Loading...
HomeMy WebLinkAbout20020149 Ver 1_COMPLETE FILE_20020131O?0 W A T ?RpG r 4 ^? Michael F. Easley Govemor William G. Ross, Jr., Secretary Department of Environment and Natural Resources Gregory J. Thorpe, Ph.D., Acting Director Division of Water Quality February 1, 2002 DWQ# 02-0149 Forsyth County Thomas C. Hall Windsor Investments 2311 West Cone Blvd., Suite 245 Greensboro, NC, 27429 APPROVAL of 401 Water Quality Certtficatlon Dear Mr. Hall: You have our approval, in accordance with the attached conditions, to impact 0.05 acre of wetlands in order to construct the Glenn Meadow Storm Sewer project in Forsyth County, as described in application materials received by the Divss5on of Water Quality on January 31, 2002. After reviewing your application, we have decided that this work is covered by General Water Quality Certification Number 3288, which can be downloaded from our web site at httD- o.enr.state.nc.us/ncwetlands . This Cefff=tion mows to use Nationwide Permit Number 12 when the Corps of Engineers issues iL In addition, you should get any other federal, state or local permits before you go ahead with your proie"t including (but not limited to) Sediment and Erosion Control, Coastal Stormwater, Non-Discharge and Water Supply Walershed regulations. Also this approval will expire when the accompanying 404 permit expires unless otherwise specifed in the General Certification. Please note that any other proposed impacts to wetlands or streams associated with this satbdivision, such as road crossings and lot fa may also require application to DWO for written approval of 401 Water Qua tdy Certification. Ttts approval is only valid for the purpose and design that you described in your application. If you change your prc*ct, you must notify us in writing and you nay be required to send us a new application for a new certification. If the proverty is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for cornafying with all conditions. If total wetland firs for this project (now or in the future) exceed one acre, compensatory mitiie? may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the condi bras listed in the attached certification. lfi you do not accept any of the conditions of this certi cation, you may ask for an adjudicatory hearing. You must act vrithin 60 days of the date that you receive this fir. To ask for a hearing, send a written petition which conforms to Cha:Aw 150B of the North Carolina General StaftCes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27511-7447. T his certification and its condtfons are 11kial and binding unless you ask for a hearing. Thus fetter completes the review of the Divsiim of Waler Quality under Section 401 of the Clean Water Act. If you have any gtesbons, please telephone Steve Mitchell in our Raheigh Regional Office at 919-571-4700 or Cyndi Karoly at 919-733- 9721_ Sincerely, ri.Thorpe,p.. cc: C *pis of Engineers Raleigh Regulatory Field Office Vrrision-Salem DWQ Regional Office FAe Copy Central Files 020149 W-xth Carolina Division of Water QuaRy, Aol Wetiards Certification Unit, 1 WA Mail Service Center, Raleigh, NC 21699-1650 ObaTng Address) 2321 Crabtree Blvd., Raleigh. NC 27EC.A-2250 (Lrr_ndr)n) ......._.l__J_/ -+ -,- .100 - T &0, ' ri-.. ___ __ _.