julibrissin silktree Exotic 2 Betula nigra river birch Tree 9 9 10 3 3 6 3 3 5 1 1 2 1 1 2 1 1 2 1 1 1 1 1 1 Carpinus caroliniana American hornbeam Tree 3 3 6 1 1 1 Carya hickory Tree 7 9 4 5 Carya alba mockernut hickory Tree 1 1 1 Carya ovata shagbark hickory Tree 1 Cercis canadensis eastern redbud Tree 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 2 2 2 2 2 2 Cornus amomum silky dogwood Shrub 2 2 2 3 Cornus florida flowering dogwood Tree 1 4 Cornus kousa Kousa dogwood 6 Crataegus hawthorn Tree 1 Diospyros virginiana common persimmon Tree 2 2 24 2 2 4 2 2 4 2 2 4 1 1 4 1 1 5 1 1 1 1 Fagus grandifolia var. grandifolia American beech Tree 1 Fraxinus pennsylvanica green ash Tree 17 17 23 18 18 29 18 18 20 4 4 8 5 5 9 5 5 5 4 4 4 4 4 4 4 4 4 Hibiscus rosemallow Shrub 1 Juglans nigra black walnut Tree 1 1 1 1 1 2 1 1 7 1 1 2 1 1 1 1 1 1 2 2 2 2 2 2 1 1 1 Juniperus virginiana var. virginiana eastern redcedar Tree 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 9 9 9 Liquidambar styraciflua sweetgum Tree 42 53 51 44 43 14 17 Liriodendron tuliptree 42 Liriodendron tulipifera tuliptree Tree 36 24 28 13 Liriodendron tulipifera var. tulipifera Tulip-tree, Yellow Poplar, Whitewood Tree 1 1 1 1 1 1 1 1 1 3 3 3 2 2 54 3 3 95 3 3 50 4 4 30 8 8 8 Nyssa sylvatica blackgum Tree 17 1 Pinus virginiana Virginia pine Tree 3 3 3 5 5 5 5 5 5 5 5 5 6 6 6 7 7 7 10 10 10 11 11 11 14 14 14 Platanus occidentalis American sycamore Tree 1 1 4 3 3 12 5 5 15 9 1 6 Platanus occidentalis var. occidentalis Sycamore, Plane-tree Tree 1 1 1 1 1 1 1 1 1 1 1 3 1 1 8 1 1 3 1 1 1 1 Populus deltoides eastern cottonwood Tree 1 Prunus plum Shrub or Tree 5 Prunus serotina black cherry Tree 8 Prunus serotina var. serotina black cherry Tree 12 6 Prunus serrulata Japanese flowering cherry 7 6 Pyrus calleryana Callery pear Exotic 1 2 Quercus oak Tree 2 2 2 5 1 1 1 1 9 9 13 19 19 19 Quercus alba white oak Tree 3 Quercus coccinea scarlet oak Tree 5 Quercus falcata southern red oak Tree 1 1 1 1 1 1 2 2 2 2 2 2 Quercus nigra water oak Tree 1 1 4 2 2 7 2 2 5 3 3 12 3 3 9 3 3 3 8 8 9 2 2 2 2 2 2 Quercus pagoda cherrybark oak Tree 1 Quercus phellos willow oak Tree 10 10 19 11 11 13 11 11 20 13 13 23 13 13 18 13 13 13 8 8 26 4 4 7 4 4 4 Quercus rubra northern red oak Tree 4 Quercus velutina black oak Tree 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 4 4 15 Salix caroliniana coastal plain willow Tree 6 3 Salix nigra black willow Tree 5 Sambucus canadensis Common Elderberry Shrub 5 8 Unknown Shrub or Tree 3 3 3 9 9 9 63 63 169 66 66 175 72 72 211 43 43 233 43 43 218 47 47 234 46 46 153 47 47 107 76 76 76 17 17 19 14 14 17 15 15 22 12 12 23 12 12 27 13 13 22 12 12 20 12 12 18 13 13 13 364 364 977 382 382 1012 416 416 1220 249 249 1347 249 249 1260 272 272 1353 266 266 885 272 272 619 439 439 439 Species count Stems per ACRE Table 9 Con't. Planted Stem and Total Stem Counts (Species by Plot) Dye Branch / Project No. 92255 0.17 0.17 Scientific Name Common Name Species Type Stem count size (ares) size (ACRES) 7 7 7 0.17 0.17 0.17 0.17 0.17 0.17 0.17 7 7 7 7 7 7 Annual Means MY8 (2019)MY7 (2018)MY6 (2018)MY5 (2015)MY4 (2014)MY3 (2013)MY2 (2012)MY1 (2011)MY0 (2011) Temporary Plot 1 10m x 10m Temporary Plot 2 10m x 10m Temporary Plot 3 10m x 10m Temporary Plot 4 5m x 20m Stem Count 10 20 26 18 Size (Ares)1 1 1 1 Size (Acres)0.02 0.02 0.02 0.02 Stems Per Acre 500 1000 1300 900 Table 9 Con't. Total Planted and Natural Stem Recruits (Temporary Random Plots) Dye Branch II / Project No. 92255 * Specific species were not collected per plot however the majority of the stems included Betula Nigra , Liriodendron tulipifera , Acer rubrum , Plantanus occidentalis , Acer negundo , and Liquidambar styraciflua . 1PnoLS: No livestakes included in tally; P-all: All planted stems included in tally; T: Total stems including recruitment. Appendix D Stream Survey Data This Page Intentionally Left Blank Appendix D Stream Survey Data Left Descending Bank Upstream Right Descending Bank Downstream Appendix D Stream Survey Data Left Descending Bank Upstream Right Descending Bank Downstream Appendix D Stream Survey Data Left Descending Bank Upstream Right Descending Bank Downstream Appendix D Stream Survey Data Left Descending Bank Upstream Right Descending Bank Downstream Appendix D Stream Survey Data Left Descending Bank Upstream Right Descending Bank Downstream Appendix D Stream Survey Data Left Descending Bank Upstream Right Descending Bank Downstream Appendix D Stream Survey Data Left Descending Bank Upstream Right Descending Bank Downstream Appendix D Stream Survey Data Left Descending Bank Upstream Right Descending Bank Downstream Appendix D Stream Survey Data Left Descending Bank Upstream Right Descending Bank Downstream Appendix D Stream Survey Data Left Descending Bank Upstream Right Descending Bank Downstream Appendix D Stream Survey Data Parameter Dimension & Substrate - Riffle LL UL Eq.Min Mean Med Max SD N Min Mean Med Max SD N Min Mean Max Min Mean Med Max SD N Bankfull Width (ft)---7.0 7.0 7.0 7.0 N/A 1 8.9 11.1 11.3 14.1 1.8 7 -10.0 -5.5 7.2 7.2 8.9 N/A 2 Floodprone Width (ft)14.2 14.2 14.2 14.2 N/A 1 19.0 54.0 36.0 100.0 38.1 5 -28.0 ->30 >30 >30 >30 N/A 2 Bankfull Mean Depth (ft)---1.0 1.0 1.0 1.0 N/A 1 0.7 0.9 0.8 1.6 0.3 7 -0.7 -0.5 0.7 0.7 0.8 N/A 2 Bankfull Max Depth (ft)1.5 1.5 1.5 1.5 N/A 1 1.0 1.5 1.3 2.4 0.5 7 0.8 1.1 1.6 1.0 1.2 1.2 1.4 N/A 2 Bankfull Cross Sectional Area (ft 2)6.8 6.8 6.8 6.8 N/A 1 6.8 9.6 8.4 18.4 3.9 7 -7.0 -3.0 5.0 5.0 7.0 N/A 2 Width/Depth Ratio 7.2 7.2 7.2 7.2 N/A 1 6.9 11.2 11.7 15.0 NA 3 -14.3 -10.3 10.8 10.8 11.2 N/A 2 Entrenchment Ratio 2.0 2.0 2.0 2.0 N/A 1 3.8 6.8 7.7 8.9 NA 3 -2.8 ->3.4 >4.4 >4.4 >5.4 N/A 2 Bank Height Ratio 1.5 1.5 1.5 1.5 N/A 1 1.0 1.1 1.0 1.2 NA 3 1.0 1.0 1.0 1.0 1.0 1.0 1.0 N/A 2 Profile Riffle Length (ft)---------------6.8 23.4 19.5 53.9 14.84 14 Riffle Slope (ft/ft)0.012 0.034 -0.088 --0.006 0.027 0.026 0.052 0.016 6 -0.048 -0.004 0.023 0.022 0.049 0.01 14 Pool Length (ft)4.7 8.2 -11.9 --3.5 19.3 19.6 32.8 11.5 6 13.8 20.7 27.6 5.8 16.2 16.9 39.1 7.17 24 Pool Max Depth (ft)-2.6 ---1.8 2.6 2.9 3.2 0.5 7 -2.0 -1.8 3.0 2.9 3.7 0.48 18 Pool Spacing (ft)22.8 86.0 -228.2 --18.0 52.7 40.2 140.8 41.7 7 18.4 27.6 32.2 4.5 38.7 36.4 111.0 24.40 24 Pattern Channel Belt Width (ft)5.3 10.8 -22.6 --26.0 49.1 40.0 119.0 29.8 9 23.0 32.2 41.4 11.3 30.6 37.0 46.7 12.3 16 Radius of Curvature (ft)3.9 19.6 -37.0 --5.0 23.8 22.0 48.0 14.6 9 18.4 27.6 36.8 8.3 13.7 12.0 29.9 5.7 16 Rc: Bankfull Width (ft/ft)0.6 2.8 -5.3 --0.6 2.1 1.8 4.3 1.3 9 1.8 2.8 3.7 2.4 2.4 2.4 2.4 N/A 1 Meander Wavelength (ft)13.6 42.0 -71.0 --26.0 72.9 69.0 155.0 47.6 9 46.0 55.2 64.4 38.8 77.4 79.1 167.0 36.1 11 Meander Width Ratio 0.8 1.5 -3.2 --2.5 4.7 3.6 10.1 2.7 7 2.3 3.2 4.1 4.9 6.6 6.6 8.2 N/A 2 Transport Parameters Reach Shear Stress (Competency) lb/ft 2 Max Part Size (mm) Mobilized at Bankfull Stream Power (Transport Capacity) W/m2 Additional Reach Parameters Rosgen Classification Bankfull Velocity (fps) Bankfull Discharge (cfs) Valley Length (ft) Channel Thalweg Length (ft) Sinuosity Water Surface Slope (ft/ft) Bankfull Slope (ft/ft) Bankfull Floodplain Area (acres) % of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other N/A - Item does not apply.Non-Applicable. - Table 10a. Baseline Stream Data Summary Dye Branch II / Project No. 92255 - Cemetery Branch (977 feet) Regional Curve Pre-Existing Condition Reference Reach Data Design Monitoring Baseline ---- 45 - 180 --- E4 E4 / C4 / C5 C4 C --- 6.6 - 7.8 4.1 - 7.0 5.5 - 6.7 44.3 - 52.8 35.0 - 128.1 38.4 - 46.6 --- ---977 1.14 1.15 - 2.22 1.14 1.08 0.0190 0.0057 - 0.0130 0.0190 - ---0.0191 --- -- -- - Information unavailable. -- Appendix D Stream Survey Data Parameter Dimension & Substrate - Riffle LL UL Eq.Min Mean Med Max SD N Min Mean Med Max SD N Min Mean Max Min Mean Med Max SD N Bankfull Width (ft)----11.2 ----16.0 18.5 -20.6 ---20.1 -25.7 28.4 26.9 32.7 N/A 3 Floodprone Width (ft)-89.5 ----67.2 70.2 -72.8 --70.9 76.9 88.8 54.4 64.9 58.6 81.8 N/A 3 Bankfull Mean Depth (ft)----1.6 ----1.6 1.6 -1.7 --1.5 1.1 1.3 1.3 1.4 N/A 3 Bankfull Max Depth (ft)-2.8 ----1.5 1.9 -2.4 --1.5 1.8 2.2 2.2 2.8 2.5 3.6 N/A 3 Bankfull Cross Sectional Area (ft2)18.1 20.2 19.7 22.9 NA 3 27.4 30.3 -33.4 --31.0 29.5 36.3 32.5 46.9 N/A 3 Width/Depth Ratio 6.2 7.0 7.0 7.9 NA 3 9.3 11.4 -12.7 --13.0 20.3 22.6 22.8 24.6 N/A 3 Entrenchment Ratio >3.2 >4.4 >5.0 >5.0 NA 3 3.5 3.8 -4.4 --3.5 3.8 4.4 2.0 2.3 2.3 2.5 N/A 3 Bank Height Ratio -1.0 ----1.0 1.2 -1.4 --1.0 1.0 1.0 1.0 1.0 1.0 1.0 N/A 3 Profile Riffle Length (ft)------6.1 17.6 -30.2 --6.6 19.1 32.7 20.1 51.6 47.1 97 29.5 8 Riffle Slope (ft/ft)0.002 0.014 -0.042 --0.006 0.028 -0.066 --0.007 0.030 0.070 0.002 0.006 0.005 0.016 0.005 8 Pool Length (ft)------18.3 35.1 -62.9 --19.9 38.1 68.1 8.76 24.6 22.4 66.4 13 20 Pool Max Depth (ft)------2.2 2.9 -3.3 --2.1 2.7 3.1 2.1 3.44 3.61 4.48 0.67 20 Pool Spacing (ft)------50.3 78.9 -105.8 --54.5 85.5 114.7 24.1 66.8 65.3 125 28.6 19 Pattern Channel Belt Width (ft)6.6 24.3 -56.9 --36.0 67.0 -150.0 --39.0 72.6 162.6 28.5 45.0 48.4 54.1 8.34 17 Radius of Curvature (ft)14.5 52.4 -148.8 --19.0 49.0 -115.0 --20.6 53.1 124.6 23.6 31.3 31.2 39.6 4.75 14 Rc: Bankfull Width (ft/ft)1.3 4.7 -13.3 --1.0 2.7 -6.2 --1.0 2.7 6.2 2.3 2.3 2.3 2.3 N/A 1 Meander Wavelength (ft)40.1 79.7 -172.7 --33.0 94.0 -155.0 --35.8 102 168.0 100.5 130.0 138.2 153.3 18.2 12 Meander Width Ratio 0.6 2.2 -5.1 --1.9 3.6 -8.1 --1.9 3.6 8.1 1.7 1.9 1.9 2.1 0.21 3 Transport Parameters Reach Shear Stress (Competency) lb/ft2 Max Part Size (mm) Mobilized at Bankfull Stream Power (Transport Capacity) W/m2 Additional Reach Parameters Rosgen Classification Bankfull Velocity (fps) Bankfull Discharge (cfs) Valley Length (ft) Channel Thalweg Length (ft) Sinuosity Water Surface Slope (Channel) (ft/ft) Bankfull Slope (ft/ft) Bankfull Floodplain Area (acres) % of Reach with Eroding Banks Channel Stability or Habitat Metric Channel Stability or Habitat Metric Biological or Other N/A - Item does not apply. Non-Applicable. ---0.0083 --- 1.04 1.20 1.20 1.21 0.0090 0.0088 0.0080 0.0080 --- 2,086 1,034 2,405 2,455 -6.2 - 6.9 4.2 3.5 -112.2 - 124.8 128 110 --- E4 C4 C5 C 30 - 100 --- -- - - - - Monitoring Baseline Table 10a. Baseline Stream Data Summary Dye Branch II / Project No. 92255 - Dye Branch-Upstream (1,465 