Loading...
HomeMy WebLinkAbout20200379 Ver 1_Shoreline Stabilization_20200316SAMPLE AGENT AUTHORIZATION FORM PROPER -if LEGAL DESCRIPTION: LOT NO. 9 -7 PLAN NO. SiREE T ADDRESS: Please print: c. Property Owner: �✓ Property Owner: PARCEL ID: The undersigned, registered property owners of the above noted property, do hereby authorize S. C ..So'x_, of (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): s v on . fA A 1'4 //0 Telephone:. —�03 21-26 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Authori Signature Date: v �'Avthorized S4nature Date: �-9ao CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: ��CccD.e&�gts-' FI , 8 1la? o✓t"r r �� County: Owner: Contract Print z)Ignaiure The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification 1'� o hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. _ Signature (owner): Date: � IZ State of North Carolina I Environmental Quality ; Water Resources 512 N. Salisbury Street Ibll Hail Service Center Raleigh. NC 27699-1611 919.707.9000 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 • Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: 160 Cc.0n 6 a Lk& Mailing Address: 3SS W Mt l( J�. 16lvk. uvi;-r //D 7 Cht,,r10He, , It�� aoa Telephone Number: :227 - �V3' 125" Fax Number: E-mail Address: kci a,n , �c'Loln co GVS kca "-"W. 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: h_ttp://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPL E AGENT AUTHORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: Ilfdvt,a f ,���n Company Affiliation: �/Q u/SortS (1 i (c- �f� ✓; t C�v�StruC�«o�► Mailing Address: ��$^OS "r-5-fct U. Telephone Number: ;�03- 83 / - V31 (o Fax Number: L63 - 31-YYS- E-mail Address: {'C (CLU-)_S Person to receive the Certification Approval: 2o4JO'V Ca.Vs",t(__ • Project Information [15A NCAC 02H .0502(a) & (b)] • Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. • Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. • Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) • Location of the property (where work is to be conducted) County: Ga..st,-,_ Nearest Town: 25eJW7&.S1t� Subdivision name or site address (include phase/lot number): A_ Sou-f 4 .S h " �2_- Zo f '2 Directions to site - please include road names and numbers, landmarks, etc.: Latitude (in decimal degrees) 3S. /SG J S9 Longitude (decimal degrees) -61, 03G9y3 • Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): F'e5'1d"4-ra J • Property size (acres): . 76 gccr-S • Lake/ river/ ocean adjacent to property: 1�ake% (air /;,`,e , K Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): o ! is 2Co j 441� aL iVtc i'o /_L!_g (�/ls'i , eaVy iai 5 i ✓� Crlx 5-erQ �ij na-f -fP� << Th i _5 wo r k w, ( t V c v� • Will work be conducted from land?Z" �-- From water? Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 1/5- .s,2, f t• 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: moo. ft L 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): oZ Sk),mll -t r<-r—s to 4`� , (��, dot/{ SS-rc 1 ; [ f'L�r� " %%v 04..r tl,_e-S h -cr-I -tb bc- cu7 ,4/14A{ r'cSt /s ✓rar6fYp IJG1SIvcS ' LIV Owner/Agent's Signature* [15A NCAC 02H .0502(f)] Date 'Agent's signature is valid only if an authorization letter from the owner is provided. PRicrosck Pc,-. : erPc!nt J, Home - Insert Design Anim bons Slide Shorn Renew 'Tiew Laser fiche Paste New Reset _ _ ,L�,. �' [ V .r Slide' Delete } - ._ _ - si 1 ) LRCL**oa o Sndes fort Parsgrspb Lake (At Full Pond/Normal Water Level) G .. 