HomeMy WebLinkAbout20020109 Ver 1_COMPLETE FILE_20020123`NATF
\O?0F 9pG Michael F. Easley
Governor
r William G. Ross, Jr., Secretary
Department of Environment and Natural Resources
Gregory J. Thorpe, Ph.D., Acting Director
Division of Water Quality
February 12, 2002
DWQ# 02-0109
Buncombe County
D&J Development, LLC
C/o Bronce C. Pesterfield
P.O. Box 980
Weaverville, NC, 28787
APPROVAL of 401 Water Quality Certification
Dear Mr. Pesterfield:
You have our approval, in accordance with the attached conditions, to place fill in 60 linear feet of streams in order to
construct a road crossing at the Twin Brook Hills Subdivision, Phase III, as described in your application received by the
Division of Water Quality on January 23, 2002. After reviewing your application, we have determined that this fill is covered
by General Water Quality Certification Number 3289, which can be downloaded from our web site at
http://h2o.enr.state.nc.us/ncwetlands . This Certification allows you to use Nationwide Permit Number 14 when it is issued
by the U.S. Army Corps of Engineers. In addition, you should get any other federal, state or local permits before you go
ahead with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply
Watershed regulations. Also this approval will expire when the accompanying 404 permit expires unless otherwise
specified in the General Certification.
This approval is only valid for the purpose and design that you described in your application. If you change your
project, you must notify us in writing and you may be required to send us a new application for a new certification. If the
property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for
complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory
mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the
conditions listed in the attached certification.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act
within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, P.O. Box 27447, Raleigh,
N.C. 27611-7447. This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have
any questions, please telephone Mike Parker in our Asheville Regional Office at 828-251-6208 or Cyndi Karoly in Raleigh at
919-733-9721.
Sincerely,
Gregory J. Thorpe, Ph.D.
Attachments
cc: Corps of Engineers Asheville Regulatory Field Office
Asheville DWQ Regional Office
Central Files
File Copy
Bronce Pesterfield, 959 Merrimon Ave., Bldg. B, Suite 204, Asheville, NC, 28804
020109
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
,,.? »? ,-,o? ..?....,.?,., ??? moo..-, ....?........,.. ,,... _ ..............................,..
MEMORANDUM
TO: John Dorney
Non-Discharge Branch
Regional Contact: Roger Edwards
WQ Supervisor: Forrest Westall
Date:
SUI3JECT: WETLAND STAFF REPORT AND RECOMMENDATIONS
Facility Name Twin Brook Hills Subdivision Phase III
Project Number 02 0109
Recvd From APP
Received Date 1/23/02 Recvd By Region
Project Type road crossing
Certificates Stream Stream Impacts (ft.)
Permit Wetland Wetland Wetland Stream Class Acres Feet
Type Type Impact Score Index Prim. Supp. Basin Req. Req. ME
14 Stream O Y -@N F- 6-88-4-1 F -c-F-40,302. F_ F-F_ F_
w ?
Mitigation Wetland
MitigationType Type Acres Feet
Is Wetland Rating Sheet Attached? 0 Y 0 N Did you request more Info? 0 Y 0 N
Have Project Changes/Conditions Been Discussed With Applicant? 0 Y 0 N
Is Mitigation required? 0 Y 0 N Recommendation: QQ Issue 0 Issue/Coed 0 Deny
Provided by Region: Latitude (ddmmss) Longitude (ddmmss)
Comments:
Proposed culvert is 60 feet as specified on plans. The cut and fill for the roadway can impact the
stream if good sediment and erosion control are not installed and maintained. Buncombe County
has local control of sediment and erosion control on this type of eject.
County Buncombe
County2
Region Asheville
cc: Regional Office
Central Office Page Number 1
Triage Check List
Date: K OZ I ?j ? I
To: ?RRO Steve Mitchell Project Name"-???Bn;s?*
?FRO Ken Averitte DWQ Project Number QZO
?WaRO Deborah Sawyer County
?WiRO Joanne Steenhuis
?WSRO Jennif e
0 Mike Parker
?M O ell
From: -t9? _ Telephone (919) 733- Q?Z
The file attached is being forwarded to you for ycur evaluation. Please call if you need
assistance.
w? ' ( I
Stream length impacted
tream determination
-t3 "I
Wetland determination and (fistance to ULe-line surface waters on USGW topo maps
Minimization/avoidance issues
? Buffer Rules (Neuse, Tar-P-anko, Cat---M-a, Randleman)
? Pond fill
? Mitigation Ratios
? Ditching
? Are the stream and or wetlaM mitigaUon sites available and viable?