feet) Reference Reach Data UT to Ostin CreekPre-Existing Condition - - - Information unavailable. DesignRegional Curve - - -- - Appendix D Stream Survey Data Parameter Dimension & Substrate - Riffle LL UL Eq.Min Mean Med Max SD N Min Mean Med Max SD N Min Mean Max Min Mean Med Max SD N Bankfull Width (ft)---14.8 14.8 14.8 14.8 NA 1 16.0 18.5 -20.6 ---20.1 -18.4 18.6 18.6 18.8 N/A 3 Floodprone Width (ft)22.0 22.0 22.0 22.0 NA 1 67.2 70.2 -72.8 --70.9 76.9 88.8 48.7 61.8 61.8 74.8 N/A 3 Bankfull Mean Depth (ft)---1.2 1.2 1.2 1.2 NA 1 1.6 1.6 -1.7 --1.5 1.9 2.0 2.0 2.0 N/A 3 Bankfull Max Depth (ft)2.4 2.4 2.4 2.4 NA 1 1.5 1.9 -2.4 --1.5 1.8 2.2 2.9 3.0 3.0 3.1 N/A 3 Bankfull Cross Sectional Area (ft2)17.4 17.4 17.4 2.4 NA 1 27.4 30.3 -33.4 --31.0 34.0 36.1 36.1 38.1 N/A 3 Width/Depth Ratio 12.5 12.5 12.5 2.4 NA 1 9.3 11.4 -12.7 --13.0 9.3 9.6 9.6 9.9 N/A 3 Entrenchment Ratio 1.5 1.5 1.5 2.4 NA 1 3.5 3.8 -4.4 --3.5 3.8 4.4 2.7 3.4 3.4 4.0 N/A 3 Bank Height Ratio 4.9 4.9 4.9 2.4 NA 1 1.0 1.2 -1.4 --1.0 1.0 1.0 1.0 1.0 1.0 1.0 N/A 3 Profile Riffle Length (ft)------6.1 17.6 -30.2 --6.6 19.1 32.7 15.7 50.3 55.7 79.3 20.2 7 Riffle Slope (ft/ft)0.003 0.021 -0.121 --0.006 0.028 -0.066 --0.007 0.030 0.070 0.001 0.006 0.006 0.014 0.004 7 Pool Length (ft)2.9 24.8 -120 --18.3 35.1 -62.9 --19.9 38.1 68.1 10.1 19.9 15.9 39.6 8.91 14 Pool Max Depth (ft)-3.1 ----2.2 2.9 -3.3 --2.1 2.7 3.1 3.3 3.91 3.77 5.05 0.59 12 Pool Spacing (ft)79.0 162.0 -261.0 --50.3 78.9 -105.8 --54.5 85.5 114.7 15.3 57.5 38.8 130 41.5 14 Pattern Channel Belt Width (ft)15.6 30.6 -67.7 --36.0 67.0 -150.0 --39.0 72.6 162.6 28.3 49.2 57.5 65.4 15.4 9 Radius of Curvature (ft)11.0 42.1 -81.9 --19.0 49.0 -115.0 --20.6 53.1 124.6 32.7 40.7 42.2 50.1 5.6 7 Rc: Bankfull Width (ft/ft)0.7 2.9 -5.6 --1.0 2.7 -6.2 --1.0 2.7 6.2 1.7 1.7 1.7 1.7 N/A 1 Meander Wavelength (ft)62.0 103.0 -157 --33.0 94.0 -155.0 --35.8 102 168.0 138.9 162.2 157.3 210.5 27.2 6 Meander Width Ratio 1.1 2.1 -4.6 --1.9 3.6 -8.1 --1.9 3.6 8.1 2.4 2.8 2.8 3.1 0.51 2 Transport Parameters Reach Shear Stress (Competency) lb/ft2 Max Part Size (mm) Mobilized at Bankfull Stream Power (Transport Capacity) W/m2 Additional Reach Parameters Rosgen Classification Bankfull Velocity (fps) Bankfull Discharge (cfs) Valley Length (ft) Channel Thalweg Length (ft) Sinuosity Water Surface Slope (ft/ft) Bankfull Slope (ft/ft) Bankfull Floodplain Area (acres) % of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other N/A - Item does not apply.Non-Applicable. - Information unavailable. -- -- ---0.0106 --- 1.14 1.46 1.09 1.10 0.0110 0.0090 0.0095 - --- ---870 -6.1 - 7.2 4.2 3.5 -105.4 - 126.0 128 110 - -- CG4cC4C5 Table 10a. Baseline Stream Data Summary Dye Branch II / Project No. 92255 - Dye Branch-Downstream (870 feet) Regional Curve Pre-Existing Condition Reference Reach Data UT to Ostin Creek Design Monitoring Baseline -- 30 - 100 --- --- -- Appendix D Stream Survey Data Parameter Ri% / Ru% / P% / G% / S% - - - - -- - - - -- - - - -35% 4% 42% 13% 7% SC% / Sa% / G% / C% / B% / Be% - - - - - -- - - - - - d16 / D35 / d50 / d84 / d95 / dip / disp (mm)0.9 1.2 2.0 8.0 10.1 88.9 - 0.21 0.5 3.5 13.9 26.6 45.0 - Entrenchment Class <1.5 / 1.5 - 1.99 / 2 - 4.9 / 5.0 - 9.9 / >10 - - - - -- - - - - Incision Class <1.2 / 1.2 - 1.49 / 1.5 - 1.99 / >2.0 - - - -- - - - N/A - Item does not apply.Non-Applicable. - Information unavailable. Table 10b. Baseline Stream Data Summary (Substrate, Bed, Bank, and Hydrologic Containment Parameter Distributions) Dye Branch II / Project No. 92255 - Cemetery Branch (977 feet) Pre-Existing Condition Reference Reach Data Design Monitoring Baseline Parameter Ri% / Ru% / P% / G% / S% - - - - -- - - - -- - - - - - - 28% 15% 34% 20% 3% SC% / Sa% / G% / C% / B% / Be% - - - - - -- - - - - - d16 / D35 / d50 / d84 / d95 / dip / disp (mm)0.15 0.4 3.3 10.3 13.7 45.7 - - - - - - - - Entrenchment Class <1.5 / 1.5 - 1.99 / 2 - 4.9 / 5.0 - 9.9 / >10 - - - - -- - - - - Incision Class <1.2 / 1.2 - 1.49 / 1.5 - 1.99 / >2.0 - - - -- - - - Non-Applicable. Table 10b. Baseline Stream Data Summary Dye Branch II / Project No. 92255 - Dye Branch-Upstream (1,465 feet) (Substrate, Bed, Bank, and Hydrologic Containment Parameter Distributions) - Information unavailable. Reference Reach Data DesignPre-Existing Condition Monitoring Baseline Parameter Ri% / Ru% / P% / G% / S% - - - - -- - - - -- - - - - - - 43% 6% 34% 13% 3% SC% / Sa% / G% / C% / B% / Be% - - - - - -- - - - - - d16 / D35 / d50 / d84 / d95 / dip / disp (mm)0.15 0.28 0.56 10.7 13.0 45.7 - - - - - - - - Entrenchment Class <1.5 / 1.5 - 1.99 / 2 - 4.9 / 5.0 - 9.9 / >10 - - - - -- - - - - Incision Class <1.2 / 1.2 - 1.49 / 1.5 - 1.99 / >2.0 - - - -- - - - N/A - Item does not apply.Non-Applicable. - Information unavailable. Table 10b. Baseline Stream Data Summary (Substrate, Bed, Bank, and Hydrologic Containment Parameter Distributions) Dye Branch II / Project No. 92255 - Dye Branch-Downstream (870 feet) Pre-Existing Condition Reference Reach Data Design Monitoring Baseline Appendix D Stream Survey Data Parameter Dimension Base MY1 MY2 MY3 MY4 MY5 Post- Repair MY6 MY7 MY8 Base MY1 MY2 MY3 MY4 MY5 Post- Repair MY6 MY7 MY8 Base MY1 MY2 MY3 