Loading...
HomeMy WebLinkAbout710031_Compliance Evaluation Inspection_20181113­�'\rw PHDivision of Water Resources Facility Number �� �, - O Division of Soil and Water Conservation \+►V//v O Other Agency Type of Visit: O Compliance Inspection O Operation Review M Structure Evaluation O Technical Assistance Reason for Visit: O Routine O Complaint 9 Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: I it 13 Arrival Time:lv0 Departure Time: County: y GtW Region: W1 9 U Farm Name: �LI, I It 2 Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine to 1 to I r to v to to Other Other Phone: Title: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. IN Non-- La er Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DW R) c. What is the estimated volume that reached waters of the State (gallons)? _ it. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes ,N No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes No ❑ Yes No ❑ Yes No ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA El NE Page I of 3 21412015 Continued Facility Number: - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? Yes ❑ No ❑ NA ❑ NE 9 a. If yes, is waste level into the structural freeboard? Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 3 _ y� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes IIX I No E] NA ❑ NE K (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 0 No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR Q-Po any of the structures need maintenance or improvement? 6Yes ❑ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No E]NA E]NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes /No ❑ NA ❑ NE maintenance or improvement? Waste Application �,,rr� 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes E] No ❑ NA E maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s) 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA R/NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA NE Reauired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No ❑ NA E 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No ❑ NA E the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. ' oes record keeping need improvement? If yes, check the appropriate box below. )Yes ❑ No ❑ NA Waste Application Weekly Freeboard ElWaste Analysis E]Soil Analysis ❑Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA 0 NE Page 2 of 3 21412015 Continued FaFili Number: - Date of Inspection: V 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ NA INE ❑ NA KNE ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA � NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ONE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ONE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes a llo ❑ NA 34. Does the facility require a follow-up visit by the same agency? ❑ YesNo ❑ NA 2 drawings of facility to better expl MCA crF any YES answers and/or any additional recommendations or any situations (use additional pages as necessary). l � Amnylo w &M 1A 5 VDn � C-&j0� pA+ — (�� 1-i 1, I- C,Uy "4 In C& UVI r b�. �eS�•oai-" d r��S =� P 0t L 6 tin �ke r M p vn 1� Ins V,nG tV�-( It(Akm. yvthqu z,e nCbn W om . 61J-+�-L S-6\( ve_�, 34 'tcz" bow Iho/1Z """ J PDA Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: —lW1C Q' 1" 1 Date: { { 3 21412015