HomeMy WebLinkAbout710031_Compliance Evaluation Inspection_20181113�'\rw PHDivision of Water Resources
Facility Number �� �, - O Division of Soil and Water Conservation \+►V//v
O Other Agency
Type of Visit: O Compliance Inspection O Operation Review M Structure Evaluation O Technical Assistance
Reason for Visit: O Routine O Complaint 9 Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: I it 13 Arrival Time:lv0 Departure Time: County: y GtW Region: W1 9 U
Farm Name: �LI, I It 2 Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
to 1
to I
r to
v to
to
Other
Other
Phone:
Title:
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
IN
Non--
La er
Design Current
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DW R)
c. What is the estimated volume that reached waters of the State (gallons)? _
it. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes ,N No
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes No
❑ Yes No
❑ Yes No
❑ NA ❑ NE
❑ NA ❑ NE
❑NA ❑NE
❑ NA ❑ NE
❑ NA ❑ NE
❑NA El NE
Page I of 3 21412015 Continued
Facility Number: - Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? Yes ❑ No ❑ NA ❑ NE
9
a. If yes, is waste level into the structural freeboard? Yes ❑ No ❑ NA ❑ NE
Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): 3 _ y�
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes IIX I No E] NA ❑ NE
K (i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 0 No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
Q-Po any of the structures need maintenance or improvement? 6Yes ❑ No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No E]NA E]NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes /No ❑ NA ❑ NE
maintenance or improvement?
Waste Application �,,rr�
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes E] No ❑ NA E
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s)
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
❑ No
❑ NA
R/NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
❑ No
❑ NA
NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
❑ No
❑ NA
NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
❑ No
❑ NA
NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
❑ No
❑ NA
NE
Reauired Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
❑ No
❑ NA
E
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
❑ No
❑ NA
E
the appropriate box.
❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. '
oes record keeping need improvement? If yes, check the appropriate box below. )Yes ❑ No ❑ NA
Waste Application Weekly Freeboard ElWaste Analysis E]Soil Analysis ❑Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA 0
NE
Page 2 of 3 21412015 Continued
FaFili Number: - Date of Inspection:
V
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑ NA INE
❑ NA KNE
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ No ❑ NA NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ❑ NA NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA � NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ONE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ONE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes a
llo ❑ NA
34. Does the facility require a follow-up visit by the same agency? ❑ YesNo ❑ NA
2 drawings of facility to better expl
MCA
crF
any YES answers and/or any additional recommendations or any
situations (use additional pages as necessary).
l � Amnylo
w &M
1A
5 VDn � C-&j0�
pA+ — (�� 1-i 1, I- C,Uy "4
In C& UVI
r b�. �eS�•oai-" d r��S =�
P
0t
L 6 tin �ke r M
p vn 1� Ins
V,nG tV�-( It(Akm. yvthqu z,e nCbn
W om .
61J-+�-L S-6\( ve_�, 34
'tcz" bow Iho/1Z """ J
PDA
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
Phone: —lW1C Q' 1" 1
Date: { { 3
21412015