MY4 MY5 Post- Repair MY6 MY7 MY8 Record Elevation (datum) Used 836.3 836.3 836.3 836.3 836.3 836.3 836.3 836.4 836.4 826.3 826.3 826.3 826.3 826.3 826.3 826.3 826.0 826.1 821.7 821.7 821.7 821.7 821.7 821.7 821.7 821.7 821.6 Low Bank Height Elevation (datum) Used -------836.4 836.5 -------826.3 826.3 -------821.9 821.9 Bankfull Width (ft)9.7 10.2 9.4 9.2 9.2 9.3 9.4 10.0 10.1 8.9 10.6 8.0 8.4 5.9 6.0 6.4 5.5 5.3 5.5 6.0 6.5 6.1 5.7 5.8 6.2 5.9 7.2 Floodprone Width (ft)>50 >50 >50 >50 >50 >50 >50 >50 >50 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 >30 Bankfull Mean Depth (ft)1.9 1.5 1.5 1.5 1.6 1.5 1.4 1.3 1.2 0.8 0.6 0.5 0.5 0.7 0.8 1.0 1.2 1.4 0.5 0.5 0.6 0.6 0.7 0.7 0.8 0.8 1.0 Bankfull Max Depth (ft)3.1 2.7 2.4 2.2 2.4 2.1 1.8 1.8 1.8 1.4 1.2 1.2 1.2 1.4 1.5 2.0 1.7 2.0 1.0 1.0 1.0 0.9 1.1 1.1 1.2 1.2 1.5 Bankfull Cross Sectional Area (ft 2)18.9 15.2 14.3 14.0 15.1 14.2 13.1 13.1 13.1 7.0 6.3 3.9 4.1 4.2 4.7 6.6 6.6 6.6 3.0 2.8 4.0 3.6 4.2 4.3 5.0 5.0 5.0 Bankfull Width/Depth Ratio 5.0 6.8 6.2 6.1 5.6 6.2 6.7 7.7 8.6 11.2 18.1 16.4 17.3 8.3 7.5 6.3 4.6 5.2 10.3 12.7 10.6 10.4 7.6 7.9 7.7 7.0 7.2 Bankfull Entrenchment Ratio >5.1 >4.9 >5.3 >5.4 >5.5 >5.4 >5.3 >5 >4.7 >3.4 >2.8 >3.8 >3.6 >5.1 >5.0 >4.7 >5.5 >5.7 >5.4 >5.0 >4.6 >4.9 >5.3 >5.1 >4.8 >5.1 >4.1 Bankfull Bank Height Ratio 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.2 1.1 1.0 1.0 1.0 1.0 1.0 1.0 1.1 1.1 1.3 d50 (mm)N/A 5.7 4.8 4.1 1.5 1.1 ---N/A 8.4 14.0 2.1 4.7 48 ---N/A 6.0 5.0 6.0 6.2 1.7 --- * Beginning in MY7 (2018), the bankfull elevation and Bank Height Ratio have been calculated using a fixed Abkf associated with the Post-Repair MY6 Report rather than a fixed Abkf associated with the Baseline Report. Table 11a. Baseline Morphology & Hydraulic Monitoring Summary Dye Branch II / Project No. 92255 - Cemetery Branch (971 Feet) Cross Section 1 Pool Cross Section 2 Riffle Cross Section 3 Riffle Appendix D Stream Survey Data Parameter Dimension Base MY1 MY2 MY3 MY4 MY5 Post- Repair MY6 MY7 MY8 Base MY1 MY2 MY3 MY4 MY5 Post- Repair MY6 MY7 MY8 Base MY1 MY2 MY3 MY4 MY5 Post- Repair MY6 MY7 MY8 Base MY1 MY2 MY3 MY4 MY5 Post- Repair MY6 MY7 MY8 Record Elevation (datum) Used 824.3 824.3 824.3 824.3 824.3 824.3 824.3 824.2 824.1 817.4 817.4 817.4 817.4 817.4 817.4 817.4 817.7 817.4 815.5 815.5 815.5 815.5 815.5 815.5 815.5 815.5 815.4 812.5 812.5 812.5 812.5 812.5 812.5 812.5 812.7 812.5 Low Bank Height Elevation (datum) Used -------824.5 824.5 -------817.4 817.8 -------815.1 815.3 -------812.4 812.5 Bankfull Width (ft)25.7 23.8 22.9 20.8 21.5 20.7 13.2 11.3 12.9 17.1 17.0 16.8 16.4 15.6 15.1 21.8 22.0 19.6 32.7 28.7 27.7 26.9 26.7 27.2 17.5 21.3 17.4 26.9 24.1 21.3 20.1 19.9 17.1 12.0 15.0 15.8 Floodprone Width (ft)>58.6 >52.8 >52.8 >52.8 >52.8 >52.8 >52.8 >52.8 >52.8 >50 >47.1 >47.1 >47.1 >47.1 >47.1 >47.1 >47.1 >47.1 >81.8 >78.2 .78.2 >78.2 >78.2 >78.2 >78.2 >78.2 >78.2 >54.4 >52.6 >52.6 >52.6 >52.6 >52.6 >52.6 >52.6 >52.6 Bankfull Mean Depth (ft)1.3 1.1 1.0 1.1 1.0 1.0 1.2 1.4 1.5 1.7 1.4 2.1 2.1 2.1 2.0 1.9 1.9 2.3 1.4 1.3 1.3 1.3 1.3 1.2 2.0 1.6 1.8 1.1 1.0 0.9 1.1 1.0 1.0 1.8 1.4 1.4 Bankfull Max Depth (ft)2.5 2.0 2.1 2.3 2.2 2.3 1.9 2.1 2.4 3.4 2.8 3.6 3.6 3.4 3.0 3.5 3.5 3.5 3.6 3.2 3.2 3.3 3.3 3.0 3.3 3.3 3.0 2.2 2.0 2.1 2.4 2.3 2.2 2.4 2.3 2.1 Bankfull Cross Sectional Area (ft 2)32.5 27.1 23.1 22.4 21.1 21.0 15.8 15.8 15.8 28.8 23.7 35.0 35.1 33.1 29.7 41.9 41.9 41.9 46.9 37.5 36.2 36.0 34.2 31.3 34.2 34.2 34.2 29.5 24.2 19.9 21.3 19.4 17.9 21.1 21.1 21.1 Bankfull Width/Depth Ratio 20.3 20.9 22.6 19.3 21.9 20.4 11.0 8.1 8.4 10.2 12.2 8.1 7.7 7.4 7.7 11.3 11.5 9.0 22.8 22.0 21.2 20.0 20.8 23.6 9.0 13.2 9.5 24.6 24.0 22.9 18.9 20.4 16.3 6.8 10.6 11.0 Bankfull Entrenchment Ratio >2.3 >2.2 >2.3 >2.5 >2.5 >2.6 >4.0 >4.7 >4.1 >2.9 >2.8 >2.8 >2.9 >3.0 >3.1 >2.2 >2.1 2.2 >2.5 >2.7 >2.8 >2.9 >2.9 >2.9 >4.5 >3.7 >4.5 >2.0 >2.2 >2.5 >2.6 >2.6 >3.1 >4.4 >3.5 >3.3 Bankfull Bank Height Ratio*1.0 1.0 1.0 1.0 1.0 1.0 1.1 1.1 1.2 1.0 1.0 1.0 1.0 1.0 1.0 1.1 0.9 1.1 1.0 1.0 1.0 1.0 1.0 1.0 1.1 0.9 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 1.0 d50 (mm)N/A 1.2 1.2 1.0 1.9 0.42 ---N/A 6.0 1.7 13.0 1.6 1.9 ---N/A 1.9 4.5 1.6 1.2 1.5 ---N/A 2.7 8.0 7.4 2.4 1.3 --- * Beginning in MY7 (2018), the bankfull elevation and Bank Height Ratio dimensions have been calculated using a fixed Abkf associated with the Post-Repair MY6 Report rather than a fixed Abkf associated with the Baseline Report. Table 11a. Baseline Morphology & Hydraulic Monitoring Summary Dye Branch II / Project No. 92255 - Dye Branch-Upstream (1,471 Feet) Cross Section 4 Riffle Cross Section 5 Pool Cross Section 6 Riffle Cross Section 7 Riffle Parameter Dimension Base MY1 MY2 MY3 MY4 MY5 Post- Repair MY6 MY7 MY8 Base MY1 MY2 MY3 MY4 MY5 Post- Repair MY6 MY7 MY8 Base MY1 MY2 MY3 MY4 MY5 Post- Repair MY6 MY7 MY8 Record Elevation (datum) Used 809.3 809.3 809.3 809.3 809.3 809.3 809.3 809.4 809.3 806.1 806.1 806.1 806.1 806.1 806.1 806.1 806.1 806.1 801.1 801.1 801.1 801.1 801.1 801.1 801.1 801.0 801.1 Low Bank Height Elevation (datum) Used -------809.1 809.3 -------806.1 806.1 -------801.1 801.5 Bankfull Width (ft)18.8 18.8 19.6 18.6 19.6 19.6 19.3 