? Check drawings for accuracy
? Is the application consistent ovkh pre-application meetings?
? Cumulative impact concerns
- .?r .? , a %7`i?,?ti - : n ??s . -! 3-• ycN?_+? ?` .c-?aR a?i'?' y=At?t i i? '?1y a : G ?? -?. -
v - --
_
4
09 MONO
?
3 Y'
t
Office Use Only:
DWQ No.
Form Version
0 0A 09
USACE Action ID No.
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
1. Processing
1. Check all of the approval(s) requested for this project:
r-1 Section 404 Permit 3 M02
r-I Section 10 Permit
F] 401 Water Quality Certification
? Riparian or Watershed Buffer Rules
2,. Nationwide, Regional or General Permit Number(s) Requested: Nationwide No. 14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here:
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here:
II. Applicant Information
1. Owner/Applicant Information
Name: D & J Development, LLC
Mailing Address: Post Office Box 980
Weaverville,North Carolina 28787
Telephone Number: 828-645-8323 Fax Number: 828-254-8351
E-mail Address: N/A
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Bronce C Pesterfield, P E
Company Affiliation: Pesterfield Engineering, P.A.
Mailing Address: 959 Merrimon Ave
Bldg, B, Suite 204
Asheville, North Carolina 28804
Telephone Number: 828-252-8423 Fax Number: 828-252-8463
E-mail Address: Brpncep@pesterfield-engincering.com
Page 5 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Twin Brook Hills Subdivision Phase III
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): 9744 01-39-4075 (Portion o
4. Location
County: Buncombe Nearest Town: Weaverville
Subdivision name (include phase/lot number): Twin Brook Hills Phase III Lots (62,63,90,
& 109)
Directions to site (include road numbers, landmarks, etc.): Project is bounded by SR 1767
(Mct can Rd) and SR 1756 (Jupiter RdRd) in Weaverville
5. Site coordinates, if available (UTM or Lat/Long): Not Available
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Pasture, rolling. clear.
7. Property size (acres): 18.465 Acres
8. Nearest body of water (stream/river/sound/ocean/lake): Stanley Branch
9. River Basin: French Broad
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr,state.nc.us/admin/maps/.)
Page 6 of 12
10. Describe the purpose of the proposed work: To allow the subdivision
11. List the type of equipment to be used to construct the project: Proposed work involves
the placement of nines on Stanley Branch Dual 48" CMP's (60 LF) Placement of tine
will be achieved using a backhoe
12. Describe the land use in the vicinity of this project: Rural - Farming & Residential
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Army Corns Action ID NO. 200031159 issued September 13, 2000.
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application:
It is not anticipated that an additional permit will be required, however, may be possible.
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
Page 7 of 12
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts
Wetland Impact
Site Number
(indicate on map)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, till,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at httu'//www fema eov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property: N/A
Total area of wetland impact proposed: N/A
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
(indicate on map)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please specify)
Culvert 60 Stanley Branch 4 ft. Perennial
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated np-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.uses.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.to o? zone,co
www,mapquc5t.com, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 60 ft
Page 8 of 12
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
(indicate on map)
Type of Impact* Area of
Impact
(acres) Name of Waterbod
(if applicable) y Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): F] uplands R stream E] wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): N/A
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
A stream crossing is necessary to provide access to the entire property We have attempted
to minimize the stream impact by providinga very nearly perpendicular crossing.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
Page 9 of 12
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http•//h2o enr state nc us/ncwetlands/strmgide htm1.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or snap, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at http://h2o,eni.state.nc.us/wrp/index.h . If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet):.
Amount of buffer mitigation requested (square feet):
Page 10 of 12
Amount of Riparian wetland mitigation requested (acres):?N ,
Amount of Non-riparian wetland mitigation requested (acres):
Amount of Coastal wetland mitigation requested (acres): N/,
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes F1 No V,
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ? No
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes ? No
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233
(Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify N/A P
Yes F] No [-] If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
I 3
2 1.5
Total
Gone I extends out 3U teet perpendicular trom near hank of channel; Gone 2 extends an
additional 20 feet from the edge of Zone 1.
Page I I of 12
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or.0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Storm Drainage & Erosion Control mea-aures_are shown on plan and have been approved by
Buncombe County.