„._ __ - ? t ?OF W q TFRQ `O G ? r 1 ?L?A 1? O Pre-Construction Notification (PCN) Application Form For Section 404 and/or Section 10 Nationwide, Regional and General Permits, Section 401 General Water Quality Certifications, and Riparian Buffer and Watershed Buffer Rules This form is to be used for projects qualifying for any of the U.S. Army Corps of Engineers' (USACE) Nationwide, Regional or General Permits as required by Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act, and for the North Carolina Division of Water Quality's (DWQ) associated General 401 Water Quality Certifications. This form is also to be used for any project requiring approval under any Riparian Buffer Rules implemented by the N.C. Division of Water Quality. This form should not be used if you arc requesting an Individual 404 Permit or Individual 401 Water Quality Certification. The USACE Individual Pen-nit application form is available online at http://www.saw.usace.at-iiiy.iiiiI/wetlands/Perlll app.httll. The USACE is the lead regulatory agency. To review the requirements for the use of Nationwide, Regional or General permits, and to determine which permit applies to your project, please go to the USACE website at littt)://www.stw.tisacc.ariiiy.iiiiI/wetlatids/re2toui-.litiii, or contact one of the field offices listed on page 3 of this application. The website also lists the responsible project manager for each county in North Carolina and provides additional infonnation regarding the identification and regulation of wetlands and waters of the U.S. The DWQ issues a corresponding Certification (General or Individual), and cannot tell tine applicant which 401 Certification will apply until the 404 Permit type has been determined by the USACE. Applicants are encouraged to visit DWQ's 401/Wetlands Unit website at http://h2o.enr.state.nc.us/ncwetIands to read about current requirements for the 401 Water Quality Certification Program and to determine whether or not Riparian Buffer Rules are applicable. The applicant is also advised to read the full text of the General Certification (GC) matching the specific 404 Permit requested. In some cases, written approval for General Certifications is not required, provided that the applicant adheres to all conditions of the GC. Applicants lacking access to the internet should contact DWQ's Central Office in Raleigh at (919) 733-1786. Trout Waters Coordination - Special coordination with the North Carolina Wildlife Resources Commission (NCWRC) is required for projects occurring in any of North Carolina's twenty-five counties that contain trout waters. In such cases, the applicant should contact the appropriate NCWRC regional coordinator (listed by county on page 4 of this application). Page 1 of 12 Coastal Area Management Act (LAMA) Coordination - If the project occurs in any of North Carolina's twenty coastal counties (listed on page 4) the applicant should contact the North Carolina Division of Coastal Management (DCM). DCM will determine whether or not the project is within a designated Area of Environmental Concern, in which case DCM will act as the lead permitting agency, In such cases, DCM will require a LAMA Permit and will coordinate the 404/401 Permits. The applicant may also choose to coordinate with the United States Fish and Wildlife Service to ensure that the proposed project will have no impact upon any endangered or threatened species or critical habitat as regulated by the Endangered Species Act, and the State Historic Preservation Office, North Carolina Department of Cultural Resources to ensure that the proposed project will have no impact upon any properties listed or eligible for listing on the National Register of Historic Places. Compliance with these regulations is required to be eligible for any Department of the Army permit. The addresses for both agencies are listed on page 3 of this application. USACE Permits - Submit one copy of this form, along with supporting narratives, maps, data forms, photos, etc. to the applicable USACE Regulatory Field Office. Upon