22.1 18.9 26.3 26.3 24.3 24.6 23.8 23.7 27.7 29.2 27.5 18.4 18.5 17.7 17.9 17.8 16.6 17.4 17.4 19.7 Floodprone Width (ft)>74.8 >73.5 >73.5 >73.5 >73.5 >73.5 >73.5 >73.5 >73.5 >70 >70 >70 >70 >70 >70 >70 >70 >70 >48.7 >47.6 >47.6 >47.6 >47.6 >47.6 >47.6 >47.6 >47.6 Bankfull Mean Depth (ft)2.0 1.9 2.1 2.0 2.2 2.1 2.2 1.9 2.2 1.8 1.7 2.3 2.6 2.6 2.6 1.5 1.4 1.5 1.9 1.6 1.6 1.6 1.8 1.8 1.8 1.8 2 Bankfull Max Depth (ft)3.1 3.0 3.9 3.3 3.9 3.9 3.9 3.4 3.4 3.5 3.5 3.5 4.1 3.4 3.6 2.1 2.3 2.3 2.9 2.4 2.5 2.7 2.8 2.6 2.8 2.6 2.9 Bankfull Cross Sectional Area (ft 2)38.1 35.9 41.0 36.8 43.2 41.8 42.3 42.3 42.3 48.4 43.6 55.3 63.5 61.1 62.7 42.1 42.1 42.1 34.0 29.5 27.8 29.4 31.6 29.4 32.0 32.0 32.0 Bankfull Width/Depth Ratio 9.3 9.9 9.3 9.4 8.9 9.2 8.8 11.6 8.4 14.3 15.9 10.7 9.6 9.3 9.0 18.2 20.3 18.0 9.9 11.7 11.3 11.0 10.0 9.4 9.4 9.4 12.1 Bankfull Entrenchment Ratio >4.0 >3.9 >3.8 >4.0 >3.8 >3.7 >3.8 >3.3 >3.4 >2.7 >2.7 2.9 >2.8 >2.9 >2.9 >2.5 >2.4 >2.5 >2.7 >2.6 >2.7 >2.7 >2.7 >2.9 >2.7 >2.7 >2.2 Bankfull Bank Height Ratio*1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.2 d50 (mm)N/A 1.3 1.1 0.9 2.0 0.26 ---N/A 0.72 6.4 1.7 1.4 0.32 ---N/A 1.0 0.9 0.1 1.8 2.7 --- * Beginning in MY7 (2018), the bankfull elevation and Bank Height Ratio dimensions have been calculated using a fixed Abkf associated with the Post-Repair MY6 Report rather than a fixed Abkf associated with the Baseline Report. Table 11a. Baseline Morphology & Hydraulic Monitoring Summary Dye Branch II / Project No. 92255 - Dye Branch-Downstream (869 Feet) Cross Section 8 Riffle Cross Section 9 Pool Cross Section 10 Riffle Appendix D Stream Survey Data Parameter Dimension & Substrate - Riffle Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Bankfull Width (ft)5.5 7.2 7.2 8.9 N/A 2 6.0 8.3 8.3 10.6 N/A 2 6.5 7.3 7.3 8.0 N/A 2 6.1 7.3 7.3 8.4 N/A 2 5.9 6.0 6.0 6.1 N/A 2 5.8 5.9 5.9 6.0 N/A 2 6.2 6.3 6.3 6.4 N/A 2 5.5 5.7 5.7 5.9 N/A 2 6.5 6.9 6.9 7.2 N/A 2 Floodprone Width (ft)>30 >30 >30 >30 N/A 2 >30 >30 >30 >30 N/A 2 >30 >30 >30 >30 N/A 2 >30 >30 >30 >30 N/A 2 >30 >30 >30 >30 N/A 2 >30 >30 >30 >30 N/A 2 30.0 30.0 30.0 30.0 N/A 2 30.0 30.0 30.0 30.0 N/A 2 30.0 30.0 30.0 30.0 N/A 2 Bankfull Mean Depth (ft)0.5 0.7 0.7 0.8 N/A 2 0.5 0.6 0.6 0.6 N/A 2 0.5 0.6 0.6 0.6 N/A 2 0.5 0.6 0.6 0.6 N/A 2 0.7 0.7 0.7 0.7 N/A 2 0.7 0.8 0.8 0.8 N/A 2 0.8 0.9 0.9 1.0 N/A 2 0.8 1.0 1.0 1.2 N/A 2 1.0 1.1 1.1 1.2 N/A 2 Bankfull Max Depth (ft)1.0 1.2 1.2 1.4 N/A 2 1.0 1.1 1.1 1.2 N/A 2 1.0 1.1 1.1 1.2 N/A 2 0.9 1.1 1.1 1.2 N/A 2 1.1 1.3 1.3 1.4 N/A 2 1.1 1.3 1.3 1.5 N/A 2 1.2 1.6 1.6 2.0 N/A 2 1.2 1.5 1.5 1.7 N/A 2 1.5 1.8 1.8 2.1 N/A 2 Bankfull Cross-Sectional Area (ft2)3.0 5.0 5.0 7.0 N/A 2 2.8 4.6 4.6 6.3 N/A 2 3.9 4.0 4.0 4.0 N/A 2 3.6 3.9 3.9 4.1 N/A 2 4.2 4.2 4.2 4.2 N/A 2 4.3 4.5 4.5 4.7 N/A 2 5.0 5.8 5.8 6.6 N/A 2 5.0 5.8 5.8 6.6 N/A 2 5.0 5.8 5.8 6.6 N/A 2 Width/Depth Ratio 10.3 10.8 10.8 11.2 N/A 2 12.7 15.4 15.4 18.1 N/A 2 10.6 13.5 13.5 16.4 N/A 2 10.4 13.9 13.9 17.3 N/A 2 8.3 8.5 8.5 8.7 N/A 2 7.5 7.7 7.7 7.9 N/A 2 6.3 7.0 7.0 7.7 N/A 2 4.6 5.8 5.8 7.0 N/A 2 5.2 6.2 6.2 7.2 N/A 2 Entrenchment Ratio >3.4 >4.4 >4.4 >5.4 N/A 2 >2.8 >3.9 >3.9 >5.0 N/A 2 >3.8 >4.2 >4.2 >4.6 N/A 2 3.6 4.3 4.3 4.9 N/A 2 4.9 5.0 5.0 5.1 N/A 2 5.0 5.1 5.1 5.1 N/A 2 4.7 4.8 4.8 4.8 N/A 2 5.1 5.3 5.3 5.5 N/A 2 4.9 6.0 5.6 6.3 N/A 2 Bank Height Ratio 1.0 1.0 1.0 1.0 N/A 2 1.0 1.0 1.0 1.0 N/A 2 1.0 1.0 1.0 1.0 N/A 2 1.0 1.0 1.0 1.0 N/A 2 1.0 1.0 1.0 1.0 N/A 2 1.0 1.0 1.0 1.0 N/A 2 1.0 1.1 1.1 1.1 N/A 2 1.1 1.2 1.2 1.2 N/A 2 1.1 1.2 1.2 1.3 N/A 2 Riffle Length (ft)6.8 23.4 19.5 53.9 14.8 14 6.9 22.9 22.7 50.3 13.3 17 6.4 24.3 15.2 53.7 17.0 13 8.4 24.4 13.2 53.7 17.8 12 7.7 23.4 18.2 48.8 15.2 12 5.2 27.2 29.1 48.7 17.6 9 Riffle Slope (ft/ft)0.004 0.023 0.022 0.049 0.013 14 0.002 0.020 0.018 0.052 0.015 17 0.002 0.027 0.022 0.064 0.020 13 0.005 0.025 0.021 0.057 0.017 12 0.005 0.019 0.018 0.037 0.011 12 0.006 0.017 0.014 0.029 0.009 9 Pool Length (ft)5.8 16.2 16.9 39.1 7.2 24 4.9 13.0 12.5 38.9 6.8 25 8.4 16.5 14.8 39.0 6.9 26 6.8 16.6 14.8 39.2 7.2 26 5.1 16.4 14.3 37.5 7.3 26 4.5 16.4 14.7 39.8 7.7 27 Pool Max Depth (ft)1.8 3.0 2.9 3.7 0.5 18 1.0 2.8 2.9 3.4 0.6 19 1.0 2.5 2.5 3.6 0.8 24 0.8 2.2 2.4 3.4 0.8 24 1.0 2.2 2.2 3.2 0.7 1 25 1 1.2 2.5 2.8 3.5 0.8 26 Pool Spacing (ft)4.5 38.7 36.4 111.0 24.4 24 12.0 39.1 33.3 110.2 24.0 24 12.0 36.9 30.1 86.7 20.6 25 11.0 36.7 27.9 96.6 22.5 25 14.9 36.6 27.8 89.3 20.9 25 9.9 35.6 28.6 93.4 20.4 26 Channel Belt Width (ft)11.3 30.6 37.0 46.7 12.26 16 Radius of Curvature (ft)8.3 13.7 12.0 29.9 5.70 16 Rc: Bankfull Width (ft/ft)2.4 2.4 2.4 2.4 N/A 1 Meander Wavelength (ft)38.8 77.4 79.1 167.0 36.08 11 Meander Width Ratio 4.2 5.4 5.4 6.7 N/A 2 Rosgen Classification Channel Thalweg Length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) Bankfull Slope (ft/ft) Ri% / Ru% / P% / G% / S%35%4%42%13%7%42%6%34%13%6%34%4%46%11%6%32%3%47%13%6%31%4%47%12%6%27%4%48%15%6% SC% / SA% / G% / C% / B% / Be%*0%38%54%7%0%0%0%30%67%3%0%0%1%41%53%4%0%0%0%49%45%6%0%0%0%52.5%26.2%21.1%0%0% d16 / d35 / d50 / d84 / d95 (mm)0.86 1.5 4.1 7.0 28.3 71.7 0.2 1.35 24.85 65 93 % of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other N/A - Information does not apply. MY - 3 MY - 4 MY - 5 1.12 0.0177 0.0183 0.01900.0189 Profile Pattern MY - 6 1.07 0.0203 MY - 1 MY - 2 C C4 C4 C4 - 0.0191 971 970 1.08 0.0203 0.0198 0% N/A N/A 1.08 0.0200 0.0195 0% N/A N/A 1.08 0% N/A N/A 0% N/A N/A 1% N/A N/A 970 1% N/A N/A 958 1.06 0.0186 MY - 7 MY - 8 Table 11b. Monitoring Data - Stream Reach Data SummaryDye Branch II / Project No. 92255 - Cemetery Branch (971 feet) 969 C4 977 Baseline Additional Reach Parameters C4 Appendix D Stream Survey Data Parameter Dimension & Substrate - Riffle Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Bankfull Width (ft)25.7 28.4 26.9 32.7 N/A 3 23.8 25.5 24.1 28.7 N/A 3 21.3 24.0 22.9 27.7 N/A 3 20.1 22.6 20.8 26.9 N/A 3 19.9 22.6 21.5 26.5 N/A 3 17.1 21.7 20.7 27.2 N/A 3 12.0 14.2 13.2 17.5 3.0 3 11.3 15.9 15.0 21.3 5.1 3 18.2 20.0 20.0 21.7 1.9 3 Floodprone Width (ft)54.4 64.9 58.6 81.8 N/A 3 52.6 61.2 52.8 78.2 N/A 3 52.6 61.2 52.8 78.2 N/A 3 52.6 61.2 52.8 78.2 N/A 3 52.6 61.2 52.8 78.2 N/A 3 52.6 61.2 52.8 78.2 N/A 3 52.6 61.2 52.8 78.2 15.0 3 52.6 61.2 52.8 78.2 14.7 3 47.6 61.2 61.2 74.8 12.0 3 Bankfull Mean Depth (ft)1.1 1.3 1.3 1.4 N/A 3 1.0 1.1 1.1 1.3 N/A 3 0.9 1.1 1.0 1.3 N/A 3 1.1 1.2 1.1 1.3 N/A 3 1.0 1.1 1.0 1.3 N/A 3 1.0 1.1 1.0 1.2 N/A 3 1.2 1.7 1.8 2.0 0.4 3 1.4 1.5 1.4 1.6 0.1 3 1.8 2.0 2.0 2.1 0.2 3 Bankfull Max Depth (ft)2.2 2.8 2.5 3.6 N/A 3 2.0 2.4 2.0 3.2 N/A 3 2.1 2.5 2.1 3.2 N/A 3 2.3 2.7 2.4 3.3 N/A 3 2.2 2.6 2.3 3.3 N/A 3 2.2 2.5 2.3 3.0 N/A 3 1.9 2.5 2.4 3.3 0.7 3 2.1 2.6 2.3 3.3 0.6 3 2.9 3.1 3.1 3.2 0.4 3 Bankfull Cross-Sectional Area (ft2)29.5 36.3 32.5 46.9 N/A 3 24.2 29.6 27.1 37.5 N/A 3 19.9 26.4 23.1 36.2 N/A 3 21.3 26.6 22.4 36.0 N/A 3 19.4 24.9 21.1 34.2 N/A 3 17.9 23.4 21.0 31.3 N/A 3 15.8 23.7 21.1 34.2 9.5 3 15.8 23.7 21.1 34.2 9.5 3 15.8 23.7 21.1 34.2 7.8 3 Width/Depth Ratio 20.3 22.6 22.8 24.6 N/A 3 20.9 22.3 22.0 24.0 N/A 3 21.2 22.2 22.6 22.9 N/A 3 18.9 19.4 19.3 20.0 N/A 3 20.4 21.0 20.8 21.9 N/A 3 16.3 20.1 20.4 23.6 N/A 3 6.8 8.9 9.0 11.0 2.1 3 8.1 10.6 10.6 13.2 2.6 3 8.7 10.4 10.4 12.1 1.0 3 Entrenchment Ratio 2.0 2.3 2.3 2.5 N/A 3 2.2 2.4 2.2 2.7 N/A 3 2.3 2.5 2.5 2.8 N/A 3 2.5 2.7 2.6 2.9 N/A 3 2.5 2.7 2.6 2.9 N/A 3 2.6 2.9 2.9 3.1 N/A 3 4.0 4.3 4.4 4.5 0.3 3 3.5 4.0 3.7 4.7 0.6 3 2.2 2.8 2.8 3.3 0.5 3 Bank Height Ratio 1.0 1.0 1.0 1.0 N/A 3 1.0 1.0 1.0 1.0 N/A 3 1.0 1.0 1.0 1.0 N/A 3 1.0 1.0 1.0 1.0 N/A 3 1.0 1.0 1.0 1.0 N/A 3 1.0 1.0 1.0 1.0 N/A 3 1.0 1.1 1.1 1.1 0.1 3 0.9 1.0 0.9 1.1 0.1 3 1.0 1.0 1.0 1.2 0.1 3 Riffle Length (ft)20.1 51.6 47.1 97.0 29.5 8 17.5 40.6 33.3 75.1 19.0 11 15.5 37.5 34.6 58.6 14.4 9 16.8 41.4 47.0 54.0 16.2 6 19.4 40.3 39.6 63.9 18.1 6 10.1 32.9 25.6 58.3 21.1 7 Riffle Slope (ft/ft)0.002 0.006 0.005 0.016 0.005 8 0.002 0.007 0.005 0.019 0.005 11 0.001 0.007 0.004 0.016 0.005 9 0.002 0.008 0.006 0.016 0.006 6 0.003 0.007 0.005 0.016 0.005 6 0.004 0.011 0.007 0.031 0.010 7 Pool Length (ft)8.8 24.6 22.4 66.4 13.0 20 10.7 29.8 27.3 75.6 15.9 20 8.8 29.5 23.2 76.3 18.7 20 7.7 26.2 21.8 81.6 17.7 21 8.9 26.9 20.6 85.8 19.4 21 8.1 28.3 21.7 94.0 19.5 21 Pool Max Depth (ft)2.1 3.4 3.6 4.5 0.7 20 1.8 3.3 3.4 4.7 0.8 20 2.2 3.7 3.8 5.0 0.8 20 1.6 3.1 3.1 4.3 0.8 20 1.4 3.0 3.4 4.4 0.9 20 2.00 3.55 3.64 4.88 0.84 20 Pool Spacing (ft)24.1 66.8 65.3 124.9 28.6 19 31.7 67.7 69.0 128.2 27.5 19 20.7 62.1 55.7 127.6 29.6 19 13.2 65.1 64.0 127.5 30.7 18 11.7 58.7 48.2 118.6 30.8 20 15.1 57.9 45.8 114.4 30.1 20 Channel Belt Width (ft)28.5 45.0 48.4 54.1 8.3 17 Radius of Curvature (ft)23.6 31.3 31.2 39.6 4.7 14 Rc: Bankfull Width (ft/ft)2.0 2.0 2.0 2.0 N/A 1 Meander Wavelength (ft)100.5 130.0 138.2 153.3 18.2 12 Meander Width Ratio 1.5 1.7 1.8 1.9 N/A 3 Rosgen Classification Channel Thalweg Length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) Bankfull Slope (ft/ft) Ri% / Ru% / P% / G% / S%28%15%34%20%3%31%10%41%15%4%23%14%40%19%3%17%15%38%26%3%17%23%39%17%4%16%23%42%16%4% SC% / SA% / G% / C% / B% / Be%*0%50%47%3%0%0%2%45%50%3%0%0%3%43%48%6%0%0%5%58%35%2%0%0%2.3%77.5%19%1.1%0%0% d16 / d35 / d50 / d84 / d95 (mm)0.48 1.08 1.8 3.3 6.7 23.0 0.235 0.89 1.07 3.47 23.7 % of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other N/A - Information does not apply. Ri = Riffle / Ru = Run / P = Pool / G = Glide / S = Step SC = Silt-Clay / SA = Sand / G = Gravel / C = Cobble / B = Boulder / Be = Bedrock*Percentages based on riffle and pool pebble counts. 1,465 1,471 1,465 1,447 0.0092 0.0091 MY - 4 MY - 5 MY - 6 C4 Additional Reach Parameters C C5 1.16 1.15 1.14 1.13 1 1.13 0.0094 0.0095 0.0091 0.0094 C4 C4 C4 -0.0092 0.0091 0.0092 0.0093 0.0093 0%0%7%10%10% N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A MY - 7 MY - 8 Table 11b. Monitoring Data - Stream Reach Data SummaryDye Branch II / Project No. 92255 - Dye Branch-Upstream (1,471 feet) Profile Pattern Baseline MY - 1 MY - 2 MY - 3 1,448 1 1,437 9% 1.15 Appendix D Stream Survey Data Parameter Dimension & Substrate - Riffle Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SD n Bankfull Width (ft)18.4 18.6 18.6 18.8 N/A 2 18.5 18.7 18.7 18.8 N/A 2 17.7 18.7 18.7 19.6 N/A 2 17.9 20.4 18.6 24.6 N/A 2 17.8 18.7 18.7 19.6 N/A 2 16.60 18.10 18.10 19.60 N/A 2 17.4 18.4 18.4 19.3 