HomeMy WebLinkAboutWQ0040504_Application (FTSE)_20200228V
State of North Carolina
V
Department of Environmental
DWRp Quality
Division of Water Resources
15A 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Dlylslan of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION
DY
Application Number: �D �B S f} ' (to be complcted by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Durham County (company, municipality, HOA, utility, etc.)
2. AppIicant type: ❑ Individual ❑ Corporation ❑ General Partnership
❑ Federal ® State/County ❑ Municipal
3. Signature authority's name: Stephanie Brixey per
Title: DeRu!y Director/ POTW Director
4. Applicant's mailing address: 5926 Highway_55 East
City: Durham State: NC Zip: 27713
5. Applicant's contact information:
Phone number: (919) 560-9034 Email Address: sbrixey@dconc.aov
aPvt. A5rtt""�G�
w.,
❑ Privately -Owned Public Utility
II. PROJECT INFORMATION: ��I
„J
I . Project name: Davis Park Townhomes — C_
2. Application/Project status: ❑ Proposed (New Permit) ® Existing Permit/Project
If a modification, provide the existing permit number: WQ0040504 and issued date: 12/10/18
If new construction but part of a master plan, provide the existing permit number: WQ00
3. County where project is located: Durham
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.8806'- Longitude:-78.8565�
5. Parcel ID (if applicable):
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Curtis Blazier License Number: 33840
Firm: McAdams
Mailing address: 2905 Meridian Parkway
City: Durham State: NC Zip. 27713-
Phone number: 919) 361-5000 Email Address: blazieramcadamsco.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Triangle WWTP Permit Number: NCO026051
Owner Name: Durham County
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
N
cc
N
ts.!
1. Permit Number(s): WQ0038873 8" & Unknown -Built 1983 16" Downstream (Receiving) Sewer Size: 8"/16" inch
System Wide Collection System Permit Number(s) (if applicable): WQCS00038
Owner Name(s): Durham County
FORM: FTA 04-16 Pagel of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No ®NIA
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational A greement F : DE been attached?
❑ Yes [-]No ®NIA
3. If the Applicant is a Home, Property Owners' Association, has an Operational _A gyreement JFORM: HOA) been attached?
❑ Yes ❑No ®N'A
4. Origin of wastewater: (check all that apply):
® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool I day care ❑ Medical / dental � veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church
❑ Swimming Pool/Filter Backwash
❑ Businesses / offices I factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
_ % Industrial (See. I SA NCAC 02T .0 103 20)}
�Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Hasa flow reduction been approved under 15A NCAC 02T .01 14 ? ❑ Yes ®No
D If yes, provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(f))
Daily Design Flow `•b
No. of Units
Flow
Townhomes (3 Bedroom Units)
360 gal/unit
140
50,400 GPD
0 gallsf
0
GPD
0 gal/day
0
GPD
0 gal/day
0
GPD
gall
GPD
L
gal/
GPD
7'olal
50,400 GPD
a See 15A NCAC 02T .O1 I4(b), d1 el(1) and (eX for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per 15A NCAC 02T .0l 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be
determined using available flow data, water using fixtures, occupancy or op�n patterns, and other measured data.
Wastewater generated by project: 50.400 GPD (per 15A NCAC 02T .0l 14)
D Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain): _
FORM: FTA 04-16 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 lie MDC (Gravity Sewers);
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
8
3943
PVC
8
,-198
DIP
➢ Section If & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) -- 02T .0305 & MDC(Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
I . Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: �° Longitude: -
3. Design flow of the pump station: —,.T _ millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 02T .0305(b),(1D:
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(l)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS - (02B .0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations found in I5A NCAC 02T _0305 &
➢ 15A NCAC 02T.0305(f) contains minimum separations that shall he nmvided rnr sewer ���ipm�•
® Yes ❑ No
Setback Parameter*
Separation Required
Storm sewers and other utilities not Iisted below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
**Any private or public water supply source, including any wells, WS-1 waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal
high water or tide elevatio!q and wetlands see item IX.2
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
Any basement
10 feet
Top slo a of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade vertical
36 inches
➢ 15A N AC 02T.030 contains alternatives where separations in 02T.0305f f? cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpace
➢ If noncompliance with 02T.0305(f) orW7 . see Section X of this application
Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No
➢ See the Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC .M .0200? ® Yes ❑ No
➢ This would include Trout Buffered Streams per 1.5A NCAC 213.0202
4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes ❑ No
➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters
➢ Information can be obtained from the 401 & Buffer Permittine Branch
5. Does project comply with 15A NCAC 02T.0I05 c(f66) (additional permits/certifications)?
® Yes ❑ No
Per 15A NCAC 02T.0I05c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location)
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCA(: 02T, the Minimum Design Criteria for the PgfMittine of Pump Stations
and Force Mains (latest version), and the Gravit Sewcr Minimum Design Criteria (latest version} as applicable?
® Yes ❑ No
If No, complete and submit the VariancerAlternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required prior to submittal of the Fast Track Application and supportintE documents.
2. Professional Engineer's Certification:
I, _-.wJe'lr5 9 --10,,9L _attest that this application for
(Professional Engineer's name from Application Item Ill.1.)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE - In accordance with General Statutes I43-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed M0,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b):
I, SVQp V, Vri
(Signature
'D%r
s
name & titlesfrom Application Item 1.3.)