receipt of an application, the USACE will determine if the application is complete as soon as possible, not to exceed 30 days. This PCN form is designed for the convenience of the applicant to address information needs for all USACE Nationwide, Regional or General permits, as well as information required for State authorizations, certifications, and coordination. Fully providing the information requested on this form will result in a complete application for any of the USACE Nationwide, Regional or General permits. To review the minimum amount of information that must be provided for a complete PCN for each USACE Nationwide permit, see Condition 13, 65 Fed. Reg. 12893 (March 9, 2000), available at http://www.saw.usacc.army.mil/wetlan(is/nwpfinalFcdRe,-.i)(it Processing times vary by permit and begin once the application has been determined to be complete. Please contact the appropriate regulatory field office for specific answers to permit processing periods. 401 Water Quality Certification or Buffer Rules - All information is required unless otherwise stated as optional. Incomplete applications will be returned. Submit seven collated copies of all USACE Permit materials to the Division of Water Quality, 401/Wetlands Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. If written approval is rcquircd or specifically requested for a 401 Certification, then a non-refundable application fee is required. In brief, if project impacts include less than one acre of cumulative wetland/water impacts and less than 150 feet cumulative impacts to streams, then a fee of $200 is required. If either of these thresholds is exceeded, then a fce of $475 is required. A check made out to the North Carolina Division of Water Quality, with the specific name of the project or applicant identified, should be stapled to the front of the application package. For more information, sec the DWQ website at http://li2o.ehnr.state.nc.us/ncwctlan(is/fccs.litml. The fee must be attached with the application unless the applicant is a federal agency in which case the check may be issued from a separate office. In such cases, the project must be identifiable on the U.S. Treasury check so that it can be credited to the appropriate project. If written approval is sought solely for Buffer Rules, the application fee does not apply, and the applicant should clearly state (in a cover letter) that only Buffer Rule approval is sought in writing. Wetlands or waters of the U.S. may not be impacted prior to issuance or waiver of a Section 401 Water Quality Certification. Upon receipt of a complete application for a 401 Certification, the Division of Water Quality has 60 days to prepare a written response to the applicant. This may include a 401 Certification, an on-hold letter pending receipt of additional requested information, or denial. Page 2 of'12 US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Caldwell Haywood McDowell US Army Corps of Engineers Alleghany Catawba Henderson Mecklenburg 151 Patton Avenue Ashe Cherokee Iredell Mitchell Room 208 Avery Clay Jackson Polk Asheville, NC 28801-5006 Buncombe Cleveland Lincoln Rowan Telephone: (828) 271-7980 Burke Gaston Macon Rutherford Fax: (828) 281-8120 Cabarrus Graham Madison Stanley ?