N/A 2 17.4 19.8 19.8 22.1 N/A 2 18.2 20.0 20.0 21.7 N/A 2 Floodprone Width (ft)48.7 61.8 61.8 74.8 N/A 2 47.6 60.6 60.6 73.5 N/A 2 47.6 60.6 60.6 73.5 N/A 2 47.6 63.7 70.0 73.5 N/A 2 47.6 60.6 60.6 73.5 N/A 2 47.60 60.55 60.55 73.50 N/A 2 47.6 60.6 60.6 73.5 N/A 2 47.6 60.6 60.6 73.5 N/A 2 47.6 61.2 61.2 74.8 N/A 2 Bankfull Mean Depth (ft)1.9 2.0 2.0 2.0 N/A 2 1.6 1.8 1.8 1.9 N/A 2 1.6 1.9 1.9 2.1 N/A 2 1.6 2.1 2.0 2.6 N/A 2 1.8 2.0 2.0 2.2 N/A 2 1.80 1.95 1.95 2.10 N/A 2 1.8 2.0 2.0 2.2 N/A 2 1.8 1.9 1.9 1.9 N/A 2 1.8 2.0 2.0 2.1 N/A 2 Bankfull Max Depth (ft)2.9 3.0 3.0 3.1 N/A 2 2.4 2.7 2.7 3.0 N/A 2 2.5 3.2 3.2 3.9 N/A 2 2.7 3.4 3.3 4.1 N/A 2 2.8 3.4 3.4 3.9 N/A 2 2.60 3.25 3.25 3.90 N/A 2 2.8 3.4 3.4 3.9 N/A 2 2.6 3.0 3.0 3.4 N/A 2 2.9 3.1 3.1 3.2 N/A 2 Bankfull Cross-Sectional Area (ft2)34.0 36.1 36.1 38.1 N/A 2 29.5 32.7 32.7 35.9 N/A 2 27.8 34.4 34.4 41.0 N/A 2 29.4 43.2 36.8 63.5 N/A 2 31.6 37.4 37.4 43.2 N/A 2 29.40 35.60 35.60 41.80 N/A 2 32.0 37.2 37.2 42.3 N/A 2 32.0 37.2 37.2 42.3 N/A 2 34.0 36.1 36.1 38.1 N/A 2 Width/Depth Ratio 9.3 9.6 9.6 9.9 N/A 2 9.9 10.8 10.8 11.7 N/A 2 9.3 10.3 10.3 11.3 N/A 2 9.4 10.0 9.6 11.0 N/A 2 8.9 9.5 9.5 10.0 N/A 2 9.20 9.30 9.30 9.40 N/A 2 8.8 9.1 9.1 9.4 N/A 2 9.4 10.5 10.5 11.6 N/A 2 8.7 10.4 10.4 12.1 N/A 2 Entrenchment Ratio 2.7 3.4 3.4 4.0 N/A 2 2.6 3.3 3.3 3.9 N/A 2 2.7 3.3 3.3 3.8 N/A 2 2.7 3.2 2.8 4.0 N/A 2 2.7 3.3 3.3 3.8 N/A 2 2.90 3.30 3.30 3.70 N/A 2 2.7 3.3 3.3 3.8 N/A 2 2.7 3.0 3.0 3.3 N/A 2 2.2 2.8 2.8 3.3 N/A 2 Bank Height Ratio 1.0 1.0 1.0 1.0 N/A 2 1.0 1.0 1.0 1.0 N/A 2 1.0 1.0 1.0 1.0 N/A 2 1.0 1.0 1.0 1.0 N/A 2 1.0 1.0 1.0 1.0 N/A 2 1.00 1.00 1.00 1.00 N/A 2 1.0 1.0 1.0 1.0 N/A 2 0.9 1.0 1.0 1.0 N/A 2 1.0 1.0 1.0 1.0 N/A 2 Riffle Length (ft)15.7 50.3 55.7 79.3 20.2 7 14.4 48.7 43.0 87.0 24.1 7 14.7 37.3 39.9 54.7 18.2 4 18.9 42.8 41.0 70.4 23.4 4 18.1 43.4 39.0 77.7 26.5 4 18.7 46.6 44.0 77.2 29.3 3 Riffle Slope (ft/ft)0.001 0.006 0.006 0.014 0.004 7 0.001 0.003 0.003 0.006 0.002 7 0.003 0.007 0.007 0.010 0.004 4 0.001 0.005 0.005 0.008 0.004 4 #####0.004 0.001 0.014 0.007 4 0.002 0.007 0.004 0.015 0.007 3 Pool Length (ft)10.1 19.9 15.9 39.6 8.9 14 9.7 17.6 17.5 26.1 5.8 15 7.6 26.2 31.4 44.2 13.0 14 8.7 26.6 30.2 56.6 15.7 15 8.0 23.4 23.7 43.3 10.7 16 5.9 23.1 20.2 57.9 15.0 16 Pool Max Depth (ft)3.3 3.9 3.8 5.1 0.6 12 3.2 3.9 4.0 4.9 0.5 13 3.0 4.2 3.8 6.7 1.0 13 3.0 3.9 3.8 5.3 0.7 12 1.8 3.4 3.4 5.0 0.8 14 3.4 4.3 4.2 5.8 0.7 14 Pool Spacing (ft)15.3 57.5 38.8 130.2 41.5 14 10.8 56.8 40.6 129.1 40.4 14 10.0 60.6 61.6 109.9 34.9 13 12.0 57.3 48.3 114.8 36.8 14 9.7 53.4 39.2 122.8 38.0 15 10.9 53.5 38.4 116.5 36.2 15 Channel Belt Width (ft)28.3 49.2 57.5 65.4 15.4 9 Radius of Curvature (ft)32.7 40.7 42.2 50.1 5.6 7 Rc: Bankfull Width (ft/ft)1.6 1.6 1.6 1.6 N/A 1 Meander Wavelength (ft)138.9 162.2 157.3 210.5 27.2 6 Meander Width Ratio 3.1 3.1 3.1 3.1 N/A 2 Rosgen Classification Channel Thalweg Length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) Bankfull Slope (ft/ft) Ri% / Ru% / P% / G% / S%43%6%34%13%3%39%10%31%18%2%17%19%42%19%3%20%11%46%20%4%20%14%43%20%3%19%19%42%18%2% SC% / SA% / G% / C% / B% / Be%*3%75%22%0%0%0 3%59%38%0%0%0%12%52%36%0%0%0%5%56%38%1%0%0%24.6%46.5%27.9%0.9%0%0% d16 / d35 / d50 / d84 / d95 (mm)1.1 1.5 1.9 3.9 8.3 31 0.062 0.705 1.48 4.72 8.955 % of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other N/A - Information does not apply. Ri = Riffle / Ru = Run / P = Pool / G = Glide / S = Step SC = Silt-Clay / SA = Sand / G = Gravel / C = Cobble / B = Boulder / Be = Bedrock *Percentages based on riffle and pool pebble counts. MY - 6 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 0%0%8%10%10%11% 0.0106 0.0104 0.0101 0.0089 0.0103 0.0088 -0.0099 0.0094 0.0099 0.0098 0.0095 1.10 1.09 1.10 1.09 1.09 1.07 870 869 875 867 868 855 MY - 3 MY - 4 MY - 5 C C5 C5 C5 C5 C5 MY - 7 MY - 8 Profile Pattern Additional Reach Parameters Baseline MY - 1 MY - 2 Table 11b. Monitoring Data - Stream Reach Data SummaryDye Branch II / Project No. 92255 - Dye Branch-Downstream (869 feet) Appendix D Stream Survey Data This Page Intentionally Left Blank Appendix E Hydrologic Data This Page Intentionally Left Blank Appendix E Hydrologic Data Table 12. Verification of Bankfull Events Dye Branch II / Project No. 92255 Date of Occurrence Method Feet Above Average Bankfull Elevation 7/8/2011 Water level logger 1.07 9/21/2011 Water level logger 1.14 9/24/2011 Water level logger 0.52 5/16/2012 Water level logger 1.63 7/11/2012 Water level logger 0.21 9/29/2012 Water level logger 0.22 4/12/2013 Water level logger 0.08 6/28/2013 Water level logger 0.81 6/30/2013 Water level logger 0.72 7/9/2013 Water level logger 1.62 7/31/2013 Water level logger 0.53 1/11/2014 Water level logger 1.29 5/14/2014 Water level logger 0.07 6/8/2014 Water level logger 0.21 Between 6/5/2015 and 11/7/2015 Wrack Lines 0.5 4/24/2018 Wrack Lines Unknown 1/25/2019 Wrack Lines Unknown This Page Intentionally Left Blank Appendix F Hydrologic Data Appendix F Invasive Species Treatment Logs This Page Intentionally Left Blank Appendix F Hydrologic Data Carolina Silvics, Inc. Pesticide Application Log CarSily - 0652 Client NC Division of Mitigation