XI1. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
On-Site server - Single family residential ___
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes 0 No W
Is this an after-the-fact permit application?
Yes F-] No [I
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
ZZ
Applicant/Agent's Signature W DMe
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
Office Use Only: Form Version October 2001
USACE Action ID No. DWQ No.
If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than
leaving the space blank.
I. Processing
Check all of the approval(s) requested for this project:
n Section 404 Permit JAN 2 3 t
Section 10 Permit
? 401 Water Quality Certification
F-I Riparian or Watershed Buffer Rules
2. Nationwide, Regional or General Permit Number(s) Requested: Nationwide No 14
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here:
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (see section VIII - Mitigation), check here: 0
II. Applicant Information
Owner/Applicant Information
Name: D & J Development, L LC
Mailing Address: Post Office Box 980
Weaverville, North Carolina 28787
Telephone Number: 828-645-8323 Fax Number: 828-254-8351
E-mail Address: N/A
2. Agent Information (A signed and dated copy of the Agent Authorization letter must be
attached if the Agent has signatory authority for the owner/applicant.)
Name: Bronce C Pesterfield? P E
Company Affiliation: Pesterfield Engineering, P.A.
Mailing Address: 959 Merrimon Ave
B1dQBSuite 204
Asheville, North Carolina 28804
Telephone Number: 828-252-8423 Fax Number: 828-252-8463
E-mail Address: Broncmna pesterfield-engineering com
Page 5 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: Twin Brook Hills Subdivision Phase III
2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A
3. Property Identification Number (Tax PIN): 9744,01-39-4075 (Portion of)
4. Location
County: Buncombe Nearest Town: Weaverville
Subdivision name (include phase/lot number): Twin Brook Hills Phase III Lots (62,63,9%
& 109)
Directions to site (include road numbers, landmarks, etc.): Project is bounded by SR 1767
(McLean Rd) and SR 1756 (Jupiter Rd) in Weaverville
5. Site coordinates, if available (UTM or Lat/Long): Not Available
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Describe the existing land use or condition of the site at the time of this application:
Pasture, rolling, clear,
7. Property size (acres): 18,465 Acres
8. Nearest body of water (stream/river/sound/ocean/lake): Stanley Branch
9. River Basin: French Broad
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http:A2Q.enr.state.nc.us/admin/maps/.)
Page 6 of 12
10. Describe the purpose of the proposed work: To allow the subdivision road to cross.
11. List the type of equipment to be used to construct the project: Proposed work involves
the placement of pipes on Stanley Branch Dual 48" CMP's (60 LF) Placement of pipe
will be achieved using a backhoe
12. Describe the land use in the vicinity of this project: Rural - Farming & Residential
IV. Prior Project History
if jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ID Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Army Corps Action ID NO 20003 1 1 59 issued September 13, 2000,
V. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application:
It is not anticipated that an additional permit will be required, however. it may be possible
VI. Proposed Impacts to Waters of the United States/Waters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
Page 7 of 12
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1. Wetland Impacts
Wetland Impact
Site Number
(indicate on map)
Type of Impact* Area of
Impact
(acres) Located within
100-year Floodplain**
(yes/no) Distance to
Nearest Stream
(linear feet)
Type of Wetland***
N/A
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FF,MA Map Service Center at 1-800-358-9616, or
online at httn://www.fema.eov.
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.)
List the total acreage (estimated) of existing wetlands on the property: N/A
Total area of wetland impact proposed: N/A
2. Stream Impacts, including all intermittent and perennial streams
Stream Impact
Site Number
(indicate on map)
Type of Impact* Length of
Impact
(linear feet)
Stream Name** Average Width
of Stream
Before Impact Perennial or
Intermittent?
(please specify)
Culvert 60 Stanley Branch 4 ft. Perennial
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.uses.eov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone,co
www.manauesUQm, etc.).
Cumulative impacts (linear distance in feet) to all streams on site: 60 ft
Page 8 of 12
3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any
other Water of the U.S.
Open Water Impact
Site Number
(indicate on map)
Type of Impact* Area of
Impact
(acres)
Name of Waterbody
(if applicable)
F Type of Waterbody
(lake, pond, estuary, sound,
bay, ocean, etc.)
N/A
* List each impact separately and identity temporary impacts. Impacts include, but are not limited to: nu, excavation, dredging,
flooding, drainage, bulkheads, etc.
4. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): E] uplands ? stream ? wetlands
Describe the method of construction (e.g., dam/embankment, excavation, installation of
draw-down valve or spillway, etc.): N/A
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.): N/A
Size of watershed draining to pond: N/A Expected pond surface area: N/A
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
A stream crossin- is necessary to provide access to the entire property. We have attempted
to minimize the stream impact by providing a very nearly perpendicular crossing
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
Page 9 of 12
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
Permits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.enr.state,nc,us/ncwetla-nds/strmgide.html.
Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that
you would like to pay into the NCWRP. Please note that payment into the NCWRP must be
reviewed and approved before it can be used to satisfy mitigation requirements. Applicants
will be notified early in the review process by the 401/Wetlands Unit if payment into the
NCWRP is available as an option. For additional information regarding the application
process for the NCWRP, check the NCWRP website at htm•/1h2o enr state nc usA=/iudex.htm. If
use of the NCWRP is proposed, please check the appropriate box on page three and provide
the following information:
Amount of stream mitigation requested (linear feet): N/A _
Amount of buffer mitigation requested (square feet): N/A
Page 10 of 12
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (DWQ Only)
Does the project involve an expenditure of public funds or the use of public (federal/state/local)
land?
Yes F] No V
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)?
Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes F-] No ?
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEPA or SEPA final approval letter.
Yes F-1 No R
X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233
(Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify N/A )?
Yes F-] No D If you answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact
(square feet) Multiplier Required
Mitigation
1 3
2 1.5
Total
Gone I extends out 30 teet perpendicular from near banK of channel; Gone t extends an
additional 20 feet from the edge of Zone 1.
Page 11 of 12
if buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 213 .0242 or. 0260.
XI. Stormwater (DWQ Only)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
Storm Drainage & Erosion Control measures are shown on plan and have been approved by
Buncombe County
XII. Sewage Disposal (DWQ Only)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
On-Site sewer - Single family residential
XIII. Violations (DWQ Only)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes E] No W
Is this an after-the-fact permit application?
Yes F] No V
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
Applicant/Agent's Signature VV Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
i
! I
GRAPHIC SEAL',. _ a / 0 25 SO 100 200
ASE IC eAMMA M. F12QI /
/ IN BROOK HILLS .B. 78/ A gtiyp Z07$188~ ~ - ~ / r
/ t IN FM
/ / 1-inch _,50 ft /
/
Ole 77\
1
40000~ / 2182.5 2178. 3 J
160 / 2175.7 - - "
too- 2t T
y /
/
/
\ ' I I r PROP04V / I
STASI l2ED DONS . / I 1
EN E (SEE TAIL - \ 1 - - - - . - Ago
O
4w so
0'I5TURIX!P AREA
/T lYVV
( ° r 5~ M BANK PROTEC\I \ , R~pPPOSE~ \ P IANEN
~ sO' PROM OPEN END of PI -
ICTr
M, DETAIL) (16" rICKNES5 loo NCDOT GL. I ( RIP-RA 4 JEW ft to
t el / \ \
1j3 /
10
705
PROP
rl . 0~ 10~ PAM 211 ~ ~ - ~ • , ~ - 0644~ - / _ - _
, i + (Tl'P AS f MAW,
1
I
Rom STME~
MACJi 3115E OF 5TA r
_ ~ r rte, ` -
41,
1100 = - - - - ' , / -
0000 ftw~ 2100
a
00 t O \ i - /
? ? - ? IRARY-SILT FENCE
(T'rPl (sm DETAILS
moo 0.00
' / 109 S41 I*b ST-5 ? ,r \ ST-6 x°
? PROPOSED 5T-3 ~ ? SEP114EW.TRAP (TYPICAL)
4a 080 RIP-RAP OUTLET 5T-3 / 5rAMPr - / / PROTECTION "A"
*two (5EE SCHEDULE i DET111LI " - ` ~(sm DETAIL AND CHART) - - - swoo 000
/ ft~ Mop
/ /
• _
/ / - - 2100
woo
{ OLLIE W, Al'9M i_ _ PFF0P03FD t \ PRopoosED - ?oso / i
1 1685rt56 _.f'- _ RIP-RAP OUTLET 60 LF - DUAL 46° GMP's / - t
PROTECTION o5° '
TYPICAL,. AT ALL PI OUTLE / atao
SC +E
0 208 -
ST - 10
-
_ J 01.