- Raleigh Regulatory Field Office Alamance Franklin Nash Surry US Army Corps Of Engineers Caswell Forsyth Northampton Vance 6508 Falls of the Neuse Road Chatham Granville Orange Wake Suite 120 Davidson Guilford Person Warren Raleigh, NC 27615 Davie Halifax Randolph Wilkes Telephone: (919) 876-8441 Durham Johnston Rockingham Wilson Fax: (919) 876-5823 Edgecombe Lee Stokes Yadkin Washington Regulatory Field Office Beaufort Currituck Jones US Army Corps Of Engineers Bertie Dare Lenoir Post Office Box 1000 Camden Gates Martin Washington, NC 27889-1000 Carteret* Green Pamlico Telephone: (252) 975-1616 Chowan I Icrtford Pasquotank Fax: (252) 975-1399 Craven I lyric Perquimans Wilmington Regulatory Field Office US Army Corps Of Engineers Post Office Box 1890 Wilmington, NC 28402-1890 Telephone: (910) 251-4511 Fax: (910) 251-4025 Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Telephone: (919) 733-1786 Fax: (919) 733-6893 Anson Duplin Onslow Bladen I Iarnett Pender Brunswick Hoke Richmond Carteret Montgomery Robeson Columbus Moore Sampson Cumberland New Hanover Scotland North Carolina State Agencies Division of Water Quality Wetlands Restoration Program 1619 Mail Service Center Raleigh, NC 27699-1619 'T'elephone: (919) 733-5208 Fax: (919) 733-5321 Pitt Tyrrell Washington Wayne Swain Transylvania Union Watauga Yancey *Croatan National Forest Only State Historic Preservation Office Department Of Cultural Resources 4617 Mail Service Center Raleigh, NC 27699-4617 Telephone: (919) 733-4763 Fax: (919) 715-2671 US Fish and Wildlife Service / National Marine Fisheries Service US Fish and Wildlife Service US Fish and Wildlife Service National Marine Fisheries Service Raleigh Field Office Asheville Field Office Habitat Conservation Division Post Office Box 33726 160 Zillicoa Street Pivers Island Raleigh, NC 27636-3726 Asheville, NC 28801 Beaufort, NC 28516 Telephone: (919) 856-4520 Telephone: (828) 665-1195 Telephone: (252) 728-5090 Page 3 of 12 CAMA and NC Coastal Counties Division of Coastal Management Beaufort Chowan Hertford Pasquotank 1638 Mail Service Center Bertie Craven Hyde Pender Raleigh, NC 27699-1638 Brunswick Currituck New Hanover Perquimans Telephone: (919) 733-2293 Camden Dare Onslow Tyrrell Fax: (919) 733-1495 Carteret Gates Pamlico Washington NCWRC and NC Trout Counties Western Piedmont Region Coordinator Alleghany Caldwell Watauga 3855 Idlewild Road Ashc Mitchell Wilkes Kernersville, NC 27284-9180 Avery Stokes Telephone: (336) 769-9453 Burke Surry Mountain Region Coordinator Buncombe Henderson Polk 20830 Great Smoky Mtn. Expressway Cherokee Jackson Rutherford Waynesville, NC 28786 Clay Macon Swain Telephone: (828) 452-2546 Graham Madison "Transylvania Fax: (828) 506-1754 Haywood McDowell Yancey APPLICATION FORM BEGINS ON PAGE 5. PLEASE, DO NOT SUBMIT PAGES 1 - 4. Page 4 of 12 Office Use Only: Form Version October 2001 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing , E C' .? -.??aa I TTE D Check all of the approval(s) requested for this project: © Section 404 Permit JAN 2 8 2002 Section 10 Permit ® 401 Water Quality Certification f:1,ATOR) F1l i,D 01"" 1(1.1 ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: Windsor Investments Mailing Address: 2311 West Cone Boulevard, Suite 245, Northwestern Business Greensboro, North Carolina 27429 Telephone Number: (336) 282-3535 Fax Number: (336) 282-3508 E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: N/A Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: Page 5 of 12 111111. Project Information Attach a vicinity map clearly showing the location of' the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than II by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans arc reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project Glenn Meadow 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): B ock 5622 - Lot 103, 104, 105, & 106 4. Location County: Forsyth Nearest Town: Abbotts Creek Subdivision name (include phase/lot number): Glenn Meadow Phase 3 Directions to site (include road numbers, landmarks, etc.): The site is