Services Project Slte Dye Branch II (NCDMS #92255) Date 07-01-2019 RECEIVED AUG292019 UlViSION OF MITivATiON SERVICES StartTime 15:00 End Time Only PAL for Site for This Day? No If NO, this is PAL # of ## Sky Cover Clear Temp (F) Wind Direction NNW Wind Speed Applicators Grainger Coughtrey (NC 026-34612) Application Method Basal Bark Herbicide Garcon® 3A (triclopyr) Herbicide Rate (%) 15 Total Concentrate Surfactant or Adjuvant (1) Surfactant/Adjudivant 1 Rate N Other Other Rate/Amt 16:10 3of3 90 1-5 mph 30 fl oz Diluent Diesel fuel Total Solution 1.5 fl oz Species Controlled Kudzu Privet spp. Multiflora Rose Area Description Basal barked target species within the easement south of Carbarrus Ave. The Privet and Rose were scattered but the Kudzu was concentrated to one pocket at the centered of the that area. Additional Comments Carolina Silvics, Inc. Pesticide Application Log CarSily - 0650 Client NC Division of Mitigation Services RECEIVED Project Site Dye Branch II (NCDMS #92255) AUG 2 9 2019 DIVISION OF Date 07-01-2019 MITIGATION SERVICES Start Time 10:00 End Time 15:00 Only PAL for Site for This Day? No If NO, this is PAL # of ## 1 of 3 Sky Cover Clear Temp (F) 90 Wind Direction NNW Wind Speed 1-5 mph Applicators Joshua G Merritt (NC 026-33717) Grainger Coughtrey (NC 026-34612) Application Method Cut and Stump Spray Herbicide Roundup® Custom (glyphosate) Herbicide Rate (%) 50 Total Concentrate 50 fl oz Surfactant or Adjuvant (1) Surfactant/Adjudivant 1 Rate N Other Other Rate/Amt Diluent Water Total Solution 100 fl oz Species Controlled Callery Pear Kudzu Privet spp. Multiflora Rose Area Description Mainly Cut and Stump Sprayed Kudzu within the easement north of Carbarrus Ave. The kudzu was mostly contained to small pockets throughout the easement. Privet, Rose, and Callery Pear were found scattered within the easement. Overall the site is looking great. Additional Comments Carolina Silvics, Inc. Pesticide Application Log CarSily - 0651 Client NC Division of Mitigation Services Project Slte Dye Branch II (NCDMS #92255) Date 07-01-2019 Start Time 15:00 End Time Only PAL for Site for This Day? No Sky Cover Clear Wind Direction NNW Applicators Joshua G Merritt (NC 026-33717) Application Method Mist Blower Herbicide Transline® (clopyralid) Herbicide Rate (%) 2 Surfactant or Adjuvant (1) Agri-Dex© Surfactant/Adjudivant 1 Rate 1 N Other Other Rate/Amt Diluent Water Total Solution 1.5 RECEIVE® AUG 2 9 2019 DIVISION OF MITIGATION SERVICES If NO, this is PAL # of ## Temp (F) Wind Speed Total Concentrate 16:00 2of3 90 1-5 mph 3.8 fl oz Species Controlled Kudzu Lespedeza spp. Area Description Foliar treated the ground cover portions of the small pockets of Kudzu found within the easement. Additional Comments Carolina Silvics, Inc- Pesticide Application Log CarSily - 0710 Client NC Division of Mitigation Services Project Site Dye Branch Date 09-26-2019 Start Time 9:30 End Time Only PAL for Site for This Day? No If NO, this is PAL # of ## Sky Cover Clear Temp (F) Wind Direction SW Wind Speed Applicators Joshua G Merritt (NC 026-33717) Application Method Basal Bark Herbicide Garlon® XRT Herbicide Rate (%) 15 Total Concentrate Surfactant or Adjuvant (1) Surfactant/Adjudivant 1 Rate (%) Other Other Rate/Amt 15:00 1 of 3 86 6-10 mph 76 fl oz Diluent Diesel fuel Total Solution 4 gallons Species Controlled Kudzu Privet spp. Multiflora Rose Area Description Some kudzu vines still present near the stream. Small Privet and Multiflora Rose treated throughout the site. Additional Comments Carolina Silvics, Inc. Pesticide Application Log CarSily - 0711 Client NC Division of Mitigation Services Project Site Dye Branch Date 09-26-2019 Start Time 9:30 End Time Only PAL for Site for This Day? No If NO, this is PAL # of ## Sky Cover Clear Temp (F) Wind Direction SW Wind Speed Applicators Grainger Coughtrey (NC 026-34612) Application Method Cut and Stump Spray Herbicide Roundup® Custom (glyphosate) Herbicide Rate (%) 50 Total Concentrate Surfactant or Adjuvant (1) Surfactant(Adjudivant 1 Rate Other Other Rate/Amt Diluent Water Total Solution 40 fi oz 12:30 2of3 86 6-10 mph 20 fl oz Species Controlled Kudzu Privet spp. Multiflora Rose Area Description Some Kudzu vines still alive mostly along the stream. Small Privet and Multiflora Rose present through the site. Additional Comments Carolina Silvics, Inc_ Pesticide Application Log CarSily - 0712 Client NC Division of Mitigation Services Project Site Dye Branch Date 09-26-2019 Start Time 12:30 End Time 15:00 Only PAL for Site for This Day? No If NO, this is PAL # of ## 3 of 3 Sky Cover Clear Temp (F) 86 Wind Direction SW Wind Speed 6-10 mph Applicators Grainger Coughtrey (NC 026-34612) Application Method Foliar Spray (Backpack) Herbicide Roundup® Custom (glyphosate) Herbicide Rate (%) 3 Total Concentrate 4 fl oz Surfactant or Adjuvant (1) Agri-DexO Surfactant/Adjudivant 1 Rate 1 (%) Other Other Rate/Amt Diluent Water Total Solution 1 gallon Species Controlled Kudzu Privet spp. Multiflora Rose Area Description Small Privet and Multiflora Rose present I'm the small section of the easement across the street. A few Kudzu vines were also present. Additional Comments