=p�oCAROB
F
.Q SEAL
033840 •' _
ti
Atli-
�
that this application for
has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE - In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature: � � � V Date: CQ
FORM: FTA 04-16 Page 5 of 5
1.
{ R NC Dept of Environmental Quality State of North Carolina
Department of Environmental Quality
DWK EB 2 R 70?0 Division of Water Resources
Division of Water Resources Raleigh Regional y.,Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Durham County
Project Name for which flow is being requested: Davis Park Townhomes
More than one FTSE maybe required jar a single project if the owner of fire lfni'TP is not responsible for all pump
stations along the route of the proposed wastewater flow.
1. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Triangle Wastewater Treatment Plant
b. WWTP Facility Permit #: NCO026051
A11 flows are in MGD
c. WWTP facility's permitted flow 12
d. Estimated obligated flow not yet tributary to the WWTP 1.666
e. WWTP facility's actual avg. flow 4.543
f. Total flow for this specific request 0
g. Total actual and obligated flows to the facility 6.209
h. Percent of permitted flow used 51.7
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Pump Average Approx. Not Yet Total Current
Station Station Finn Daily Flow** Current Tributary Flow Plus
(Name or Permit Capacity, * (Firm i pf), Avg, Daily Daily Flow, Obligated Available
Number) No, MGD MGD Flow, MGD MGD Flow Capacity***
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Durham County Sewer
Downstream Permit Number: W CS00038
Page 1 of 6
FTSE 10-18
IIl. Certification Statement:
1 10 certify to the best of my knowledge that the addition of
the volume of wastewater to W permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
Signing Official Signature
Title of Signi Q Official
- 4IQD4C)
Date
Page 2 of 6
FTSE 10-18
!
& w -
}
�
-
���
� • � � - \ �.
! ._ / %$ »PI
}
, . .
. ® � \/
TOWNHOMES SITE\
■ . � �
- yZ
� ■
.� �,-
\
ot
E/._ • .� � � ,2� m::. . \Qzz- s��2(—�•'�
'��:��& J �
DAVISPARK TOWNHOMES
SITE AERIAL MAP
■ ■ ..1 11111,11411• . Si. . otFSTM
LL
i►
[7
'"_�iMCADAMS
Date: February 28, 2020
To: NCDEQ
Raleigh Regional
3800 Barrett Drive
Raleigh, North Carolina 27609
I am sending you the following items:
❑ Drawings ❑ Letter
❑ Specifications ® Submittal
❑ Plans ❑ Prints
LEI -TER OF TRANSMITTAL
NAND DELIVER
Re: Davis Park Townhomes
NCDEQ Submittal
WQ 0040504 — Permit Modification
Job #: PLT-17000
❑ Statement of Qualifications
❑ Other
QUANTITY
1
UNIT
Copy
DESCRIPTION
Developers Operational Agreement
2
Copy + Original
Public Sewer FTA
1
Check
$480.00 Fee (Public Sewer)
1
Copy
Site Maps :Environmental Quality
1
Copy
Cover Letters
Transmitted as checked below:
® For approval
❑ For your use
❑ As requested
Remarks -
Copy to:
Raleigh Regional Office
❑ For review + comment
❑ Other
❑ Other
Signature: 111
Curt Blazier, PE / ca
Asst. Project Manager, Residential
creating experiences through experience 2905 Meridian Parkway, Durham, NC 27713 1919. 361. 5000
TI MCADAMS
February 28, 2020
NCDENR - DWR
Raleigh Regional Office
1628 Mail Service Center
Raleigh, North Carolina 27699-1628
PAST TRACK APPLICATION COVER LETTER > PLT-17000
RE: Davis Park Townhomes — Public — Permit Modification
Durham, North Carolina
PLT-17000
NC Dept of Environmental Quality
Raleigh Regional Office
The accompanied Fast -Track Application (FTA 04-16) is a modification to existing Permit #WQ0040504. The
modification is due to increases in pipe length of greater than 10% from what was originally permitted to what was
installed.
This modification includes 4,141 lineal feet of 8-inch gravity sewer (3,943 lineal feet of 8" PVC and 198 lineal feet of
8" DIP gravity sanitary sewer) for the proposed Davis Park Townhomes development located at the intersection of
Davis Drive and Hopson Road in Durham, NC. The sewer system will be a public system owned and operated by
Durham County. The private collection system is being permitted separately.
Existing permit #WQ0040504 includes 3,428 linear feet of 8-inch gravity sewer to serve 140 three -bedroom
townhomes.
There are currently residents in this project waiting to get Certificates of Occupancy for their homes. If there is any
way you could expedite the review process, it would be greatly appreciated.
This package includes the following:
• Fast Track Application FTA-04-16 for Permit Modification
• Flow Tracking FTSE 10-18
• Street Level and USGS Topo Map
• Developer's Operational Agreement
• Check for $480
Please do not hesitate to call me at (919) 287-0786 if you have any questions.
Sincerely,
MCADAMS
Curt Blazier, PE C
Asst. Project Manager, Residential
creating experiences through experience
2905 Meridian Parkway, Durham, NC 27713 / 919, 361, 5000