located on Glenn Hi Road (SR 2678) 1.25 miles west of the intersection of Glenn Hi Road (SR 2678) and Union Cross Road. 5. Site coordinates, if available (UTM or Lat/Long): N/A (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Single Family Housing 7. Property size (acres): 43.136 Acres 8. Nearest body of water (stream/river/sound/ocean/lake): Swaim Urc,ek 9. River Basin: Yadkin River Basin (Note this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://li20.ciii-.state.nC.Lls/a(imin/maps/.) Pagc 0 of, 12 10. Describe the purpose of the proposed work: Install storm sewer for roadway crossing 11. List the type of equipment to be used to construct the project: Digging and trenching egiii pmanf 12. Describe the land use in the vicinity of this project: single family housing; IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. Page 7 of 12 1. Wetland Impacts Wetland Impact Site Number (indicate on map) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (yes/no) Distance to Nearest Stream (linear feet) Type of Wetland*** 1 drainage .004 Yes 19 forested wetland 2 Fill(roadway) .016 No 76 forested wetland 3 drainage .005 No 329 forested wetland 4 clearing 007 No 392 forested wetland 5 drainage .005 No 490 forested wetland 6 clearing .005 No 565 forested wetland 7 fill .008 No 647, forested wetland * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at bttl2:///www.feina.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: - 15 Ac. Total area of wetland impact proposed: .05 Ac 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please specify) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.uses.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozonexom, www.mapguest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: N/A Page 8 of 12 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number (indicate on map) Type of Impact* Area of Impact (acres) Name Wat) (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): 0 uplands F] stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. This impact must take place in order to access the remaining property. The only way to get to the remaining property is to cross the stream. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in deterniining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.eiii*.state.nc.us/iicwetlands/sti-mgide.htin1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river- basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at htt2://112o.enr.state.nc us/wrp/index.litm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A Page 10 of 12 IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes F] No Fx] If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes F] No n If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes F1 No x X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes F-] No X? If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. lone* Impact (square feet) Multiplier Required Mitigation 1 3 2 1.5 Total Gone I extends out 30 teet perpendicular trom near bank of channel; Lone 2 extends an additional 20 feet from the edge of Zone I . Page 11 of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213.0242 or.0260. N/A XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. The density of this site is 2.78 Units/Ac which gives an impervious surface of 28.3%. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The sewer connects into public sewer (City of Winston-Salem). XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). N/A c hhU n ? Applicant/Agent's Signature J Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 ?Y ?O ?a o? oa ?F s boo ?? o ? ?o?o w v n " O m Z CIA ? a o O ?o o ? y c? co i O ?O m rri r m IK N C7 2 O O r O D O UI- 0 ?o o?nHO 3&0 a '8 ?d0 d 08 H O O 12 O O UNION CRO SS ROA pc-pp"'. i?Ip? Aitf;RaS ii 11 ? !1i ad "pig q AR 11 s6 Qc ? x a <? AA 111111 1111 • I" 1101 fill ##44 ? a? N I till Alit SS11 ?S a 19 p I ----- I y a r I ?, fig) I pp qq 1 -4: m --- - ??) Q6 O I I \ ; I; N g g jj 1 N x 510 Cie y g P I? ? a ' ? ?( T -T- ' ?& w o s^?. I ?a 4 a N Ph 992 , I I I I I W `N) / r 1 I I I I I ???? m n b ava anon oe (eD I f t-; I z I p pEB VaUean Lane I I I Pa ?? ®I I / ?; I 1 I- - _l --L7 `l) I I y\?.- %. -, 1 1 1 I; ( 1 I I ?4ha etr? I I I I e/a onend ?.09p (?LDez 'as) (( O1 I 1 j O' I - - -- 1111"'Ir?'_-__ _ _ .=?? I L-L - - ..................... 7' L:L I =_---O_? T- 11 f---------,- I I I e I I I € '?==Q J '1111 I ?O , O t i? 1I I ?J i I I (? TI J-- 1? ' II ?? J=_ ___ -- a If 11 N ( O 1iilit I f I ---, --- ! _ ... o I , i 1 1 ti_ ?- L _) I a 11 -L----- I I L --O I I; ?- - pill 1 1 I r---------- Z r r 1 S r?- a I III I I O I i O I li 1 I 0 1 I ab i l j + 9L I r II I a at G --- 7 ? t I- 7V Cr1 I I ---_= 1 1 1 fl I f 0? I I N- I I, 1 I Q ? I ® I 0?1 o`i I -- 1 r ..., 1 b Od 00 DDD - - 1 ?' I I N I I i ~ ,1 1 1' ti r O 1 ' o O' __ I; r L? Z Ns `- _ `Y--' i O I I N I I I I m _ r if I I v- I I I I?O I pip I ,?O II U II ?i11ii 1, m ? --- I c` I I €i '11 ?I I`--1 -- vpi? I I ?? ''------ r l :N1 fill L- -- f I pip I p p? I ;r 1 I K- y I ,II _ co end (DLOZ NN I I 5311 xN $ vo m ftm 4 ti O n n O O Sn ti ? ? Q) a =z o^,? tioo `z) m ^^ U ' 00 \ rn c0? av3? 001 xoaddr W 3r>oz n / ssV13 3sn all, .553NNp1 £Z.1 p.OSP .9t•M S\ 1N37 ?-? . 'U G,) Nm o M4e ti? 113 wo?? Co y b co y? to 0 r-? p Z M F, 0 0 N 0 h-?-I 11 V 1 N O > 14 i ? i g qyg^ / / 000 20 / \\ ??dd g00 ?/ \\ •XOdd 00 ? \ 00 L CY) ` 00 \` p0 > 00 p ? ? \ ? 9g Ox gg ?n o g \ CJ) / J I I 1 It O I I W I O I I I I _J I I I I I I I 2 ° 00 [Y \ N C JI ,GL'03s1(313N 1l6 sl 3115 I W103s 4Mtl/1 NZ39901 d,418 30N0 0 - / IAl,, 99u pLB LL9 ?Q ? I I 9L9 ?? \ I ? \ OL9 4LH ? OD? I 1\?I?j 1 1 I ` I I j HL9 I I 'lH + -?-_J 00+ A A V ??N In? I I o / N u??o g ? I C 4 g m N J ` I A II " I 00 N q 1 . t?o J I 00 I III m Lz / Q i I I I I L I I I 11 II I cjl 11 I II II I , II II I ? I ? \ 11 I II l ? 1 11 II II II II 11 \ 1 II 11 I II II II 11 II I I 11 if if if u If 1 N \ n II I 11 I I / _ II n ?7JII II II I II II 11 I II II 1I\ 11 I ? 1\ \? II - ?_ n II I 11 I u 11 ---_ ___ - II _ I 11 II -- {I 11 II \ \ I II II II I II 11 II I 11 11 11 II II if n II II II \ l 1 \ II I II 11 II I 11 II 11 II ? -_ -_-- - 11 II - I 11 II _IJI 11 If 11 II N 0 022 ? I ? II " N\ ?{yrn?I??Im??W ?yN ?,A 7 ?O-1 C ?•:o. o? N N 4 ?mrz?m y?? p[7a = TI O ? g OOZ O ? o M z ??? t3? I-- Z ? o ? h m C) 99 00 \ 1 I J UI I I L- I I 1 - 00 00 I N J ? I I I I I L---°-- co - (? 1 00 J co I I 1 I I I L------------ J 1 I 0 x-gym 00+0 I - (L I e69 t N P 0) P (A I 9 / \ I I co cle 80 I co 0 ; 1 I , - - • co L------------J I T 1 1 I 1 ?? CD I i 1 00 (C) Q i CA ?I (D 11 I I NO I I \\ w i + r------- ?-------J I I I `? ° ; o) ; d --- L--- - ------- 6g I I Z69 F I ( a' cfl 469 L---------_ r i d © 0 ???? -------? ------ 1 0 I or?? I 1 I I --? I I I I (9 I I ( -/ I I I I 0 J I I J / 0I I 00 N CD ? cc I I CD (? I N ? I b I ? I co ncy) I I J ___+ 1 00 00 O I I I 1 / / I R 2+00+45 u I II ? \ u II `? I II I II II If u II 11 11 II II I I 11 II I 1 II II \ V I 11 II n II II II 11 If - II II 11 I II ® ?? \ 11 II 1 II I, 11 I tl II u ,1 II II _ ? ?R ?N \?? I 11 II n I I I II II II II If ?VV I1 11 I p ?3 / I n ` 11 II 1 11 I I I II II I I ____ I II If i •51\J _-•??1 ? ? • •• _..•• I:-?_/•... ? L ? ?• • • • ? I IV. i I i t, / l ? I -, r / .', ' I i '. __' \ off' ?' \ -fib' (?,1' ?'-•, ?,y • • • • t• (( I A ?? ?? I V I fill, ?;.