5k� Slide cf; 'Office Theme' Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: • All proposed vegetation clearing • Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation • Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation • Location of any proposed structures such as buildings, retaining walls, docks, etc. • Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation rd • Location of construction access corridors R Ll 0 'CS VICINITY MAP Not To Scale IMPERVIOUS SURFACE AREA DESCRIPTION AREA HOUSE w/ PORCH 3,550 S.F. PATIO/HVAC/MISC 9 S.F. DRIVEWAY & WALKS 1,751 S.F. TOTAL (ALLOWED)= 10,500 S.F. LOT AREA = 1 33,033 S.F. TOTAL (AS -BUILT)= 1 5,310 S.F. NOTE: 1. BUILDER ASSUMES RESPONSIBILITY FOR GRADING LOT AND/OR DESIGNING STEPS, PORCHES, DECKS, ETC. AS NECESSARY TO PREVENT ENCROACHMENT INTO SETBACKS. 2. HOUSE DIMENSIONS AND OPTIONS SHOULD BE VERIFIED WITH CONTRACTOR PRIOR TO CONSTRUCTION. 3. SETBACKS/ EASEMENTS SHOULD BE VERIFIED NTH DEVELOPER AND LOCAL OFFICIALS PRIOR TO CONSTRUCTION. 4. THIS IS A CONCEPTUAL DRAWING AND CONTENTS SHOWN HEREON ARE SUBJECT TO CHANGE UPON FINAL CONSTRUCTION. LAKE WYLIE DUKE ENERGY PROJECT BOUNDARY (ELEV=569.4 MSL) i3OLLOWS PROPERTY LINE) �FLO% N FCOp P( 50' RIPARIAN_ BUFFER LINE TABLE LINE LENGTH BEARING L7 3.69 N73'07'54'E L2 2.61 S20'06'35'E L3 16.67 7' 9'35'E L4 16.40 S44 ' L5 13.30 S30'21'32'E L6 26.48 S10'05'35'E L7 9.59 S38'07'43'E L8 5.70 S28-47.58-E L91 21.001 N482 '59'W CURVE TABLE 3.6' CURVE I BEARING CHORD ILENGTH RADIUS CIS4423'46E 89.09 89.17 625.. PUBLIC R/W — 778 �\ #245 CAPE AUGUST PL. REVISIONS TAX ID225785 THIS DRAWING DOES NOT REFLECT AS —BUILT INFORMATION THIS PROPERTY MAY BE SUBJECT TO ANY AND ALL APPLICABLE DEED AIMP RESTRICTIONS, EASEMENTS, RIGHT-OF-WAY, UTILITIES AND PRELM NARY PLAT RESTRICTIVE COVENANTS WHICH MAY BE OF RECORD OR IMPLIED FM RIBCORUUMN m4lWANCES, OR &[SS 60 ° 60 HOUSE LOCATION PLOT PLAN SCALE: 1' = 60' FOR RASTOVER LOT 2MCLEAN — SOUTH SHORE, MP 6 T North Carolina South Poine Township, City of Belmont, Gaston County, LAND SURVEYING COMPANY, PA PROPERTY OF: PULTE HOMES LAND SURVEYORS - PLANNERS (C-1833) 10430 PARK ROAD, SUITE p300 MAP BOOK 85 PAGE 117-118nEED REFERENCE CHARLOTTE, NORTH CAROLINA 28210 PHONE (704) 927-5080 FAX (980) 309-0842 DRAWN BY: ERG DATE: OCTOBER 11, 2019 kIoel( e� ) Ll&lc- n,e ek ►t„to%e� �fvf-o4t( YOUR TRIP TO: 245 Cape August PI 13 MIN I 7.3 MI Est. fuel cost: $0.63 Trip time based on traffic conditionv as of 1:45 PM on March 6, 2020. Current Traffic: Moderate Print a full health report of your car with HUM vehicle diagnostics (800) 906-2501 O1. Start out going northwest on Charlotte Hwy/SC-49 toward Blucher Cir. Then 2.63 miles 2,63 total miles 2. Turn right onto Highway 274/SC-274. Highway 274 is 0.1 miles past Latitude Ln. Then 0.91 miles 3.53 total miles 3. Turn slight right onto Pole Branch Rd/SC-279 (Crossing into North Carolina). Pole Branch Rd is 0.1 miles past Blue Rock Rd. Then 1.92 miles 5.45 total miles ,r 4. Pole Branch Rd/SC-279 becomes S New Hope Rd/NC-279. Then 0.92 miles 6.38 total miles T5. Enter next roundabout and take the 1st exit onto Armstrong Rd/NC-273 Then 0.49 miles 6.86 total miles 6. Tom right onto Shimmnerlake Ln. If you reach Commodore Ct you've done about 0.1 miles too far. Then 0.21 miles 7.07 total miles 7. Tom right onto Cape August Pt. Then 0.27 miles 7.34 total miles ®S. 245 Cape August Pl, Belmont, NC 28012-6768, 245 CAPE AUGUST PL is on g the left. Your destination is 0.1 miles past Cross Current Ln. If you reach South Shore Dr you've pone a little too far. Use of directions end maps is subted to our Terms of Um We don't guarantee accuracy, ro iae conditions or usability. You assume ail ri ek of use. SO Gastonia $ Munlclpirl WrpOr[ G� a n O n� P 4A P y S O n� A 6 BeSon. �� CA SOUTH ROLINA — '—"— na � 'v High,ay SSJ tl �op'o Sledge, 55T t O 'P t 1 3' '� 3f % 3er�e.44i'+3E tat die � � McDoweQ � cS P o S~ 49 J��