~ tf
~
IR STORM DRAINAGE AN17 EROSION. CONTROL y / y
0\ - ~ - - ~ 1090
'TES, CHART'S AND SGI..ES - SEE DETAIL
T 4
/ 2
..~rds..~1ir-" CAA
PWW; V17W name :P'1STERFIELA ENGINEERING! P.A. RELEASES DATES w
C11~?'L t~NCIN~`6RING CONS(/GTAN9s' na?w+~ra?r ?a~ L C~ UfNE~ ~O~. D J'El.i" ht'', LLG 2 tTWIN *BROOK HILLS PHASE III STORM 171~AINA6E AND of
raiera~r
959ll6arrimon Ave 11?? MWOQMBE VCOMBE COUNTY, HEAVI=RVILLE, NORTH CAROLINA tRo:~SI L PLAN
(sm W44" BUd.B,Suite 104 fm C40MVW t t4(d Ae6en11e,N.C2UN n!iamoa+ais L'•c "WQjF~f~+° %
!xpTEMBER 2601
F
~A
>J.20 u
GRAPHIC SCAL r
i
' / - so / 0 25 50 100
5A M^ M. FBI -
/ ASE it TWIN HILL j A 100
IN FEET)
x \ 1 inch 50 LL. - -
2178.3
- - l 2182.5
V'
/ 2175.71-~- _ -•-u \
21
im,
I al
5T~ABI ~ CONS . I
1 / / I I EN NCE (SEE AILY 10 \ ? 10 1010
/ I I
/ r 2 D15 a~p AREA / / \ \
45 - --y
vr7v
PROF 10-AM
RIP-RAP f 05E
I o 5 M SANK PROTEr, i ANE -o ~ TAI IU ° , \ \ ~
20M OPEN END OF PIPS ~ 1 ) l5E
l15" ~}iICKNE55 NGDOT CL. I Rlp_; r~ ~
(SEM DETAIL) • q , /(r~1 /
/ . / / to
10
2130
I/ Q I I ~ w~~ i ? O /
K C+C;CoK DAM PI 211
- - 1 / Mir A0 C~ 4 11415 PLAN?
- - ENTEW lSM DETAI . -
- - - - - 104
/ / , I \ - , If=AC~# °.1151` OF ST
62 ?
- 411 11114
,9. 46
\
2100
\ - zrao - _ 1 0.00
0000
r5T-2 ? PROP D
J IRARIf -FWLT FENCE
ETAIL)
® Imo. I'~
0000 0000,
s 5T-5 O \ \ \ 5T-6
wool / 109 Owns MINOR
PROPOSED 000
.wo f r 2080 \ RIP-RAP OUTLET = ST-° owl* WOW 45 TAh~EY PROTECTION "A" 5T-3 SEDIMENT TRAP (TYPICAL)
' 151E SCHEDULE i DL~TAII=)" - 4*,**(SM DETAIL AND CHART) oov
r~~g
2100 _ _ \ - _
wow
i / \ i \ -Pogo
- OLLIE A. AY~5 - - - PFEOP05f~ ? 60 LF - DUAL 4611 owls zrzo - - -
" - - RIP-RAP OUTLET X685/156 - f'
1 1"-- (Q PROTECTION "B'
1 - TYPICAL AT ALL PI pl~ ~OUTLt so,'
/ ' I _ _ - -{5>~5GHEf~JLE'tAfla \ " ? 1
/ - - _ =
- 20x0 j 5T-4 - ao \
/ ,
l-~
y
FOR 5' t - - .O, =OR STORM PRAINAbE NO E!ROlON GOB j
4 2090 \ \ / NOTE gOTES, GHART5 AND SCHEVIULES = DETAIL
y
00
WOW KWWW a"rwc~ PESTERFIELD ENGINEERING, P.A. RELEASES DATES o Ess,o
a •~OQ F VnnQ< DESG I ION DATE Ttz We T7 J, DEVEI.oP"Wo U.C 2 .
_ CIY/L ENabVIFF Ya COYSIILT14YTS Rej4wwaLY L TWIN #31"LOOK HILI.a PHASE 111 STQI t DRAINASE AND
MRW%"OILY ,A• Ott - - 959IMenimou Ave. F VV/// r ~iON
_ 9rc.a+br ai > t (618)252 8113 Sld& Suitt 101 % F FOR •\~v0~.• BUNCOMBE COUNTY, MAVERV14Llp, NORTH CAROLINA osic" CONTROL PLM
(828)232 8463 ARhevMe, N.C. 28601 RFCOIM oRa1u y. P TE o 5EPTEH$ER 2001
,a•
a d f f'.pY