••'? ?,_ ?)l ? ??... 1. ?? ? ?%?l>' _' ??V ' i . ?-•,'vv;, l,?t`..o;?'? ?'%' i. ? / r' .?j?jG??dLe ? ?? :??? ??1 ??? ? 1 - ? \;? ?L?i `r ;? ?r ` _ ?? •? v a`eo ?_ V ! t:F=FZ?? ??Ck roe BM VY (?? 111 ??' (Y,h 935 i? ll?t \ i? ?? ?.99 " 4'????? ?? \J 1 u II ' _?' HMS 0 /1• R0AO 4 n ?? I ? ICC "L 933 1 ? ? _? - (/J 1 •1 i, ?-}? ii 1 ? ? ?i - op \ 7i 9 5 ,? • .., ???????1?ro?/??? ??i ?v'??? ?? •?\ V. o???o RI???? 92 ?? ii A/ '? ?v ah?/? r' _ ??J? I? ??? U ??v II • ??" . I Radar Sig rt?l .• ?, 111( w? (II d r s0 5 / ( 1, ,I ?ll? i .I Z c ??_? u • ? 1? ? ? Station r It I?- ??'? i ?? •? it ii /('\ i('. /., -'Y? ?U el? [45 ?o , ' ? ? oil ??/ .??'?'_?,?, >. , 1 ? i `?o' • i--" / f 't 64 -\ asc'-?11? _?: ,n11 I ? ?n ??, )' • - ? V' `? ? ? °O _.-.?? ? _? /, f-?A ? 85 ?0 _?? ? ? J ???11?1 .?-? - HOo? .A I 'x(11 1 ?? ?m(? ?•. 1f? %?'? ?? ( wil, '?,?,?? IPA a V 1111 p O 50- 769 8741 ° 855 I ?? +t? c _ % j . ° : ! I ?.__? ?? i n'• • S•vo VA IIj e ', ? ??,. ??`1• ? 1-? C- ?\•t??` r t /I ? °• n?. _ • Y aoo J _1 P » 111 , ,. - ??l ??t _ - ? ; ((i ,?, ?? ?J ? ,,, !• ,) V?( _,?I? - I ? ., .}l°._ ..t 1 , -? ?,???. ? ?rr • ??? `,3 I ' 1 11' I l ?1 ??-;?// ?1r?,} ??:1, Uhl('"??? ?? . •II;? ??1/ n ?. > -Q I) ?I •? ?????AI?vII? (???) ?? ?.A?L °•????•I( ??--f VA \? (? - - 1•?e 9 8? _. U????? ( f / ?• o• '978' \ \ I1' 8 Ldke ))\. C f k, }I gas •fo)? ?1?J t V ? ? 1 ??? .1111 ? ? n' ? t •1?` ?.,I( l ? l (\y , (? 19' , ?? ? 1 ? +'' ? ? ??? ? ? ?? \ I < i, l/ 1 ??(? _•? s 1 ( Ir \ \ \ ` „I ,, I \-r- , ----•l?l I? r -? ? I I 1? ?h--r- - ? ' /` 111 ? ---? 1 ?? / I ? ?? i ?///,? C ?\ ? ; l t I / ? ??? ? < V ?I? 1 '???? / ??1 ? ??? ? ? ? ?1?• I i. I ' ?1 ? ' to l ? ?? 1???v?(' ,:•!? ? I I ,t?? ? 1 ? I 964' . ?? `V, ? 9/5 ? ii a,?/•?'?° ??' ? ?? ??? 1Z%?????5? ,- h ? ?.? ? u '? j I h 1 n<? % ?t_I . o 1 _ 19 BM 9 V ?\ :_?- %1 ?o. • ?? ??i, ?7' - sae I "''? / ! v 923 o? J ors If / ?? 1 ?? ?? Mt ve- .h71)934'• ?? ???L?I \1 _?I tVAv_ ?? Ill ?))?, ??¢i??111t??•,?? / ?? ti 1 ?- J 87 `I, A- \I1 I I\/ 111 \\ ` ?? A -6, L?A\Y ??????(???)?I?? ??• it, u? 1 I ? f? 0 c ?it ?? d ????' rlf ?'?r?' ?• /pJ?{J 906 9.1 9 `.• - ? ? ? ,•?A?..r\1 •'Ift. 1?? (I ? ? ?B?l 1 pO?I ??( L. ? ?) ?? ? ? ? ? ? /?. _i.? 404'- 9 ?, ?1 ??? d ri I (C yl-? t ?:? / (????? •.1 _1S ? ?? ?? O S ? i .-? ??Sr?? / ???? ??f i_ ? ? ??? -Il?% l ? , I ? ?? ! ? j _(-?? hll???( _ _ ? ? )? ??? ? ?l //(? • ? ,.>?0 ? 1 Q _?_?. 4._ _1111 ??1 11?1?11I . _ .ll 1?. L,_ (??[?__ _L. ?_[ ?, ?Il_f_ ; 1 (_,1?. ??_ 1 • ^-, ,'r . l.? 1673 (ELLE . aI I 1574 4966 I NW 10, 576 • RI rE RIOR -UEOI OC CAL SURVEY WASH1 N°tON n I I M/.I 80° 7' IIif WA W11 1I I 7 Ml. 518MOIR.E. Pr SCALE 1 24000 ROAD CLASSIFICATION MII h Co Heav ' I A NF 6 L ,1NF -1 ? :_ ?: -- - - - = - I Y-duty__.o ? L- ight duty -- an( uou ?uoo -- 3000 - noon oa Doan uuo IF1I Medium-dot rn,va le cANl_ --------------- - - 1 A -? y Unimproved dirt Tol 5 0 1 Kul ()Mt I I I+ W U. S. Route O State Route No CONTOUR INTERVAL 10 FEET 10 (La DATUM IS MEAN SEA LEVEL CO PLIES WITH NATIONAL MAP ACCURACY STANDARDS Y U. . GEOLOGICAL SURVEY, WASHINGTON, D. C. 20242 NG T POGRAPHIC MAPS AND SYMBOLS IS AVAII AHI E ON REQUEST WINSTON-SALEM EAST, N. C o N3600-W8007.5/7.5 col I for 1950 I Sul AMS 4956 II SW-SERIES V842 Re( Fin, EVANS ENGINEERING, INC. ENGINEERS, PLANNERS, SURVEYORS 4609 DUNDAS DRIVE GREENSBORO, NORTH CAROLINA 27407 PHONE: (336) 854-8877 FAX: (336) 854-8876 DATE: /- Z9 - O Z A.M. CLIENT: J z 3 P.M. PROJECT: Noi 020 TO: I u l i o Aj OF t'--Vl Tf K OL) A I i 7 q FROM: CNzIJ !£?T EZ TO BE DELIVERED [ ] TO BE MAILED [ VJ TO BE PICKED UP [ ] WORLDWIDE EXPRESS [ ] FEDERAL EXPRESS [ ] COMMENTS: GLFNS ")o?J L)-5ACE T ?T ,yF?, d? C f/C" C4