Loading...
HomeMy WebLinkAbout310386_Plan of Action_20180809opbc(ct 9-3 od C(W CIA IA+ PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number 31-386 County: Duplin Facility Name: Edward Brock Farm Certified Operator Name: Melissa Wallace Operator Number: AWA 17319 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways: and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 N N 11 18 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 8/9/18 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Brock Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: 910-271-1746 Date: 8/13/18 I. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD Al 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1 Structure ID: Lagoon 41 line m = 371 6 lb PAN 2 Structore ID'. Lagoon 2 line m = 601 6 in PAN 3. Structure ID I.ne m = Ib PAN 4. Structure ID_ Nine m = IN PAN 5. Stricture ID: line m = IN PAN 6. Structure ID'. line m = Ib PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 973.2 to PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN DFPInn nn UnT I ICT FIFI nS Tn WHICH PAN CANNnT RF APPI wn nI1PINR TNI.0 30 nAV PFRl 0. tract # p. field 4 q. crop r. acres s. rema nng IRR-2 PAN balance Oblac-e7 1. TOTAL PAN BALANCE FOR FIELD (tbs.) column r x s u. application nlncow' 4776 IT4A bermuda rass 0.56 235.00 131.6 Mar -Oct 4787 IT bermuda rass 1.76 205.38 361.5 Mar -Oct 4787 H2 bermuda rass 2.31 215.72 498-3 Mar -Oct 4787 H3 bermuda rass 2.49 205 42 511.5 Mar -Oct 4787 H4 bermuda rass 2.32 131.4.1 304.9 Mar -Oct 4787 H5 bermuda rass 1.30 203,42 264.4 Mar -Oct 4787 H6 bermuda rass 1.28 179.27 229.5 Mar -Oct 'Stale current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2301.7 lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 973.2 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 2301.7 Ib. PAN y. Overall PAN balance (w - x) = -1328 lb. PAN y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, Ipulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new mation. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance PoA (30 Day) 2121100 and 'ecalcuiaie the overate PAN balance. It aninnal waste is to be hauled to anolae' permit_ec lacil ty. prov de iatio� regarding the herd population and lagoon freeboard revels at the receiving facih.'.y. Irrigation onto existing spray f eids wi.I continue as weather and field conditions permit PoA (30 Day) 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon #1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yc/24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period I. temporary storage period according to structural design g. volume of waste produced according to structural design 11.0 inches 9.0 inches 8.0 inches 64476 fe 321520 gallons 180 days 71210 fe h. current herd # 1744 certified herd # 2160 actual waste produced = current herd # x line g = 57495 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I, current waste analysis dated 7/4/18 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) �plft3 39462.5 ft3 120874 gallons 0.84 Ibs/1000 gal. 371.6 Ibs. PAN PoA (30 Day) 2/2 V00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1_ Structure NamelIdentifier (ID): Lagoon 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. lop of dike surface area according to design (area at below structural freeboard elevation) e, line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 18 0 inches 30.0 inches 12.0 inches 90816 fiz 679304 gallons 180 days g. volume of waste produced according to structural design 79123 to h. current herd # 1766 certified herd # 2400 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/4/18 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2121/00 58221 ft3 fe 67095 ft3 156228 gallons 0.72 Ibs/1000 gal. 601.6 Ibs. PAN If. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n. linest+2+3+4+5+6= o. line n 127154 = line I = 60336 gallons line I = gallons line I = gallons line I = gallons line 1 = gallons line I = gallons 60336 gallons 2.22 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIODt'2 While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. Fields with no remaining PAN balance, no receiving crop, and!or completely saturated are not considered available to receive waste. p. tract # g. field # r. soil type s. crop L acres u...a "rig IRR-2 PAN balance alaue v, maximum application rate rlrJhr; w. maximum apprcabor amoun+(inches) 4787 H13 PaA bermuda 2,48 154.75 0.7 1 4787 H14 PaA bermuda 2.93 123.34 0.7 1 x. total acres available during 5 day draw down (sum of column t) = 5.41 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE y. line o = 0.41 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hvdraulic load based on new information. PoA (5 Day) 2!21!00 1-N/A 1. Describe moisture conditions of fields? (e.g. Is there water standing in field, does irrigation Aug 9 and Friday. Aug 10 - dry enough for irrigation 2. Date and amount of last rainfall event? DATE: 08108.118 AMOUNT: 0.50 inches 8110118 - hydrant 13, 8r10118 - hydrant 14 - for lagoon 1 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in per irrigation event, changes made in gun sizes, nozzles, "o" rings, operating lime, travel speed, etc. to O118 - 9:30am-12:30pm at 106 gpm on hydrant 13 at 5,879 gallac 0/18 - 9.30am-12:30pm at 81 gpm on hydrant 14 at 4,976 gallac Hatcher n Agent re, Livestock Technical Specialist POA (5 Day) 2,121,100 PLAN OF ACTION (i FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): La oon 1 2. Current liquid volume in structural freeboard a. current liquid level according to marker 11.0 inches b. designed structural freeboard zone (Normally 12 inches or greater) c. line In - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/l2 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period I. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 1744 certified herd # 2160 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design I. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 12.0 inches 1.0 inches 64476 It, 40190 gallons 180 days 71210 ft3 57495 ft3 00 ft3 39462 fts 20146 gallons 60336 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2121100